CN103818832A - Quay crane with lifting-type truss crossbeam and three trolleys - Google Patents
Quay crane with lifting-type truss crossbeam and three trolleys Download PDFInfo
- Publication number
- CN103818832A CN103818832A CN201410048037.1A CN201410048037A CN103818832A CN 103818832 A CN103818832 A CN 103818832A CN 201410048037 A CN201410048037 A CN 201410048037A CN 103818832 A CN103818832 A CN 103818832A
- Authority
- CN
- China
- Prior art keywords
- bank bridge
- crossbeam
- bank
- grider
- lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Ship Loading And Unloading (AREA)
Abstract
The invention discloses a quay crane with a lifting-type truss crossbeam and three trolleys. The quay crane comprises a quay crane gantry (1) and a quay crane crossbeam (2), wherein the quay crane crossbeam (2) is arranged at the upper end of the inner side of the quay crane gantry (1); the quay crane gantry (1) comprises four gantry upright posts (3); the lower parts of the gantry upright posts (3) are connected through connecting cross beams a (4); the quay crane crossbeam (2) is connected with the upper part of the quay crane gantry (1); two quay crane lifting trolleys (5) are arranged on the upper layer of the quay crane crossbeam (2); a transport trolley (6) is arranged on the lower layer of the quay crane crossbeam (2). Compared with the conventional art, the ground clearance of the quay crane crossbeam can be adjusted at any time by the quay crane, the influence of external environment on the loading and unloading processes of containers is avoided, and the production, manufacturing and using cost of a quayside container transport system is reduced; through the coordination of the two lifting trolleys and one hanging transport trolley, the loading and unloading efficiency is improved effectively.
Description
Technical field
The present invention relates to a kind of bank bridge, especially a kind of bank bridge with lifting mode truss crossbeam and three dollies, belongs to harbour container logistics field.
Background technology
In the logistics field of harbour container, bank bridge system plays irreplaceable effect in container handling system, but along with the process of international trade is constantly accelerated, the freight transport volume at harbour is also in cumulative year after year, the work efficiency of quayside container crane system has obtained unprecedented test, and the work efficiency that therefore how to improve container handling bank bridge becomes problem instantly anxious to be resolved.
At present, general harbour container bank bridge be by single lifting trolley by freight container from ship hang oneself transport to the top of truck or from truck handling to ship, in handling process, because lifting trolley lower end suspender is far apart from lifting trolley, now suspender is as easy as rolling off a log swings, cause suspender and freight container to bit comparison difficulty, have a strong impact on the efficiency of container handling system handling, in order to contribute to freight container and suspender to carry out contraposition, need to increase anti roll device, prevent shaking effect although can play, can increase like this complexity of equipment; In addition, in handling ship process, because freight container needs stacking highlyer, therefore in the time of design, the lifting mechanism of lifting trolley need to be chosen higher working level, so the integral structure of container handling bank bridge is relatively large, cause its production, use and maintenance cost higher.
Summary of the invention
The invention provides a kind of bank bridge with lifting mode truss crossbeam and three dollies, he can realize the function of bank bridge grider lifting, reduce the requirement of the lifting altitude of bank bridge system to lifting trolley, reduce the complexity of quayside container crane system, and can improve the handling efficiency of quayside container crane system.
Technical scheme of the present invention: a kind of bank bridge with lifting mode truss crossbeam and three dollies, comprise bank portal frame and bank bridge grider, bank bridge grider is located at the upper end of bank portal frame inner side, bank portal frame comprises four door frame columns, door frame column below is connected by connecting cross beam a, bank bridge grider is connected with the top of bank portal frame, and the upper strata of bank bridge grider is provided with two bank bridge lifting trolleys, and the lower floor of bank bridge grider is provided with suspension type transport carriage.In the aforesaid bank bridge with lifting mode truss crossbeam and three dollies, bank bridge grider is located at the inner side of bank portal frame and is connected by crossbeam latching device, the inner side on bank bridge grider top and the outside of bottom are equipped with trolley track, two ends in the inner track on bank bridge grider top are respectively equipped with a bank bridge lifting trolley, and the track in the outside of bank bridge grider bottom is provided with suspension type transport carriage; The top of four door frame columns is parallel is provided with two connecting cross beam b, the below of connecting cross beam b is provided with assembly pulley a, connecting cross beam a is provided with crossbeam lifting mechanism, and bank bridge grider top is provided with assembly pulley b, and the steel rope on crossbeam lifting mechanism is connected with bank bridge grider with assembly pulley b by assembly pulley a.In the handling ship process of carrying out freight container, the container transshipment pattern of two bank bridge lifting trolleys and a suspension type transport carriage coordinative operation has replaced traditional quayside container crane to use the pattern that hoist and transport of single lifting trolley to freight container, solve traditional single lifting trolley and hung the slow-footed persistent ailment of handling, improved dramatically the transport speed of freight container.
In the aforesaid bank bridge with lifting mode truss crossbeam and three dollies, the distance of the upper and lower two-layer track of bank bridge grider is 6m~10m.
In the aforesaid bank bridge with lifting mode truss crossbeam and three dollies, the distance of the upper and lower two-layer track of bank bridge grider is preferably 7m.
In the aforesaid bank bridge with lifting mode truss crossbeam and three dollies, bank bridge grider is truss structure, and bank bridge grider comprises truss girder a and truss girder b, and truss girder a is parallel to each other with truss girder b and is connected by 3~15 saddle beams.Bank bridge grider adopts truss structure, and the one, be the impact in order to reduce the resistance to overturning of sea wind on quayside container crane, prevent that bank bridge from toppling; The 2nd, with respect to the solid web girder of traditional bank bridge, truss crossbeam can alleviate the weight of crossbeam, reduces wheel load.
In the aforesaid bank bridge with lifting mode truss crossbeam and three dollies, crossbeam latching device comprises the positioning step of being located at bank portal frame inner side and the positioning and locking device of being located at bank bridge grider side, positioning and locking device comprises the bearing that is fixed on bank bridge grider side, one end is articulated with the hydraulic thrust pull bar of bearing, crossbeam radius stay and the connecting rod being hinged, crossbeam radius stay one end and bearing are hinged, near the termination of the crossbeam radius stay other end, be hinged with one end of the connecting rod being hinged, hydraulic thrust pull bar is hinged with the hinged place of the connecting rod being hinged, the other end of the connecting rod being hinged is hinged on bearing.This scheme is a kind of locking scheme of bank bridge grider, in the time that bank bridge grider needs lifting, hydraulic thrust pull bar does not interfere crossbeam radius stay and the positioning step on positioning and locking device in bank bridge grider lifting process after driving crossbeam radius stay left-hand revolution certain angle, under the drive of large lifting device of girder, realize the lifting of bank bridge grider, in the time that bank bridge grider is elevated to assigned address, drive radius stay rotation clickwise by hydraulic thrust pull bar again, make crossbeam radius stay on positioning and locking device rotate to positioning step directly over.Now as when running into bank bridge grider and doing the movement of falling object, positioning and locking device is locked on positioning step, plays the effect of safety guard-safeguard.In the aforesaid bank bridge with lifting mode truss crossbeam and three dollies, the positioning and locking device of being located at bank bridge grider side is 4~32.
In the aforesaid bank bridge with lifting mode truss crossbeam and three dollies, the positioning and locking device of being located at bank bridge grider side is 4.
In the aforesaid bank bridge with lifting mode truss crossbeam and three dollies, the positioning and locking device of being located at bank bridge grider side is 8.
In the aforesaid bank bridge with lifting mode truss crossbeam and three dollies, the range of the distance on bank bridge grider and ground is 25m~65m.
Compared with conventional art, the invention provides a kind of bank bridge with lifting mode truss crossbeam and three dollies, this bank bridge can regulate the terrain clearance of bank bridge grider at any time, the working level of the lifting trolley on bank bridge and the working level of whole bank bridge system are effectively reduced, avoid the impact of external environment on container handling process, and then reduced production, the manufacturing cost and use cost of Quayside container movement system; By two lifting trolleys and the co-ordination of a suspension type transport carriage, effectively improve the handling efficiency of container handling bank bridge in addition.
Accompanying drawing explanation
Fig. 1 is the structural representation with the bank bridge of lifting mode truss crossbeam and three dollies;
Fig. 2 is the B-B cutaway view of Fig. 1;
Structural representation when Fig. 3 is the decline of bank bridge grider;
Structural representation when Fig. 4 is the rising of bank bridge grider;
Fig. 5 is the structural representation of lifting latching device;
Fig. 6 is the structural representation of lifting latching device open mode;
Fig. 7 is the structural representation of lifting latching device locking state.
Being labeled as in accompanying drawing: 1-bank portal frame, 2-bank bridge grider, 3-door frame column, 4-connecting cross beam a, 5-bank bridge lifting trolley, 6-suspension type transport carriage, 7-crossbeam latching device, 9-connecting cross beam b, 10-assembly pulley a, 11-crossbeam lifting mechanism, 12-assembly pulley b, 13-truss girder a, 14-truss girder b, 15-saddle beam, 16-positioning step, 17-positioning and locking device, 18-bearing, 19-hydraulic thrust pull bar, 20-crossbeam radius stay, 21-connecting rod.
The specific embodiment
Below in conjunction with drawings and Examples, the present invention is further illustrated.
Embodiments of the invention 1: a kind of bank bridge with lifting mode truss crossbeam and three dollies, comprise bank portal frame 1 and bank bridge grider 2, bank bridge grider 2 is located at the upper end of bank portal frame 1 inner side, bank portal frame 1 comprises four door frame columns 3, door frame column 3 belows are connected by connecting cross beam a4, bank bridge grider 2 is connected with the top of bank portal frame 1, and the upper strata of bank bridge grider 2 is provided with two bank bridge lifting trolleys 5, and the lower floor of bank bridge grider 2 is provided with transport carriage 6.Bank bridge grider 2 is located at the inner side of bank portal frame 1 and is connected by crossbeam latching device 7, the inner side on bank bridge grider 2 tops and the outside of bottom are equipped with trolley track, two ends in the inner track on bank bridge grider 2 tops are respectively equipped with a bank bridge lifting trolley 5, and the track in the outside of bank bridge grider 2 bottoms is provided with suspension type transport carriage 6; The top of four door frame columns 3 is parallel is provided with two connecting cross beam b9, the below of connecting cross beam b9 is provided with assembly pulley a10, connecting cross beam a4 is provided with crossbeam lifting mechanism 11, bank bridge grider 2 tops are provided with assembly pulley b12, and the steel rope on crossbeam lifting mechanism 11 is connected with bank bridge grider 2 with assembly pulley b12 by assembly pulley a10.The distance of the upper and lower two-layer track of bank bridge grider is 7m.Bank bridge grider 2 is truss structure, and bank bridge grider 2 comprises truss girder a13 and truss girder b14, and truss girder a13 is parallel to each other with truss girder b14 and is connected by 6 saddle beams 15.Crossbeam latching device 7 comprises the positioning step 16 of being located at bank portal frame 1 inner side and the positioning and locking device 17 of being located at bank bridge grider 2 sides, positioning and locking device 17 comprises the bearing 18 that is fixed on bank bridge grider 2 sides, one end is articulated with the hydraulic thrust pull bar 19 of bearing 18, crossbeam radius stay 20 and the connecting rod 21 being hinged, crossbeam radius stay 20 one end and bearing 18 are hinged, near the termination of crossbeam radius stay 20 other ends, be hinged with one end of the connecting rod 21 being hinged, hydraulic thrust pull bar 19 is hinged with the hinged place of the connecting rod 21 being hinged, the other end of the connecting rod 21 being hinged is hinged on bearing 18.The positioning and locking device 17 of being located at bank bridge grider 2 sides is 4.Bank bridge grider 2 is 25m~65m with the range of the distance on ground.
Embodiments of the invention 2: a kind of bank bridge with lifting mode truss crossbeam and three dollies, comprise bank portal frame 1 and bank bridge grider 2, bank bridge grider 2 is located at the upper end of bank portal frame 1 inner side, bank portal frame 1 comprises four door frame columns 3, door frame column 3 belows are connected by connecting cross beam a4, bank bridge grider 2 is connected with the top of bank portal frame 1, and the upper strata of bank bridge grider 2 is provided with two bank bridge lifting trolleys 5, and the lower floor of bank bridge grider 2 is provided with transport carriage 6.Bank bridge grider 2 is located at the inner side of bank portal frame 1 and is connected by crossbeam latching device 7, the inner side on bank bridge grider 2 tops and the outside of bottom are equipped with trolley track, two ends in the inner track on bank bridge grider 2 tops are respectively equipped with a bank bridge lifting trolley 5, and the track in the outside of bank bridge grider 2 bottoms is provided with suspension type transport carriage 6; The top of four door frame columns 3 is parallel is provided with two connecting cross beam b9, the below of connecting cross beam b9 is provided with assembly pulley a10, connecting cross beam a4 is provided with crossbeam lifting mechanism 11, bank bridge grider 2 tops are provided with assembly pulley b12, and the steel rope on crossbeam lifting mechanism 11 is connected with bank bridge grider 2 with assembly pulley b12 by assembly pulley a10.The distance of the upper and lower two-layer track of bank bridge grider is 6m.Bank bridge grider 2 is truss structure, and bank bridge grider 2 comprises truss girder a13 and truss girder b14, and truss girder a13 is parallel to each other with truss girder b14 and is connected by 8 saddle beams 15.Crossbeam latching device 7 comprises the positioning step 16 of being located at bank portal frame 1 inner side and the positioning and locking device 17 of being located at bank bridge grider 2 sides, positioning and locking device 17 comprises the bearing 18 that is fixed on bank bridge grider 2 sides, one end is articulated with the hydraulic thrust pull bar 19 of bearing 18, crossbeam radius stay 20 and the connecting rod 21 being hinged, crossbeam radius stay 20 one end and bearing 18 are hinged, near the termination of crossbeam radius stay 20 other ends, be hinged with one end of the connecting rod 21 being hinged, hydraulic thrust pull bar 19 is hinged with the hinged place of the connecting rod 21 being hinged, the other end of the connecting rod 21 being hinged is hinged on bearing 18.The positioning and locking device 17 of being located at bank bridge grider 2 sides is 8.Bank bridge grider 2 is 30m~60m with the range of the distance on ground.
Embodiments of the invention 3: a kind of bank bridge with lifting mode truss crossbeam and three dollies, comprise bank portal frame 1 and bank bridge grider 2, bank bridge grider 2 is located at the upper end of bank portal frame 1 inner side, bank portal frame 1 comprises four door frame columns 3, door frame column 3 belows are connected by connecting cross beam a4, bank bridge grider 2 is connected with the top of bank portal frame 1, and the upper strata of bank bridge grider 2 is provided with two bank bridge lifting trolleys 5, and the lower floor of bank bridge grider 2 is provided with transport carriage 6.Bank bridge grider 2 is located at the inner side of bank portal frame 1 and is connected by crossbeam latching device 7, the inner side on bank bridge grider 2 tops and the outside of bottom are equipped with trolley track, two ends in the inner track on bank bridge grider 2 tops are respectively equipped with a bank bridge lifting trolley 5, and the track in the outside of bank bridge grider 2 bottoms is provided with suspension type transport carriage 6; The top of four door frame columns 3 is parallel is provided with two connecting cross beam b9, the below of connecting cross beam b9 is provided with assembly pulley a10, connecting cross beam a4 is provided with crossbeam lifting mechanism 11, bank bridge grider 2 tops are provided with assembly pulley b12, and the steel rope on crossbeam lifting mechanism 11 is connected with bank bridge grider 2 with assembly pulley b12 by assembly pulley a10.The distance of the upper and lower two-layer track of bank bridge grider is 10m.Bank bridge grider 2 is truss structure, and bank bridge grider 2 comprises truss girder a13 and truss girder b14, and truss girder a13 is parallel to each other with truss girder b14 and is connected by 9 saddle beams 15.Crossbeam latching device 7 comprises the positioning step 16 of being located at bank portal frame 1 inner side and the positioning and locking device 17 of being located at bank bridge grider 2 sides, positioning and locking device 17 comprises the bearing 18 that is fixed on bank bridge grider 2 sides, one end is articulated with the hydraulic thrust pull bar 19 of bearing 18, crossbeam radius stay 20 and the connecting rod 21 being hinged, crossbeam radius stay 20 one end and bearing 18 are hinged, near the termination of crossbeam radius stay 20 other ends, be hinged with one end of the connecting rod 21 being hinged, hydraulic thrust pull bar 19 is hinged with the hinged place of the connecting rod 21 being hinged, the other end of the connecting rod 21 being hinged is hinged on bearing 18.The positioning and locking device 17 of being located at bank bridge grider 2 sides is 12.Bank bridge grider 2 is 40m~59m with the range of the distance on ground.
Principle of work of the present invention: take the process of unloading a ship as example, comprise the steps:
(a) first crossbeam latching device 7 is opened, then crossbeam lifting mechanism 11 drives bank bridge grider 2 to move up or down, by bank bridge grider 2 adjust to bank bridge lifting trolley 5 apart from the distance of the freight container that will hoist when ten meters of left and right, by crossbeam latching device 7, bank bridge grider 2 is locked on bank portal frame 1;
(b) the bank bridge lifting trolley 5 of freighter top is sling the freight container on ship and is placed on suspension type transport carriage 6, the below of the bank bridge lifting trolley 5 of suspension type transport carriage 6 along orbital motion to bank bridge grider 2 other ends;
(c) bank bridge lifting trolley 5 is sling the freight container on suspension type transport carriage 6 and container transshipment is transported to truck or on ferry-boat bridge.
In the time of container transshipment process, in time carry out the operation of step (a), the efficiency of container transshipment is effectively improved; The transporting mode cooperatively interacting by three dollies is realized the rapid transport of freight container, has effectively avoided the problem of the transport process contraposition of traditional handling bridge.
Claims (10)
1. one kind has the bank bridge of lifting mode truss crossbeam and three dollies, it is characterized in that: comprise bank portal frame (1) and bank bridge grider (2), bank bridge grider (2) is located at the upper end of bank portal frame (1) inner side, bank portal frame (1) comprises four door frame columns (3), door frame column (3) below is by connecting cross beam a(4) be connected, bank bridge grider (2) is connected with the top of bank portal frame (1), the upper strata of bank bridge grider (2) is provided with two bank bridge lifting trolleys (5), and the lower floor of bank bridge grider (2) is provided with suspension type transport carriage (6).
2. the bank bridge with lifting mode truss crossbeam and three dollies according to claim 1, it is characterized in that: bank bridge grider (2) is located at the inner side of bank portal frame (1) and is connected by crossbeam latching device (7), the inner side on bank bridge grider (2) top and the outside of bottom are equipped with trolley track, two ends in the inner track on bank bridge grider (2) top are respectively equipped with a bank bridge lifting trolley (5), and the track in the outside of bank bridge grider (2) bottom is provided with suspension type transport carriage (6); The top of four door frame columns (3) is provided with two parallel connecting cross beam b(9), connecting cross beam b(9) below be provided with assembly pulley a(10), connecting cross beam a(4) be provided with crossbeam lifting mechanism (11), bank bridge grider (2) top is provided with assembly pulley b(12), the steel rope on crossbeam lifting mechanism (11) is by assembly pulley a(10) with assembly pulley b(12) be connected with bank bridge grider (2).
3. the bank bridge with lifting mode truss crossbeam and three dollies according to claim 2, is characterized in that: the distance of the upper and lower two-layer track of bank bridge grider is 6m~10m.
4. the bank bridge with lifting mode truss crossbeam and three dollies according to claim 2, is characterized in that: the distance of the upper and lower two-layer track of bank bridge grider is 7m.
5. the bank bridge with lifting mode truss crossbeam and three dollies according to claim 1, it is characterized in that: bank bridge grider (2) is truss structure, bank bridge grider (2) comprises truss girder a(13) and truss girder b(14), truss girder a(13) with truss girder b(14) be parallel to each other and be connected by 3~15 saddle beams (15).
6. the bank bridge with lifting mode truss crossbeam and three dollies according to claim 2, it is characterized in that: crossbeam latching device (7) comprises the positioning step (16) of being located at bank portal frame (1) inner side and the positioning and locking device (17) of being located at bank bridge grider (2) side, positioning and locking device (17) comprises the bearing (18) that is fixed on bank bridge grider (2) side, one end is articulated with the hydraulic thrust pull bar (19) of bearing (18), crossbeam radius stay (20) and the connecting rod (21) being hinged, crossbeam radius stay (20) one end and bearing (18) are hinged, near the termination of crossbeam radius stay (20) other end, be hinged with one end of the connecting rod (21) being hinged, hydraulic thrust pull bar (19) is hinged with the hinged place of the connecting rod (21) being hinged, the other end of the connecting rod (21) being hinged is hinged on bearing (18).
7. the bank bridge with lifting mode truss crossbeam and three dollies according to claim 2, is characterized in that: the positioning and locking device (17) of being located at bank bridge grider (2) side is 4~32.
8. the bank bridge with lifting mode truss crossbeam and three dollies according to claim 6, is characterized in that: the positioning and locking device (17) of being located at bank bridge grider (2) side is 4.
9. the bank bridge with lifting mode truss crossbeam and three dollies according to claim 6, is characterized in that: the positioning and locking device (17) of being located at bank bridge grider (2) side is 8.
10. the bank bridge with lifting mode truss crossbeam and three dollies according to claim 1, is characterized in that: bank bridge grider (2) is 25m~65m with the range of the distance on ground.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410048037.1A CN103818832A (en) | 2014-02-11 | 2014-02-11 | Quay crane with lifting-type truss crossbeam and three trolleys |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410048037.1A CN103818832A (en) | 2014-02-11 | 2014-02-11 | Quay crane with lifting-type truss crossbeam and three trolleys |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103818832A true CN103818832A (en) | 2014-05-28 |
Family
ID=50754174
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410048037.1A Pending CN103818832A (en) | 2014-02-11 | 2014-02-11 | Quay crane with lifting-type truss crossbeam and three trolleys |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103818832A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105366555A (en) * | 2015-11-26 | 2016-03-02 | 三一海洋重工有限公司 | Quayside container crane |
CN106477453A (en) * | 2016-12-08 | 2017-03-08 | 上海振华重工(集团)股份有限公司 | Three open type truss structure crossbeams and the bank bridge applying this crossbeam |
CN107352443A (en) * | 2017-09-07 | 2017-11-17 | 上海振华重工(集团)股份有限公司 | A kind of quayside container crane to be climbed using hydraulic jack |
CN113003410A (en) * | 2019-12-19 | 2021-06-22 | 华电重工股份有限公司 | Crossing type vibration-proof high-speed shore bridge |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4750429A (en) * | 1984-05-09 | 1988-06-14 | Flyda-Mordaunt Limited | Transportation systems |
CN1212231A (en) * | 1998-06-12 | 1999-03-31 | 张占成 | Equipment and technology of loading and unloading system for harbour container |
CN1785786A (en) * | 2004-12-08 | 2006-06-14 | 上海振华港口机械(集团)股份有限公司 | Rise and fall crossbeam type crane for container |
CN201092515Y (en) * | 2007-01-23 | 2008-07-30 | 武汉理工大学 | Novel highly effective container handling bridge |
CN103523680A (en) * | 2013-10-14 | 2014-01-22 | 华电重工股份有限公司 | Container loading and unloading shore bridge with lifting type double-layer girder and three trolleys |
CN203699710U (en) * | 2014-02-11 | 2014-07-09 | 华电重工股份有限公司 | Quayside container crane with elevating type truss girder and three trolleys |
-
2014
- 2014-02-11 CN CN201410048037.1A patent/CN103818832A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4750429A (en) * | 1984-05-09 | 1988-06-14 | Flyda-Mordaunt Limited | Transportation systems |
CN1212231A (en) * | 1998-06-12 | 1999-03-31 | 张占成 | Equipment and technology of loading and unloading system for harbour container |
CN1785786A (en) * | 2004-12-08 | 2006-06-14 | 上海振华港口机械(集团)股份有限公司 | Rise and fall crossbeam type crane for container |
CN201092515Y (en) * | 2007-01-23 | 2008-07-30 | 武汉理工大学 | Novel highly effective container handling bridge |
CN103523680A (en) * | 2013-10-14 | 2014-01-22 | 华电重工股份有限公司 | Container loading and unloading shore bridge with lifting type double-layer girder and three trolleys |
CN203699710U (en) * | 2014-02-11 | 2014-07-09 | 华电重工股份有限公司 | Quayside container crane with elevating type truss girder and three trolleys |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105366555A (en) * | 2015-11-26 | 2016-03-02 | 三一海洋重工有限公司 | Quayside container crane |
CN106477453A (en) * | 2016-12-08 | 2017-03-08 | 上海振华重工(集团)股份有限公司 | Three open type truss structure crossbeams and the bank bridge applying this crossbeam |
CN106477453B (en) * | 2016-12-08 | 2018-10-12 | 上海振华重工(集团)股份有限公司 | The gantry crane of three pieces open type truss structure crossbeam and the application crossbeam |
CN107352443A (en) * | 2017-09-07 | 2017-11-17 | 上海振华重工(集团)股份有限公司 | A kind of quayside container crane to be climbed using hydraulic jack |
CN107352443B (en) * | 2017-09-07 | 2020-12-01 | 上海振华重工(集团)股份有限公司 | Container shore bridge climbing by adopting hydraulic oil cylinder |
CN113003410A (en) * | 2019-12-19 | 2021-06-22 | 华电重工股份有限公司 | Crossing type vibration-proof high-speed shore bridge |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103818734B (en) | A kind of Quayside container conveyer method and movement system | |
CN104640793B (en) | Assembly with at least two overhead cranes and container warehouse with assembly | |
CN103818832A (en) | Quay crane with lifting-type truss crossbeam and three trolleys | |
CN203699710U (en) | Quayside container crane with elevating type truss girder and three trolleys | |
CN103523680A (en) | Container loading and unloading shore bridge with lifting type double-layer girder and three trolleys | |
CN103318771A (en) | Bank crane with three sets of trolleys | |
CN103072902A (en) | Double-crossbeam quayside container crane | |
CN103910200B (en) | Shore container transfer method and transfer system | |
CN105473492B (en) | Crane | |
KR20110044175A (en) | Bridge crane or gantry crane comprising a revolving arrangement and lifting frames suspended thereunder | |
CN114031004A (en) | Lifting machine | |
EP3002246B1 (en) | System for reducing the counterweight of a crane | |
CN102887437A (en) | Double-super cantilever type electromagnetic gantry crane with large base distance | |
CN201873462U (en) | Container loading and unloading bridge employing continuous loopback quay wall type used in port | |
CN208829199U (en) | A kind of transfer device for port handling | |
CN202220047U (en) | Duel-super-cantilever large-base-distance electromagnetic portal crane | |
CN106395619B (en) | Truss-like gantry crane girder and truss-like gantry crane | |
CN106477453B (en) | The gantry crane of three pieces open type truss structure crossbeam and the application crossbeam | |
CN105731268B (en) | A kind of cargo transport lifts transporter | |
CN203048439U (en) | Double-beam portal crane | |
CN206654045U (en) | A kind of haulage vehicle | |
CN203877523U (en) | Novel shoreside container transit system | |
CN104555750B (en) | A kind of transporting and hoisting machinery | |
CN105752853B (en) | Port and pier cargo transportation device | |
CN102730575A (en) | Quayside cable crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140528 |