CN103790151A - 一种软土路基排水预压后封堵结构及施工方法 - Google Patents

一种软土路基排水预压后封堵结构及施工方法 Download PDF

Info

Publication number
CN103790151A
CN103790151A CN201410032467.4A CN201410032467A CN103790151A CN 103790151 A CN103790151 A CN 103790151A CN 201410032467 A CN201410032467 A CN 201410032467A CN 103790151 A CN103790151 A CN 103790151A
Authority
CN
China
Prior art keywords
horizontal
grouting pipe
drainage
vertical
discrete material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410032467.4A
Other languages
English (en)
Other versions
CN103790151B (zh
Inventor
徐辞剑
田向东
叶国江
薛玉明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHOU CONSTRUCTION GROUP CO., LTD.
Original Assignee
JIANGSU ZHONGRUI ROAD & BRIDGE CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU ZHONGRUI ROAD & BRIDGE CONSTRUCTION Co Ltd filed Critical JIANGSU ZHONGRUI ROAD & BRIDGE CONSTRUCTION Co Ltd
Priority to CN201410032467.4A priority Critical patent/CN103790151B/zh
Publication of CN103790151A publication Critical patent/CN103790151A/zh
Application granted granted Critical
Publication of CN103790151B publication Critical patent/CN103790151B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

本发明涉及一种软土路基排水预压后封堵结构,其特征在于所述结构主要由散体材料短桩、塑料排水板、水平排水垫层、竖向注浆管和水平注浆管组成;散体材料短桩设于水平排水垫层以下,其内布设竖向注浆管和塑料排水板;水平排水垫层铺设于路堤填料以下,其内铺设水平注浆管;水平注浆管和竖向注浆管通过三通接头相互连通;路基排水预压结束后,通过竖向注浆管和水平注浆管分别向散体材料短桩与水平排水垫层内压浆形成竖向注浆封闭短桩及浆固垫层承载板。本发明不但可以通过路基土的排水固结改善路基土的性能,而且可以解决排水固结法处理路段工后沉降量过大的问题,还可以通过压浆提高路基的承载能力和整体性。本发明还公开了上述结构的施工方法。

Description

一种软土路基排水预压后封堵结构及施工方法
技术领域
本发明涉及一种软土路基排水预压后封堵结构及施工方法,属于地基工程领域,适用于软土层厚度大、地基沉降控制要求高的道路工程新建或改扩建项目的地基处理工程。 
背景技术
软土在我国分布广泛,在沿海和河流的中下游及湖泊附近均有软土覆盖层深厚地区。我们在公路的施工中经常遇到穿越农田、河道或土体含水量大,地下水较多的情况,也就是所谓的软土地基。软土具有含水量大,抗剪强度低,超载能力差的特性。如果不处理或处理不当,就会造成地基失稳,不但会引起路面结构破坏、桥头跳车等工程问题,还会影响行车的舒适性,造成通过车辆大幅度减速,甚至造成行车事故。因此,路基沉降问题,特别是软土路基沉降控制问题已成为影响高等级公路等路基工程质量、造价、运营修护成本、运营效益等重要因素,这已引起工程界和学术界的广泛关注。 
由于影响软土路基沉降的因素很多,建造于软土地基上的路基工程,在设计时虽已采取了一定的病害防治措施,如采用刚性桩或柔性桩复合地基加固处理高填土路段或台背填筑前地基、不同处理方式间设置过渡段、合理设置桥涵构造物、采用轻质土填料、严格控制填料质量、设置桥台搭板等等,但一些路段在投入运营后一段时间内,仍然会发生软基沉降异常现象。 
目前,对于软土地基的处理措施主要有两类,一类为排水固结预压法,另一类为复合桩基方法。排水固结预压法即先在需处理的地基内打入排水体,排水体内设有排水通道,然后对地基进行预压,使地基中的孔隙水从排水通道排出,从而达到加固地基的目的。这种方法的工期需要很长,需要充分的预压和排水固结时间,且无法解决软土地基本身所固有的次固结原因而引起的工后沉降问题。复合桩基方法即软土地基中打入大量各种方式的桩形成复合桩基来达到减小地基沉降的目的,这种方式的造价很高,是排水固结方法造价的十几倍甚至几十倍以上,不能在实际工程中大量使用。尤其在地基土体强度较低,需要打很多的桩,工程造价非常昂贵。 
已有一种复合加筋排水式土工格栅,包括塑料双向土工格栅与复合加筋吸排水带,复合加筋吸排水带设置在双向土工格栅的横向或者纵向的筋条之上,与不同向筋条交叉形成的节点固定,且与同向筋条间隔设置。复合加筋吸排水带是以排水芯板基板,在排水芯板的上面和下面各设置一层网状吸排水体,在网状吸排水体内纵向穿插高强钢丝,在吸排水体的上面与下面各铺设一层水平网状加筋,并在复合加筋吸排水带的两端均设置竖向支撑加筋,然后用土工布滤膜整体包覆。上述结构虽具有排水功能,且有利于地基表面的水排至两侧边沟,但难以解决路基的后期固结问题,当土体固结度满足要求时,地基的后期沉降量容易出现异常。 
综上所述,尽管工程中已有一些可用于处治公路路基施工期沉降问题的方法,这种方法的工期需要很长,需要充分的预压和排水固结时间,且无法解决软土地基本身所固有的次固结原因而引起的工后沉降问题。复合桩基方法即软土地基中打入大量各种方式的桩形成复合桩基来达到减小地基沉降的目的,这种方式的造价很高,是排水固结方法造价的十几倍甚至几十倍以上,不能在实际工程中大量使用。尤其在地基土体强度较低,需要打很多的桩,工程造价非常昂贵。 
鉴于此,为了丰富公路路基沉降控制方法,更好的解决公路施工期沉降问题,目前亟需发明一种可同时加速路基土体固结、提高路基承载能力、有效控制后期沉降变形量的新型路基加固结构及施工方法。 
发明内容
本发明的目的在于提供一种路基处理和沉降控制结构,使结构不仅可以在路基施工期间可起到排水固结的作用,而且可以在预压期结束后通过压浆形成纵、横向注浆加固承载体,达到在较低造价的前提下缩短工期、提高地基加固效果的目的。 
为了实现上述技术目的,本发明采用了以下技术方案: 
一种软土路基排水预压后封堵结构,其特征在于所述结构主要由散体材料短桩、塑料排水板、水平排水垫层、竖向注浆管和水平注浆管组成;散体材料短桩设于水平排水垫层以下,其内布设竖向注浆管和塑料排水板;水平排水垫层铺设于路堤填料以下,其内铺设水平注浆管;水平注浆管和竖向注浆管通过三通接头相互连通。
塑料排水板设于散体材料短桩的中心线位置,塑料排水板底端长于散体材料短桩,植入下部软弱土体内。 
所述竖向注浆管设置于塑料排水板的一侧,底端可以与散体材料短桩齐平,或者伸出散体材料短桩底端。 
水平注浆管可采用PPR波纹管、PVC双壁波纹管、PE双壁波纹管或HDPE双壁波纹管,在管壁部位沿纵向均匀间隔设置有花孔,并在管壁外侧包覆土工布,设于水平排水垫层内。 
竖向注浆管设置于散体材料桩内,与水平注浆管材料相同,管径与水平注浆管相等或略小。 
软土路基排水预压后封堵结构的施工方法,主要包括以下步骤: 
1)施工准备:根据设计要求,平整场地,铺设砂垫层,组织施工机械进场;
2)竖向排水体打设:在设计位置先后打入竖向注浆管和塑料排水板,竖向注浆管的顶部伸出原地面一定长度;
3)水平排水体铺设:铺设水平排水垫层和水平注浆管,并将竖向注浆管与水平注浆管连通,确保紧密连接; 
4)路堤填筑:根据设计要求在水平排水垫层上部填筑路堤填料,随后进行路基预压,使路基土体排水固结;
5)压浆封堵排水***:预压结束后,通过注浆管向水平排水垫层和散体材料桩内压浆,形成浆固垫层承载板和竖向注浆封闭短桩;
6)开口封堵:压浆结束后,封堵水平注浆管,并修整两侧边坡;
7)路面结构施工:待压浆混凝土初凝后,进行上部路面结构施工。
本发明具有以下特点:
(1)本发明设置在路基内及水平排水垫层内的排水体,仅在施工期发挥排水效应,路堤预压期结束后对排水体进行注浆封堵,既可发挥排水***提高路基土体固结度的作用,又可解决排水体在运营期继续排水、地基土体沉降而导致变形量过大的问题;
(2)本发明结构在预压期结束后,通过注浆管向竖向及水平排水体内压浆,可在路基内形成浆固短桩、在水平排水垫层内形成横向浆固体,有助于增强路基的整体性、提高路基的承载能力。
(3)本发明结构可根据工程实际情况,确定进行压浆的时机、位置,以及压浆量,实现了对路基加固质量、承载能力、沉降变形的动态控制。 
附图说明
图1是本发明软土路基排水预压期结构的横断面图; 
图2是本发明软土路基排水后封堵期结构的横断面图;
图3是本发明软土路基排水预压后封堵结构的水平剖视图;
图4-1至图4-4是本发明软土路基排水预压后封堵结构的施工流程示意图。
图中:1—水平排水垫层;2—散体材料短桩;3—水平注浆管;4—竖向注浆管;5—三通接头;6—塑料排水板;7—花孔;8—土工布;9—浆固垫层承载板;10—竖向注浆封闭短桩;11—路堤;12—软土层;13—相对持力层。 
具体实施例
本实施方式中路堤和路面结构的设计和施工技术要求、水平排水垫层、竖向排水体水平注浆管、竖向注浆管的施工技术要求等本实施例中不再累述,重点阐述本发明涉及结构的实施方式。 
图1是本发明软土路基排水预压期结构的横断面图,图2是本发明软土路基排水后封堵期结构的横断面图,图3是本发明软土路基排水预压后封堵结构的水平剖视图。参照图1、图2、图3所示,所需加固的公路为双向六车道一级公路,路堤内的排水体压浆封堵完成后的横断面主要由浆固垫层承载板9、竖向注浆封闭短桩10、路堤11组成;施工期路堤排水预压结构主要由水平排水垫层1、散体材料短桩2、水平注浆管3、竖向注浆管4和塑料排水板6组成。 
水平排水垫层1厚度为0.5m,采用级配良好的中粗砂;在水平排水垫层1内横向均匀间隔设置碎砾石材料,横向间隔为3m,碎砾石材料横断面宽度为0.5m。 
水平排水垫层1内铺设水平注浆管3,管径为40mm,水平注浆管3采用45#无缝钢管,强度等级为Q235,注浆钢管3壁厚为5mm,钢管的外侧壁上钻花孔7,并且包覆有土工布8。 
竖向排水体采用直径为500mm的散体材料短桩2与宽度为150mm的塑料排水板6的组合结构,散体材料短桩2内填充粒径均匀的中粗砂;沿散体材料短桩2的中心线方向先后竖向注浆管4和***塑料排水板6,塑料排水板6***至地基以下的相对持力层13内500~1000mm;竖向注浆管4的材料与水平注浆管3相同,顶端与水平注浆管3之间采用三通接头5连接。 
预压期结束后,通过水平注浆管3和竖向注浆管4分别向水平排水垫层1和散体材料短桩2内压浆,分别形成浆固垫层承载板9和竖向注浆封闭短桩10;压浆浆液先采用水灰比为5:1的高水灰比水泥浆液,再采用水灰比为1:1的中低水灰比水泥浆液进行注浆;水泥采用42.5#普通硅酸盐水泥。 
注浆完成后将水平注浆管3的另一端封闭,并封堵开挖面上注浆管周围土体,防止浆液流出。 
图4-1至图4-4是本发明软土路基排水预压后封堵结构的施工流程示意图,参照图4-1至图4-4所示,软土路基排水预压后封堵结构包括以下施工步骤: 
1)施工准备:根据设计要求,平整场地,铺设砂垫层,组织施工机械进场;
2)竖向排水体打设:在设计位置先后打入竖向注浆管4和塑料排水板6,竖向注浆管4的顶部伸出原地面一定长度;
3)水平排水体铺设:铺设水平排水垫层1和水平注浆管3,并将竖向注浆管4与水平注浆管1连通,确保紧密连接; 
4)路堤填筑:根据设计要求在水平排水垫层1上部填筑路堤填料,随后进行路基预压,使路基土体排水固结;
5)压浆封堵排水***:预压结束后,通过注浆管向水平排水垫层1和散体材料桩2内压浆,形成浆固垫层承载板9和竖向注浆封闭短桩10;
6)开口封堵:压浆结束后,封堵水平注浆管1,并修整两侧边坡;
7)路面结构施工:待压浆混凝土初凝后,进行上部路面结构施工。

Claims (6)

1.一种软土路基排水预压后封堵结构,其特征在于所述结构主要由散体材料短桩、塑料排水板、水平排水垫层、竖向注浆管和水平注浆管组成;散体材料短桩设于水平排水垫层以下,其内布设竖向注浆管和塑料排水板;水平排水垫层铺设于路堤填料以下,其内铺设水平注浆管;水平注浆管和竖向注浆管通过三通接头相互连通。
2.根据权利要求1所述的软土路基排水预压后封堵结构,其特征在于所述塑料排水板设于散体材料短桩的中心线位置,塑料排水板底端长于散体材料短桩,植入下部软弱土体内。
3.根据权利要求1所述的软土路基排水预压后封堵结构,其特征在于所述竖向注浆管设置于塑料排水板的一侧,底端可以与散体材料短桩齐平,或者伸出散体材料短桩底端。
4.根据权利要求1所述的软土路基排水预压后封堵结构,其特征在于所述水平注浆管可采用PPR波纹管、PVC双壁波纹管、PE双壁波纹管或HDPE双壁波纹管,在管壁部位沿纵向均匀间隔设置有花孔,并在管壁外侧包覆土工布,设于水平排水垫层内。
5.根据权利要求1所述的软土路基排水预压后封堵结构,其特征在于所述竖向注浆管设置于散体材料桩内,与水平注浆管材料相同,管径与水平注浆管相等或略小。
6.根据权利要求1~5所述软土路基排水预压后封堵结构的施工方法,其特征在于包括以下步骤:
1)施工准备:根据设计要求,平整场地,铺设砂垫层,组织施工机械进场;
2)竖向排水体打设:在设计位置先后打入竖向注浆管和塑料排水板,竖向注浆管的顶部伸出原地面一定长度;
3)水平排水体铺设:铺设水平排水垫层和水平注浆管,并将竖向注浆管与水平注浆管连通,确保紧密连接; 
4)路堤填筑:根据设计要求在水平排水垫层上部填筑路堤填料,随后进行路基预压,使路基土体排水固结;
5)压浆封堵排水***:预压结束后,通过注浆管向水平排水垫层和散体材料桩内压浆,形成浆固垫层承载板和竖向注浆封闭短桩;
6)开口封堵:压浆结束后,封堵水平注浆管,并修整两侧边坡;
7)路面结构施工:待压浆混凝土初凝后,进行上部路面结构施工。
CN201410032467.4A 2014-01-23 2014-01-23 一种软土路基排水预压后封堵结构及施工方法 Expired - Fee Related CN103790151B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410032467.4A CN103790151B (zh) 2014-01-23 2014-01-23 一种软土路基排水预压后封堵结构及施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410032467.4A CN103790151B (zh) 2014-01-23 2014-01-23 一种软土路基排水预压后封堵结构及施工方法

Publications (2)

Publication Number Publication Date
CN103790151A true CN103790151A (zh) 2014-05-14
CN103790151B CN103790151B (zh) 2016-08-31

Family

ID=50666171

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410032467.4A Expired - Fee Related CN103790151B (zh) 2014-01-23 2014-01-23 一种软土路基排水预压后封堵结构及施工方法

Country Status (1)

Country Link
CN (1) CN103790151B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234034A (zh) * 2014-09-01 2014-12-24 安徽省交通建设有限责任公司 一种先排水后封堵板承式路堤及施工方法
CN107447613A (zh) * 2017-07-31 2017-12-08 浙江大学城市学院 一种深厚超软土路堤及施工方法
CN108118684A (zh) * 2017-11-28 2018-06-05 浙江大学城市学院 一种滩涂围垦吹填淤泥夹砂层地基加固结构及施工方法
CN110158383A (zh) * 2019-05-05 2019-08-23 浙江大东吴集团建设有限公司 滩涂路面施工方法
CN114657967A (zh) * 2022-03-10 2022-06-24 浙江新盛建设集团有限公司 一种软弱土层施工临时混凝土道路加固装置
CN115419045A (zh) * 2022-10-24 2022-12-02 水利部交通运输部国家能源局南京水利科学研究院 一种后注浆式复合地基联合增压式真空预压加固软土地基的方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101591904A (zh) * 2008-05-28 2009-12-02 徐立新 先排水预压后注浆排水体复合桩基的加固方法
CN201495468U (zh) * 2009-08-18 2010-06-02 冯守中 处于湿地软基处的公路路基结构
KR20100059209A (ko) * 2008-11-26 2010-06-04 (주)지구환경전문가그룹 연약지반 성토시 강제 배수 및 동시 보강을 위한 연약지반 배수구조
CN102433876A (zh) * 2011-08-31 2012-05-02 浙江大学城市学院 多隔室套管复合桩及其施工方法
CN102650128A (zh) * 2012-04-26 2012-08-29 浙江大学城市学院 一种先排水预压后注浆劲芯水泥搅拌桩及其施工方法
CN102926304A (zh) * 2012-11-28 2013-02-13 中铁第四勘察设计院集团有限公司 处理运营前铁路软土路基沉降超标的加固方法及加固结构
CN202787246U (zh) * 2012-08-01 2013-03-13 浙江新中源建设有限公司 一种柔性桩与排水体同体组合桩
CN203741814U (zh) * 2014-01-23 2014-07-30 江苏中瑞路桥建设有限公司 一种软土路基排水预压后封堵结构

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101591904A (zh) * 2008-05-28 2009-12-02 徐立新 先排水预压后注浆排水体复合桩基的加固方法
KR20100059209A (ko) * 2008-11-26 2010-06-04 (주)지구환경전문가그룹 연약지반 성토시 강제 배수 및 동시 보강을 위한 연약지반 배수구조
CN201495468U (zh) * 2009-08-18 2010-06-02 冯守中 处于湿地软基处的公路路基结构
CN102433876A (zh) * 2011-08-31 2012-05-02 浙江大学城市学院 多隔室套管复合桩及其施工方法
CN102650128A (zh) * 2012-04-26 2012-08-29 浙江大学城市学院 一种先排水预压后注浆劲芯水泥搅拌桩及其施工方法
CN202787246U (zh) * 2012-08-01 2013-03-13 浙江新中源建设有限公司 一种柔性桩与排水体同体组合桩
CN102926304A (zh) * 2012-11-28 2013-02-13 中铁第四勘察设计院集团有限公司 处理运营前铁路软土路基沉降超标的加固方法及加固结构
CN203741814U (zh) * 2014-01-23 2014-07-30 江苏中瑞路桥建设有限公司 一种软土路基排水预压后封堵结构

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234034A (zh) * 2014-09-01 2014-12-24 安徽省交通建设有限责任公司 一种先排水后封堵板承式路堤及施工方法
CN104234034B (zh) * 2014-09-01 2016-01-06 安徽省交通建设有限责任公司 一种先排水后封堵板承式路堤的施工方法
CN107447613A (zh) * 2017-07-31 2017-12-08 浙江大学城市学院 一种深厚超软土路堤及施工方法
CN108118684A (zh) * 2017-11-28 2018-06-05 浙江大学城市学院 一种滩涂围垦吹填淤泥夹砂层地基加固结构及施工方法
CN108118684B (zh) * 2017-11-28 2023-06-16 浙江大学城市学院 一种滩涂围垦吹填淤泥夹砂层地基加固结构及施工方法
CN110158383A (zh) * 2019-05-05 2019-08-23 浙江大东吴集团建设有限公司 滩涂路面施工方法
CN114657967A (zh) * 2022-03-10 2022-06-24 浙江新盛建设集团有限公司 一种软弱土层施工临时混凝土道路加固装置
CN114657967B (zh) * 2022-03-10 2024-04-16 浙江新盛建设集团有限公司 一种软弱土层施工临时混凝土道路加固装置
CN115419045A (zh) * 2022-10-24 2022-12-02 水利部交通运输部国家能源局南京水利科学研究院 一种后注浆式复合地基联合增压式真空预压加固软土地基的方法
CN115419045B (zh) * 2022-10-24 2023-06-09 水利部交通运输部国家能源局南京水利科学研究院 一种后注浆式联合增压式真空预压加固软土地基的方法

Also Published As

Publication number Publication date
CN103790151B (zh) 2016-08-31

Similar Documents

Publication Publication Date Title
CN103628378B (zh) 一种临水公路拓宽路堤结构及施工方法
CN204059124U (zh) 一种砂桩排水强夯后注浆地基加固结构
CN103074891B (zh) 双层塑料套管散体材料与混凝土劲芯组合桩及施工方法
CN102433876B (zh) 多隔室套管复合桩及其施工方法
CN103790151B (zh) 一种软土路基排水预压后封堵结构及施工方法
CN203383119U (zh) 一种新型公路路堤拓宽结构
CN103334357B (zh) 一种高架桥下桩基承台伸入路基的路堤结构及施工方法
CN107905089A (zh) 一种防治桥头跳车的加强台背及其施工方法
CN103510441A (zh) 防止寒区公路水损破坏的立体排水路基结构及施工方法
CN103835203B (zh) 一种深厚软基后顶升轻质路堤结构的施工方法
CN103031836A (zh) 一种在新吹填淤泥地基上快速修筑道路的方法
CN105178125A (zh) 一种湖区高填路基吹沙路堤施工方法和路堤结构
CN103174074B (zh) 一种已通车公路路基沉降控制结构及施工方法
CN110965416B (zh) 一种针对山区高填方路基加固的竹材加筋体系及施工方法
CN104234034B (zh) 一种先排水后封堵板承式路堤的施工方法
CN203741814U (zh) 一种软土路基排水预压后封堵结构
CN204570720U (zh) 一种路基加宽涵洞地基
CN203334154U (zh) 一种高架桥下桩基承台伸入路基的路堤结构
CN112681043B (zh) 路基拼接拓宽结构及施工方法
CN203066064U (zh) 双层塑料套管散体材料与混凝土劲芯组合桩
CN202766944U (zh) 三维土工复合排水网增强路基排水***
CN205062597U (zh) 一种湖区高填路基吹沙路堤结构
CN214459270U (zh) 路基拼接拓宽结构
CN213013736U (zh) 一种加筋抛石挤淤扩展路基
CN111997030B (zh) 一种软土增强固化方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Wang Xinquan

Inventor before: Xu Cijian

Inventor before: Tian Xiangdong

Inventor before: Ye Guojiang

Inventor before: Xue Yuming

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160517

Address after: 310015 Hangzhou, Gongshu District Wanda Commercial Center, building 3, room 3, unit 1901, room

Applicant after: Hangzhou Jiang Run Science and Technology Ltd.

Address before: 225300 standard factory building No. 6, North Station Road, Taizhou Agricultural Development Zone, Jiangsu, C1

Applicant before: JIANGSU ZHONGRUI ROAD & BRIDGE CONSTRUCTION CO., LTD.

C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Xie Yongcheng

Inventor before: Wang Xinquan

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160704

Address after: 350800, Fujian District, Minqing, Fuzhou Business Plaza A District 2

Applicant after: SHENZHOU CONSTRUCTION GROUP CO., LTD.

Address before: 310015 Hangzhou, Gongshu District Wanda Commercial Center, building 3, room 3, unit 1901, room

Applicant before: Hangzhou Jiang Run Science and Technology Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160831

Termination date: 20210123

CF01 Termination of patent right due to non-payment of annual fee