CN102433876A CN2011102539728A CN201110253972A CN102433876A CN 102433876 A CN102433876 A CN 102433876A CN 2011102539728 A CN2011102539728 A CN 2011102539728A CN 201110253972 A CN201110253972 A CN 201110253972A CN 102433876 A CN102433876 A CN 102433876A
Authority
CN
China
Prior art keywords
pile body
sleeve pipe
pile
many compartments
flexible
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102539728A
Other languages
English (en)
Other versions
CN102433876B (zh
Inventor
王新泉
陈永辉
陈龙
陈庚
张俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hwaking Construction Group Co ltd
Original Assignee
Zhejiang University City College ZUCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University City College ZUCC filed Critical Zhejiang University City College ZUCC
Priority to CN201110253972.8A priority Critical patent/CN102433876B/zh
Publication of CN102433876A publication Critical patent/CN102433876A/zh
Application granted granted Critical
Publication of CN102433876B publication Critical patent/CN102433876B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明涉及一种多隔室套管复合桩及其施工方法,复合桩包括多隔室套管,套管的底部连接预制桩尖,套管的部分隔室内灌入砂砾、建筑垃圾或碎石形成柔性桩体,柔性桩体外周均匀设置排水孔,内部预埋竖向注浆管,顶部封闭;部分隔室内灌入砂浆或细石混凝土形成刚性桩体,刚性桩体的顶部插设桩顶钢筋,并与盖板配筋连接后浇注盖板。多隔室套管径向贯通,盖板顶部铺设加筋垫层,并安放水平注浆管,水平注浆管与竖向注浆管连接后引至堤坝坡脚处,作为排水滤管使用。可根据总沉降量、沉降速率、预测工后沉降和地基土体的固结度,通过注浆管向柔性桩体内注入水泥浆液,散体材料浆固使柔性桩体成为刚性桩体,实现动态设计和动态施工。

Description

多隔室套管复合桩及其施工方法
技术领域
本发明涉及一种散体材料桩及刚性桩同体组合的地基处理方法,特别涉及一种多隔室套管复合桩及其施工方法。
背景技术
在本技术发明之前,各种路基等堤坝工程中其软土地基处理措施主要有两大类,一类为排水固结法,另一类为复合地基法。
排水固结法常用的有真空预压法、堆载预压法和真空堆载联合预压法,常用的排水通道有塑料排水板、袋装砂井、碎石桩或砂砾桩等散体材料桩。造价方面一般是塑料排水板和小直径的袋装砂井最低,散体材料桩偏高。排水固结法的目的主要有两个:一是使地基的沉降在加载预压期间大部分或基本完成,使建(构)筑物在运营后的使用期间产生尽可能小的沉降,即减小工后沉降,另外就是通过排水通道的存在加速地基软土的排水固结,使软土的强度快速增长,从而提高地基的承载力和稳定性,使得路基或堤坝在加载期间不会由于地基土强度不足而出现失稳滑塌。其优点在于加固费用低廉,施工方法简单,因此在实际工程中优先选用,应用相当广泛。但其缺点在于工期长,需要充分的预压和排水固结时间,特别是在深厚的软土地基工程中需要漫长的预压期,而且软土地基本身固有的次固结原因所引起的工后沉降问题一般很难采用这种排水预压方法来解决,因此即使在有充裕时间的情况下其加固效果一般也不如复合地基处理方法。另外,由于目前现有的设计理论无法准确预估实际工程所需要的预压期,理论计算与实际固结沉降情况差别或多或少存在,有时会差别很大,往往需要边施工边根据实际固结沉降情况调整预压期,即整个工程的工期无法事先准确估计,会对工程的工期产生不确定性的影响。
复合地基方法是采用在软土地基中大量打设各种桩的方式来形成复合地基,以减小地基沉降。采用圆形单孔套管护壁的刚性桩复合地基目前在工程中已被采用,如单壁螺纹塑料套管混凝土桩,也有学者提出塑料蜂窝管护壁的异形灌注桩的理念,该类桩型目前存在的缺陷之一为采用大于桩体尺寸的扩大桩尖及沉管,若桩周土不能及时回挤,塑料套管打设过程中扩孔效应对桩侧摩阻力具有削弱效应,桩体承载力具有明显的时效性。复合地基方法特别是刚性桩复合地基的方法具有加固效果好,沉降收敛快,工期短,能有效控制工后沉降,处理深度深,质量易保证,加固效果好等优点,但是其缺点在于造价很高,要远远高于各种排水固结方法。同时对于桩端难于至于相对硬土层上的深厚软基或超软土,也存在预压期偏长或工后沉降过大的缺点。
目前堤坝荷载下的软基处理,一般采用单一的地基处理方法:要么排水固结方法,要么复合地基方法。充分发挥两类方法的特点,将排水固结法与复合地基法组合使用的方法,目前已经出现,如有排水板和粉喷桩结合(称为2D工法);使用透水混凝土管桩进行地基处理的方法、带帽PTC型有孔管桩复合地基方法、管桩与塑料排水板间隔打设形成复合地基的方法等。
目前排水固结法与复合地基法组合使用的方法可总结为两类:一是排水体与刚(柔)性桩交叉打设加固软基的方法,另一类是采用透水混凝土或在刚性桩体上开孔的方法。对第1类方法需要两种软基处理设备配合施工,排水体及刚柔性桩的施工质量存在相互干扰和影响,施工速度慢,工期较长。第2类方法透水混凝土存在孔隙堵塞问题且排水效果有限,有孔管桩预制较为困难,且为满足打设及运输的要求,桩体强度及配筋要求比普通预应力管桩高很多,导致处理费用较高。两类方法存在的共性问题是在预压期结束或运营期,排水体仍在发挥作用,排水体加速土体排水固结的效应,在该阶段对减少工后沉降变为了不利因素。
综上所述,根据目前的实际情况和技术条件,亟需发明一种在工期、工程投资、工程质量之间能够合理平衡,充分发挥排水固结法与复合地基法的特点,将其组合使用,且又能在实施过程中根据工期或预压效果的实际需要对地基加固方法可以动态设计和动态施工的一种新型地基处理方式。
发明内容
本发明的目的在于组合排水固结法与复合地基法的特点,改进目前技术的不足及存在的缺陷,实现排水固结法与复合地基技术的有效结合,实现动态设计和动态施工。
为了实现上述的目的,发明采用了以下技术方案:
多隔室套管复合桩,包括多隔室套管,套管的底部连接预制桩尖,套管的部分隔室内灌入砂砾、建筑垃圾或碎石形成柔性桩体,部分隔室内灌入砂浆或细石混凝土形成刚性桩体,柔性桩体与刚性桩体同体组合;
其中,柔性桩体内预埋竖向注浆管,外周均匀设置排水孔,竖向注浆管由桩体盖板内穿出,该桩体的顶部封闭;
刚性桩体的顶部插设桩顶钢筋,设置盖板配筋后,桩顶钢筋与盖板配筋连前接,浇注盖板;
所述的多隔室套管径向贯通,,盖板顶部铺设加筋垫层,并安放水平注浆管,水平注浆管与柔性桩体内的竖向注浆管连接,且水平注浆管引至堤坝坡脚处,水平注浆管在排水预压期间作为排水滤管使用。
前述的多隔室套管复合桩,其特征在于,多隔室套管外侧包覆透水性土工织物;柔性桩体内预埋的竖向注浆管沿多隔室套管全桩长埋设或部分桩长埋设。
前述的多隔室套管复合桩,其特征在于所述的多隔室套管为单壁或双壁,材料为PVC、PE或者HDPE。
前述的多隔室套管复合桩,其特征在于所述的多隔室套管为圆管,所述的刚性桩体与柔性桩体沿着圆周间隔布置,中部隔室设置成刚性桩体或柔性桩体。
前述的多隔室套管复合桩,其特征在于所述的多隔室套管为方管,刚性桩体布置在对角线上,四角布置柔性桩体;或者刚性桩体布置在内部,柔性桩体沿着外周布置;或者刚性桩体呈“十”字布置在中轴线上,四角布置柔性桩体。多隔室套管复合桩的施工方法,其特征在于,包括以下的步骤:
(1)根据设计桩长采用接头将多隔室套管连接,并与预制桩尖连接;
(2)根据预制桩尖尺寸,在套管周围外包土工织物袋;
(3)在吊绳的牵引下将多隔室套管自沉管底部放入沉管内,采用沉管桩机,静压辅助振动打入地基中;
(4)待一定区域多隔室套管集中打设完毕后,在部分隔室内安放竖向注浆管后,灌入砂砾、建筑垃圾或碎石,并采取固定措施使竖向注浆管位于隔室的中心位置,并将该隔室顶封闭,形成柔性桩体;
(5)根据盖板设计尺寸安放盖板模板或开挖土模;
(6)根据设计要求向多隔室套管的部分隔室内灌注细石混凝土或砂浆,灌至桩顶后,插设桩顶钢筋,形成刚性桩体;
(7)布设盖板配筋,浇注盖板;
(8)待桩体及盖板强度达标后,铺设加筋垫层,安放水平注浆管,水平注浆管与柔性桩体内的竖向注浆管连接,并将水平注浆管引至堤坝坡脚处;
(9)进行堤坝填筑及预压,在堤坝填筑过程中竖向注浆管、水平注浆管作为排水滤管使用,可采用潜水泵或真空泵进行抽水;
(10)根据堤坝沉降速率,在预压期结束后或运营期间,通过竖向注浆管、水平注浆管向柔性桩体内注入水泥浆液,柔性桩体内的散体材料浆固成为刚性桩体。前述的多隔室套管复合桩的施工方法,其特征在于多隔室套管外侧包覆透水性土工织物,步骤(10)注入的浆液扩散至外包土工织物袋内形成水泥土。
前述的多隔室套管复合桩的施工方法,其特征在于所述的多隔室套管为单壁或双壁圆管或方管,材料为PVC、PE或者HDPE;柔性桩体内预埋的注浆管沿套管全桩长埋设或部分桩长埋设。
前述的多隔室套管复合桩,其特征在于所述的多隔室套管为圆管,所述的刚性桩体与柔性桩体沿着圆周间隔布置,中部隔室设置成刚性桩体或柔性桩体;或者所述的多隔室套管为方管,刚性桩体布置在对角线上,四角布置柔性桩体;或者刚性桩体布置在内部,柔性桩体沿着外周布置;或者刚性桩体呈“十”字布置在中轴线上,四角布置柔性桩体。
前述的多隔室套管复合桩的施工方法,其特征在于在垫层中铺设不透气的封闭膜以与真空预压结合。
附图说明
图1 本发明多隔室套管复合桩的剖面示意图;
图2是方形多隔室套管的立体图;
图3是方形多隔室套管的横截面图;
图4是圆形多隔室套管的立体图;
图5是圆形多隔室套管的横截面图;
图6本发明多隔室套管复合桩施工工艺示意图;
图7是垫层中水平注浆管布置示意图;
图8是多隔室套管复合桩堤坝示意图。
图中:1-多隔室套管、2-竖向注浆管、3-柔性可排水桩体、4-刚性桩体、5-桩顶插筋、6-土工织物袋、7-水泥土、8-盖板配筋、9-盖板、10-预制桩尖、11-多隔室套管孔壁开孔、12-套管接头、13-沉管、14-吊绳、15-水平注浆管、16-加筋垫层、17-堤坝。
具体实施实例
    图1多隔室套管复合桩的剖面示意图,参照图1所示,多隔室套管复合桩,包括径向贯通的多隔室套管1、套管的底部连接预制桩尖10。套管的部分隔室内灌入砂砾、建筑垃圾或碎石形成散体材料柔性可排水桩体3,柔性可排水桩体3内预埋竖向注浆管2,由桩体盖板内穿出,并将套管的顶部封闭,竖向注浆管2的管周开孔,且竖向注浆管2可全桩长埋设也可部分桩长埋设;部分隔室内灌入砂浆或细石混凝土形成刚性桩体4,刚性桩体4的顶部插设桩顶钢筋5,并设置了盖板9,盖板9设置盖板配筋8,柔性可排水桩体3与刚性桩体4同体组合;多隔室套管复合桩的盖板顶部铺设加筋垫层16,安放水平注浆管15,水平注浆管15与柔性可排水桩体3的竖向注浆管2连接,且水平注浆管15引至堤坝17坡脚处。
图2是方形多隔室套管的立体图,图3是方形多隔室套管的横截面图,图4是圆形多隔室套管的立体图,图5是圆形多隔室套管的横截面图。参照图2至图5所示,多隔室套管1可采用单壁或双壁圆管或方管,其材料可采用PVC、PE、HDPE。对于方形套管,刚性桩体可以呈“十”字布置在中轴线上,四角布置柔性桩体,或者可以将刚性桩体4布置在对角线上,四角布置柔性可排水桩体3;对于圆形套管,可以将刚性桩体4、柔性可排水桩体3间隔布置,中部设置成刚性桩体4或者柔性桩体,但附图中仅用于解释,并非限定,总体来说,尽量将柔性桩体布置在套管的外周。多隔室套管1的柔性可排水桩体3的***均匀设置多个排水孔11,并在管外包覆透水性土工织物,形成的土工织物袋6尺寸略大于预制桩尖10的尺寸。
图6多隔室套管复合桩施工工艺示意图,参照图6所示,多隔室套管复合桩的施工方法,包括以下的步骤:
(1)根据设计桩长,采用套管接头12将多隔室套管1连接,并与预制桩尖10连接,多隔室套管1采用9孔PVC方形栅格管,壁厚2.5mm,内孔80×80mm,厚度为25cm;预制桩尖10采用直径33cm圆形钢筋混凝土预制桩尖,采用C30混凝土浇注而成;方形沉管采用外边长为30cm,由厚度为1.2cm钢板焊接而成,方形沉管内净边长27.6cm;
(2)根据预制桩尖10尺寸,在多隔室套管1周围外包土工织物袋6,土工织物布袋6的直径为33cm;
(3)在吊绳14的牵引下将多隔室套管1自沉管13底部放入沉管13内,采用普通沉管桩机,静压辅助振动打入地基中;打设至桩底设计标高后,拔出沉管13,多隔室套管1留在地基内;
(4)待一定区域多隔室套管1集中打设完毕后,在部分隔室内安放竖向注浆管2,然后灌入砂、建筑垃圾或碎石成柔性可排水桩体3,采取固定措施使竖向注浆管位于隔室的中心位置,竖向注浆管2超过盖板9顶标高5cm,并将该隔室顶部用PVC塑料盖封闭。竖向注浆管2是直径2cm的PVC管,管周均匀开孔,在PVC管的两端及中间位置,根据设计埋入深度均匀布置略小于所埋设孔的定位圈;
(5)根据盖板9设计尺寸安放盖板模板或开挖土模;
(6)根据设计要求向套管1部分隔室内灌注细石混凝土或砂浆形成刚性桩体4,灌至顶后,插设桩顶钢筋5;
(7)布设盖板配筋8,并与桩顶插筋5连接后,浇注盖板9;
(8)图7是垫层中水平注浆管布置示意图,参照图7所示,待桩体及盖板达到一定强度后,安放水平注浆管15,并与埋入多隔室套管内的竖向注浆管2连接,将水平注浆管15引至堤坝17坡脚处;
(9)图8是多隔室套管复合桩堤坝示意图,铺设加筋垫层16后,进行堤坝17填筑及预压,在堤坝17填筑过程中竖向注浆管2、水平注浆管15作为排水滤管使用,可采用潜水泵或真空泵进行抽水,若需与真空预压结合,在垫层中铺设不透气的封闭膜;
(10)根据堤坝进入预压期后或运营后的总沉降量、沉降速率、预测工后沉降和地基土体的固结度,对隔室套管内散体材料桩体进行注浆设计,确定浆液指标和注浆桩数,通过竖向注浆管2和水平注浆管15向散体材料柔性可排水桩体内注入水泥浆,散体材料浆固成刚性桩体,同时浆液扩散至多隔室套管外包土工织物袋内形成水泥土7。

Claims (10)

1.多隔室套管复合桩,包括多隔室套管、套管的底部连接预制桩尖,套管的部分隔室内灌入砂砾、建筑垃圾或碎石形成柔性桩体,部分隔室内灌入砂浆或细石混凝土形成刚性桩体,柔性桩体与刚性桩体同体组合;
其中,柔性桩体内预埋竖向注浆管,外周均匀设置排水孔,竖向注浆管由桩体盖板内穿出,该桩体的顶部封闭;
刚性桩体的顶部插设桩顶钢筋,设置盖板配筋后,桩顶钢筋与盖板配筋连接,浇注盖板;
所述的多隔室套管径向贯通,盖板顶部铺设加筋垫层,并安放水平注浆管,水平注浆管与柔性桩体内的竖向注浆管连接,且水平注浆管引至堤坝坡脚处,水平注浆管在排水预压期间作为排水滤管使用。
2.根据权利要求1所述的多隔室套管复合桩,其特征在于,多隔室套管外侧包覆透水性土工织物;柔性桩体内预埋的竖向注浆管沿多隔室套管全桩长埋设或部分桩长埋设。
3.根据权利要求1所述的多隔室套管复合桩,其特征在于所述的多隔室套管为单壁或双壁,材料为PVC、PE或者HDPE。
4.根据权利要求1所述的多隔室套管复合桩,其特征在于所述的多隔室套管为圆管,所述的刚性桩体与柔性桩体沿着圆周间隔布置,中部隔室设置成刚性桩体或柔性桩体。
5.根据权利要求1所述的多隔室套管复合桩,其特征在于所述的多隔室套管为方管,刚性桩体布置在对角线上,四角布置柔性桩体;或者刚性桩体布置在内部,柔性桩体沿着外周布置;或者刚性桩体呈“十”字布置在中轴线上,四角布置柔性桩体。
6.多隔室套管复合桩的施工方法,其特征在于,包括以下的步骤:
根据设计桩长采用接头将多隔室套管连接,并与预制桩尖连接;
根据预制桩尖尺寸,在套管周围外包土工织物袋;
在吊绳的牵引下将多隔室套管自沉管底部放入沉管内,采用沉管桩机,静压辅助振动打入地基中;
待一定区域多隔室套管集中打设完毕后,在部分隔室内安放竖向注浆管后,灌入砂砾、建筑垃圾或碎石,并采取固定措施使竖向注浆管位于隔室的中心位置,并将该隔室顶封闭,形成柔性桩体;
根据盖板设计尺寸安放盖板模板或开挖土模;
根据设计要求向多隔室套管的部分隔室内灌注细石混凝土或砂浆,灌至桩顶后,插设桩顶钢筋,形成刚性桩体;
布设盖板配筋,浇注盖板;
待桩体及盖板强度达标后,铺设加筋垫层,安放水平注浆管,水平注浆管与柔性桩体内的竖向注浆管连接,并将水平注浆管引至堤坝坡脚处;
进行堤坝填筑及预压,在堤坝填筑过程中竖向注浆管、水平注浆管作为排水滤管使用,可采用潜水泵或真空泵进行抽水;
(10)根据堤坝沉降速率,在预压期结束后或运营期间,通过竖向注浆管、水平注浆管向柔性桩体内注入水泥浆液,柔性桩体内的散体材料浆固成为刚性桩体。
7.根据权利要求6所述的多隔室套管复合桩的施工方法,其特征在于多隔室套管外侧包覆透水性土工织物,步骤(10)注入的浆液扩散至外包土工织物袋内形成水泥土。
8.根据权利要求6所述的多隔室套管复合桩的施工方法,其特征在于所述的多隔室套管为单壁或双壁圆管或方管,材料为PVC、PE或者HDPE;柔性桩体内预埋的注浆管沿套管全桩长埋设或部分桩长埋设。
9.根据权利要求6所述的多隔室套管复合桩的施工方法,其特征在于所述的多隔室套管为圆管,所述的刚性桩体与柔性桩体沿着圆周间隔布置,中部隔室设置成刚性桩体或柔性桩体;或者所述的多隔室套管为方管,刚性桩体布置在对角线上,四角布置柔性桩体;或者刚性桩体布置在内部,柔性桩体沿着外周布置;或者刚性桩体呈“十”字布置在中轴线上,四角布置柔性桩体。
10.根据权利要求6所述的多隔室套管复合桩的施工方法,其特征在于在垫层中铺设不透气的封闭膜以与真空预压结合。
CN201110253972.8A 2011-08-31 2011-08-31 多隔室套管复合桩及其施工方法 Expired - Fee Related CN102433876B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110253972.8A CN102433876B (zh) 2011-08-31 2011-08-31 多隔室套管复合桩及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110253972.8A CN102433876B (zh) 2011-08-31 2011-08-31 多隔室套管复合桩及其施工方法

Publications (2)

Publication Number Publication Date
CN102433876A true CN102433876A (zh) 2012-05-02
CN102433876B CN102433876B (zh) 2014-01-29

Family

ID=45982206

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110253972.8A Expired - Fee Related CN102433876B (zh) 2011-08-31 2011-08-31 多隔室套管复合桩及其施工方法

Country Status (1)

Country Link
CN (1) CN102433876B (zh)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102995622A (zh) * 2012-11-14 2013-03-27 河海大学 一种用于处理液化地基的套管排水端承桩及施工方法
CN103061332A (zh) * 2013-01-29 2013-04-24 新宇建设有限公司 内置外包双层排水体与中间混凝土组合桩及施工方法
CN103074891A (zh) * 2013-01-29 2013-05-01 浙江信博城市建设有限公司 双层塑料套管散体材料与混凝土劲芯组合桩及施工方法
CN103243710A (zh) * 2013-05-17 2013-08-14 中国十七冶集团有限公司 一种振动沉管布袋桩
CN103437336A (zh) * 2013-08-27 2013-12-11 武汉中力岩土工程有限公司 一种pvc带孔管碎石桩及其处理软弱地基的方法
CN103510511A (zh) * 2013-09-26 2014-01-15 鸿厦建设有限公司 一种顶部加强型现浇混凝土薄壁管桩及施工方法
CN103790151A (zh) * 2014-01-23 2014-05-14 江苏中瑞路桥建设有限公司 一种软土路基排水预压后封堵结构及施工方法
CN103993598A (zh) * 2014-05-19 2014-08-20 杭州江润科技有限公司 一种引孔植入布袋碎石注浆桩及施工方法
CN104131556A (zh) * 2014-07-22 2014-11-05 冠鲁建设股份有限公司 一种软硬夹层交互地基排水预应力管桩及施工方法
CN104131555A (zh) * 2014-07-21 2014-11-05 冠鲁建设股份有限公司 一种外包透水性钢筋混凝土管碎石注浆桩及其施工方法
CN106240749A (zh) * 2016-07-06 2016-12-21 中国海洋大学 灌浆式吸力锚及其安装方法
CN107577893A (zh) * 2017-09-20 2018-01-12 沙焕焕 劲性复合桩数据计算***
CN108643177A (zh) * 2018-04-16 2018-10-12 上海交通大学 一种水下固结桩及其施工方法
CN108978630A (zh) * 2018-09-29 2018-12-11 上海勘察设计研究院(集团)有限公司 一种带刚性管材的抽水注浆两用复合桩装置及施工方法
CN110700240A (zh) * 2019-09-27 2020-01-17 中国一冶集团有限公司 注浆管桩及注浆管桩的施工方法
CN110896644A (zh) * 2018-09-25 2020-03-20 高永光 全套管钻孔导引预制桩的注浆固结方法及其预制桩
CN111270662A (zh) * 2020-03-05 2020-06-12 安徽安舜水利建设工程有限公司 一种复合地基的施工方法
CN112359815A (zh) * 2020-11-05 2021-02-12 浙江世润建创科技发展有限公司 用于软基处理的干式振冲碎石桩及其施工方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759223B (zh) * 2015-11-19 2019-03-08 五邑大学 可控刚性桩+排水体+加筋垫层组合型复合地基

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU746042A1 (ru) * 1976-01-04 1980-07-07 Всесоюзный Ордена Ленина Проектно- Изыскательский И Научно-Исследовательский Институт "Гидропроект" Им. С.Я.Жука Устройство дл бетонировани свай- оболочек
CN1136622A (zh) * 1995-07-04 1996-11-27 张国梁 地基复合处理方法及其专用设备
CN101525880A (zh) * 2009-02-25 2009-09-09 河海大学 塑料套管混凝土桩及其加固处理软土地基的方法
CN101591904A (zh) * 2008-05-28 2009-12-02 徐立新 先排水预压后注浆排水体复合桩基的加固方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU746042A1 (ru) * 1976-01-04 1980-07-07 Всесоюзный Ордена Ленина Проектно- Изыскательский И Научно-Исследовательский Институт "Гидропроект" Им. С.Я.Жука Устройство дл бетонировани свай- оболочек
CN1136622A (zh) * 1995-07-04 1996-11-27 张国梁 地基复合处理方法及其专用设备
CN101591904A (zh) * 2008-05-28 2009-12-02 徐立新 先排水预压后注浆排水体复合桩基的加固方法
CN101525880A (zh) * 2009-02-25 2009-09-09 河海大学 塑料套管混凝土桩及其加固处理软土地基的方法

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102995622A (zh) * 2012-11-14 2013-03-27 河海大学 一种用于处理液化地基的套管排水端承桩及施工方法
CN103061332B (zh) * 2013-01-29 2015-01-14 新宇建设有限公司 内置外包双层排水体与中间混凝土组合桩及施工方法
CN103061332A (zh) * 2013-01-29 2013-04-24 新宇建设有限公司 内置外包双层排水体与中间混凝土组合桩及施工方法
CN103074891A (zh) * 2013-01-29 2013-05-01 浙江信博城市建设有限公司 双层塑料套管散体材料与混凝土劲芯组合桩及施工方法
CN103074891B (zh) * 2013-01-29 2015-07-15 浙江信博城市建设有限公司 双层塑料套管散体材料与混凝土劲芯组合桩及施工方法
CN103243710A (zh) * 2013-05-17 2013-08-14 中国十七冶集团有限公司 一种振动沉管布袋桩
CN103437336A (zh) * 2013-08-27 2013-12-11 武汉中力岩土工程有限公司 一种pvc带孔管碎石桩及其处理软弱地基的方法
CN103510511A (zh) * 2013-09-26 2014-01-15 鸿厦建设有限公司 一种顶部加强型现浇混凝土薄壁管桩及施工方法
CN103510511B (zh) * 2013-09-26 2015-05-27 鸿厦建设有限公司 一种顶部加强型现浇混凝土薄壁管桩及施工方法
CN103790151A (zh) * 2014-01-23 2014-05-14 江苏中瑞路桥建设有限公司 一种软土路基排水预压后封堵结构及施工方法
CN103790151B (zh) * 2014-01-23 2016-08-31 神州建设集团有限公司 一种软土路基排水预压后封堵结构及施工方法
CN103993598A (zh) * 2014-05-19 2014-08-20 杭州江润科技有限公司 一种引孔植入布袋碎石注浆桩及施工方法
CN103993598B (zh) * 2014-05-19 2015-10-07 杭州江润科技有限公司 一种引孔植入布袋碎石注浆桩及施工方法
CN104131555A (zh) * 2014-07-21 2014-11-05 冠鲁建设股份有限公司 一种外包透水性钢筋混凝土管碎石注浆桩及其施工方法
CN104131555B (zh) * 2014-07-21 2016-06-08 杭州江润科技有限公司 一种外包透水性钢筋混凝土管碎石注浆桩及其施工方法
CN104131556A (zh) * 2014-07-22 2014-11-05 冠鲁建设股份有限公司 一种软硬夹层交互地基排水预应力管桩及施工方法
CN104131556B (zh) * 2014-07-22 2016-03-30 杭州江润科技有限公司 一种软硬夹层交互地基排水预应力管桩的施工方法
CN106240749A (zh) * 2016-07-06 2016-12-21 中国海洋大学 灌浆式吸力锚及其安装方法
CN107577893A (zh) * 2017-09-20 2018-01-12 沙焕焕 劲性复合桩数据计算***
CN108643177A (zh) * 2018-04-16 2018-10-12 上海交通大学 一种水下固结桩及其施工方法
CN110896644A (zh) * 2018-09-25 2020-03-20 高永光 全套管钻孔导引预制桩的注浆固结方法及其预制桩
CN110896644B (zh) * 2018-09-25 2021-04-09 高永光 全套管钻孔导引预制桩的注浆固结方法
CN108978630A (zh) * 2018-09-29 2018-12-11 上海勘察设计研究院(集团)有限公司 一种带刚性管材的抽水注浆两用复合桩装置及施工方法
CN110700240A (zh) * 2019-09-27 2020-01-17 中国一冶集团有限公司 注浆管桩及注浆管桩的施工方法
CN111270662A (zh) * 2020-03-05 2020-06-12 安徽安舜水利建设工程有限公司 一种复合地基的施工方法
CN112359815A (zh) * 2020-11-05 2021-02-12 浙江世润建创科技发展有限公司 用于软基处理的干式振冲碎石桩及其施工方法

Also Published As

Publication number Publication date
CN102433876B (zh) 2014-01-29

Similar Documents

Publication Publication Date Title
CN102433876B (zh) 多隔室套管复合桩及其施工方法
CN103074891B (zh) 双层塑料套管散体材料与混凝土劲芯组合桩及施工方法
CN103233454B (zh) 湿陷性黄土地基的砂桩浸水真空预压及注浆处理方法
CN103526770B (zh) 一种高防渗抗浮桩筏结构的施工方法
CN204059124U (zh) 一种砂桩排水强夯后注浆地基加固结构
CN104131555B (zh) 一种外包透水性钢筋混凝土管碎石注浆桩及其施工方法
CN101532290B (zh) 加固软土地基的带孔波纹塑料套管粒料注浆桩及加固方法
CN102995599B (zh) 湿陷性黄土输水渠道的抗冻防渗导水治理方法
CN104005404B (zh) 一种外包活性材料桩体的预应力管桩及施工方法
CN203924036U (zh) 一种外包活性材料桩体的预应力管桩
CN108560542B (zh) 一种废旧轮胎包覆建渣的双向增强体及其施工方法
CN203393530U (zh) 一种抗浮轻质高路堤结构
CN106759223B (zh) 可控刚性桩+排水体+加筋垫层组合型复合地基
CN101220589B (zh) 土工袋与动力挤密综合加固软土地基的方法
CN107217683B (zh) 一种排水管道基础充填防渗防塌结构及其施工方法
CN109797769A (zh) 一种湿陷性黄土地区地下综合管廊地基结构及其施工方法
CN204000851U (zh) 一种外包透水性钢筋混凝土管碎石注浆桩
CN203594041U (zh) 一种高防渗抗浮桩筏结构
CN104480956B (zh) 一种小直径模袋混凝土桩复合地基
CN103061332B (zh) 内置外包双层排水体与中间混凝土组合桩及施工方法
CN203066064U (zh) 双层塑料套管散体材料与混凝土劲芯组合桩
CN102322055A (zh) 防止检查井周围路面沉降的构造及施工方法
CN101793027A (zh) 一种桩心注浆静压锚杆桩
CN105756100A (zh) 地下室后浇带***及其制备方法
CN108914959B (zh) 一种适用于山区房建的基础结构及其施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: HWAKING CONSTRUCTION GROUP CO., LTD.

Effective date: 20121220

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Wang Xinquan

Inventor after: Shi Haotian

Inventor after: Zhang Jun

Inventor after: Yue Kefeng

Inventor after: Chen Chunlai

Inventor after: Wang Hang

Inventor after: Chen Yonghui

Inventor after: Xu Jianjun

Inventor after: Chen Long

Inventor after: Jin Haibo

Inventor after: Chen Geng

Inventor before: Wang Xinquan

Inventor before: Chen Yonghui

Inventor before: Chen Long

Inventor before: Chen Geng

Inventor before: Zhang Jun

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WANG XINQUAN CHEN YONGHUI CHEN LONG CHEN GENG ZHANG JUN TO: WANG XINQUAN LE KEFENG CHEN CHUNLAI WANG HANG CHEN YONGHUI XU JIANJUN CHEN LONG JIN HAIBO CHEN GENG SHI HAOTIAN ZHANG JUN

TA01 Transfer of patent application right

Effective date of registration: 20121220

Address after: Zhejiang University City College No. 50 Huzhou street Hangzhou city Zhejiang province 310015 2-315

Applicant after: Zhejiang University City College

Applicant after: HWAKING CONSTRUCTION GROUP Co.,Ltd.

Address before: Zhejiang University City College No. 50 Huzhou street Hangzhou city Zhejiang province 310015 2-315

Applicant before: Zhejiang University City College

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140129