CN103758362B - 既有砌体建筑后增圈梁、构造柱及钢拉杆的抗震加固方法 - Google Patents

既有砌体建筑后增圈梁、构造柱及钢拉杆的抗震加固方法 Download PDF

Info

Publication number
CN103758362B
CN103758362B CN201410007481.9A CN201410007481A CN103758362B CN 103758362 B CN103758362 B CN 103758362B CN 201410007481 A CN201410007481 A CN 201410007481A CN 103758362 B CN103758362 B CN 103758362B
Authority
CN
China
Prior art keywords
pull rod
reinforcing
reinforcing pull
reinforced concrete
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410007481.9A
Other languages
English (en)
Other versions
CN103758362A (zh
Inventor
董有
甄进平
吴保光
郑方昊遐
李薇
杨娜茵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Rongda Xingye Building Materials Co., Ltd.
Original Assignee
BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd filed Critical BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201410007481.9A priority Critical patent/CN103758362B/zh
Publication of CN103758362A publication Critical patent/CN103758362A/zh
Application granted granted Critical
Publication of CN103758362B publication Critical patent/CN103758362B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

本发明涉及一种既有砌体建筑后增圈梁、构造柱及钢拉杆的抗震加固方法,属于抗震加固技术领域。具体方法为:在既有砌筑建筑横墙外侧架设钻孔设备在拟设钢拉杆部位通过在墙体内长距离水平钻孔,然后孔内穿钢拉杆,然后在孔内注聚合物砂浆,最后进行后增钢筋混凝土构造柱以及后增钢筋混凝土圈梁的钢筋绑扎,浇注混凝土。本发明能增强墙体整体性,减少地震力对上部结构造成的破坏,不入户实现对砌体抗震性能较大提高,而且施工简单,造价低,且应用范围广泛,适用于实心砖墙、多孔砖墙、空斗砖墙、空心砌块墙、条石砌筑墙、毛石墙。

Description

既有砌体建筑后增圈梁、构造柱及钢拉杆的抗震加固方法
技术领域
本发明涉及一种抗震加固施工方法,特别是一种既有砌体建筑后增圈梁、构造柱及钢拉杆的抗震加固方法,属于抗震加固技术领域。
背景技术
目前,中国既有住宅、农宅抗震加固开始启动,在既有居住建筑加固期间,百姓不愿意让入户施工,这使得目前部分工程所设计的外套加固技术(外墙外侧对横墙增加附加钢筋混凝土外套圈梁构造柱)所需穿楼钢拉杆等需入户加固施工技术难以实现,钢拉杆的缺失严重影响外套加固技术的整体性。
发明内容
为了解决上述问题,本发明提出了一种墙体内后增钢拉杆抗震加固技术——既有砌体建筑后增圈梁、构造柱及钢拉杆的抗震加固方法。其无需破坏外貌、室内装饰,无需入户施工,全部外部作业形成外套加固技术所需钢拉杆杆件,保证既有砌筑建筑外套加固整体性效果,能够大幅提高既有建筑的抗震性能,避免了传统钢拉杆占用室内空间、影响美观、室内操作等一系列为住户所不愿意接受的问题。
本发明的技术方案如下:
一种既有砌体建筑后增圈梁、构造柱及钢拉杆的抗震加固方法,包括原纵墙和原横墙,在所述原横墙中设置有通长水平钻孔,所述通长水平钻孔内穿设有钢拉杆,所述钢拉杆与所述通长水平钻孔间灌注有聚合物砂浆;所述原横墙的两端的原纵墙上设置有后增钢筋混凝土构造柱,每层所述后增钢筋混凝土构造柱的顶部、靠近楼板的底部位置连接设置有后增钢筋混凝土圈梁,所述钢拉杆两端伸出通长水平钻孔外并通过钢拉杆端头埋件锚固在后增钢筋混凝土圈梁及后增钢筋混凝土构造柱内,其特征在于:采用如下步骤:
步骤一:对既有砌体建筑原纵墙和原横墙进行鉴定,设计钻孔位置、孔径大小、钻孔距离以及钢拉杆的规格直径、及内部聚合物砂浆强度,钢拉杆选取位置靠近楼板,现场测量标记钻孔位置;
步骤二:搭设脚手架后搭设施工平台,选择钻孔设备,由顶层开始由上至下逐层进行钻孔施工;
步骤三:顶层钻孔完毕后穿入钢拉杆,将钢拉杆架立居中,将钢拉杆端部锚固部分架立支撑;
步骤四:在钻孔两端封口,架设高压注浆机向钻孔内注聚合物砂浆,水平注聚合物砂浆时应注意两端不要漏浆,注聚合物砂浆完毕后对注浆口处进行封堵,安装钢拉杆端头埋件;
步骤五:待聚合物砂浆终凝后进行下一层钻孔、穿入钢拉杆、注聚合物砂浆以及安装钢拉杆端头埋件的施工步骤;
步骤六:待所有层施工完毕后开始进行后增钢筋混凝土构造柱以及后增钢筋混凝土圈梁的钢筋绑扎,由下至上逐层进行施工,一层内钢筋绑扎全部完毕后进行支模、浇注混凝土,浇注顺序为先浇注后增钢筋混凝土构造柱,再浇注后增钢筋混凝土圈梁,从而将钢拉杆两端锚固在后增钢筋混凝土圈梁及后增钢筋混凝土构造柱内;
步骤七:所有工程完毕后对施工内容进行验收。
进一步地,所述通长水平钻孔直径为40mm至150mm。
进一步地,所述钢拉杆位于通长水平钻孔横截面正中,所述通长水平钻孔位于原横墙横向居中位置。
进一步地,所述钢拉杆为钢筋或钢绞线,特别是,所述钢拉杆采用钢筋时,钢筋之间的连接采用搭接或焊接的形式。
其中,孔内注聚合物砂浆,聚合物砂浆采用高压注浆泵注入,需孔内饱满,聚合物砂浆强度根据设计选取。同时,钻孔位置及截面大小根据设计确定,且钢筋或钢绞线规格型号由设计确定。
有益效果:
本发明能增强砌筑建筑外套加固整体性效果和实现远距离免入户构件间拉结。地震时将约束墙体裂缝开展,增强墙体整体性,减少地震力对上部结构造成的破坏。本发明不入户实现对砌体抗震性能较大提高而且施工速度快,施工简单,造价低。本发明应用范围适用于实心砖墙、多孔砖墙、空心砌块墙、空斗砖墙、条石砌筑墙、毛石墙。本发明实施具有较高的经济效益和社会效益。
附图说明
图1为本发明后增圈梁、构造柱及钢拉杆布置平面图;
图2为图1的剖视图;
图3为图1的剖视图;
图4为图2的处放大图;
图5为图3的处放大图。
图中,1、后增钢筋混凝土构造柱;2、楼板;3、钢拉杆;4、后增钢筋混凝土圈梁;6、聚合物砂浆;7、原纵墙;8、原横墙;9、钢拉杆端头埋件。
具体实施方式
一种既有砌体建筑后增圈梁、构造柱及钢拉杆的抗震加固方法,参见图1至5所示,包括原纵墙7、原横墙8,还包括原横墙8中的通长水平钻孔、孔内穿钢拉杆3、孔内注聚合物砂浆6,所述在既有砌体建筑外部架设钻孔设备在拟设钢拉杆3部位通过在原横墙8内长距离水平钻孔,然后孔内穿钢拉杆3,然后在孔内注聚合物砂浆6形成钢拉杆3约束杆件增强砌体建筑整体性的抗震加固技术。水平钻孔采用专用设备,钻孔位置位于原横墙8横向居中,钻孔大小需根据设计确定,在40mm至150mm之间。孔内穿钢拉杆3,若使用钢筋则采用搭接或焊接,长度为与孔纵向长度相同,钢拉杆3位于钻孔横截面正中。孔内注聚合物砂浆6,聚合物砂浆6采用高压注浆泵注入,需孔内饱满,聚合物砂浆6强度根据设计选取。最后形成钢拉杆3约束杆件增强砌体建筑整体性的抗震加固技术。在原横墙8的两端的原纵墙7上设置有后增钢筋混凝土构造柱1,每层后增钢筋混凝土构造柱1的顶部、靠近楼板2的底部位置连接设置有后增钢筋混凝土圈梁4,钢拉杆3两端伸出通长水平钻孔外并通过钢拉杆端头埋件9锚固在后增钢筋混凝土圈梁4及后增钢筋混凝土构造柱1内。参见图3和图5,所述钢拉杆3为钢筋或钢绞线。
钢拉杆3端部通过钢拉杆端头埋件9锚固于后增钢筋混凝土圈梁4内,其钢拉杆端头埋件9型号以及尺寸依据设计而定,参见图4。
其具体施工方法采用如下步骤:
步骤一:对既有砌体建筑原纵墙7和原横墙8进行鉴定,设计钻孔位置、孔径大小、钻孔距离以及钢拉杆3的规格直径、及内部聚合物砂浆6强度,钢拉杆3选取位置靠近楼板2,现场测量标记钻孔位置;
步骤二:搭设脚手架后搭设施工平台,选择钻孔设备,由顶层开始由上至下逐层进行钻孔施工;
步骤三:顶层钻孔完毕后穿入钢拉杆3,将钢拉杆3架立居中,将钢拉杆3端部锚固部分架立支撑;
步骤四:在钻孔两端封口,架设高压注浆机向钻孔内注聚合物砂浆6,水平注聚合物砂浆6时应注意两端不要漏浆,注聚合物砂浆6完毕后对注浆口处进行封堵,安装钢拉杆端头埋件9;
步骤五:待聚合物砂浆6终凝后进行下一层钻孔、穿入钢拉杆3、注聚合物砂浆6以及安装钢拉杆端头埋件9的施工步骤;
步骤六:待所有层施工完毕后开始进行后增钢筋混凝土构造柱1以及后增钢筋混凝土圈梁4的钢筋绑扎,由下至上逐层进行施工,一层内钢筋绑扎全部完毕后进行支模、浇注混凝土,浇注顺序为先浇注后增钢筋混凝土构造柱1,再浇注后增钢筋混凝土圈梁4,从而将钢拉杆3两端锚固在后增钢筋混凝土圈梁4及后增钢筋混凝土构造柱1内;
步骤七:所有工程完毕后对施工内容进行验收。
以上是本发明的一典型实施方式,本发明的具体实施不限于此。

Claims (1)

1.一种既有砌体建筑后增圈梁、构造柱及钢拉杆的抗震加固方法,包括原纵墙(7)和原横墙(8),在所述原横墙(8)中设置有通长水平钻孔,所述通长水平钻孔内穿设有钢拉杆(3),所述钢拉杆(3)与所述通长水平钻孔间灌注有聚合物砂浆(6);所述原横墙(8)的两端的原纵墙(7)上设置有后增钢筋混凝土构造柱(1),每层所述后增钢筋混凝土构造柱(1)的顶部、靠近楼板(2)的底部位置连接设置有后增钢筋混凝土圈梁(4),所述钢拉杆(3)两端伸出通长水平钻孔外并通过钢拉杆端头埋件(9)锚固在后增钢筋混凝土圈梁(4)及后增钢筋混凝土构造柱(1)内,其特征在于:采用如下步骤:
步骤一:对既有砌体建筑原纵墙(7)和原横墙(8)进行鉴定,设计钻孔位置、孔径大小、钻孔距离以及钢拉杆(3)的规格直径、及内部聚合物砂浆(6)强度,钢拉杆(3)选取位置靠近楼板(2),现场测量标记钻孔位置;
步骤二:搭设脚手架后搭设施工平台,选择钻孔设备,由顶层开始由上至下逐层进行钻孔施工;
步骤三:顶层钻孔完毕后穿入钢拉杆(3),将钢拉杆(3)架立居中,将钢拉杆(3)端部锚固部分架立支撑;
步骤四:在钻孔两端封口,架设高压注浆机向钻孔内注聚合物砂浆(6),水平注聚合物砂浆(6)时应注意两端不要漏浆,注聚合物砂浆(6)完毕后对注浆口处进行封堵,安装钢拉杆端头埋件(9);
步骤五:待聚合物砂浆(6)终凝后进行下一层钻孔、穿入钢拉杆(3)、注聚合物砂浆(6)以及安装钢拉杆端头埋件(9)的施工步骤;
步骤六:待所有层施工完毕后开始进行后增钢筋混凝土构造柱(1)以及后增钢筋混凝土圈梁(4)的钢筋绑扎,由下至上逐层进行施工,一层内钢筋绑扎全部完毕后进行支模、浇注混凝土,浇注顺序为先浇注后增钢筋混凝土构造柱(1),再浇注后增钢筋混凝土圈梁(4),从而将钢拉杆(3)两端锚固在后增钢筋混凝土圈梁(4)及后增钢筋混凝土构造柱(1)内;
步骤七:所有工程完毕后对施工内容进行验收;
其中,所述通长水平钻孔直径为40mm至150mm;
所述钢拉杆(3)位于钻孔横截面正中,所述通长水平钻孔位于原横墙(8)横向居中位置;
所述钢拉杆(3)为钢筋或钢绞线;
所述钢拉杆(3)采用钢筋时,钢筋之间的连接采用搭接或焊接的形式。
CN201410007481.9A 2014-01-06 2014-01-06 既有砌体建筑后增圈梁、构造柱及钢拉杆的抗震加固方法 Active CN103758362B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410007481.9A CN103758362B (zh) 2014-01-06 2014-01-06 既有砌体建筑后增圈梁、构造柱及钢拉杆的抗震加固方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410007481.9A CN103758362B (zh) 2014-01-06 2014-01-06 既有砌体建筑后增圈梁、构造柱及钢拉杆的抗震加固方法

Publications (2)

Publication Number Publication Date
CN103758362A CN103758362A (zh) 2014-04-30
CN103758362B true CN103758362B (zh) 2016-05-04

Family

ID=50525668

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410007481.9A Active CN103758362B (zh) 2014-01-06 2014-01-06 既有砌体建筑后增圈梁、构造柱及钢拉杆的抗震加固方法

Country Status (1)

Country Link
CN (1) CN103758362B (zh)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888091A (zh) * 2014-11-27 2016-08-24 王振牛 一种永乐宫壁画体系防地震及背面维护技术方案
CN105421810B (zh) * 2015-12-17 2023-11-21 新疆彦鑫建筑安装工程有限责任公司 一种预制墙板加固砌体结构及其施工方法
CN105604344B (zh) * 2016-02-28 2018-01-30 叶香竹 一种有裂缝内墙的加固方法
CN110067401A (zh) * 2019-03-25 2019-07-30 北京筑福国际抗震技术有限责任公司 一种既有砌体结构采用装配式预制板墙加固及其施工方法
CN110748186A (zh) * 2019-10-25 2020-02-04 徐子泰 一种旧楼改造节能施工工艺
CN111101730A (zh) * 2019-12-31 2020-05-05 中震(北京)工程检测股份有限公司 一种预制楼板预留孔采用穿钢拉杆加固砌体结构及其施工方法
CN113719151A (zh) * 2021-10-08 2021-11-30 北京六建集团有限责任公司 一种不入户加固改造的钻孔注浆施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000336945A (ja) * 1999-06-01 2000-12-05 Kajima Corp 無補強・無アンカーの耐震補強壁の施工法
CN201391093Y (zh) * 2009-04-14 2010-01-27 福州大学 设有构造柱与圈梁的砖混结构预应力抗震体系加固装置
JP2011006947A (ja) * 2009-06-26 2011-01-13 Takenaka Komuten Co Ltd 組積造壁の補強構造、組積造壁、組積造構造物、及び組積造壁の補強工法
CN101963002A (zh) * 2010-09-17 2011-02-02 浙江大学 强震下增强抗倒塌能力和整体性的砌体结构及方法
CN202530630U (zh) * 2012-03-31 2012-11-14 西安工业大学 一种加固砖混结构的构造柱
CN102864945A (zh) * 2012-10-11 2013-01-09 北京筑福建设工程有限责任公司 一种砂浆锚杆砌体加固结构及其加固方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000336945A (ja) * 1999-06-01 2000-12-05 Kajima Corp 無補強・無アンカーの耐震補強壁の施工法
CN201391093Y (zh) * 2009-04-14 2010-01-27 福州大学 设有构造柱与圈梁的砖混结构预应力抗震体系加固装置
JP2011006947A (ja) * 2009-06-26 2011-01-13 Takenaka Komuten Co Ltd 組積造壁の補強構造、組積造壁、組積造構造物、及び組積造壁の補強工法
CN101963002A (zh) * 2010-09-17 2011-02-02 浙江大学 强震下增强抗倒塌能力和整体性的砌体结构及方法
CN202530630U (zh) * 2012-03-31 2012-11-14 西安工业大学 一种加固砖混结构的构造柱
CN102864945A (zh) * 2012-10-11 2013-01-09 北京筑福建设工程有限责任公司 一种砂浆锚杆砌体加固结构及其加固方法

Also Published As

Publication number Publication date
CN103758362A (zh) 2014-04-30

Similar Documents

Publication Publication Date Title
CN103758362B (zh) 既有砌体建筑后增圈梁、构造柱及钢拉杆的抗震加固方法
CN107587506A (zh) 一种预制预应力锚杆杆件及施工工法
CN103510540B (zh) 浆砌片石挡土墙加固施工方法及其结构
CN103498574B (zh) 砌筑墙体内后增芯柱抗震加固方法
CN107201909B (zh) 膨胀土隧道支护结构及方法
CN103898916A (zh) 迷你桩复合式支挡结构及施工方法
CN103603379A (zh) 抗浮水泥土桩和抗浮锚杆相结合的抗浮体系及其施工工艺
CN103911989B (zh) 一种带有护壁的水下浇筑根式基础及其施工方法
CN102345292B (zh) 一种带有扩大头的复合预应力抗拔桩
CN103758361B (zh) 既有建筑后增短肢墙和钢拉杆的抗震加固施工方法
CN104294823B (zh) 一种预应力管桩抗浮桩筏结构的施工方法
CN204040026U (zh) 用于强腐蚀环境的预制套筒—灌注组合桩
CN103410144B (zh) 预应力钢筋嵌岩灌注桩及施工方法
CN204662494U (zh) 一种公路挡土墙加固结构
CN102220764B (zh) 深基坑支护体系的施工方法
CN103498567B (zh) 砌筑墙体内后增暗圈梁抗震加固方法及其加固结构
CN104775429B (zh) 一种置于混凝土面板内的锚头及其施工方法
CN203613568U (zh) 抗浮水泥土桩和抗浮锚杆相结合的抗浮体系
CN106480878A (zh) 一种上、下部扩大型水泥土复合管桩
CN103741961B (zh) 既有建筑预制圆孔板后增销键暗梁抗震加固方法
RU2367743C2 (ru) Фундамент
CN205577430U (zh) 地上大体量劲性柱体溜球式导管串管混凝土浇筑结构
CN105064411B (zh) 一种地下构筑物墙板后浇膨胀加强带的构筑方法
CN204401627U (zh) 对拉式预应力管桩基坑支护结构
CN103911990B (zh) 一种带有护壁的水下浇筑式管柱及其施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20171229

Address after: 102600, room 2, building 2212, pop Center, Xinghua street, Beijing, Daxing District

Patentee after: Beijing Yong Bo Science and Technology Ltd.

Address before: 100043 building Fu International, No. 69, earthquake resistant garden, 1 Yang Zhuang Avenue, Beijing, Shijingshan District

Patentee before: Beijing Aeido International Engineering Technology Co., Ltd.

CB03 Change of inventor or designer information

Inventor after: Dong You

Inventor after: Li Wei

Inventor after: Diao Runxin

Inventor after: Zhang Ying

Inventor after: Wang Lian

Inventor after: Zhang Yongqiang

Inventor after: Wang Shunwei

Inventor after: Fan Shaofei

Inventor after: Zhou Nanbin

Inventor after: Wang Wei

Inventor after: Shang Yuanjun

Inventor after: Zhen Jinping

Inventor after: Fan Juan

Inventor after: Xiong Deqiang

Inventor after: Zhao Ying

Inventor after: Song Yu

Inventor after: Chang Yana

Inventor after: Xu Mingwei

Inventor after: Zhao Yongming

Inventor after: Wu Baoguang

Inventor after: ZHENG-FANG Haoxia

Inventor after: Yang Nayin

Inventor after: Wang Shiliang

Inventor after: Xu Changli

Inventor after: Ao Wen

Inventor before: Dong You

Inventor before: Zhen Jinping

Inventor before: Wu Baoguang

Inventor before: ZHENG-FANG Haoxia

Inventor before: Li Wei

Inventor before: Yang Nayin

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20180320

Address after: 300450 Tianjin Development Zone Olympic road No. 11 -2-2-315

Patentee after: Tianjin Construction Engineering Group Building Design Co., Ltd.

Address before: 102600, room 2, building 2212, pop Center, Xinghua street, Beijing, Daxing District

Patentee before: Beijing Yong Bo Science and Technology Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200115

Address after: No. 548, zhangzikou village, Yangsong Town, Huairou District, Beijing

Patentee after: Beijing Rongda Xingye Building Materials Co., Ltd.

Address before: 300450 Tianjin Development Zone Olympic road No. 11 -2-2-315

Patentee before: Tianjin Construction Engineering Group Building Design Co., Ltd.

TR01 Transfer of patent right