CN103696573B - The quick keeper of reinforcing bar binding - Google Patents

The quick keeper of reinforcing bar binding Download PDF

Info

Publication number
CN103696573B
CN103696573B CN201310638795.4A CN201310638795A CN103696573B CN 103696573 B CN103696573 B CN 103696573B CN 201310638795 A CN201310638795 A CN 201310638795A CN 103696573 B CN103696573 B CN 103696573B
Authority
CN
China
Prior art keywords
reinforcing bar
keeper
installing plate
quick
locating groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310638795.4A
Other languages
Chinese (zh)
Other versions
CN103696573A (en
Inventor
周光强
张洪
戴书学
杨永宏
刘经国
苏怀平
孙志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
CCCC Fourth Harbor Engineering Co Ltd
China Communications 2nd Navigational Bureau 2nd Engineering Co Ltd
No 2 Engineering Co of CCCC Fourth Harbor Engineering Co Ltd
Original Assignee
CCCC Second Harbor Engineering Co
CCCC Fourth Harbor Engineering Co Ltd
China Communications 2nd Navigational Bureau 2nd Engineering Co Ltd
No 2 Engineering Co of CCCC Fourth Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co, CCCC Fourth Harbor Engineering Co Ltd, China Communications 2nd Navigational Bureau 2nd Engineering Co Ltd, No 2 Engineering Co of CCCC Fourth Harbor Engineering Co Ltd filed Critical CCCC Second Harbor Engineering Co
Priority to CN201310638795.4A priority Critical patent/CN103696573B/en
Publication of CN103696573A publication Critical patent/CN103696573A/en
Application granted granted Critical
Publication of CN103696573B publication Critical patent/CN103696573B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of quick keeper of reinforcing bar binding, particularly relate to and a kind of realized respectively treating that assembling reinforcement carries out the quick keeper quickly positioned by locating groove.This quick keeper has an installing plate, and on this installing plate, one or both sides are provided with multiple locating groove.The present invention adopts the design of locating groove, this installation draw-in groove is arranged according to pre-designed arrangement positions and dimensions, each reinforcing bar needing colligation can be carried out the location before colligation, the spacing that locating groove treats assembling reinforcement is relied on to be controlled, make the produced cumulative errors of reinforcing bar placement to share to eliminate one by one in each locating groove, quickly correct can carry out reinforcement installation, can guarantee that again bar spacing deviation fully meets code requirement, make the lashing location of reinforcing bar meet detail design requirement accurately;Accuracy guarantee rate is high;It is greatly improved the quality of steel reinforcement cage colligation, makes steel reinforcement cage colligation construction be capable of standardization, batch production.

Description

The quick keeper of reinforcing bar binding
Technical field
The present invention relates to a kind of quick keeper of reinforcing bar binding, particularly relate to and a kind of realized respectively treating that assembling reinforcement carries out the quick keeper quickly positioned by locating groove.
Background technology
At present, for steel reinforcement cage technology for binding, constructing especially for large volume steel reinforcement cage colligation, generally adopt the design of colligation platform, reinforcing bar is placed in advance on colligation platform by workman by the Position Approximate of designing requirement;The lashing location of each reinforcing bar is looked after and guided one by one again through the pre-indexing being indicated on steel pipe;The process of this kind of colligation location is relatively more random, and binding precision is also very low, is more especially positioned at the reinforcing bar of small space, it is positioned difficulty bigger;Once there is positioning precision deviation, then rectification of doing over again takes time and effort, and is unfavorable for batch production, standardized construction.Along with instantly become more meticulous construction carry out in an all-round way, demand a series of can guaranteed efficiency, save manpower, standard, tooling device attractive in appearance and component can be accomplished again.
Therefore, for above deficiency, the present invention is badly in need of providing a kind of quick keeper of new reinforcing bar binding.
Summary of the invention
It is an object of the invention to provide a kind of quick keeper of reinforcing bar binding, this reinforcing bar binding is realized respectively treating that assembling reinforcement carries out the purpose of quickly location by locating groove with quick keeper.
It is an object of the invention to be achieved through the following technical solutions: a kind of quick keeper of reinforcing bar binding, have an installing plate, on this installing plate, one or both sides are provided with multiple locating groove.
Further, described locating groove is arranged on described installing plate edge, and arranges along described installing plate length direction order.
Further, the rectangular setting of the notch of described locating groove.
Further, described installing plate is provided with multiple for the para-position hole slot with described fastener for connection.
Further, described para-position hole slot is rectangle hole slot, and is horizontally disposed with along described installing plate length direction.
Further, described installing plate is made up of the installing plate pipe nipple that multiple head and the tail are connected in order.
The present invention compared with prior art has the advantage that
1, the present invention adopts the design of locating groove, this installation draw-in groove is arranged according to pre-designed arrangement positions and dimensions, each reinforcing bar needing colligation can be carried out the location before colligation, the spacing that locating groove treats assembling reinforcement is relied on to be controlled, make the produced cumulative errors of reinforcing bar placement to share to eliminate one by one in each locating groove, quickly correct can carry out reinforcement installation, can guarantee that again bar spacing deviation fully meets code requirement, make the lashing location of reinforcing bar meet detail design requirement accurately;Accuracy guarantee rate is high;It is greatly improved the quality of steel reinforcement cage colligation, makes steel reinforcement cage colligation construction be capable of standardization, batch production.
2, the present invention adopts the rectangular setting of notch of locating groove, can after reinforcing bar binding, by removing bolt, quick keeper is made to rely on self gravitation naturally to come off from steel pipe, without the quick keeper dismounting difficulty that notch and Fast detachable unit cause because of lodge occurs.It addition, for preventing the width of notch to be suitably larger than the diameter of reinforcing bar, and the degree of depth of notch is not more than the radius of reinforcing bar, in order to avoid causing locating groove cannot take out stuck for reinforcing bar.
3, para-position hole slot of the present invention adopts the design of rectangle hole slot, can pass through para-position hole slot and coordinate the relative position adjusted between steel pipe and installing plate with bolt;Effectively adjust the dislocation between quick keeper and steel pipe;So that be placed on the reinforcing bar in locating groove and between steel pipe relative binding position obtain accurate adjustment.Para-position hole slot described in the present embodiment adopts and arranges in pairs, adopts such design, and the relative position between reinforcing bar and steel pipe, time bigger with designing requirement deviation;When namely needing the length of reinforcement location more than one para-position hole slot of adjustment, next adjacent para-position hole slot will be used instead and proceed to adjust.
4, the present invention adopts the design of installing plate pipe nipple, and quick keeper can be made to adapt to the steel pipe needs of different specification size;Owing to the colligation space ratio of effective reinforcement component is narrow, therefore adopt installing plate short circuit can realize the purpose that segmentation is installed, enable the installation corresponding to the steel pipe on colligation platform fast and accurately of quick keeper;And the transport of fast and easy keeper and moving;Reduce difficulty of construction, improve work efficiency.
5, the present invention adopts installing plate both sides to arrange the design of locating groove, and quick keeper can be made to adapt to the needs of reinforcing bar binding construction widely;The locating groove of both sides can be configured according to identical colligation design, it is also possible to is be configured according to different colligation designs;When adopting identical colligation design to be configured, when the locating groove of side damages wherein, for ensureing positioning precision, when upper once colligation positions, the reversing of quick keeper can be used, utilize the locating groove of its opposite side to position;Improve the utilization ratio of the quick keeper of the present invention, save the cost of colligation construction.
When adopting different colligation design to be configured;After the colligation construction of reinforcing bar location is terminated by the locating groove utilizing wherein side, when to next group reinforcing bar location colligation construction, quick keeper can be reversed and uses, utilize the locating groove of its opposite side to carry out next group reinforcing bar location colligation construction;Realize the position fixing process to twice reinforcing bar binding construction by a quick keeper, improve the utilization ratio of the quick keeper of the present invention, save the cost of colligation construction.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described.
Fig. 1 is the structural representation (front view) of the embodiment of the present invention one;
Fig. 2 is the structural representation (side view) of the embodiment of the present invention one;
Fig. 3 is the structural representation (front view) of the embodiment of the present invention two.
Detailed description of the invention
Embodiment one
Shown in Fig. 1, Fig. 2, the quick keeper of a kind of reinforcing bar binding of the present invention, there is an installing plate 2 for installation corresponding to the steel pipe 1 on steel reinforcement cage colligation platform, be provided with in the upside of this installing plate for disposable multiple locating grooves 3 that a plurality of reinforcing bar is carried out colligation location.The material of installing plate described in the present embodiment adopts compared with steel plate or other on-deformable hard material, and is fabricated to be applicable to the locating groove that practice of construction design needs on this installing plate by lathe.Adopt the quick keeper of this kind of reinforcing bar binding to solve to be applicable to narrow space, a nothing individually support system, different bar spacing in steel reinforcement cage process of binding, can quickly pacify the technical problem torn open.
The present invention adopts the design of locating groove, this installation draw-in groove is arranged according to pre-designed arrangement positions and dimensions, each reinforcing bar needing colligation can be carried out the location before colligation, the spacing that locating groove treats assembling reinforcement is relied on to be controlled, make the produced cumulative errors of reinforcing bar placement to share to eliminate one by one in each locating groove, quickly correct can carry out reinforcement installation, can guarantee that again bar spacing deviation fully meets code requirement, make the lashing location of reinforcing bar meet detail design requirement accurately;Accuracy guarantee rate is high;It is greatly improved the quality of steel reinforcement cage colligation, makes steel reinforcement cage colligation construction be capable of standardization, batch production.
Locating groove described in the present embodiment is arranged on described installing plate edge, and arranges along described installing plate length direction order.
The rectangular setting of notch of locating groove described in the present embodiment.Adopt this kind of design, after reinforcing bar binding, by removing bolt, quick keeper can be made to rely on self gravitation naturally to come off from steel pipe, without the quick keeper dismounting difficulty that notch and Fast detachable unit cause because of lodge occurs.It addition, for preventing the width of notch to be suitably larger than the diameter of reinforcing bar, and the degree of depth of notch is not more than the radius of reinforcing bar, in order to avoid causing locating groove cannot take out stuck for reinforcing bar;Described notch adopts lathe process, in order to avoid causing bigger shaped steel to deform.
Installing plate described in the present embodiment is provided with multiple for the para-position hole slot 4 with described fastener for connection.The present invention adopts the design of para-position hole slot, can conveniently quickly be connected fixing with the steel pipe on cage colligation platform, is installed in para-position hole slot by bolt 5, and corresponding with the bolt hole being preset on described steel pipe installs;Both are fixed.
Para-position hole slot described in the present embodiment is rectangle hole slot, and is horizontally disposed with along described installing plate length direction.Adopt this kind of design, para-position hole slot can be passed through and coordinate the relative position adjusted between steel pipe and installing plate with bolt;Effectively adjust the dislocation between quick keeper and steel pipe;So that be placed on the reinforcing bar in locating groove and between steel pipe relative binding position obtain accurate adjustment.Para-position hole slot described in the present embodiment adopts and arranges in pairs, adopts such design, and the relative position between reinforcing bar and steel pipe, time bigger with designing requirement deviation;When namely needing the length of reinforcement location more than one para-position hole slot of adjustment, next adjacent para-position hole slot will be used instead and proceed to adjust.
Installing plate described in the present embodiment is made up of the installing plate pipe nipple 6 that multiple head and the tail are connected in order.In the present embodiment, each installing plate short circuit connects into an entirety by forms such as welding, riveted joints, thus forming installing plate;The present invention adopts the design of installing plate pipe nipple, and quick keeper can be made to adapt to the steel pipe needs of different specification size;Owing to the colligation space ratio of effective reinforcement component is narrow, therefore adopt installing plate short circuit can realize the purpose that segmentation is installed, enable the installation corresponding to the steel pipe on colligation platform fast and accurately of quick keeper;And the transport of fast and easy keeper and moving;Reduce difficulty of construction, improve work efficiency.
Embodiment two
The improvement that quick keeper is on embodiment one basis of reinforcing bar binding in the present embodiment, the technology contents not repeated description disclosed in embodiment one, embodiment one disclosure falls within the present embodiment disclosure.
Shown in Figure 3, the quick keeper of a kind of reinforcing bar binding of the present invention, there is an installing plate 101 for installation corresponding to the steel pipe on steel reinforcement cage colligation platform, be equipped with for disposable multiple locating grooves 102 that a plurality of reinforcing bar is carried out colligation location in the upper and lower both sides of this installing plate.
The present invention adopts installing plate both sides to arrange the design of locating groove, and quick keeper can be made to adapt to the needs of reinforcing bar binding construction widely;The arrangement positions and dimensions wherein setting up the locating groove in installing plate both sides separately can be identical, it is also possible to is different;That is the locating groove of both sides can be configured according to identical colligation design, it is also possible to is be configured according to different colligation designs.
When adopting identical colligation design to be configured, when the locating groove of side damages wherein, for ensureing positioning precision, when upper once colligation positions, the reversing of quick keeper can be used, utilize the locating groove of its opposite side to position;Improve the utilization ratio of the quick keeper of the present invention, save the cost of colligation construction.
When adopting different colligation design to be configured, after the colligation construction of reinforcing bar location is terminated by the locating groove utilizing wherein side, when to next group reinforcing bar location colligation construction, the reversing of quick keeper can be used, utilizes the locating groove of its opposite side to carry out next group reinforcing bar location colligation construction;Realize the position fixing process to twice reinforcing bar binding construction by a quick keeper, improve the utilization ratio of the quick keeper of the present invention, save the cost of colligation construction.

Claims (4)

1. the quick keeper of reinforcing bar binding, it is characterized in that: have an installing plate for installation corresponding to the steel pipe on steel reinforcement cage colligation platform, on this installing plate, one or both sides are provided with multiple locating groove, described installing plate is provided with multiple for the para-position hole slot with described fastener for connection, described para-position hole slot is rectangle hole slot, can coordinate, by described para-position hole slot, the relative position adjusted between described steel pipe and described installing plate with bolt;Described installing plate is made up of the installing plate pipe nipple that multiple head and the tail are connected in order.
2. the quick keeper of reinforcing bar binding according to claim 1, it is characterised in that: described locating groove is arranged on described installing plate edge, and arranges along described installing plate length direction order.
3. the quick keeper of reinforcing bar binding according to claim 2, it is characterised in that: the rectangular setting of notch of described locating groove.
4. the quick keeper of reinforcing bar binding according to claim 1, it is characterised in that: described para-position hole slot is horizontally disposed with along described installing plate length direction.
CN201310638795.4A 2013-11-29 2013-11-29 The quick keeper of reinforcing bar binding Active CN103696573B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310638795.4A CN103696573B (en) 2013-11-29 2013-11-29 The quick keeper of reinforcing bar binding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310638795.4A CN103696573B (en) 2013-11-29 2013-11-29 The quick keeper of reinforcing bar binding

Publications (2)

Publication Number Publication Date
CN103696573A CN103696573A (en) 2014-04-02
CN103696573B true CN103696573B (en) 2016-06-29

Family

ID=50358223

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310638795.4A Active CN103696573B (en) 2013-11-29 2013-11-29 The quick keeper of reinforcing bar binding

Country Status (1)

Country Link
CN (1) CN103696573B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104494509A (en) * 2014-11-21 2015-04-08 无锡市百顺机械厂 Steel bar binder
CN107387127A (en) * 2017-09-13 2017-11-24 中交公局桥隧工程有限公司 A kind of tunnel inverted arch reserves ring muscle positioning fixture and application method
CN108487649A (en) * 2018-03-26 2018-09-04 中国十七冶集团有限公司 A kind of bracket and its application method for reinforcing bar binding
CN109235900A (en) * 2018-10-09 2019-01-18 河南中安征信建筑科技有限公司 Reinforcing bar arrangement positioning rule device and application method, integrated positioning ruler
CN110284651B (en) * 2019-06-28 2021-07-30 王本淼 Connecting method for prefabricated frame floor slab reinforcing steel bars
CN110670806B (en) * 2019-10-31 2021-03-23 中冶建工集团有限公司 Shaping method for binding reinforcing steel bars of shear wall
CN111644544A (en) * 2020-05-21 2020-09-11 中国一冶集团有限公司 Steel bar binding clamping fixture for movable precast box girder top plate and use method
CN112324152A (en) * 2020-10-30 2021-02-05 上海二十冶建设有限公司 Construction method for accurately installing annular foundation steel reinforcement framework of rotary hearth furnace

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2440888Y (en) * 2000-08-17 2001-08-01 王继强 Durable blocked frameworks as thermal insulating materials
EP1260656A1 (en) * 2001-05-23 2002-11-27 Cogito Casing for reinforcement connection box
CN201593146U (en) * 2010-01-28 2010-09-29 中国建筑第五工程局有限公司 Steel reinforcement binding clamping fixture for ballastless track concrete base
CN201661013U (en) * 2010-04-16 2010-12-01 中建三局第一建设工程有限责任公司 Binding-free self-positioning steel bar spacer block
SE1150368A1 (en) * 2011-04-28 2012-10-29 Akira Imamura Device and system for placement of reinforcing bars
CN202578006U (en) * 2012-05-30 2012-12-05 陕西建工集团第一建筑工程有限公司 Positioning structure for binding steel bar
CN203229865U (en) * 2013-04-23 2013-10-09 中交路桥华南工程有限公司 Clamping-groove type bridge pier shaft steel bar positioning device
CN103350165A (en) * 2013-06-28 2013-10-16 中国一冶集团有限公司 Processing device and method capable of manufacturing reinforcement cages with different diameters

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2440888Y (en) * 2000-08-17 2001-08-01 王继强 Durable blocked frameworks as thermal insulating materials
EP1260656A1 (en) * 2001-05-23 2002-11-27 Cogito Casing for reinforcement connection box
CN201593146U (en) * 2010-01-28 2010-09-29 中国建筑第五工程局有限公司 Steel reinforcement binding clamping fixture for ballastless track concrete base
CN201661013U (en) * 2010-04-16 2010-12-01 中建三局第一建设工程有限责任公司 Binding-free self-positioning steel bar spacer block
SE1150368A1 (en) * 2011-04-28 2012-10-29 Akira Imamura Device and system for placement of reinforcing bars
CN202578006U (en) * 2012-05-30 2012-12-05 陕西建工集团第一建筑工程有限公司 Positioning structure for binding steel bar
CN203229865U (en) * 2013-04-23 2013-10-09 中交路桥华南工程有限公司 Clamping-groove type bridge pier shaft steel bar positioning device
CN103350165A (en) * 2013-06-28 2013-10-16 中国一冶集团有限公司 Processing device and method capable of manufacturing reinforcement cages with different diameters

Also Published As

Publication number Publication date
CN103696573A (en) 2014-04-02

Similar Documents

Publication Publication Date Title
CN103696573B (en) The quick keeper of reinforcing bar binding
CN103846920A (en) Adjustable tooling
CN203304803U (en) Material taking mechanism
CN104773441A (en) Conveying device for carrier plate
CN204140564U (en) Panel beating fastening structure
CN103780006A (en) Belt motor adjustment mounting rack
CN103522038A (en) Automatic plug assembly device for lock
CN104191216A (en) Equipment assembling system and method
CN204934673U (en) A kind of box type rod piece via hole drilling equipment
US8979414B2 (en) Connection system
CN103287073B (en) A kind of method realizing PCB and steel mesh rapid-aligning in printing machine
CN202271891U (en) Jacking auxiliary handle and vehicle with same
CN204114488U (en) A kind of positioning device
CN203731998U (en) Drag link testing device
CN205010980U (en) Steel band sheet metal is carried and is used micromatic setting
CN203599394U (en) Processing profile die for medial stainless steel tube
CN205086231U (en) BGA mould utensil of moulding
CN203706122U (en) Cooling fan base
CN204382214U (en) The fin erecting tools of three-terminal voltage-stabilizing pipe
KR20140006209U (en) Dummy apparatus for installing a pump
CN203579466U (en) Gluing jig for notebook case
CN203283791U (en) Anti-collision transporting frame
CN203282142U (en) Product automatic segregator jig
CN205770789U (en) A kind of transporter of photocopier scraper support
CN205066621U (en) Be used for car seat mounting hole to examine utensil

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant