CN103643801A - Internal-pipe construction operation vehicle for erecting inverted siphon on slant and long steep side slope - Google Patents

Internal-pipe construction operation vehicle for erecting inverted siphon on slant and long steep side slope Download PDF

Info

Publication number
CN103643801A
CN103643801A CN201310657475.3A CN201310657475A CN103643801A CN 103643801 A CN103643801 A CN 103643801A CN 201310657475 A CN201310657475 A CN 201310657475A CN 103643801 A CN103643801 A CN 103643801A
Authority
CN
China
Prior art keywords
working vehicle
skeleton
pipe
internal
channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310657475.3A
Other languages
Chinese (zh)
Inventor
相汉雨
孙冰
刘月光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 6 Co Ltd
Original Assignee
Sinohydro Bureau 6 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 6 Co Ltd filed Critical Sinohydro Bureau 6 Co Ltd
Priority to CN201310657475.3A priority Critical patent/CN103643801A/en
Publication of CN103643801A publication Critical patent/CN103643801A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention relates to an internal-pipe construction operation vehicle for erecting an inverted siphon on a slant and long steep side slope. The internal-pipe construction operation vehicle is totally divided into a supporting structure, a platform structure and a protection structure. The supporting structure is mainly composed of box iron and sliding iron, and a body framework of the conveying vehicle is formed; the platform structure is composed of a steel die and a steel plate; the protection structure is mainly composed of steel bars, and therefore the whole construction safety of the operation vehicle is guaranteed. The protection structure can be welded with a steel pipe according to requirements, and accidental dropping of workers, devices and the like caused by accidental sliding at the operation position is prevented. The internal-pipe construction operation vehicle can stably walk and is high in conveying speed, a platform is comfortable and stable, the internal-pipe construction operation vehicle is safe, reliable, effective, high in construction speed, low in construction cost, easy to manufacture, not prone to be damaged and high in using rate, the construction speed is accordingly quickened, and cost is saved.

Description

On a kind of plagioclase gradient slope, set up the interior working vehicle of pipe of sag pipe
Technical field
The present invention relates to set up on a kind of plagioclase gradient slope the interior working vehicle of pipe of sag pipe, relate in particular to a kind of the gradient is large, chamfer distance is longer, and straight smooth in sag pipe, directly cause impassable construction in pipe, therefore working vehicle in the sag pipe of using in the time of need setting up job platform and the upper lower channel of personnel.
Background technology
During sag pipe integral erection steel pipe, the construction links such as sag pipe domestic demand welds, anticorrosion and flaw detection, if but sag pipe with side slope, set up, and the gradient is large, inclined-plane is when longer, constructor is impassable and operation at all in straight smooth pipe, and manage interior construction from bottom to top, and adopting one section of one section of installation platform operation, program is comparatively complicated, and platform construction link can strengthen, and expend the plenty of time, and efficiency of construction is lower, and security risk is also larger.
Summary of the invention
In order to overcome in sag pipe, difficulty of construction is large, long, the shortcoming such as efficiency of construction is low and potential safety hazard is large that expends time in, the invention provides a kind of can walk stable, safe and reliable, make working vehicle in the simple and economic applicable pipe that is applied to set up on plagioclase gradient slope the purposes such as construction in sag pipe pipe is current.
Addressing the above problem taked technical measures is:
On a kind of plagioclase gradient slope, set up the interior working vehicle of pipe of sag pipe, it is characterized in that: four channel-section steel 1 integral solder become working vehicle's skeleton, in working vehicle's skeleton, by twice channel-section steel 2 and two vertical channel-section steels 1 of working vehicle's skeleton, be welded into skeleton cross binding, on the vertical channel-section steel 1 of twice of working vehicle's skeleton, weld respectively two groups of slip iron 3, working vehicle's skeleton tail end adopts reinforcing bar 4 assembled by spacing, and horizontal, longitudinally be welded into several grids and form baffle plate, channel-section steel 1 integral solder of reinforcing bar 4 and working vehicle's skeleton afterbody, top channel-section steel 1 integral solder of steel plate 5 and working vehicle's skeleton, the automobile-used preformed hole of towage 6 is set on the centre position of steel plate 5.
The invention has the beneficial effects as follows: working vehicle can walk stable, and transporting velocity is fast, platform is comfortable stable, and safe and reliable effectively speed of application is fast, and cost is low, makes simply, and not fragile, utilization rate is high, thereby has accelerated speed of application, has saved cost.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is top view of the present invention.
The specific embodiment
Below in conjunction with accompanying drawing and example, the present invention is further described.
On a kind of plagioclase gradient slope, set up the interior working vehicle of pipe of sag pipe, as Fig. 1, shown in Fig. 2, four channel-section steel 1 integral solder become working vehicle's skeleton, in working vehicle's skeleton, by twice channel-section steel 2 and two vertical channel-section steels 1 of working vehicle's skeleton, be welded into skeleton cross binding, on the vertical channel-section steel 1 of twice of working vehicle's skeleton, weld respectively two groups of slip iron 3, working vehicle's skeleton tail end adopts reinforcing bar 4 assembled by spacing, and horizontal, longitudinally be welded into several grids and form baffle plate, channel-section steel 1 integral solder of reinforcing bar 4 and working vehicle's skeleton afterbody, top channel-section steel 1 integral solder of steel plate 5 and working vehicle's skeleton, the automobile-used preformed hole of towage 6 is set on the centre position of steel plate 5.
When the present invention uses, first constructor is carried out to setting-out by design drawing to working vehicle, by the standard component in figure, Assembling.This transport vehicle is divided into braced structures, platform structure and safeguard structure three parts generally, mainly channel-section steel, steel plate, reinforcing bar and slip iron, consists of.Braced structures is mainly comprised of channel-section steel and slip iron, forms the main body frame of transport vehicle; Platform structure is comprised of punching block and steel plate; Safeguard structure mainly contains reinforcing bar and forms, and for guaranteeing working vehicle's integral construction safety, safeguard structure can weld with steel pipe as required, prevents that unexpected slip from appearring in operation place, causes the accidental fallings such as personnel, equipment.First by four channel-section steel 1 integral solder, as working vehicle's skeleton, in working vehicle's skeleton, by twice channel-section steel 2 and two vertical channel-section steels 1 of working vehicle's skeleton, be welded into skeleton cross binding, form working vehicle's general frame structure; On the vertical channel-section steel 1 of twice of working vehicle's skeleton, weld respectively two groups of slip iron 3, slip iron 3 is firm with vertical channel-section steel 1 welding, working vehicle's skeleton tail end adopts reinforcing bar 4 assembled by spacing, horizontal, be longitudinally welded into several grids and form baffle plate, channel-section steel 1 integral solder of reinforcing bar 4 and working vehicle's skeleton afterbody, top channel-section steel 1 integral solder of steel plate 5 and working vehicle's skeleton arranges preformed hole 6 on the centre position of steel plate 5, current up and down in order to towage car.After working vehicle's overall package, can be interior current at steel pipe 7.After working vehicle assembles, be that integral body hangs in steel pipe 7, working vehicle adopts elevator traction upper and lower, constructor, facility can directly utilize the current construction of working vehicle, after personnel's conveying is put in place, carry out working vehicle and fix, and carry out safeguard structure reinforcing, until possess after execution conditions, can construct.

Claims (1)

1. on a plagioclase gradient slope, set up the interior working vehicle of pipe of sag pipe, it is characterized in that: four channel-section steels (1) integral solder becomes working vehicle's skeleton, in working vehicle's skeleton, by twice channel-section steel (2) and two vertical channel-section steels (1) of working vehicle's skeleton, be welded into skeleton cross binding, on the vertical channel-section steel of twice (1) of working vehicle's skeleton, weld respectively two groups of slip iron (3), working vehicle's skeleton tail end adopts reinforcing bar (4) assembled and horizontal by spacing, longitudinally be welded into several grids and form baffle plate, channel-section steel (1) integral solder of reinforcing bar (4) and working vehicle's skeleton afterbody, top channel-section steel (1) integral solder of steel plate (5) and working vehicle's skeleton, the automobile-used preformed hole of towage (6) is set on the centre position of steel plate (5).
CN201310657475.3A 2013-12-09 2013-12-09 Internal-pipe construction operation vehicle for erecting inverted siphon on slant and long steep side slope Pending CN103643801A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310657475.3A CN103643801A (en) 2013-12-09 2013-12-09 Internal-pipe construction operation vehicle for erecting inverted siphon on slant and long steep side slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310657475.3A CN103643801A (en) 2013-12-09 2013-12-09 Internal-pipe construction operation vehicle for erecting inverted siphon on slant and long steep side slope

Publications (1)

Publication Number Publication Date
CN103643801A true CN103643801A (en) 2014-03-19

Family

ID=50249078

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310657475.3A Pending CN103643801A (en) 2013-12-09 2013-12-09 Internal-pipe construction operation vehicle for erecting inverted siphon on slant and long steep side slope

Country Status (1)

Country Link
CN (1) CN103643801A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104763159A (en) * 2015-03-12 2015-07-08 中国能源建设集团浙江火电建设有限公司 Nuclear power CB20 module integral splicing transportation platform

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3547040A (en) * 1966-05-27 1970-12-15 K Saverwein Dr Flaw-detector carriage for introducing radioactive source into pipelines
CN201109471Y (en) * 2007-08-28 2008-09-03 上海水务建设工程有限公司 Pipeline internal walking tool
CN101486025A (en) * 2009-02-13 2009-07-22 保定天威集团有限公司 Lacquering device for internal wall of connection pipe of small diameter
CN201742067U (en) * 2010-07-07 2011-02-09 徐玥 Vehicle applicable to constructions in pipeline
CN201747033U (en) * 2010-05-25 2011-02-16 中建三局建设工程股份有限公司 Mounting device for stainless steel smoke-exhaust air duct in narrow space
CN102152807A (en) * 2011-03-16 2011-08-17 张晓荣 Unpowered self-traction pipe duct trolley
CN201951939U (en) * 2010-12-22 2011-08-31 胜利油田龙玺石油工程服务有限责任公司 Trolley running in simple pipeline
CN202481102U (en) * 2011-12-28 2012-10-10 江苏道达海洋装备技术有限公司 Electric ship pipe tunnel trolley
CN102927405A (en) * 2011-08-11 2013-02-13 管丽环境技术(上海)有限公司 Travelling trolley for detection in multifunctional concrete underground pipeline
CN203640312U (en) * 2013-12-09 2014-06-11 中国水利水电第六工程局有限公司 Inter-pipe construction operation vehicle with inverted siphon erected on inclined long steep slope

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3547040A (en) * 1966-05-27 1970-12-15 K Saverwein Dr Flaw-detector carriage for introducing radioactive source into pipelines
CN201109471Y (en) * 2007-08-28 2008-09-03 上海水务建设工程有限公司 Pipeline internal walking tool
CN101486025A (en) * 2009-02-13 2009-07-22 保定天威集团有限公司 Lacquering device for internal wall of connection pipe of small diameter
CN201747033U (en) * 2010-05-25 2011-02-16 中建三局建设工程股份有限公司 Mounting device for stainless steel smoke-exhaust air duct in narrow space
CN201742067U (en) * 2010-07-07 2011-02-09 徐玥 Vehicle applicable to constructions in pipeline
CN201951939U (en) * 2010-12-22 2011-08-31 胜利油田龙玺石油工程服务有限责任公司 Trolley running in simple pipeline
CN102152807A (en) * 2011-03-16 2011-08-17 张晓荣 Unpowered self-traction pipe duct trolley
CN102927405A (en) * 2011-08-11 2013-02-13 管丽环境技术(上海)有限公司 Travelling trolley for detection in multifunctional concrete underground pipeline
CN202481102U (en) * 2011-12-28 2012-10-10 江苏道达海洋装备技术有限公司 Electric ship pipe tunnel trolley
CN203640312U (en) * 2013-12-09 2014-06-11 中国水利水电第六工程局有限公司 Inter-pipe construction operation vehicle with inverted siphon erected on inclined long steep slope

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104763159A (en) * 2015-03-12 2015-07-08 中国能源建设集团浙江火电建设有限公司 Nuclear power CB20 module integral splicing transportation platform

Similar Documents

Publication Publication Date Title
CN203834373U (en) Lifting movement mold carriage trolley for box culvert side wall formwork
CN203640312U (en) Inter-pipe construction operation vehicle with inverted siphon erected on inclined long steep slope
CN103643801A (en) Internal-pipe construction operation vehicle for erecting inverted siphon on slant and long steep side slope
CN204212390U (en) A kind of Construction of Steel Structure Worker carrying basket
CN103601081B (en) Support system is climbed in tower crane
CN101967903A (en) Basic guide rail for helicopter assembly transmission line iron tower leg section
CN202337945U (en) Outer side in-place beam body lifting device
CN204185146U (en) Construction of Steel Structure overhang crane between skyscraper two tall buildings
CN105152004B (en) Hoisting device for reinforcing beam of top surface inside box-shaped coal conveying gallery road
CN205558308U (en) Integrated form platform of unloading
CN204980839U (en) Inboard top surface reinforcement girder hoist device of defeated coal strage way of box
CN210127855U (en) Coal mine vertical shaft arrangement structure
CN204098493U (en) The dismantled and assembled input and output material movable platform of a kind of modular for building
CN203361596U (en) Auxiliary support of integrated lifting operation platform
CN205046858U (en) Processing of major diameter steel reinforcement cage and transportation auxiliary device
CN204059900U (en) The dull and stereotyped scaffold in a kind of colliery
CN103953198B (en) The syndeton of connecting traverse under section steel beam
CN203806956U (en) Connecting structure of lifting hook beam under section steel beam
CN203833459U (en) Hydraulic motor mounting lifting beam
CN206846097U (en) A kind of Men Gangyu frameworks separately-loaded pipeline support structure
CN204626251U (en) Steel box girder cantilever and web intersect the operation platform of weld seam
CN204434238U (en) A kind of well maintenance vehicle heavier-duty turning rack with pressure
CN103803395A (en) Hydraulic motor installation hoisting beam as well as application thereof
CN205687501U (en) Many people operate construction suspension platform
CN204551265U (en) A kind of frame type combination sky crane link

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140319