CN204098493U - The dismantled and assembled input and output material movable platform of a kind of modular for building - Google Patents

The dismantled and assembled input and output material movable platform of a kind of modular for building Download PDF

Info

Publication number
CN204098493U
CN204098493U CN201420501880.6U CN201420501880U CN204098493U CN 204098493 U CN204098493 U CN 204098493U CN 201420501880 U CN201420501880 U CN 201420501880U CN 204098493 U CN204098493 U CN 204098493U
Authority
CN
China
Prior art keywords
semi girder
transverse beam
welded
building
semi
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420501880.6U
Other languages
Chinese (zh)
Inventor
赵拯卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN ZHENG WEI CONSTRUCTION SCIENCE AND TECHNOLOGY Co Ltd
Original Assignee
HUNAN ZHENG WEI CONSTRUCTION SCIENCE AND TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN ZHENG WEI CONSTRUCTION SCIENCE AND TECHNOLOGY Co Ltd filed Critical HUNAN ZHENG WEI CONSTRUCTION SCIENCE AND TECHNOLOGY Co Ltd
Priority to CN201420501880.6U priority Critical patent/CN204098493U/en
Application granted granted Critical
Publication of CN204098493U publication Critical patent/CN204098493U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to the dismantled and assembled input and output material movable platform of a kind of modular for building.The utility model comprises one end and is fixed on a pair semi girder on building structure, each semi girder opposite side is provided with a pair transverse beam, one of this two transverse beam is arranged on semi girder end, another of this transverse beam is arranged in the middle of semi girder, between two transverse beams of described semi girder, upper erecting is provided with side direction railing, perpendicularly in the transverse beam being arranged on cantilever end be provided with front rail, many cross binding steel are longitudinally laid with between described two semi girders, this cross binding steel is channel-section steel, end is welded with the pedestal being provided with hole and is bolted fixing with the waist of overarm arm, described semi girder is welded with hoisting ring.The utility model easy installation and removal, structure is solid and reliable simply again, drastically increases efficiency of construction, and the convenient transport of material platform after dismounting, reduce cost of production.

Description

The dismantled and assembled input and output material movable platform of a kind of modular for building
Technical field
The utility model relates to the dismantled and assembled input and output material movable platform of a kind of modular for building.
Background technology
In work progress, the use turning material platform is very general, and of the prior art turn of material platform mainly realizes being elevated by tower crane, this kind of mode not only complex operation but also waste construction cost; Meanwhile, the material platform that turns of prior art mostly is integral structure, and this kind of structure is not only unfavorable for turning the installation of material platform, dismounting and transport but also this kind and turns material platform and extremely waste construction space, for construction is made troubles.On the other hand, there is many potential safety hazards in of the prior art turn of material platform, is only connected with tower crane as turned material platform, and when tower crane moves left and right, inertia force probably makes to turn material platform and rolls, and then causes security incident.
Summary of the invention
The purpose of this utility model is improved according to the shortcoming existed in background technology and problem, provides that a kind of structure is simple, the dismantled and assembled input and output material movable platform of modular for building of safety durable, fast assembling and disassembling.
The technical solution of the utility model is to provide the dismantled and assembled input and output material movable platform of a kind of modular for building, comprise one end and be fixed on a pair semi girder on building structure, this semi girder is channel-section steel, and two legs of this channel-section steel and waist are provided with multiple hole for making bolt pass, each semi girder opposite side is provided with a pair transverse beam, one of this two transverse beam is arranged on semi girder end, another of this transverse beam is arranged in the middle of semi girder, two transverse beams are made up of channel-section steel and the leg-of-mutton corner brace being welded on channel-section steel two ends, and two transverse beam notches are oppositely arranged, corner brace in transverse beam is connected and fixed by bolt and semi girder, between two transverse beams of described semi girder, upper erecting is provided with side direction railing, perpendicularly in the transverse beam being arranged on cantilever end be provided with front rail, described side direction railing and front rail are made by round steel, the vertical vertical rod including horizontal handrail and be welded as a whole with horizontal handrail, the bottom of the vertical vertical rod of side direction railing is provided with the pedestal in hole by welding and semi girder is bolted fixing, the bottom of the vertical vertical rod of front rail is connected and fixed with the transverse beam being arranged on semi girder end by welding the pedestal being provided with hole, many cross binding steel are longitudinally laid with between described two semi girders, this cross binding steel is channel-section steel, end is welded with the pedestal being provided with hole and is bolted fixing with the waist of overarm arm, described semi girder is welded with hoisting ring.
The utility model has the following advantages:
The great advantage of the dismantled and assembled input and output material movable platform of modular is that engineering is tied the fortune of moving after pushing up and facilitated, it not only can fill many when transporting, and be temporarily stored in warehouse when not using and also take up an area few, certainly its great advantage still can rely on equipment hoisting after decomposing, but direct labor's handling, this is a kind of maximum convenient.
Movable input and output material platform is before typical floor starts construction to knot top, the temporary platform be equipped with specially when workman needs the transhipment material from the floor completing main body frame toward attic, it can tower crane auxiliary under follow the continuous rising of main body floor and raise.The movable input and output material platform that we use now in work progress is all generally that electric welding is fixed dead, time wouldn't needing it to engineering knot top, hang by tower crane the place not too hindered put away, but often this is put and will become very large trouble, because along with the slowly completion of engineering, crane gears all on our building site all can be withdrawn away, because these equipment substantially Dou Shi unit in charge of construction lease, just as tower crane, the hire charge of month is minimum wants 15,000 more than.And by the time those already no movable input and output material platform along with the completion (no longer allowing to deposit) of engineering also must withdraw from scene time, just become the thing of a most headache, because do not have crane gear, it is difficult to shipment, and it is large to take up space, this finished product material platform of large car of one seven or eight meters long can only fill four or five, so only employ gas cutting equipment to take off first it is divided, or the special equipment going for loop wheel machine, fork truck and so on for filling these pocket-handkerchieves is come.If but these platforms install to warehouse, unload and must rely on again crane gear lifting down and get on, have a strong impact on operating efficiency.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of embodiment of the utility model.
Fig. 2 is the disassemblying structure schematic diagram of Fig. 1.
Fig. 3 is the disassemblying structure schematic diagram of Fig. 1.
Fig. 4 is the disassemblying structure schematic diagram of Fig. 1.
Detailed description of the invention
From Fig. 1 ~ 2, the utility model comprises one end and is fixed on a pair semi girder 4 on building structure, this semi girder 4 is channel-section steel, and two legs of this channel-section steel and waist are provided with multiple hole for making bolt pass, each semi girder 4 opposite side is provided with a pair transverse beam 5, one of this two transverse beam 5 is arranged on semi girder 4 end, another of this transverse beam 5 is arranged in the middle of semi girder 4, two transverse beams 5 are made up of channel-section steel and the leg-of-mutton corner brace 2 being welded on channel-section steel two ends, and two transverse beam 5 notches are oppositely arranged, corner brace 2 in transverse beam 5 is connected and fixed by bolt and semi girder 4, between two transverse beams 5 of described semi girder 4, upper erecting is provided with side direction railing 3, perpendicularly in the transverse beam 5 being arranged on semi girder 4 end be provided with front rail 1, described side direction railing 3 is made by round steel with front rail 1, the vertical vertical rod including horizontal handrail and be welded as a whole with horizontal handrail, the bottom of the vertical vertical rod of side direction railing 3 is provided with the pedestal in hole by welding and semi girder 4 is bolted fixing, the bottom of the vertical vertical rod of front rail 1 is connected and fixed with the transverse beam 5 being arranged on semi girder 4 end by welding the pedestal being provided with hole, many cross binding steel 6 are longitudinally laid with between described two semi girders 4, this cross binding steel 6 is channel-section steel, end is welded with the pedestal being provided with hole and is bolted fixing with the waist of overarm arm 4, on described semi girder 4, between two transverse beams 5, interval is welded with three pairs of hoisting rings 7, wherein: by the hoisting ring 7 of front rail 1 side by being connected to the wall connecting of wire rope on the special gaily decorated basket 9 and high one deck, be welded in balance when middle a pair hoisting ring 7 is used for the dismantled and assembled input and output material movable platform of modular for building is promoted, a pair hoisting ring 7 near building structure side is by being connected to the wall connecting of wire rope on the special gaily decorated basket 9 and low one deck, the described special gaily decorated basket 9 comprises pull bar 10, a pair threaded adjusting bar 11 be separately positioned in two screws at pull bar about 10 two ends, described threaded adjusting bar 11 comprises threaded shank portion 12 and is welded on the U-shaped round steel 13 of threaded shank portion 12 end, the both ends of described U-shaped round steel 13 are provided with screw, lead screw 14 runs through in this screw and U-shaped round steel 13 is spirally connected fixing, and lead screw 14 is vertical with threaded shank portion 12.
The special gaily decorated basket 9 overcoat described in the utility model has the gum cover for isolated concrete slag.
Described lead screw 14 one end described in the utility model is provided with the protuberance for holding, and the other end is provided with the screw thread be spirally connected with U-shaped round steel 22.
The utility model semi girder one end is fixed on building structure, the other end is provided with three groups of hoisting rings, outermost hoisting ring is connected with the special gaily decorated basket by wire rope, the special gaily decorated basket is connected with the pre-embedded device in the body of wall of high one deck again, the hoisting ring of innermost layer is connected with the special gaily decorated basket by wire rope, this special gaily decorated basket is connected with the pre-embedded device in the body of wall of low one deck again, is arranged so that semi girder stress balance like this, balance when installing when middle that is used for semi girder lifting to hoisting ring simultaneously.The special gaily decorated basket pull bar that this device adopts is monolithic, threaded adjusting bar and being threaded in pull bar, the threaded portion of threaded adjusting bar and U-shaped round steel part are also an entirety, vertical with threaded adjusting bar with the lead screw of the pull bar that concrete upper bracket is connected or wire rope for support and connection, integrated symmetric, firmly stressed; The part that the threaded adjusting bar other end is connected with wire rope adopts lead screw detachably to arrange, threaded adjusting bar threaded portion long enough, and use with wire rope the whole series, detachably, rope capacity is adjustable, easy to use.
Embodiment described in the utility model is only the description carried out preferred embodiment of the present utility model; not the utility model design and scope are limited; under the prerequisite not departing from the utility model design philosophy; the various modification that in this area, engineers and technicians make the technical solution of the utility model and improvement; protection domain of the present utility model all should be fallen into; the technology contents of the utility model request protection, all records in detail in the claims.

Claims (3)

1. the dismantled and assembled input and output material movable platform of modular for building, it is characterized in that: it comprises one end and is fixed on a pair semi girder (4) on building structure, this semi girder (4) is channel-section steel, and two legs of this channel-section steel and waist are provided with multiple hole for making bolt pass
Each semi girder (4) opposite side is provided with a pair transverse beam (5), one of this two transverse beam (5) is arranged on semi girder (4) end, another of this transverse beam (5) is arranged in the middle of semi girder (4), two transverse beams (5) are made up of channel-section steel and the leg-of-mutton corner brace (2) being welded on channel-section steel two ends, and two transverse beams (5) notch is oppositely arranged, corner brace (2) in transverse beam (5) is connected and fixed by bolt and semi girder (4)
Between two transverse beams (5) of described semi girder (4), upper erecting is provided with side direction railing (3), and upper the erecting of transverse beam (5) being arranged on semi girder (4) end is provided with front rail (1),
Described side direction railing (3) and front rail (1) are made by round steel, the vertical vertical rod including horizontal handrail and be welded as a whole with horizontal handrail, the bottom of the vertical vertical rod of side direction railing (3) is provided with the pedestal in hole by welding and semi girder (4) is bolted fixing, the bottom of the vertical vertical rod of front rail (1) is connected and fixed with the transverse beam (5) being arranged on semi girder (4) end by welding the pedestal being provided with hole
Longitudinally be laid with many cross binding steel (6) between described two semi girders (4), this cross binding steel (6) is channel-section steel, and end is welded with the pedestal being provided with hole and is bolted fixing with the waist of overarm arm (4),
On described semi girder (4), between two transverse beams (5), interval is welded with three pairs of hoisting rings (7), wherein:
By the hoisting ring (7) of front rail (1) side by being connected to the wall connecting of wire rope on the special gaily decorated basket (9) and high one deck, be welded in balance when middle a pair hoisting ring (7) is used for the dismantled and assembled input and output material movable platform of modular for building is promoted, a pair hoisting ring (7) near building structure side is by being connected to the wall connecting of wire rope on the special gaily decorated basket (9) and low one deck;
The described special gaily decorated basket (9) comprises pull bar (10), a pair threaded adjusting bar (11) be separately positioned in two screws at the upper and lower two ends of pull bar (10), described threaded adjusting bar (11) comprises threaded shank portion (12) and is welded on the U-shaped round steel (13) of threaded shank portion (12) end, the both ends of described U-shaped round steel (13) are provided with screw, lead screw (14) runs through in this screw and U-shaped round steel (13) is spirally connected fixing, and lead screw (14) is vertical with threaded shank portion (12).
2. the dismantled and assembled input and output material movable platform of modular for building according to claim 1, the described special gaily decorated basket (9) overcoat has the gum cover for isolated concrete slag.
3. the dismantled and assembled input and output material movable platform of modular for building according to claim 1, described lead screw (14) one end is provided with the protuberance for holding, and the other end is provided with the screw thread be spirally connected with U-shaped round steel (13).
CN201420501880.6U 2014-09-02 2014-09-02 The dismantled and assembled input and output material movable platform of a kind of modular for building Expired - Fee Related CN204098493U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420501880.6U CN204098493U (en) 2014-09-02 2014-09-02 The dismantled and assembled input and output material movable platform of a kind of modular for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420501880.6U CN204098493U (en) 2014-09-02 2014-09-02 The dismantled and assembled input and output material movable platform of a kind of modular for building

Publications (1)

Publication Number Publication Date
CN204098493U true CN204098493U (en) 2015-01-14

Family

ID=52266931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420501880.6U Expired - Fee Related CN204098493U (en) 2014-09-02 2014-09-02 The dismantled and assembled input and output material movable platform of a kind of modular for building

Country Status (1)

Country Link
CN (1) CN204098493U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106150171A (en) * 2015-04-01 2016-11-23 五冶集团上海有限公司 The internal formwork support platform of a kind of reinforced concrete silo and application thereof
CN108715431A (en) * 2018-07-10 2018-10-30 中铁大桥局武汉桥梁特种技术有限公司 A kind of hanger platform of T beams maintenance and reinforcement

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106150171A (en) * 2015-04-01 2016-11-23 五冶集团上海有限公司 The internal formwork support platform of a kind of reinforced concrete silo and application thereof
CN106150171B (en) * 2015-04-01 2018-06-29 五冶集团上海有限公司 Formwork support platform and its application inside a kind of reinforced concrete silo
CN108715431A (en) * 2018-07-10 2018-10-30 中铁大桥局武汉桥梁特种技术有限公司 A kind of hanger platform of T beams maintenance and reinforcement

Similar Documents

Publication Publication Date Title
CN102444203B (en) High-altitude long-span overhanging corridor type reinforced concrete structure and construction method
CN112938774B (en) Integral hoisting system and hoisting method for assembly type component
CN103243930B (en) System and method for modularized construction of super high-rise steel structures
CN105692470A (en) Internal climbing tower crane and operating method thereof
CN203834373U (en) Lifting movement mold carriage trolley for box culvert side wall formwork
CN103437563A (en) Installation method for steel skeleton of large steel structure factory building
CN204098493U (en) The dismantled and assembled input and output material movable platform of a kind of modular for building
CN202945798U (en) Overhanging type scaffold corner device
CN203877109U (en) Lifting storage rack for building prefabricated composite floor slabs
CN103174093A (en) Mounting device and mounting method of steel box girder in support zone
CN203795311U (en) Multi-leg high pier and slip form construction device
CN203284126U (en) Simple composite gantry high-altitude weight hoisting device
US12012311B2 (en) Construction system
CN103352570A (en) Assembled construction gateway
CN202208696U (en) Construction platform used for dry quenching furnace
CN105863280B (en) A kind of discharging platform that can be voluntarily lifted
CN205935746U (en) Simple and easy terraced barreled is put
CN101967902A (en) Basic guide rail for helicopter assembly transmission line iron tower leg section
CN214269948U (en) Lifting device for dismantling wet joint formwork of bridge
CN204185146U (en) Construction of Steel Structure overhang crane between skyscraper two tall buildings
CN211257769U (en) Truss bridging based on attached lifting platform
CN202297035U (en) Glass box hoisting device for forklift
CN206220547U (en) A kind of operating platform for steel structure column installation
CN205531262U (en) Steel construction construction platform can rise automatically
CN215717067U (en) Construction platform suitable for concrete composite shear wall structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150114

Termination date: 20160902

CF01 Termination of patent right due to non-payment of annual fee