CN103603665B - Upper dish side ore body stoping method in the scope of adopting of mine - Google Patents

Upper dish side ore body stoping method in the scope of adopting of mine Download PDF

Info

Publication number
CN103603665B
CN103603665B CN201310509626.0A CN201310509626A CN103603665B CN 103603665 B CN103603665 B CN 103603665B CN 201310509626 A CN201310509626 A CN 201310509626A CN 103603665 B CN103603665 B CN 103603665B
Authority
CN
China
Prior art keywords
ore
ore body
segmentation
stope
pulse
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310509626.0A
Other languages
Chinese (zh)
Other versions
CN103603665A (en
Inventor
边振辉
周映辉
白树龙
吕书平
刘海生
李文华
杨继锋
马爱军
程宏
翟涿
殷振海
张玲飞
范新建
常伟
王贺
董增顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Province Fan Shan Phosphorus Ore Co Ltd
Original Assignee
Hebei Province Fan Shan Phosphorus Ore Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Province Fan Shan Phosphorus Ore Co Ltd filed Critical Hebei Province Fan Shan Phosphorus Ore Co Ltd
Priority to CN201310509626.0A priority Critical patent/CN103603665B/en
Publication of CN103603665A publication Critical patent/CN103603665A/en
Application granted granted Critical
Publication of CN103603665B publication Critical patent/CN103603665B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to mining technique field, specifically upper dish side ore body stoping method in the scope of adopting of a kind of mine.At present, there is the unity of opposites contradiction between efficiency, cost, safety, dilution, loss in the recovery process of Ultra-low-grade magnetite.The present invention utilizes the existing Development system in mine, carries out adopting cutting work arrangement, and rib is divided into some square or circular ore pillars, these ore pillars will not reclaim, and as permanent loss, makes Two step mining become single stage back production.The present invention has the advantage that the large and filling method of room-and-pillar method production capacity is pressed with effectively controlling concurrently.The present invention is applicable to: a, thickness are greater than gentle dip or the inclination big thick ore body of more than 8m; B, ground do not allow to subside, and need strict protection earth's surface; Do not allow the geological conditions of the displacement that overlying rock avalanche is even large; C, the production scale that requirement is larger; D, ore are worth lower or grade is relatively low, need avoid two step rib pillar stopings.

Description

Upper dish side ore body stoping method in the scope of adopting of mine
Technical field
The present invention relates to mining technique field, upper dish side ore body stoping method in the scope of adopting of a kind of mine specifically, be applicable to after the mother-lode back production of lower wall side terminates, existing development haulage system, supporting role by lower wall ore body delay filling body are utilized to ore body in the scope of adopting of upper dish side, arrange and suitable adopt cut journey, realize the recycling to Hanging orebody, make the safe and efficient mining methods that the resource in the scope of adopting is fully used.
Background technology
Under current Mining technology condition, after the ore body back production of lower wall side, in the certain limit of upper dish side, define inbreak, crack, metaboly by mining influence, make the ore body in the scope of adopting be difficult to exploitation.Along with the expansion of mineral resource utilization scope and the development of mining technique, some poor values even country rock are provided with certain exploitation value.And these potential resource majorities are all positioned at the scope of adopting of former industry ore body.Mineral resources safely and efficiently in the back production scope of adopting just become one of problem of mining technique forward position research.
Summary of the invention
The object of this invention is to provide upper dish side ore body stoping method in the scope of adopting of a kind of mine, for: a, thickness are greater than gentle dip or the inclination big thick ore body of 8m; B, ground do not allow to subside, and need strict protection earth's surface.Do not allow the displacement that overlying rock avalanche is even large, as mining, scenic spot mining condition under mining under the water bodys such as beach, lake, rivers, mining under euildings, the main line of communication; C, the production scale that requirement is larger; D, ore are worth lower or grade is relatively low, avoids two step rib pillar stopings.Be applicable to after the mother-lode back production of lower wall side terminates, existing development haulage system, supporting role by lower wall ore body delay filling body are utilized to ore body in the scope of adopting of upper dish side, arrange and suitable adopt cut journey, realize the recycling to Hanging orebody;
Technical scheme of the present invention is: adopt in scope ore body in upper dish side, along orebody trend in stage casing along the pulse transportation roadway top arrange segmentation stope connecting taxiway, as ore removal passage, stope capwise is arranged, from stope connecting taxiway to ore body dish and lower wall back production, length is 60m, and wide is ore body horizontal breadth, is highly miding level height 45m; Eight mineral buildings arranged by each stope, and width is 5m; The wide 2m of bar post, long is orebody thickness; Fore-set height 6m, post of not keeping on file;
Adopt accurate engineering and have stage casing transportation roadway, segmentation along the pulse connection roadway, ore pass, segmentation stope connecting taxiway, ventilation sluicing courtyard, upper dish side ore body back production passage along the pulse; Utilize on the stage casing of existing back production industry mother-lode and coil haulage drift, every 60m, across pitch arranges that a drop shaft and a pedestrian are ventilated sluicing courtyard, meets ore drawing in stope and pedestrian, ventilation needs; Segmentation along the pulse connection roadway and back production industry mother-lode segmentation along the pulse connection roadway share; This segmentation along the pulse connecting taxiway is arranged in outside the lower wall arteries and veins of industrial mother-lode, is communicated with upper and lower stage casing by exploiting field ramp, in studding reserved after industrial mother-lode back production from segmentation along the pulse connecting taxiway coil side ore body back production passage to ore body driving; By all comparatively stable position construction return air filling sluicing courtyard of Pan Kuangyan on ore body in mineral building, bottom is used as drainage sump, and top is used as return air, fill pass, and exports as Stope safty;
Adopt after cutting engineering construction and carry out mineral building mining, rock drilling adopts jumbo cutter horizontal shallow hole, hole depth 3.8 ~ 4.0m, and first mining room to paste on ore body the drawing back of dish capwise along the pulse to stope border from undercuting; Can the back production simultaneously of multiple mineral building in stope, also can move back simultaneously and adopt by several routes in a mineral building; Slicing height 2m; Each segmentation divides 6 layers of back production; After all routes or part drift stoping terminate in a mineral building, packing job can be carried out.
Further, described packing job refers to that first closed good mineral building and service channel joint export, and filling pipe is transferred in mineral building by filling return air raise, carries out continuous filling; Mineral building control heights of roofs 3m, actual mining terminates rear filling 2m, and casting resin adopts ore dressing plant classified tailings, adopt hydraulic filling 1.5m bottom mineral building, top surface layer needs consolidated fill 0.5m, and intensity is greater than 2MPa, the solid material of tailings glue: tailings is 1:8, and tailings concentration is 65 ~ 70%; 1m space is reserved in each filling.
Advantage of the present invention adopts ore body in the scope of adopting of filling method mining exploitation upper dish side, takes full advantage of Low grade resource, achieves the resource of country rock and exploit natural resources and the benign cycle of ecological environment.Achieve the underground mining to upper dish side Low grade resource, economic benefit and social benefit remarkable.The present invention has the advantage that the large and filling method of room-and-pillar method production capacity is pressed with effectively controlling concurrently.
Accompanying drawing explanation
Fig. 1 is standard nugget figure of the present invention;
Fig. 2 is Fig. 1 II-II view;
Fig. 3 is III-III view of Fig. 1.
In figure:
1-stage casing transportation roadway along the pulse, 2-wears arteries and veins transportation roadway, 3-segmentation connection roadway along the pulse, 4-segmentation stope connecting taxiway, 5-extracting drift, 6-ramp, 7-ore pass, 8-is drop shaft by the way, 9-ventilation sluicing courtyard, mother-lode goaf, 10-lower wall side, 11-upper dish side ore body back production passage, 12-reserves bar shaped studding, and transportation roadway is coiled in stage casing to 13-, 14-upper dish side ore body.
Detailed description of the invention
The present invention mainly for: 1, thickness is greater than gentle dip or the inclination big thick ore body of more than 8m; 2, ground does not allow to subside, and needs strict protection earth's surface.Do not allow the displacement that overlying rock avalanche is even large, as conditions such as mining, scenic spot mining under mining, mining under euildings, the main line of communication under the water bodys such as beach, lake, rivers; 3, larger production scale is required; 4, ore is worth lower or grade is relatively low, avoids two step rib pillar stopings.Be applicable to after the mother-lode back production of lower wall side terminates, existing development haulage system, supporting role by lower wall ore body delay filling body are utilized to ore body in the scope of adopting of upper dish side, arrange and suitable adopt cut journey, realize the recycling to Hanging orebody;
First determine safe top board exposed area by analytical calculation, and determine bar column dimension and block structure parameter; Transportation roadway 1 and ramp 6 along the pulse in construction stage casing, ore body bottom, and coil transportation roadway 13 from stage casing toward segmentation stope connecting taxiway 4 construction ventilation sluicing courtyard 9 and ore pass 7; After ramp is through, construction segmentation connection roadway 3 along the pulse; Wearing after arteries and veins transportation roadway 2 construction puts in place, construction ore pass 7 and by the way drop shaft 8; Behind ventilation sluicing courtyard position, start construction ventilation sluicing courtyard 9 at segmentation stope connecting taxiway 4 and extracting drift 5 construction, first form ventilation system;
Adopt after cutting engineering construction and carry out mineral building mining, extracting drift 5 rock drilling adopts Boomer 281 jumbo cutter horizontal shallow hole, hole depth 4.0m, aperture φ 45mm, and ore removal lumpiness controls at 500 × 500 below mm; Explosion adopts pin ammonium grain powder, explosive loader powder charge, nonel tube millisecond detonating; After explosion is ventilated, adopt 1.5m 3scraper mechanical shovel ore deposit, through route, segmentation stope connection roadway, pours into ore in direct route drop shaft; Transport stage casing uses the means of transportation of ZK10-6/250 stringing formula rail electric locomotive traction side bottom dumping car, mine car is transportation roadway 1 and wear arteries and veins transportation roadway 2 and enter and to wear in arteries and veins dress ore deposit, drop shaft bottom by the way along the pulse through stage casing, coils transportation roadway 13 ore is transported to stage casing discharge point carries out unloading ore deposit after dress ore deposit from stage casing; Each transport stage casing is equipped with ore, barren rock discharge point, then after crushing system is slightly broken, loads main shaft skip hoisting to earth's surface ore storage bin, is finally transported to ore dressing plant by belt.
After described back production terminates, can carry out packing job, packing job refers to that first closed good mineral building and service channel joint export, and filling pipe is transferred in mineral building by filling return air raise, carries out continuous filling; Mineral building control heights of roofs 3m, actual mining terminates rear filling 2m, and casting resin adopts ore dressing plant classified tailings, adopt hydraulic filling 1.5m bottom mineral building, top surface layer needs consolidated fill 0.5m, and intensity is greater than 2MPa, the solid material of tailings glue: tailings is 1:8, and tailings concentration is 65 ~ 70%; 1m space is reserved in each filling.
Obviously, the above embodiment of the present invention is only for example of the present invention is clearly described, and is not the restriction to embodiments of the present invention.For those of ordinary skill in the field, can also make other changes in different forms on the basis of the above description.Here cannot give exhaustive to all embodiments.Every belong to technical scheme of the present invention the apparent change of extending out or variation be still in the row of protection scope of the present invention.

Claims (3)

1. a upper dish side ore body stoping method in the scope of adopting of mine, for: a, thickness are greater than gentle dip or the inclination big thick ore body of 8m; B, ground do not allow to subside, and need strict protection earth's surface; Do not allow the displacement that overlying rock avalanche is even large; C, the production scale that requirement is larger; D, ore are worth lower or grade is relatively low, avoids two step rib pillar stopings; Be applicable to after the mother-lode back production of lower wall side terminates, existing development haulage system, supporting role by lower wall ore body delay filling body are utilized to ore body in the scope of adopting of upper dish side, arrange and suitable adopt cut journey, realize the recycling to Hanging orebody;
It is characterized in that: adopt in scope ore body in upper dish side, along orebody trend in stage casing along the pulse transportation roadway top arrange segmentation stope connecting taxiway, as ore removal passage, stope capwise is arranged, from stope connecting taxiway to ore body dish and lower wall back production, length is 60m, and wide is ore body horizontal breadth, is highly miding level height 45m; Eight mineral buildings arranged by each stope, and width is 5m; The wide 2m of bar post, long is orebody thickness; Fore-set height 6m, post of not keeping on file;
Adopt accurate engineering and have stage casing transportation roadway, segmentation along the pulse connection roadway, ore pass, segmentation stope connecting taxiway, ventilation sluicing courtyard, upper dish side ore body back production passage along the pulse; Utilize on the stage casing of existing back production industry mother-lode and coil haulage drift, every 60m, across pitch arranges that a drop shaft and a pedestrian are ventilated sluicing courtyard, meets ore drawing in stope and pedestrian, ventilation needs; Segmentation along the pulse connection roadway and back production industry mother-lode segmentation along the pulse connection roadway share; This segmentation along the pulse connecting taxiway is arranged in outside the lower wall arteries and veins of industrial mother-lode, is communicated with upper and lower stage casing by exploiting field ramp, in studding reserved after industrial mother-lode back production from segmentation along the pulse connecting taxiway coil side ore body back production passage to ore body driving; By all comparatively stable position construction return air filling sluicing courtyard of Pan Kuangyan on ore body in mineral building, bottom is used as drainage sump, and top is used as return air, fill pass, and exports as Stope safty;
Adopt after cutting engineering construction and carry out mineral building mining, rock drilling adopts jumbo cutter horizontal shallow hole, hole depth 3.8 ~ 4.0m, and first mining room to paste on ore body the drawing back of dish capwise along the pulse to stope border from undercuting; Can the back production simultaneously of multiple mineral building in stope, also can move back simultaneously and adopt by several routes in a mineral building; Slicing height 2m; Each segmentation divides 6 layers of back production; After all routes or part drift stoping terminate in a mineral building, packing job can be carried out.
2. upper dish side ore body stoping method in the scope of adopting of a kind of mine as claimed in claim 1, is characterized in that:
First determine safe top board exposed area by analytical calculation, and determine bar column dimension and block structure parameter; Transportation roadway (1) and ramp (6) along the pulse in construction stage casing, ore body bottom, and coil transportation roadway (13) from stage casing toward segmentation stope connecting taxiway (4) construction ventilation sluicing courtyard (9) and ore pass (7); After ramp is through, construction segmentation connection roadway (3) along the pulse; Wear arteries and veins transportation roadway (2) construction put in place after, construction ore pass (7) and direct route drop shaft (8); Behind ventilation sluicing courtyard position, start construction ventilation sluicing courtyard (9) at segmentation stope connecting taxiway (4) and extracting drift (5) construction, first form ventilation system;
Adopt after cutting engineering construction and carry out mineral building mining, extracting drift (5) rock drilling adopts jumbo cutter horizontal shallow hole, hole depth 4.0m, aperture φ 45mm, and ore removal lumpiness controls at 500 × 500 below mm; Explosion adopts pin ammonium grain powder, explosive loader powder charge, nonel tube millisecond detonating; After explosion is ventilated, adopt scraper mechanical shovel ore deposit, through route, segmentation stope connection roadway, ore is poured in direct route drop shaft; Transport stage casing uses the means of transportation of rail trolley locomotive traction side bottom dumping car, mine car is transportation roadway (1) and wear arteries and veins transportation roadway (2) and enter and to wear in arteries and veins dress ore deposit, drop shaft bottom by the way along the pulse through stage casing, coils transportation roadway (13) ore is transported to stage casing discharge point carries out unloading ore deposit after dress ore deposit from stage casing; Each transport stage casing is equipped with ore, barren rock discharge point, then after crushing system is slightly broken, loads main shaft skip hoisting to earth's surface ore storage bin, is finally transported to ore dressing plant by belt.
3. upper dish side ore body stoping method in the scope of adopting of a kind of mine as claimed in claim 1, it is characterized in that: described packing job refers to that first closed good mineral building and service channel joint export, filling pipe is transferred in mineral building by filling return air raise, carries out continuous filling; Mineral building control heights of roofs 3m, actual mining terminates rear filling 2m, and casting resin adopts ore dressing plant classified tailings, adopt hydraulic filling 1.5m bottom mineral building, top surface layer needs consolidated fill 0.5m, and intensity is greater than 2MPa, the solid material of tailings glue: tailings is 1:8, and tailings concentration is 65 ~ 70%; 1m space is reserved in each filling.
CN201310509626.0A 2013-10-25 2013-10-25 Upper dish side ore body stoping method in the scope of adopting of mine Active CN103603665B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310509626.0A CN103603665B (en) 2013-10-25 2013-10-25 Upper dish side ore body stoping method in the scope of adopting of mine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310509626.0A CN103603665B (en) 2013-10-25 2013-10-25 Upper dish side ore body stoping method in the scope of adopting of mine

Publications (2)

Publication Number Publication Date
CN103603665A CN103603665A (en) 2014-02-26
CN103603665B true CN103603665B (en) 2015-08-12

Family

ID=50121917

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310509626.0A Active CN103603665B (en) 2013-10-25 2013-10-25 Upper dish side ore body stoping method in the scope of adopting of mine

Country Status (1)

Country Link
CN (1) CN103603665B (en)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018836B (en) * 2014-06-25 2016-05-18 中南大学 A kind of point mining method that has false top rake middle thickness orebody built on the sand
CN105525921A (en) * 2016-02-18 2016-04-27 刘玉勇 Conjugate type mining preparation method
CN106640075B (en) * 2016-11-09 2018-09-14 福州大学 Low-angle dip mineral ore continuous mining based on combination checkerboard type bottom structure
CN107989614B (en) * 2017-12-06 2019-04-26 昆明冶金高等专科学校 The mining methods of the inclined thick ore body of disk rock crusher in a kind of back production
CN108894783B (en) * 2018-07-11 2019-06-21 鄂托克旗乌仁都西煤焦有限责任公司 A kind of half-edge coal seam paste body filling coal-mining technique
CN109268011B (en) * 2018-11-30 2020-05-08 中冶沈勘秦皇岛工程设计研究总院有限公司 Combined filling mining method
CN110984986B (en) * 2019-12-19 2021-05-14 山东东山新驿煤矿有限公司 Radial coal mining method for controlling surface deformation
CN111911160A (en) * 2020-07-15 2020-11-10 中国恩菲工程技术有限公司 Slowly-inclined ore body stope arrangement system
CN111894592A (en) * 2020-08-05 2020-11-06 长沙矿山研究院有限责任公司 Wall column type upward horizontal layered filling mining method
CN111963194B (en) * 2020-08-21 2021-08-31 内蒙古维维能源有限公司 Roadway arrangement method based on irregular mining area
CN112855159A (en) * 2021-01-15 2021-05-28 山东黄金归来庄矿业有限公司 Sector recovery method for gently inclined ore pillar
CN113062740B (en) * 2021-04-08 2024-05-10 湖北三鑫金铜股份有限公司 Small layered filling mining method for multi-directional ramp without ore pillar
CN113250695B (en) * 2021-06-01 2023-10-24 额济纳旗圆通矿业有限责任公司 Layered filling mining method and mine filling system
CN113482614B (en) * 2021-07-20 2023-06-27 河南发恩德矿业有限公司 Mining method for gently inclined extremely thin gold vein

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3838886A (en) * 1972-09-29 1974-10-01 O Kilroy Hydraulically powered ore raising mechanism for mining system
CN87100375A (en) * 1987-01-20 1987-07-15 吴振虎 Strip caving open stopping method and equipment
CN1067290A (en) * 1991-05-28 1992-12-23 枣庄市联营石膏矿 Room-and-pilar type caving for mine
CN1450249A (en) * 2002-04-10 2003-10-22 招远市大河金矿 Mining method
CN1548702A (en) * 2003-05-22 2004-11-24 中南大学 Mining method for continuous stoping of inclined medium-thick multilayer or thick ore body

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3838886A (en) * 1972-09-29 1974-10-01 O Kilroy Hydraulically powered ore raising mechanism for mining system
CN87100375A (en) * 1987-01-20 1987-07-15 吴振虎 Strip caving open stopping method and equipment
CN1067290A (en) * 1991-05-28 1992-12-23 枣庄市联营石膏矿 Room-and-pilar type caving for mine
CN1450249A (en) * 2002-04-10 2003-10-22 招远市大河金矿 Mining method
CN1548702A (en) * 2003-05-22 2004-11-24 中南大学 Mining method for continuous stoping of inclined medium-thick multilayer or thick ore body

Also Published As

Publication number Publication date
CN103603665A (en) 2014-02-26

Similar Documents

Publication Publication Date Title
CN103603665B (en) Upper dish side ore body stoping method in the scope of adopting of mine
CN106869931B (en) A kind of barren rock and cementing layering wedging mining with stowing technique and its structure
CN103527200B (en) Bottom-column-free sectional Rhombic room afterwards filling mining method
CN102562065B (en) Sublevel open-stop and delayed filling mining method
CN106894817B (en) A kind of mechanization Upward slicing wedging mixed filling mining codes
CN104533416B (en) Pole big thick ore body massive mechanical non-pillar sublevel caving mining methods
CN106121643B (en) Reserved two step nesting of retaining wall mine combines the method for mining by the way of filling
CN109488301A (en) A kind of mine, which picks up, fills place's recovery method
CN105019904B (en) Mining- machine-based slowly inclined thin ore vein mechanized continuous mining method
CN104481539B (en) From kerve tight-face blasting caved stopes
CN106223958A (en) The slant middle thick orebody subregion rock drilling stage ore deposit afterwards filling that falls works in coordination with mining codes
CN206571487U (en) A kind of barren rock and cementing layering wedging mining with stowing structure
CN103437769B (en) Combination is reproduced structure medium-length hole ore blast and is worked in coordination with cable bolting afterwards filling mining method
CN102086765B (en) High-sublevel multi-layer mining method of ultrathin copper ore body
CN103967494B (en) A kind of shallow-hole shrinkage afterwards filling mining methods
CN104481543B (en) Stage shrink caved stopes
CN103306720A (en) Inclined layered solid filling coal mining method for ultra-thick coal seam
CN102168579A (en) Rib-pillar-free continuous sublevel filling method for mining preparation in medium-thickness slope crushed ore body vein
CN110359914B (en) Safe and low-cost combined sublevel mining method for gently inclined medium-thickness ore body
CN106499396B (en) Medium-thickness slowly-inclined waste rock-containing interlayer ore body room-column mining method
CN104790956A (en) Remote control heading machine tunnel type or fully-mechanized top coal exploitation end slope coal technology
CN106194188A (en) The quick-fried power of scraper collaborative carrying puppet tilts room and pillar stoping
CN109458181A (en) A kind of filling mining method of metallic ore across pitch full-seam mining
CN102635357A (en) Pillarless phased caving method with top tailing crushed stone filling and sectional water injection binding
CN201474347U (en) Sublevel mining room

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant