CN103603275B - 一种节段钢箱梁滑移上岸的***及方法 - Google Patents
一种节段钢箱梁滑移上岸的***及方法 Download PDFInfo
- Publication number
- CN103603275B CN103603275B CN201310496435.5A CN201310496435A CN103603275B CN 103603275 B CN103603275 B CN 103603275B CN 201310496435 A CN201310496435 A CN 201310496435A CN 103603275 B CN103603275 B CN 103603275B
- Authority
- CN
- China
- Prior art keywords
- girder
- steel box
- slideway
- slippage
- transverse shifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本发明是一种节段钢箱梁滑移上岸的***及方法,其结构是可横向移动滑道2在固定滑道1上,可横向移动滑道2、固定滑道1及顶面纵横向高程差不大于±5mm,可横向移动滑道梁2在下滑道9上, 桥面架梁吊机6与运输驳船7是对应设置的,节段钢箱梁8在运输驳船7上,桥面架梁吊机6提升驳船7上的钢箱梁8,至离开滑道50cm,运输驳船7驶出,由钢管桩5和滑道组成滑移支架,滑道由贝雷梁3和滑道梁4组成,桥面架梁吊机6、钢箱梁8、滑块10对应设置的。优点:不需要另外配置大型起吊和运输设备,直接利用桥面架梁吊机,将节段钢箱梁从驳船上提升并滑移到待架位置,快速方便,节约工程费用。
Description
技术领域
本发明涉及的是一种大跨度钢箱梁节段悬臂拼装架设的节段钢箱梁滑移上岸的***及方法,属桥梁施工领域。
背景技术
随着我国桥梁建设水平的日益提高,大跨度钢箱梁在跨江、跨海桥梁建设中得到越来越多的应用,大跨度钢箱梁一般采用节段悬臂拼装法架设。当桥梁的边跨位于浅滩或陆地,运输船舶无法到达桥面架梁吊机下方,且受上下游桥梁净空或水深影响,大型吊船无法驶入,而钢箱梁结构尺寸大,陆地又无法运输时,给桥梁施工带来了困难。
发明内容
本发明提出的是一种节段钢箱梁滑移上岸的***及方法,其目的旨在克服现有技术所存在的上述缺陷,解决节段钢箱梁水上运输后无法上岸的难题。具有安全可靠、快速简便,并且滑移支架可部分横向移动等功能。
本发明的技术解决方案为:一种节段钢箱梁滑移上岸***,其结构包括固定滑道、可横向移动滑道、贝雷梁、滑道梁、钢管桩、架梁吊机、运输驳船、节段钢箱梁、下滑道、滑块;其中可横向移动滑道在固定滑道上,可横向移动滑道、固定滑道及顶面纵横向高程差不大于±5mm,可横向移动滑道梁在下滑道上, 桥面架梁吊机与运输驳船是对应设置的,节段钢箱梁在运输驳船上,工作时运输驳船按架梁顺序依次运载节段钢箱梁驶入,桥面架梁吊机提升运输驳船上的钢箱梁,至离开滑道50cm,运输驳船驶出,由钢管桩和滑道组成滑移支架,滑道由贝雷梁和滑道梁组成,桥面架梁吊机、钢箱梁、滑块对应设置的,工作时桥面架梁吊机将钢箱梁下放至滑块上。
节段钢箱梁滑移上岸方法,包括如下实施步骤:
a、施工钢梁滑移上岸滑移支架,严格控制固定滑道及可横向移动滑道顶面纵横向高程差不大于±5mm;
b、运输驳船按架梁顺序依次运输深水区节段钢箱梁,桥面架梁吊机提升钢箱梁架设,直至架设到设置滑移支架位置;
c、可横向移动滑道梁在下滑道上滑移至同一侧,使运输驳船及其运输的钢箱梁与滑道平面位置不冲突;
d、 运输驳船按架梁顺序依次运载节段钢箱梁驶入,桥面架梁吊机提升运输驳船上的钢箱梁,至离开滑道50cm,运输驳船驶出;
e、可横向移动滑道复位,与固定滑道连接固定,桥面架梁吊机将钢箱梁下放至滑块上,通过牵引千斤顶将钢箱梁滑移上岸至待安装位置,以备架梁吊机提升架设。
本发明的优点:不需要另外配置大型起吊和运输设备,直接利用桥面架梁吊机,将节段钢箱梁从驳船上提升并滑移到待架位置,快速方便,节约工程费用。
附图说明
图1是桥面架梁吊机在驳船上取梁立面图。
图2是桥面架梁吊机在驳船上取梁平面图。
图3是桥面架梁吊机落梁及钢梁滑移就位立面图。
图4是桥面架梁吊机落梁及钢梁滑移就位平面图。
图中的1是固定滑道、2是可横向移动滑道、3是贝雷梁、4是滑道梁、5是钢管桩、6是架梁吊机、7是运输驳船、8是节段钢箱梁、9是下滑道、10是滑块。
具体实施方式
一种节段钢箱梁滑移上岸***,其结构包括固定滑道1、可横向移动滑道2、贝雷梁3、滑道梁4、钢管桩5、架梁吊机6、运输驳船7、节段钢箱梁8、下滑道9、滑块10;其中可横向移动滑道2在固定滑道1上,可横向移动滑道2、固定滑道1及顶面纵横向高程差不大于±5mm,可横向移动滑道梁2在下滑道9上, 桥面架梁吊机6与运输驳船7是对应设置的,节段钢箱梁8在运输驳船7上,工作时运输驳船7按架梁顺序依次运载节段钢箱梁8驶入,桥面架梁吊机6提升驳船7上的钢箱梁8,至离开滑道50cm,运输驳船7驶出,由钢管桩5和滑道组成滑移支架,滑道由贝雷梁3和滑道梁4组成,桥面架梁吊机6、钢箱梁8、滑块10对应设置的,工作时桥面架梁吊机6将钢箱梁8下放至滑块10上。
节段钢箱梁滑移上岸方法,包括如下实施步骤:
a、施工钢梁滑移上岸滑移支架,严格控制固定滑道1及可横向移动滑道2顶面纵横向高程差不大于±5mm。
b、运输驳船7按架梁顺序依次运输深水区节段钢箱梁8,桥面架梁吊机6提升钢箱梁8架设,直至架设到设置滑移支架位置。
c、可横向移动滑道梁2在下滑道9上滑移至同一侧,使运输驳船7及其运输的钢箱梁8与滑道2平面位置不冲突。
d. 运输驳船7按架梁顺序依次运载节段钢箱梁8驶入,桥面架梁吊机6提升驳船7上钢箱梁8,至离开滑道50cm,运输驳船7驶出。
e、可横向移动滑道2复位,与固定滑道1连接固定,桥面架梁吊机6将钢箱梁8下放至滑块10上,通过牵引千斤顶将钢箱梁8滑移上岸至待安装位置,以备架梁吊机6提升架设。
所述的可横向移动滑道在运输驳船驶入前,向一侧移开,供船舶进入和架梁吊机提升钢箱梁;运梁船舶退出后,可横向移动滑道复位,与固定滑道连接牢固,形成一整体滑道。
所述的纵向滑移支架是在桥梁投影面位置,从岸边至水中设置上下游两幅。
所述的可横向移动滑道为水中端头部分,两幅可横向移动滑道在运输驳船驶入前,同时向两侧滑开,以避开滑道与驳船的平面位置冲突,方便架梁吊机起吊钢箱梁。
对照附图1、附图2,可横向移动滑道2与固定滑道1脱离,并通过千斤顶牵引滑移至下滑道9一侧,装载钢箱梁8的运输驳船7驶入,架梁吊机6提起钢箱梁8。
对照附图3和附图4,运输驳船7退出,可横向移动滑道2复位,与固定滑道1连接牢固。桥面架梁吊机6将钢箱梁8下放至可横向移动滑道2的顶面滑块10上,钢箱梁8通过千斤顶牵引,滑移至待架位置,架梁吊机6依次提升架设钢箱梁8。
Claims (4)
1.节段钢箱梁滑移上岸方法,其特征是该方法包括如下实施步骤:
a、施工钢梁滑移上岸滑移支架,严格控制固定滑道及可横向移动滑道顶面纵横向高程差不大于±5mm;
b、运输驳船按架梁顺序依次运输深水区节段钢箱梁,桥面架梁吊机提升钢箱梁架设,直至架设到设置滑移支架位置;
c、可横向移动滑道梁在下滑道上滑移至同一侧,使运输驳船及其运输的钢箱梁与滑道平面位置不冲突;
d、 运输驳船按架梁顺序依次运载节段钢箱梁驶入,桥面架梁吊机提升运输驳船上的钢箱梁,至离开滑道50cm,运输驳船驶出;
e、可横向移动滑道复位,与固定滑道1连接固定,桥面架梁吊机将钢箱梁下放至滑块上,通过牵引千斤顶将钢箱梁滑移上岸至待安装位置,以备架梁吊机提升架设。
2.根据权利要求1所述的节段钢箱梁滑移上岸方法,其特征是所述的可横向移动滑道在运输驳船驶入前,向一侧移开,供运梁船舶进入和架梁吊机提升钢箱梁;运梁船舶退出后,可横向移动滑道复位,与固定滑道连接牢固,形成一整体滑道。
3.根据权利要求1所述的节段钢箱梁滑移上岸方法,其特征是所述的纵向滑移支架是在桥梁投影面位置,从岸边至水中设置上下游两幅可横向移动滑道。
4.根据权利要求1所述的节段钢箱梁滑移上岸方法,其特征是所述的可横向移动滑道为水中端头部分,两幅可横向移动滑道在运输驳船驶入前,同时向两侧滑开,以避开滑道与驳船的平面位置冲突,方便架梁吊机起吊钢箱梁。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310496435.5A CN103603275B (zh) | 2013-10-22 | 2013-10-22 | 一种节段钢箱梁滑移上岸的***及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310496435.5A CN103603275B (zh) | 2013-10-22 | 2013-10-22 | 一种节段钢箱梁滑移上岸的***及方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103603275A CN103603275A (zh) | 2014-02-26 |
CN103603275B true CN103603275B (zh) | 2015-08-26 |
Family
ID=50121530
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310496435.5A Active CN103603275B (zh) | 2013-10-22 | 2013-10-22 | 一种节段钢箱梁滑移上岸的***及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103603275B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104790300B (zh) * | 2015-05-19 | 2017-07-21 | 中铁大桥局集团有限公司 | 一种柔性墩旁架梁平台及其施工方法 |
CN109137759B (zh) * | 2018-09-29 | 2023-12-19 | 中铁第四勘察设计院集团有限公司 | 一种预应力混凝土箱梁节段预制悬臂拼装方法及*** |
CN114016422B (zh) * | 2021-11-23 | 2023-11-03 | 中铁大桥局集团有限公司 | 一种钢梁架设方法 |
CN114671265B (zh) * | 2022-04-13 | 2023-10-20 | 中交路桥华南工程有限公司 | 智能化重物移位装置 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006077521A (ja) * | 2004-09-13 | 2006-03-23 | Oriental Construction Co Ltd | 橋梁構築装置 |
CN201144394Y (zh) * | 2007-12-27 | 2008-11-05 | 中铁四局集团有限公司 | 大型钢梁移位装置 |
CN101725115B (zh) * | 2009-12-18 | 2011-05-04 | 中铁大桥局集团第二工程有限公司 | 一种顶推钢箱梁的固定起吊支架装置及施工方法 |
CN102071652B (zh) * | 2010-12-28 | 2013-06-12 | 武汉二航路桥特种工程有限责任公司 | 实施大吨位物体拖拉上岸的方法及其装置 |
CN201952736U (zh) * | 2011-01-18 | 2011-08-31 | 中铁大桥局集团第五工程有限公司 | 辅助不变幅架梁吊机架设钢箱梁用辅助墩活动支架 |
-
2013
- 2013-10-22 CN CN201310496435.5A patent/CN103603275B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN103603275A (zh) | 2014-02-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103603275B (zh) | 一种节段钢箱梁滑移上岸的***及方法 | |
CN101736699B (zh) | 全支架钢箱梁滑移精确定位方法 | |
CN101225638A (zh) | 地锚式悬索桥预应力混凝土加劲箱梁安装方法 | |
KR102085994B1 (ko) | 런칭 갠트리 크레인을 이용한 교량 거더의 횡방향 양측 동시 인양 방식의 교량 시공방법 | |
CN102367650A (zh) | 一种钢管拱桥的施工方法 | |
WO2018090875A1 (zh) | 一种自航式水下隧道沉管运载安装一体船 | |
CN104532748A (zh) | 一种超千吨线钢桁梁浮托顶推架设施工方法 | |
KR20100129451A (ko) | 분할 건조 방식을 이용한 선박 진수 방법 | |
CN101831888A (zh) | 1200吨级水利渡槽运、架设备 | |
CN102808380B (zh) | 一种索鞍横移***及索鞍横移施工方法 | |
CN102477733A (zh) | 悬臂梁整体拖移至平台的安装方法 | |
CN104018426A (zh) | 一种钢桁梁安装方法 | |
CN102849470A (zh) | 一种钢箱梁节的装船方法 | |
CN105544409A (zh) | 双导梁架桥机架设组合梁现拼段钢梁施工工艺 | |
CN107140154B (zh) | 一种双体船下水装置及方法 | |
CN107031801A (zh) | 一种平地造船下水方法 | |
CN103640909B (zh) | 大型构件滚装装船方法 | |
CN203546610U (zh) | 一种节段钢箱梁滑移上岸*** | |
CN103174093A (zh) | 一种支架区钢箱梁的安装装置及其安装方法 | |
KR100642343B1 (ko) | 항만공사용 대형 케이슨 진수대 | |
CN103334442A (zh) | 竖转连接围堰的方法及结构 | |
CN103332271B (zh) | 一种吹砂用可行进式浮动平台 | |
CN102837978B (zh) | 一种大构件滚装和浮吊相结装船方法 | |
CN210529503U (zh) | 一种悬索桥运梁船定位装置 | |
CN208932569U (zh) | 一种运梁船调整平台 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |