CN103174093A - 一种支架区钢箱梁的安装装置及其安装方法 - Google Patents

一种支架区钢箱梁的安装装置及其安装方法 Download PDF

Info

Publication number
CN103174093A
CN103174093A CN2013100808466A CN201310080846A CN103174093A CN 103174093 A CN103174093 A CN 103174093A CN 2013100808466 A CN2013100808466 A CN 2013100808466A CN 201310080846 A CN201310080846 A CN 201310080846A CN 103174093 A CN103174093 A CN 103174093A
Authority
CN
China
Prior art keywords
platform
steel case
case beam
falsework
steel box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100808466A
Other languages
English (en)
Inventor
张鸿
彭琳琳
唐衡
何承海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
CCCC SHEC Fourth Engineering Co Ltd
Original Assignee
CCCC Second Harbor Engineering Co
CCCC SHEC Fourth Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co, CCCC SHEC Fourth Engineering Co Ltd filed Critical CCCC Second Harbor Engineering Co
Priority to CN2013100808466A priority Critical patent/CN103174093A/zh
Publication of CN103174093A publication Critical patent/CN103174093A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种支架区钢箱梁的安装装置及其安装方法,属于桥梁施工领域,装置包括搭设在桥梁的纵向中轴线上的临时支架平台,以及锚固在所述临时支架平台上的变幅式桥面吊机,还包括环绕所述临时支架平台布置的滑移支架平台,所述滑移支架平台顶部平台平面上铺设固定有相连接的横向滑移轨道及两纵向滑移轨道。安装方法,依次包括以下步骤:布置安装装置;变幅式桥面吊机起吊钢箱梁;将分块钢箱梁放置在滑移支架平台上;分块钢箱梁通过横纵向滑移轨道滑移至预定的钢箱梁安装位置;重复,完成支架区梁段的安装。本发明的目的在于:提出一种在不具备大型起重船或者起重吊车的驻位条件的情况下,进行支架区分幅式钢箱梁的安装施工的装置及其方法。

Description

一种支架区钢箱梁的安装装置及其安装方法
技术领域
本发明属于桥梁施工领域,尤其涉及桥梁建造过程中,支架区分幅式钢箱梁的安装施工。
背景技术
1)传统支架区钢箱梁安装装置及其工艺:
钢箱梁做为桥梁结构中承受桥面荷载的重要结构物,越来越多的被广泛采用。传统支架区整体式或分幅式钢箱梁往往采用大型起重船舶或者起重吊车,将运输至现场的钢箱梁起吊并抬升后,通过旋转起重大臂的方式将钢箱梁搁置在预先搭设的钢箱梁支架上。
2)传统施工工艺的局限性:
传统方法施工时,往往需要采用大型起重船或者起重吊车。当现场水文条件恶劣,不具备大型起重船或者起重吊车的驻位条件时,钢箱梁往往无法吊装。传统工艺受条件限制较大。
发明内容
本发明的目的在于:提出一种在不具备大型起重船或者起重吊车的驻位条件的情况下,进行支架区分幅式钢箱梁的安装施工的装置及其方法。
本发明目的通过下述技术方案来实现:
一种支架区钢箱梁的安装装置,包括搭设在桥梁的纵向中轴线上的临时支架平台,且所述临时支架平台位于左右幅钢箱梁的分幅的中间空档,以及锚固在所述临时支架平台上的变幅式桥面吊机,且所述变幅式桥面吊机也驻位于桥梁的纵向中轴线上,还包括环绕所述临时支架平台布置的滑移支架平台,所述滑移支架平台顶部平台平面上铺设固定有相连接的横向滑移轨道及两纵向滑移轨道,且所述两纵向滑移轨道位置分别对应左右幅钢箱梁位置。
一种使用前述安装装置安装支架区钢箱梁的安装方法,依次包括以下步骤:
1)布置所述安装装置;
2)运输分块钢箱梁至设计位置,变幅式桥面吊机变幅下勾、连接,起吊钢箱梁;
3)通过变幅式桥面吊机的变幅功能,将分块钢箱梁放置在滑移支架平台上;
4)分块钢箱梁通过滑移支架平台上的横向滑移轨道横向滑移至纵向滑移轨道,再通过纵向滑移轨道纵向滑移至预定的钢箱梁安装位置;
5)重复第2-4步,完成多片分块钢箱梁的起吊和滑移工作;
6)重复第5步,完成对称一片梁段的安装;
7)重复第6步,完成支架区梁段的安装。
作为优选方式,所述变幅式桥面吊机锚固位置的高度超过安装完成后的钢箱梁高度。
上述方案中,避免钢箱梁在滑移过程中受到阻碍。
工作过程为:单片钢箱梁通过变幅式桥面吊机起吊后,通过预设的横、纵向滑移轨道,横移和纵移两次滑移到位。该方法既适用于索塔支架区钢箱梁安装,也适用于边跨支架区钢箱梁安装。
本发明的有益效果:桥面吊机跨中一次就位无需挪位即可实现支架区全部钢箱梁安装。安装方便,无需大型的起重船舶和起重吊车。变幅式桥面吊机安装完支架区钢箱梁后,可就地周转至悬臂钢箱梁安装,不额外增加桥面吊机购买成本,施工费用大幅降低。
附图说明
图1是本发明实施例支架区钢箱梁安装装置的结构示意图;
图2是本发明实施例支架区钢箱梁安装方法的步骤1的示意图;
图3是图2的俯视图;
图4是本发明实施例支架区钢箱梁安装方法的步骤2的示意图;
图5是图4的俯视图;
图6是本发明实施例支架区钢箱梁安装方法的步骤3的示意图;
图7是图6的俯视图;
图8是本发明实施例支架区钢箱梁安装方法的步骤4的示意图;
图9是图8的俯视图;
图10是本发明实施例支架区钢箱梁安装方法的步骤5的示意图;
图11是图10的俯视图;
图12是本发明实施例支架区钢箱梁安装方法的步骤6的示意图;
图13是图12的俯视图;
图14是本发明实施例支架区钢箱梁安装方法的步骤7的示意图;
图15是图14的俯视图;
其中1为变幅式桥面吊机、2为临时支架平台、3为滑移支架平台、4为纵向滑移轨道、5为横向滑移轨道、6为桥梁的纵向中轴线、7为钢箱梁。
具体实施方式
下列非限制性实施例用于说明本发明。
如图1至15所示,一种支架区钢箱梁的安装装置,包括搭设在桥梁的纵向中轴线6上的临时支架平台2,且临时支架平台2位于左右幅钢箱梁7的分幅的中间空档,以及锚固在临时支架平台2上的变幅式桥面吊机1,且变幅式桥面吊机1也驻位于桥梁的纵向中轴线6上,还包括环绕临时支架平台2布置的滑移支架平台3,滑移支架平台3顶部平台平面上铺设固定有相连接的横向滑移轨道5及两纵向滑移轨道4,且两纵向滑移轨道4位置分别对应左右幅钢箱梁7位置。
如图2至15所示,一种使用前述安装装置安装支架区钢箱梁的安装方法,依次包括以下步骤:
1)布置所述安装装置,其中变幅式桥面吊机1锚固位置的高度超过安装完成后的钢箱梁7高度,如图2、3所示;
2)运输分块钢箱梁7至设计位置,变幅式桥面吊机1变幅下勾、连接,起吊钢箱梁7,如图4、5所示;
3)通过变幅式桥面吊机1的变幅功能,将分块钢箱梁7放置在滑移支架平台3上,如图6、7所示;
4)分块钢箱梁7通过滑移支架平台3上的横向滑移轨道5横向滑移至纵向滑移轨道4,再通过纵向滑移轨道4纵向滑移至预定的钢箱梁安装位置,如图8、9所示;
5)重复第2-4步,完成多片分块钢箱梁7的起吊和滑移工作,如图10、11所示;
6)重复第5步,完成对称一片梁段的安装,如图12、13所示;
7)重复第6步,完成支架区梁段的安装,如图14、15所示。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。

Claims (3)

1.一种支架区钢箱梁的安装装置,其特征在于:包括搭设在桥梁的纵向中轴线上的临时支架平台,且所述临时支架平台位于左右幅钢箱梁的分幅的中间空档,以及锚固在所述临时支架平台上的变幅式桥面吊机,且所述变幅式桥面吊机也驻位于桥梁的纵向中轴线上,还包括环绕所述临时支架平台布置的滑移支架平台,所述滑移支架平台顶部平台平面上铺设固定有相连接的横向滑移轨道及两纵向滑移轨道,且所述两纵向滑移轨道位置分别对应左右幅钢箱梁位置。
2.一种使用权利要求1所述安装装置安装支架区钢箱梁的安装方法,其特征在于依次包括以下步骤:
1)布置所述安装装置;
2)运输分块钢箱梁至设计位置,变幅式桥面吊机变幅下勾、连接,起吊钢箱梁;
3)通过变幅式桥面吊机的变幅功能,将分块钢箱梁放置在滑移支架平台上;
4)分块钢箱梁通过滑移支架平台上的横向滑移轨道横向滑移至纵向滑移轨道,再通过纵向滑移轨道纵向滑移至预定的钢箱梁安装位置;
5)重复第2-4步,完成多片分块钢箱梁的起吊和滑移工作;
6)重复第5步,完成对称一片梁段的安装;
7)重复第6步,完成支架区梁段的安装。
3.如权利要求2所述支架区钢箱梁的安装方法,其特征在于:所述变幅式桥面吊机锚固位置的高度超过安装完成后的钢箱梁高度。
CN2013100808466A 2013-03-14 2013-03-14 一种支架区钢箱梁的安装装置及其安装方法 Pending CN103174093A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100808466A CN103174093A (zh) 2013-03-14 2013-03-14 一种支架区钢箱梁的安装装置及其安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100808466A CN103174093A (zh) 2013-03-14 2013-03-14 一种支架区钢箱梁的安装装置及其安装方法

Publications (1)

Publication Number Publication Date
CN103174093A true CN103174093A (zh) 2013-06-26

Family

ID=48634248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100808466A Pending CN103174093A (zh) 2013-03-14 2013-03-14 一种支架区钢箱梁的安装装置及其安装方法

Country Status (1)

Country Link
CN (1) CN103174093A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105442451A (zh) * 2015-11-11 2016-03-30 中铁大桥局集团第一工程有限公司 平弯钢槽梁顶推施工装置及方法
CN105648913A (zh) * 2015-12-17 2016-06-08 浙江大学 一种钢箱梁桥横向分块施工临时加固方法
CN106522097A (zh) * 2016-11-02 2017-03-22 中交第二航务工程局有限公司 超大跨空间索面悬索桥架梁用自适应缆载吊机
CN106544956A (zh) * 2016-10-09 2017-03-29 浙江大学 一种钢箱梁横向分块施工临时撑纵向布置方法
CN110318344A (zh) * 2019-06-28 2019-10-11 中交二航局第四工程有限公司 一种新型钢箱梁0号块支架及0号块搭设施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1800498A (zh) * 2005-07-12 2006-07-12 上海市第二市政工程有限公司 一种大型混凝土箱梁的起吊方法
CN102182147A (zh) * 2011-03-31 2011-09-14 中铁港航局集团第二工程有限公司 一种钢箱梁架设方法
CN102277825A (zh) * 2011-05-23 2011-12-14 江苏沪宁钢机股份有限公司 一种钢桁架桥及其制作方法
KR20120103300A (ko) * 2011-03-10 2012-09-19 주식회사 아모텍 Nfc 안테나 모듈

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1800498A (zh) * 2005-07-12 2006-07-12 上海市第二市政工程有限公司 一种大型混凝土箱梁的起吊方法
KR20120103300A (ko) * 2011-03-10 2012-09-19 주식회사 아모텍 Nfc 안테나 모듈
CN102182147A (zh) * 2011-03-31 2011-09-14 中铁港航局集团第二工程有限公司 一种钢箱梁架设方法
CN102277825A (zh) * 2011-05-23 2011-12-14 江苏沪宁钢机股份有限公司 一种钢桁架桥及其制作方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李传习等: ""嘉绍大桥斜拉桥边跨钢箱梁架设方法及支架的受力分析",李传习等,中外公路,第6期,第129~133页,2012年12月31日", 《中外公路》, no. 6, 31 December 2012 (2012-12-31), pages 129 - 133 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105442451A (zh) * 2015-11-11 2016-03-30 中铁大桥局集团第一工程有限公司 平弯钢槽梁顶推施工装置及方法
CN105648913A (zh) * 2015-12-17 2016-06-08 浙江大学 一种钢箱梁桥横向分块施工临时加固方法
CN106544956A (zh) * 2016-10-09 2017-03-29 浙江大学 一种钢箱梁横向分块施工临时撑纵向布置方法
CN106544956B (zh) * 2016-10-09 2018-03-20 浙江大学 一种钢箱梁横向分块施工临时撑纵向布置方法
CN106522097A (zh) * 2016-11-02 2017-03-22 中交第二航务工程局有限公司 超大跨空间索面悬索桥架梁用自适应缆载吊机
CN106522097B (zh) * 2016-11-02 2018-12-04 中交第二航务工程局有限公司 超大跨空间索面悬索桥架梁用自适应缆载吊机
CN110318344A (zh) * 2019-06-28 2019-10-11 中交二航局第四工程有限公司 一种新型钢箱梁0号块支架及0号块搭设施工方法
CN110318344B (zh) * 2019-06-28 2024-04-19 中交二航局第四工程有限公司 一种新型钢箱梁0号块支架及0号块搭设施工方法

Similar Documents

Publication Publication Date Title
CN102602712B (zh) 一种钢箱梁节段滚装装船的方法
JP6701362B2 (ja) Stsマルチトロリーポータルガントリーコンテナクレーン
CN103174093A (zh) 一种支架区钢箱梁的安装装置及其安装方法
CN104805773A (zh) 施工小曲线桥的节段拼装架桥机
CN105484162A (zh) 悬索桥施工岸上加劲梁二次荡移装置及方法
CN101381055A (zh) 利用四吊钩龙门起重机对大型物件进行旋转的方法
CN104060543A (zh) 一种预制桥面板的安装装置
CN106082049B (zh) 一种32t钢板龙门吊长距离转运工艺
CN202689016U (zh) 深水桥墩双壁钢围堰施工用围堰拼装及提升平台
CN202880701U (zh) 无轨门式起重机
CN103964300B (zh) 顶升式加高设备
CN104294763B (zh) 一种移动模架钢筋网片转运装置
KR101373098B1 (ko) 복합 트러스 에프씨엠 교량시공장치 및 이를 이용한 복합 트러스 에프씨엠 교량시공방법
RU2553487C1 (ru) Оснащение для монтажа тяжелого судового оборудования и способ монтажа
CN102530735B (zh) 门座起重机的整体装运工艺及设备
CN103434992B (zh) 桥吊用液压推进式台车搬运***
CN204139067U (zh) 一种移动模架钢筋网片转运装置
CN101664963B (zh) 大体积预应力砼箱梁张拉多功能操作平台
CN105317031B (zh) 一种升船机主机房桥机主梁吊装方法
CN204098493U (zh) 一种建筑用模块式可拆装进出料活动平台
CN104386586B (zh) 水工预制构件的陆上安装方法
CN103498418B (zh) 挂篮组装件移位装置及施工方法
CN203782573U (zh) 一种架设钢管拱桥用拖拉跑道结构
CN106087756A (zh) 波形钢腹板的安装装置和安装方法
CN202465110U (zh) 一种带夹轨器的造船龙门起重机

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhang Hong

Inventor after: Peng Linlin

Inventor after: Tang Heng

Inventor after: He Chenghai

Inventor after: Yang Yanhua

Inventor before: Zhang Hong

Inventor before: Peng Linlin

Inventor before: Tang Heng

Inventor before: He Chenghai

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHANG HONG PENG LINLIN TANG HENG HE CHENGHAI TO: ZHANG HONG PENG LINLIN TANG HENG HE CHENGHAI YANG YANHUA

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130626