CN103557747A - 一种非电耦合多段微差起爆网路 - Google Patents
一种非电耦合多段微差起爆网路 Download PDFInfo
- Publication number
- CN103557747A CN103557747A CN201310589316.4A CN201310589316A CN103557747A CN 103557747 A CN103557747 A CN 103557747A CN 201310589316 A CN201310589316 A CN 201310589316A CN 103557747 A CN103557747 A CN 103557747A
- Authority
- CN
- China
- Prior art keywords
- main line
- hole
- primacord
- detonator
- millisecond
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
本发明涉及一种非电耦合多段微差起爆网路。其技术方案是:工作面上的每两排炮孔(5)中间设有一根干路导爆索(2),每排炮孔(5)内均装有入孔支路导爆管(4)、导爆管***和药包,以干路导爆索(2)为对称轴的两炮孔(5)通过各自孔内的入孔支路导爆管(4)与干路导爆索(2)簇并联;每个干路导爆索(2)与激发装置(1)簇并联,每根干路导爆索(2)上分别设有干路毫秒延期***(3)。每个干路毫秒延期***(3)按照100~200ms的延迟时间依次进行微差累加。每1~3个炮孔(5)间的导爆管***按照25~50ms的延迟时间进行微差累加,干路导爆索(2)簇并联的两个对称炮孔(5)的导爆管***延迟时间为25~50ms。本发明具有传爆可靠和经济可行的特点。
Description
技术领域
本发明属微差起爆网路技术领域,具体涉及一种非电耦合多段微差起爆网路。
背景技术
目前,矿山采掘或建筑工程土石方开挖主要采用的非电微差起爆网路有两大类,一类是单一导爆管起爆网路另一类是单一导爆索起爆网路。第一类起爆网路采用单一导爆管传爆,单一导爆管传爆速度为(1950±50)m/s,而工程中常用的2#岩石***传爆速度大于或等于3200m/s,在微差起爆网路爆轰波传爆过程中,往往产生先起爆药包产生的爆轰波将后排导爆管拉紧、拉细甚至击断现象,继而引发***作业事故;后一种单纯采用导爆索传爆,导爆索传爆速度在6000m/s以上,具有传爆可靠性高的优点,但导爆索价格昂贵,***成本较高,对于***作业量较大的矿山或建筑工程,采用单一导爆索起爆网路不经济。
发明内容
本发明旨在克服上述技术中的不足,目的是提供一种传爆可靠、经济可行的非电耦合多段微差起爆网路。
为实现上述目的,本发明采用的技术方案是:该起爆网路由干路导爆索、入孔支路导爆管、炮孔和干路毫秒延期***组成。工作面上的每两排炮孔中间设有一根干路导爆索,每排炮孔内均装有入孔支路导爆管、导爆管***和药包,以干路导爆索为对称轴的两炮孔通过各自孔内的入孔支路导爆管与干路导爆索簇并联。每个干路导爆索与激发装置簇并联,每根干路导爆索上分别设有干路毫秒延期***。
所述的干路毫秒延期***的延期时间是:从自由面的第一个干路毫秒延期***算起,每个干路毫秒延期***按照100~200ms的延迟时间依次进行微差累加。
所述的两排炮孔中的一排炮孔,每1~3个炮孔间的导爆管***按照25~50ms的延迟时间进行微差累加。一排炮孔中的每个炮孔与以干路导爆索为对称轴的另一排各自对应的炮孔的导爆管***延迟时间为25~50ms,即干路导爆索簇并联的两个对称炮孔的导爆管***延迟时间为25~50ms。
由于采用上述技术方案,本发明突出优点在于:导爆索传爆速度远超过一般岩石***和导爆管,采用其作为起爆网路的干路,可避免微差起爆网路爆轰波传爆过程中先起爆药包产生的爆轰波将后排导爆管拉紧、拉细甚至击断的现象,从而增强了传爆的可靠性;导爆管较导爆索价格低廉,采用导爆管作为入孔支路,能够有效地减少导爆索的使用量,从而降低***成本,经济可行。
本发明能够有效的控制孔间和排间的微差起爆效果,达到较为理想的状态,且技术可行、经济合理,为矿山***作业提供了一种传爆可靠、经济可行的非电耦合多段微差起爆网路。
因此,本发明具有传爆可靠和经济可行的特点。
附图说明
图1为本发明起爆网路示意图。
具体实施方式
下面结合附图和具体实施方式对本发明的做进一步描述,并对其保护范围的限制:
实施例1
一种非电耦合多段微差起爆网路。该起爆网路如图1所示,由干路导爆索2、入孔支路导爆管4、炮孔5和干路毫秒延期***3组成。工作面上的每两排炮孔5中间设有一根干路导爆索2,每排炮孔5内均装有入孔支路导爆管4、导爆管***和药包,以干路导爆索2为对称轴的两炮孔5通过各自孔内的入孔支路导爆管4与干路导爆索2簇并联。每个干路导爆索2与激发装置1簇并联,每根干路导爆索2上分别设有干路毫秒延期***3。
所述的干路毫秒延期***3的延期时间是:从自由面6的第一个干路毫秒延期***3算起,每个干路毫秒延期***3按照100~150ms的延迟时间依次进行微差累加。
所述的两排炮孔5中的一排炮孔5,每1个炮孔5间的导爆管***按照25~40ms的延迟时间进行微差累加。一排炮孔5中的每个炮孔5与以干路导爆索2为对称轴的另一排各自对应的炮孔5的导爆管***延迟时间为25~40ms,即干路导爆索2簇并联的两个对称炮孔5的导爆管***延迟时间为25~40ms。
实施例2
一种非电耦合多段微差起爆网路。该起爆网路如图1所示,由干路导爆索2、入孔支路导爆管4、炮孔5和干路毫秒延期***3组成。工作面上的每两排炮孔5中间设有一根干路导爆索2,每排炮孔5内均装有入孔支路导爆管4、导爆管***和药包,以干路导爆索2为对称轴的两炮孔5通过各自孔内的入孔支路导爆管4与干路导爆索2簇并联。每个干路导爆索2与激发装置1簇并联,每根干路导爆索2上分别设有干路毫秒延期***3。
所述的干路毫秒延期***3的延期时间是:从自由面6的第一个干路毫秒延期***3算起,每个干路毫秒延期***3按照100~150ms的延迟时间依次进行微差累加。
所述的两排炮孔5中的一排炮孔5,每2个炮孔5间的导爆管***按照35~50ms的延迟时间进行微差累加。一排炮孔5中的每个炮孔5与以干路导爆索2为对称轴的另一排各自对应的炮孔5的导爆管***延迟时间为35~50ms,即干路导爆索2簇并联的两个对称炮孔5的导爆管***延迟时间为35~50ms。
实施例3
一种非电耦合多段微差起爆网路。该起爆网路如图1所示,由干路导爆索2、入孔支路导爆管4、炮孔5和干路毫秒延期***3组成。工作面上的每两排炮孔5中间设有一根干路导爆索2,每排炮孔5内均装有入孔支路导爆管4、导爆管***和药包,以干路导爆索2为对称轴的两炮孔5通过各自孔内的入孔支路导爆管4与干路导爆索2簇并联。每个干路导爆索2与激发装置1簇并联,每根干路导爆索2上分别设有干路毫秒延期***3。
所述的干路毫秒延期***3的延期时间是:从自由面6的第一个干路毫秒延期***3算起,每个干路毫秒延期***3按照125~175ms的延迟时间依次进行微差累加。
所述的两排炮孔5中的一排炮孔5,每2个炮孔5间的导爆管***按照25~40ms的延迟时间进行微差累加。一排炮孔5中的每个炮孔5与以干路导爆索2为对称轴的另一排各自对应的炮孔5的导爆管***延迟时间为25~40ms,即干路导爆索2簇并联的两个对称炮孔5的导爆管***延迟时间为25~40ms。
实施例4
一种非电耦合多段微差起爆网路。该起爆网路如图1所示,由干路导爆索2、入孔支路导爆管4、炮孔5和干路毫秒延期***3组成。工作面上的每两排炮孔5中间设有一根干路导爆索2,每排炮孔5内均装有入孔支路导爆管4、导爆管***和药包,以干路导爆索2为对称轴的两炮孔5通过各自孔内的入孔支路导爆管4与干路导爆索2簇并联。每个干路导爆索2与激发装置1簇并联,每根干路导爆索2上分别设有干路毫秒延期***3。
所述的干路毫秒延期***3的延期时间是:从自由面6的第一个干路毫秒延期***3算起,每个干路毫秒延期***3按照125~175ms的延迟时间依次进行微差累加。
所述的两排炮孔5中的一排炮孔5,每3个炮孔5间的导爆管***按照35~50ms的延迟时间进行微差累加。一排炮孔5中的每个炮孔5与以干路导爆索2为对称轴的另一排各自对应的炮孔5的导爆管***延迟时间为35~50ms,即干路导爆索2簇并联的两个对称炮孔5的导爆管***延迟时间为35~50ms。
实施例5
一种非电耦合多段微差起爆网路。该起爆网路如图1所示,由干路导爆索2、入孔支路导爆管4、炮孔5和干路毫秒延期***3组成。工作面上的每两排炮孔5中间设有一根干路导爆索2,每排炮孔5内均装有入孔支路导爆管4、导爆管***和药包,以干路导爆索2为对称轴的两炮孔5通过各自孔内的入孔支路导爆管4与干路导爆索2簇并联。每个干路导爆索2与激发装置1簇并联,每根干路导爆索2上分别设有干路毫秒延期***3。
所述的干路毫秒延期***3的延期时间是:从自由面6的第一个干路毫秒延期***3算起,每个干路毫秒延期***3按照150~200ms的延迟时间依次进行微差累加。
所述的两排炮孔5中的一排炮孔5,每2个炮孔5间的导爆管***按照25~40ms的延迟时间进行微差累加。一排炮孔5中的每个炮孔5与以干路导爆索2为对称轴的另一排各自对应的炮孔5的导爆管***延迟时间为25~40ms,即干路导爆索2簇并联的两个对称炮孔5的导爆管***延迟时间为25~40ms。
实施例6
一种非电耦合多段微差起爆网路。该起爆网路如图1所示,由干路导爆索2、入孔支路导爆管4、炮孔5和干路毫秒延期***3组成。工作面上的每两排炮孔5中间设有一根干路导爆索2,每排炮孔5内均装有入孔支路导爆管4、导爆管***和药包,以干路导爆索2为对称轴的两炮孔5通过各自孔内的入孔支路导爆管4与干路导爆索2簇并联。每个干路导爆索2与激发装置1簇并联,每根干路导爆索2上分别设有干路毫秒延期***3。
所述的干路毫秒延期***3的延期时间是:从自由面6的第一个干路毫秒延期***3算起,每个干路毫秒延期***3按照150~200ms的延迟时间依次进行微差累加。
所述的两排炮孔5中的一排炮孔5,每3个炮孔5间的导爆管***按照35~50ms的延迟时间进行微差累加。一排炮孔5中的每个炮孔5与以干路导爆索2为对称轴的另一排各自对应的炮孔5的导爆管***延迟时间为35~50ms,即干路导爆索2簇并联的两个对称炮孔5的导爆管***延迟时间为35~50ms。
本具体实施方式突出优点在于:导爆索传爆速度远超过一般岩石***和导爆管,采用其作为起爆网路的干路,可避免微差起爆网路爆轰波传爆过程中先起爆药包产生的爆轰波将后排导爆管拉紧、拉细甚至击断的现象,从而增强了传爆的可靠性;导爆管较导爆索价格低廉,采用导爆管作为入孔支路,能够有效地减少导爆索的使用量,从而降低***成本,经济可行。
本具体实施方式能够有效的控制孔间和排间的微差起爆效果,达到较为理想的状态,且技术可行、经济合理,为矿山***作业提供了一种传爆可靠、经济可行的非电耦合多段微差起爆网路。
因此,本具体实施方式具有传爆可靠和经济可行的特点。
Claims (3)
1.一种非电耦合多段微差起爆网路,其特征在于该起爆网路由干路导爆索(2)、入孔支路导爆管(4)、炮孔(5)和干路毫秒延期***(3)组成;工作面上的每两排炮孔(5)中间设有一根干路导爆索(2),每排炮孔(5)内均装有入孔支路导爆管(4)、导爆管***和药包,以干路导爆索(2)为对称轴的两炮孔(5)通过各自孔内的入孔支路导爆管(4)与干路导爆索(2)簇并联;每个干路导爆索(2)与激发装置(1)簇并联,每根干路导爆索(2)上分别设有干路毫秒延期***(3)。
2.根据权利要求1所述的非电耦合多段微差起爆网路,其特征在于所述的干路毫秒延期***(3)的延期时间是:从自由面(6)的第一个干路毫秒延期***(3)算起,每个干路毫秒延期***(3)按照100~200ms的延迟时间依次进行微差累加。
3.根据权利要求1所述的非电耦合多段微差起爆网路,其特征在于所述的两排炮孔(5)中的一排炮孔(5),每1~3个炮孔(5)间的导爆管***按照25~50ms的延迟时间进行微差累加;一排炮孔(5)中的每个炮孔(5)与以干路导爆索(2)为对称轴的另一排各自对应的炮孔(5)的导爆管***延迟时间为25~50ms。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310589316.4A CN103557747B (zh) | 2013-11-22 | 2013-11-22 | 一种非电耦合多段微差起爆网路 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310589316.4A CN103557747B (zh) | 2013-11-22 | 2013-11-22 | 一种非电耦合多段微差起爆网路 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103557747A true CN103557747A (zh) | 2014-02-05 |
CN103557747B CN103557747B (zh) | 2016-02-10 |
Family
ID=50012058
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310589316.4A Expired - Fee Related CN103557747B (zh) | 2013-11-22 | 2013-11-22 | 一种非电耦合多段微差起爆网路 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103557747B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107843160A (zh) * | 2017-12-01 | 2018-03-27 | 武汉科技大学 | 一种深基坑钢筋混凝土支撑梁***拆除的起爆网络 |
CN111795623A (zh) * | 2020-06-24 | 2020-10-20 | 河南发恩德矿业有限公司 | 一种低成本高可靠数码***与导爆索串联起爆方法 |
CN113790645A (zh) * | 2021-08-12 | 2021-12-14 | 广西鱼峰水泥股份有限公司 | 一种数码电子***逐孔起爆网路及其***延时方案 |
CN113870678A (zh) * | 2021-08-31 | 2021-12-31 | 中国人民解放军陆军工程大学 | 一种大当量地下多点延时***弹坑效应模拟装置及方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3987732A (en) * | 1975-02-10 | 1976-10-26 | The Ensign-Bickford Company | Non-electric double delay borehole downline unit for blasting operations |
WO2008146954A1 (en) * | 2007-05-03 | 2008-12-04 | Im, Chol Hun | New non-electric 'pulkkot' parallel firing system |
KR20090047912A (ko) * | 2007-11-09 | 2009-05-13 | 전남대학교산학협력단 | 터널의 외곽공을 2개의 영역으로 구분하여 20~25ms시차로 발파하는 방법 |
CN102230769A (zh) * | 2011-06-16 | 2011-11-02 | 汇通路桥建设集团有限公司 | 多排微差路基深孔***施工方法 |
-
2013
- 2013-11-22 CN CN201310589316.4A patent/CN103557747B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3987732A (en) * | 1975-02-10 | 1976-10-26 | The Ensign-Bickford Company | Non-electric double delay borehole downline unit for blasting operations |
WO2008146954A1 (en) * | 2007-05-03 | 2008-12-04 | Im, Chol Hun | New non-electric 'pulkkot' parallel firing system |
KR20090047912A (ko) * | 2007-11-09 | 2009-05-13 | 전남대학교산학협력단 | 터널의 외곽공을 2개의 영역으로 구분하여 20~25ms시차로 발파하는 방법 |
CN102230769A (zh) * | 2011-06-16 | 2011-11-02 | 汇通路桥建设集团有限公司 | 多排微差路基深孔***施工方法 |
Non-Patent Citations (6)
Title |
---|
吴毅: "导爆管套末绕搭导爆索起爆法的应用", 《化工矿山技术》 * |
巴宝力尔: "非电起爆网路的可靠度分析", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 * |
康宏垚: "非电起爆网路***可靠性研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 * |
张敢生: "导爆索与导爆管传爆结点可靠性的检测、分析与评价", 《***》 * |
李守巨等: "拆除***中导爆索-导爆管***起爆技术", 《***》 * |
王彧: "硐室***中导爆管与导爆索90°联接的机理分析", 《现代矿业》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107843160A (zh) * | 2017-12-01 | 2018-03-27 | 武汉科技大学 | 一种深基坑钢筋混凝土支撑梁***拆除的起爆网络 |
CN107843160B (zh) * | 2017-12-01 | 2024-04-12 | 武汉科技大学 | 一种深基坑钢筋混凝土支撑梁***拆除的起爆网络 |
CN111795623A (zh) * | 2020-06-24 | 2020-10-20 | 河南发恩德矿业有限公司 | 一种低成本高可靠数码***与导爆索串联起爆方法 |
CN113790645A (zh) * | 2021-08-12 | 2021-12-14 | 广西鱼峰水泥股份有限公司 | 一种数码电子***逐孔起爆网路及其***延时方案 |
CN113870678A (zh) * | 2021-08-31 | 2021-12-31 | 中国人民解放军陆军工程大学 | 一种大当量地下多点延时***弹坑效应模拟装置及方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103557747B (zh) | 2016-02-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103940309B (zh) | 一种井下***成井的方法 | |
CN103557747B (zh) | 一种非电耦合多段微差起爆网路 | |
CN102927866B (zh) | 一种露天台阶***控制爆堆前冲的***方法 | |
CN102878876A (zh) | 一种矿井平巷掘进掏槽方法及***主要参数 | |
CN103851967A (zh) | 大型***波模拟装置的多点式非电起爆*** | |
CN110030891B (zh) | 隧道掌子面全断面光面***起爆***网络 | |
CN102620612B (zh) | 一种井下矿中深孔***方法 | |
CN109827480A (zh) | 一种新型束状孔拉槽***高阶段成井法 | |
CN202002581U (zh) | 瞬发电***起爆装置 | |
CN114191905A (zh) | 一种露天铁矿爆水降尘方法 | |
CN105605994A (zh) | 一种导爆管***网络结构及***方法 | |
CN106225612A (zh) | 一种基于爆轰波拐角效应的***二极管 | |
CN101634540A (zh) | 地下矿山上向深孔底部间隔起爆工艺及底部间隔起爆具 | |
CN202255133U (zh) | 微差***斜线起爆网路 | |
CN114111478A (zh) | 一种电子***与导爆索联用的起爆网路及其施工方法 | |
CN203385336U (zh) | ***降震带 | |
CN102435111B (zh) | ***网路控制检测方法 | |
CN202255138U (zh) | 一种油井射孔引爆用延时电*** | |
CN205002686U (zh) | 适用于矿山中深孔孔底起爆装置 | |
CN203772146U (zh) | 一种双路公共腔非电传起爆*** | |
CN203869597U (zh) | 大型***波模拟装置的多点式非电起爆*** | |
CN208012470U (zh) | 一种延期***簇联与逐孔起爆相结合的混合起爆网路结构 | |
CN207231329U (zh) | 一种双向传爆导爆索预裂***网路 | |
CN206683505U (zh) | 一种深孔断顶***单元式装药装置 | |
CN106382868B (zh) | 一种高瓦斯隧/巷道电***串联起爆网络联线方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160210 Termination date: 20161122 |