CN103490433A
CN103490433A CN201310460466.5A CN201310460466A CN103490433A CN 103490433 A CN103490433 A CN 103490433A CN 201310460466 A CN201310460466 A CN 201310460466A CN 103490433 A CN103490433 A CN 103490433A
Authority
CN
China
Prior art keywords
station
particle
tap
value
imin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310460466.5A
Other languages
English (en)
Inventor
刘红国
张洪利
刘东伟
刘波
马红霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGZHOU POWER SUPPLY CO Ltd
State Grid Corp of China SGCC
Original Assignee
QINGZHOU POWER SUPPLY CO Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGZHOU POWER SUPPLY CO Ltd, State Grid Corp of China SGCC filed Critical QINGZHOU POWER SUPPLY CO Ltd
Priority to CN201310460466.5A priority Critical patent/CN103490433A/zh
Publication of CN103490433A publication Critical patent/CN103490433A/zh
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明涉及一种配电网无功优化方法,该方法包括以下步骤:a、读入原始数据;b、初始化粒子群的位置和速度值;c、计算粒子的适应值;d、求出粒子的个体极值和全局极值;e、更新粒子群的位置和速度值;f、再次计算粒子的适应值;g、更新粒子的个体极值和全局极值;h、判断终止条件,如果不符合终止条件,则重复步骤e、f和g;如果符合终止条件,则输出结果,程序结束;本方法充分考虑配电网网络结构参数和未来一段时间内有功功率和无功功率的变化情况,获得电容器和有载调压变压器分接头最优动作时间、投入容量以及挡位值,降低了配电网的网络损耗,提高了电网的电压质量。

Description

一种配电网无功优化方法
技术领域
本发明涉及一种配电网无功优化方法,属于供配电技术领域。
背景技术
随着国民经济的发展,一方面电网负荷在持续快速增加,人们对电能质量的要求越来越高;另一方面一次能源的减少及其成本的增加,使节能降耗成为当今社会关注的焦点。
合理的无功优化规划,不仅可以节约电能损耗,而且可以提高电能质量,是当今供电部门的主要工作之一。以往的配电网无功补偿只关注于局部电网,针对某一特定时刻,进行静态无功优化,没有充分考虑控制设备动作次数的限制,也没有***负荷随时间的变化情况,脱离了电网的实际运行情况。
发明内容
本发明要解决的问题是针对以上问题,提供一种能够充分考虑配电网网络结构参数和未来一段时间内有功功率和无功功率的变化情况,以获得电容器和有载调压变压器分接头最优动作时间、投入容量以及档位值、降低配电网网络损耗、提高电网电压质量的配电网无功优化方法。
为解决上述问题,本发明所采用的技术方案是:一种配电网无功优化方法,该方法包括以下步骤:
a、读入原始数据;
b、初始化粒子群的位置和速度值;
c、计算粒子的适应值;
d、求出粒子的个体极值和全局极值;
e、更新粒子群的位置和速度值;
f、再次计算粒子的适应值;
g、更新粒子的个体极值和全局极值;
h、判断终止条件,如果不符合终止条件,则重复步骤e、f和g;如果符合终止条件,则输出结果,程序结束。
作为一种优化方案,所述步骤a中读入数据的约束条件为:
Uimin≤Ui≤Uimax
TAPimin≤TAPi≤TAPimax
Cimin≤Ci≤Cimax
Pi=f1(Uii)
Qi=f2(Uii)
ti=1+VTAPi×TAPi
Qi=Ci×CAPi
式中,Uimin、Ui、Uimax分别为节点i电压及其上下限;TAPi、TAPimin、TAPimax分别为节点i有载调压变压器分接头档位及其上下限;Ci、Cimin、Cimax分别为节点i可投切电容器组的组数及其上下限;ti为可调变压器的变比;VTAPi为每档可调变比值;CAPi为每组电容器的容量。
作为一种优化方案,所述步骤b和步骤e中的粒子群为规模为n的m维粒子群,包括随机位置和速度,该粒子群中的每个粒子代表一种控制方案,即可投切电容器组数和变压器分接头的档位。
作为一种优化方案,所述所述步骤c和步骤f中的适应值计算数学式为:
J = min ( ω 1 P loss + ω 2 Σ i = 1 n | U i - U iset | )
式中,J为总线路损耗和总电压偏差之和;取ω1=1.0,ω2=0.001;piloss为第i条支路的线路损耗;Ui、Uiset分别为节点i的电压及其电压设定值,取Uiset=1.0,n为***节点数。
作为一种优化方案,所述步骤d和步骤g的求解方法为:
对每个粒子i,将其适应值与个体所经历过的最好位置pbestx做比较,如果该粒子较好,将其作为当前各个方案的最好位置,即个体极值pbestx。
对每个粒子i,将其适应值与全局经历最好位置gbest比较,得出当前全局最好值gbest。
作为一种优化方案,所述步骤b和步骤e的求解数学式为:
v id k + 1 = wv id k + c 1 rand ( ) ( pbest d - x id k ) + c k Rand ( ) ( gbest d - x id k )
x id ( k + 1 ) = x id k + v id ( k + 1 )
ω = ω max - ω max - ω min K k
式中,
Figure BDA0000390723850000034
为粒子i在迭代第k次的速度,
Figure BDA0000390723850000035
ω为权重因子;cj为加速常数;rand(),Rand()是两个0到1之间的随机数;
Figure BDA0000390723850000036
为个体i在第k次迭代的当前位置;pbesti为第i个粒子的个体极值;gbest为全局极值;ωmax=0.9,ωmin=0.4;k为当前迭代次数,K为算法的总迭代次数。
本发明采取以上技术方案,具有以下优点:本方法充分考虑配电网网络结构参数和未来一段时间内有功功率和无功功率的变化情况,获得电容器和有载调压变压器分接头最优动作时间、投入容量以及档位值,降低了配电网的网络损耗,提高了电网的电压质量。
下面结合附图和实施例对本发明作进一步说明。
附图说明
附图1为本发明实施例中一种配电网无功优化方法的程序流程图。
具体实施方式
实施例:如附图1所示,一种配电网无功优化方法,该方法包括以下步骤:
a、读入原始数据;
b、初始化粒子群的位置和速度值;
c、计算粒子的适应值;
d、求出粒子的个体极值和全局极值;
e、更新粒子群的位置和速度值;
f、再次计算粒子的适应值;
g、更新粒子的个体极值和全局极值;
h、判断终止条件,如果不符合终止条件,则重复步骤e、f和g;如果符合终止条件,则输出结果,程序结束。
步骤a中读入数据的约束条件为:
Uimin≤Ui≤Uimax
TAPimin≤TAPi≤TAPimax
Cimin≤Ci≤Cimax
Pi=f1(Uii)
Qi=f2(Uii)
ti=1+VTAPi×TAPi
Qi=Ci×CAPi
式中,Uimin、Ui、Uimax分别为节点i电压及其上下限;TAPi、TAPimin、TAPimax分别为节点i有载调压变压器分接头档位及其上下限;Ci、Cimin、Cimax分别为节点i可投切电容器组的组数及其上下限;ti为可调变压器的变比;VTAPi为每档可调变比值;CAPi为每组电容器的容量。
步骤b和步骤e中的粒子群为规模为n的m维粒子群,包括随机位置和速度,该粒子群中的每个粒子代表一种控制方案,即可投切电容器组数和变压器分接头的档位。
所述步骤c和步骤f中的适应值计算数学式为:
J = min ( ω 1 P loss + ω 2 Σ i = 1 n | U i - U iset | )
式中,J为总线路损耗和总电压偏差之和;取ω1=1.0,ω2=0.001;piloss为第i条支路的线路损耗;Ui、Uiset分别为节点i的电压及其电压设定值,取Uiset=1.0,n为***节点数。
步骤d和步骤g的求解方法为:
对每个粒子i,将其适应值与个体所经历过的最好位置pbestx做比较,如果该粒子较好,将其作为当前各个方案的最好位置,即个体极值pbestx。
对每个粒子i,将其适应值与全局经历最好位置gbest比较,得出当前全局最好值gbest。
步骤b和步骤e的求解数学式为:
v id k + 1 = wv id k + c 1 rand ( ) ( pbest d - x id k ) + c k Rand ( ) ( gbest d - x id k )
x id ( k + 1 ) = x id k + v id ( k + 1 )
ω = ω max - ω max - ω min K k
式中,
Figure BDA0000390723850000054
为粒子i在迭代第k次的速度,ω为权重因子;cj为加速常数;rand(),Rand()是两个0到1之间的随机数;
Figure BDA0000390723850000056
为个体i在第k次迭代的当前位置;pbesti为第i个粒子的个体极值;gbest为全局极值;ωmax=0.9,ωmin=0.4;k为当前迭代次数,K为算法的总迭代次数。
由于配电网无功优化规划问题属于复杂非线性优化问题,其目标函数不具有可微性、连续性,约束条件中既含有等式约束也含有不等式约束,而且控制变量比较多且都是离散变量。为了更好的求解上述数学模型所描述的优化问题,本发明采用粒子群优化算法(PSO),该算法是基于群体智能的全局随机优化算法,可以针对整个配电网进行全局最优搜索,可以处理大量的离散变量,且搜索速度受网络规模的影响很小。因此,利用该算法可以较好的得到全局最优解。
粒子群优化算法采用速度-位置模型,即在允许范围内初始化为一群随机粒子(潜在解),每个粒子都有一个速度决定它们的飞行方向和距离,即搜索方向和步长。在每一次迭代中通过跟踪两个极值来更新自己:粒子本身迄今为止所找到的个体极值pbesti和整个种群迄今为止所找到的全局极值gbest。所有的粒子的优劣由被优化函数所决定的适应值来衡量。
利用PSO算法计算时,一般取C1=2,C2=1,ωmax=0.9,ωmin=0.4,惯性权重ω对优化性能有很大的影响,ω较大算法具有较强的全局搜索能力,ω较小则算法有利于局部搜索。本发明利用自适应PSO算法调整ω的策略,如果让ω随算法迭代的进行而线性的减少,将显著改善算法的收敛性能。
利用该算法求解配电网无功优化规划问题,算法原理简单,容易实现,不需要对离散变量进行连续化处理,具有收敛速度快,搜索能力强的优点。
以青州地区配电网为例进行无功优化:
本发明主要针对青州配电网110kV,35kV电压等级变电站进行无功集中优化,为了防止无功倒送,减小功率损耗,我们设计投切电容器主要安装在10kV母线侧,51条母线处安装了不同容量的电容器组,可以分组投切;有载调压变压器共有52个,110/35kV变压器分接头的档位为±8,共17档,每档可调值为0.0125,35/10kV变压器分接头档位为±3,共7档,每当可调值为0.025。
在进行无功优化规划时,由于更改控制方案就会改变***潮流数据,因此,每一次搜索中都要重新进行潮流计算以获得当前***的运行状态。目前,具有潮流计算功能的软件有PSASP、PSS/E、BPA等,在这些电力***仿真软件中,PSS/E3.0以上版本带有Python语言,我们可以使用Python语言编写基于PSO算法的无功优化程序,然后直接调用PSS/E里面的潮流计算,输出我们需要的结果。这样在进行配电网潮流计算的时候,功能强大的PSS/E软件可以不受网络规模的限制,得到较好的潮流结果。
随着负荷的增长,必然导致电力***潮流数据的变化,使无功补偿不足,既增加了电能损耗,又降低了电能质量。因此,对青州地区配电网进行定期合理的无功优化规划,设定每年规划一次,例如,2010年青州地区总负荷为287.5MW,2011年的无功规划以2010年为基准,按负荷增长10%计算,并根据《电压和无功电力技术导则》规定开展有效地控制,规定如下:
(1)500kV线路一般可不装设电容器组,低压电抗器容量不宜低于500kV线路充电功率的90%。
(2)220kV的低压侧功率因数应达到0.95-0.98,装设电容器组的容量一般为12%-16.7%;220kV电缆进线的终端站应装设低压电抗器,其容量不宜低于220kV电缆充电功率的110%;变电站毗邻大中型发电厂,满足电压控制范围的情况下可不配置电容器组。
(3)110/35kV的低压侧功率因数应达到0.90-0.95,装设电容器组的容量一般为主变容量的15%-20%;
(4)10kV的低压侧功率因数应达到0.85-0.95,装设电容器组的容量一般为配电变压器容量的20%-30%。
运用针对青州配电网研究的数学模型和求解算法,用Python语言编制程序,调用PSS/E已有的功能,进行青州配电***无功优化规划仿真计算,结果如表1和表2所示,表1为无功优化规划有载变压器分接头控制方案,表2为无功优化电容器组配置方案。
对负荷的处理,进行了适当的归并;对三绕组变压器等效为三个双绕组变压器,进行可调变压器分接头位于高压侧;电容器组安装位置都在10kV母线侧,总安装容量根据《电压和无功电力技术导则》的规定设定,分组数按每组容量相等近似处理。
表1
出线站名 进线站编号 进线站名 ID 档位值 每档可调量 变比
益都站110 100046 益都站1 1 -3 0.0125 0.9625
益都站110 100047 益都站2 2 -3 0.025 0.925
益都站110 100053 益都站3 3 -4 0.0125 0.95
云门山站1 100050 云门山站110 1 1 0.025 1.025
云门山站2 100050 云门山站110 2 -3 0.0125 0.9625
尧王山站1 100055 尧王山站110 1 -3 0.0125 0.9625
尧王山站2 100105 尧王山站110 1 -6 0.0125 0.925
东坝站110 100061 东坝站1 1 -3 0.0125 0.9625
东坝站110 100112 东坝站2 1 -2 0.0125 0.975
徐集站1 100068 徐集站110 1 -6 0.0125 0.925
徐集站2 100068 徐集站110 2 1 0.0125 1.0125
兴旺站110 100066 兴旺站1 1 -7 0.0125 0.9125
时代站110 100071 时代站10-1 1 3 0.0125 1.0375
时代站110 100116 时代站10-2 2 3 0.0125 1.0375
黄楼站35 100073 黄楼站10-1 1 3 0.025 1.075
黄楼站35 100119 黄楼站10-2 2 -3 0.025 0.925
黄楼站35-2 100120 黄楼站10-3 3 3 0.025 1.075
郑母站35 100074 郑母站10-1 1 3 0.025 1.075
郑母站35 100121 郑母站10-2 2 3 0.025 1.075
杨家庄站35 100075 杨家庄站10-1 1 3 0.025 1.075
杨家庄站35 100122 杨家庄站10-2 2 1 0.025 1.025
谭坊站35 100076 谭坊站10-1 1 3 0.025 1.075
谭坊站35 100123 谭坊站10-2 2 3 0.025 1.075
桃园站35 100077 桃园站10-1 1 -3 0.025 0.925
桃园站35 100124 桃园站10-2 2 0 0.025 1
口埠站35 100078 口埠站10-1 1 3 0.025 1.075
口埠站35 100125 口埠站10-2 2 3 0.025 1.075
阳河站35 100080 阳河站10-1 1 3 0.025 1.075
阳河站35 100127 阳河站10-2 2 -1 0.025 0.975
何官站35 100079 何官站10-1 1 3 0.025 1.075
何官站35 100126 何官站10-2 2 3 0.025 1.075
王母宫站35 100081 王母宫站10-1 1 3 0.025 1.075
王母宫站35 100128 王母宫站10-2 2 -3 0.025 0.925
高柳站35 100082 高柳站10-1 1 0 0.025 1
高柳站35 100130 高柳站10-2 2 3 0.025 1.075
东高站35 100083 东高站10-1 1 -3 0.025 0.925
东高站35 100131 东高站10-2 2 3 0.025 1.075
普通站35 100084 普通站10-1 1 3 0.025 1.075
普通站35 100132 普通站10-2 2 -3 0.025 0.925
王坟站35 100089 王坟站10-1 1 2 0.025 1.05
王坟站35 100137 王坟站10-2 2 3 0.025 1.075
五里站35 100086 五里站10-1 1 3 0.025 1.075
五里站35 100134 五里站10-2 2 -3 0.025 0.925
庙子站35 100087 庙子站10-1 1 1 0.025 1.025
庙子站35 100135 庙子站10-2 2 -3 0.025 0.925
弥河站35 100088 弥河站10-1 1 0 0.025 1
弥河站35 100136 弥河站10-2 2 3 0.025 1.075
邵庄站35 100085 邵庄站10-1 1 3 0.025 1.075
邵庄站35 100133 邵庄站10-2 2 -3 0.025 0.925
仁和站35 100090 仁和站10-1 1 -3 0.025 0.925
昭德站35 100072 昭德站10-1 1 3 0.025 1.075
昭德站35 100117 昭德站10-2 2 3 0.025 1.075
表2
配电站编号 配电站名称 电容器组数 每组容量(Mvar) 补偿容量
100045 益都站10-1 0 0.8 0
100109 益都站10-2 3 1 3
100052 云门山站10-1 0 1 0
100110 云门山10-2 1 0.9 0.9
100056 尧王山站10-1 4 1 4
100106 尧王山10-2 1 0.5 0.5
100060 东坝站10-1 8 0.8 6.4
100113 东坝站10-2 3 0.6 1.8
100139 东坝站10-3 3 1.04 3.12
100070 徐集站10-1 0 0.8 0
100115 徐集站10-2 4 0.6 2.4
100065 兴旺站10 0 0.6 0
100071 时代站10-1 7 0.8 5.6
100116 时代站10-2 6 0.8 4.8
100073 黄楼站10-1 2 0.25 0.5
100119 黄楼站10-2 4 0.25 1
100120 黄楼站10-3 2 0.5 1
100081 王母宫站10-1 2 0.3 0.6
100128 王母宫站10-2 9 0.3 2.7
100080 阳河站10-1 6 0.25 1.5
100127 阳河站10-2 3 0.3 0.9
100088 弥河站10-1 8 0.3 2.4
100136 弥河站10-2 1 0.2 0.2
100084 普通站10-1 3 0.3 0.9
100132 普通站10-2 6 0.3 1.8
100078 口埠站10-1 1 0.3 0.3
100125 口埠站10-2 1 0.3 0.3
100077 桃园站10-1 6 0.3 1.8
100124 桃园站10-2 5 0.3 1.5
100079 何官站10-1 5 0.3 1.5
100127 何官站10-2 5 0.3 1.5
100074 郑母站10-1 2 0.3 0.6
100121 郑母站10-2 0 0.3 0
100075 杨家庄站10-1 10 0.18 1.8
100122 杨家庄站10-2 9 0.18 1.62
100082 高柳站10-1 5 0.3 1.5
100130 高柳站10-2 4 0.3 1.2
100083 东高站10-1 5 0.25 1.25
100131 东高站10-2 0 0.15 0
100089 王坟站10-1 7 0.12 0.84
100137 王坟站10-2 5 0.06 0.3
100090 仁和站10-1 0 0.06 0
100086 五里站10-1 3 0.3 0.9
100134 五里站10-2 1 0.3 0.3
100076 谭坊站10-1 2 0.4 0.8
100123 谭坊站10-2 1 0.4 0.4
100085 邵庄站10-1 6 0.3 1.8
100133 邵庄站10-2 4 0.3 1.2
100087 庙子站10-1 0 0.09 0
100072 昭德站10-1 3 0.3 0.9
100117 昭德站10-2 3 0.3 0.9
无功优化补偿之前,青州地区配电网的总有功损耗为5.0MW,节点电压值有的偏低;经无功优化计算之后,***总有功损耗为4.54MW,节约能耗5.8%,达到节能降耗的目的;各节点电压(标幺值)在0.95-1.05之间,电压质量得到不同程度的改善。
从算法及软件的可行性上看,基于粒子群优化算法所编写的无功优化程序,计算速度快(一分钟左右),收敛性能好,不受网络规模的限制,只需根据实际负荷增长情况,修改潮流数据和控制变量数据,就可以定期进行无功优化规划,以界面的形式输出结果,操作简单,这便保证了定期合理的无功优化规划可行性。

Claims (6)

1.一种配电网无功优化方法,其特征在于:该方法包括以下步骤:
a、读入原始数据;
b、初始化粒子群的位置和速度值;
c、计算粒子的适应值;
d、求出粒子的个体极值和全局极值;
e、更新粒子群的位置和速度值;
f、再次计算粒子的适应值;
g、更新粒子的个体极值和全局极值;
h、判断终止条件,如果不符合终止条件,则重复步骤e、f和g;如果符合终止条件,则输出结果,程序结束。
2.如权利要求1所述的一种配电网无功优化方法,其特征在于:所述步骤a中读入数据的约束条件为:
Uimin≤Ui≤Uimax
TAPimin≤TAPi≤TAPimax
Cimin≤Ci≤Cimax
Pi=f1(Uii)
Qi=f2(Uii)
ti=1+VTAPi×TAPi
Qi=Ci×CAPi
式中,Uimin、Ui、Uimax分别为节点i电压及其上下限;TAPi、TAPimin、TAPimax分别为节点i有载调压变压器分接头档位及其上下限;Ci、Cimin、Cimax分别为节点i可投切电容器组的组数及其上下限;ti为可调变压器的变比;VTAPi为每档可调变比值;CAPi为每组电容器的容量。
3.如权利要求1或2所述的一种配电网无功优化方法,其特征在于:所述步骤b和步骤e中的粒子群为规模为n的m维粒子群,包括随机位置和速度,该粒子群中的每个粒子代表一种控制方案,即可投切电容器组数和变压器分接头的档位。
4.如权利要求1或2所述的一种配电网无功优化方法,其特征在于:所述所述步骤c和步骤f中的适应值计算数学式为:
J = min ( ω 1 P loss + ω 2 Σ i = 1 n | U i - U iset | )
式中,J为总线路损耗和总电压偏差之和;取ω1=1.0,ω2=0.001;piloss为第i条支路的线路损耗;Ui、Uiset分别为节点i的电压及其电压设定值,取Uiset=1.0,n为***节点数。
5.如权利要求1或2所述的一种配电网无功优化方法,其特征在于:所述步骤d和步骤g的求解方法为:
对每个粒子i,将其适应值与个体所经历过的最好位置pbestx做比较,如果该粒子较好,将其作为当前各个方案的最好位置,即个体极值pbestx。
对每个粒子i,将其适应值与全局经历最好位置gbest比较,得出当前全局最好值gbest。
6.如权利要求1或2所述的一种配电网无功优化方法,其特征在于:所述步骤b和步骤e的求解数学式为:
v id k + 1 = wv id k + c 1 rand ( ) ( pbest d - x id k ) + c k Rand ( ) ( gbest d - x id k )
x id ( k + 1 ) = x id k + v id ( k + 1 )
ω = ω max - ω max - ω min K k
式中,
Figure FDA0000390723840000025
为粒子i在迭代第k次的速度,
Figure FDA0000390723840000026
ω为权重因子;cj为加速常数;rand(),Rand()是两个0到1之间的随机数;
Figure FDA0000390723840000027
为个体i在第k次迭代的当前位置;pbesti为第i个粒子的个体极值;gbest为全局极值;ωmax=0.9,ωmin=0.4;k为当前迭代次数,K为算法的总迭代次数。
CN201310460466.5A 2013-09-30 2013-09-30 一种配电网无功优化方法 Pending CN103490433A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310460466.5A CN103490433A (zh) 2013-09-30 2013-09-30 一种配电网无功优化方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310460466.5A CN103490433A (zh) 2013-09-30 2013-09-30 一种配电网无功优化方法

Publications (1)

Publication Number Publication Date
CN103490433A true CN103490433A (zh) 2014-01-01

Family

ID=49830465

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310460466.5A Pending CN103490433A (zh) 2013-09-30 2013-09-30 一种配电网无功优化方法

Country Status (1)

Country Link
CN (1) CN103490433A (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104269855A (zh) * 2014-10-22 2015-01-07 贵州电力试验研究院 一种适应多种能源接入的站点无功电压快速调节方法
CN105826946A (zh) * 2016-05-09 2016-08-03 东北电力大学 大规模光伏接入的配电网动态无功优化方法
CN106487025A (zh) * 2016-08-29 2017-03-08 马玉婷 用于能耗节省的配电方法
CN106816877A (zh) * 2017-03-10 2017-06-09 国网江苏省电力公司常州供电公司 一种含光伏的配电网电压跌落检测补偿方法
CN107069742A (zh) * 2017-05-05 2017-08-18 国网上海市电力公司 基于Python与PSD‑BPA的电力***连续潮流计算***
CN107819332A (zh) * 2017-11-02 2018-03-20 成都春源食品有限公司 一种变压器无功补偿的方法
CN108988390A (zh) * 2018-08-13 2018-12-11 国网江西省电力有限公司电力科学研究院 一种基于最佳弃光率的配电网电压控制方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000116003A (ja) * 1998-09-29 2000-04-21 Kansai Electric Power Co Inc:The 電圧無効電力制御方法
CN102856918A (zh) * 2012-07-31 2013-01-02 上海交通大学 一种基于小生境粒子群算法的配电网的无功优化方法
CN103199544A (zh) * 2013-03-26 2013-07-10 上海理工大学 电力***的无功优化方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000116003A (ja) * 1998-09-29 2000-04-21 Kansai Electric Power Co Inc:The 電圧無効電力制御方法
CN102856918A (zh) * 2012-07-31 2013-01-02 上海交通大学 一种基于小生境粒子群算法的配电网的无功优化方法
CN103199544A (zh) * 2013-03-26 2013-07-10 上海理工大学 电力***的无功优化方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵晶晶等: "基于粒子群优化算法的配电网重构和分布式电源注入功率综合优化算法", 《电网技术》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104269855A (zh) * 2014-10-22 2015-01-07 贵州电力试验研究院 一种适应多种能源接入的站点无功电压快速调节方法
CN104269855B (zh) * 2014-10-22 2017-01-18 贵州电力试验研究院 一种适应多种能源接入的站点无功电压快速调节方法
CN105826946A (zh) * 2016-05-09 2016-08-03 东北电力大学 大规模光伏接入的配电网动态无功优化方法
CN106487025A (zh) * 2016-08-29 2017-03-08 马玉婷 用于能耗节省的配电方法
CN106487025B (zh) * 2016-08-29 2019-03-01 湛江天汇综合能源服务有限公司 用于能耗节省的配电方法
CN106816877A (zh) * 2017-03-10 2017-06-09 国网江苏省电力公司常州供电公司 一种含光伏的配电网电压跌落检测补偿方法
CN107069742A (zh) * 2017-05-05 2017-08-18 国网上海市电力公司 基于Python与PSD‑BPA的电力***连续潮流计算***
CN107069742B (zh) * 2017-05-05 2019-10-15 国网上海市电力公司 基于Python与PSD-BPA的电力***连续潮流计算***
CN107819332A (zh) * 2017-11-02 2018-03-20 成都春源食品有限公司 一种变压器无功补偿的方法
CN108988390A (zh) * 2018-08-13 2018-12-11 国网江西省电力有限公司电力科学研究院 一种基于最佳弃光率的配电网电压控制方法

Similar Documents

Publication Publication Date Title
CN103490433A (zh) 一种配电网无功优化方法
CN108683179B (zh) 基于混合整数线性规划的主动配电网优化调度方法及***
CN103441506B (zh) 不同时间尺度下多目标协调分散风电场无功优化控制方法
CN102611118B (zh) 一种引入预测信息的风电场综合无功电压控制方法
CN109687510B (zh) 一种计及不确定性的配电网多时间尺度优化运行方法
Ma et al. Reactive power optimization in power system based on improved niche genetic algorithm
CN102832627B (zh) 一种基于电力网络模型的风电场自动电压控制方法
CN105740973A (zh) 基于混合整数锥规划的智能配电网综合电压无功优化方法
CN106253352B (zh) 计及风电概率分布特征的鲁棒实时调度方法
CN104835080A (zh) 微电网日内调度计划混合整数规划模型的建模方法
CN102856899B (zh) 一种微电网降低网损的方法
CN107565576B (zh) 一种多主动管理手段相协调的主动配电网无功电压优化方法
CN104269847A (zh) 一种柔性环网控制***运行及潮流优化方法
CN107196316A (zh) 主动配电网内多级无功电压协调控制方法
CN102244384A (zh) 一种基于经济当量分析的主变压器优化运行方法
CN104158198A (zh) 配电网优化潮流控制装置和方法
CN105098788A (zh) 一种时序递进的无功电压优化调度控制方法
CN109066741A (zh) 一种用于区域电网削峰填谷的分布式储能规划方法及***
Zeng et al. Model predictive control for energy storage systems in a network with high penetration of renewable energy and limited export capacity
CN104253439B (zh) 电池储能电站无功功率分配与控制方法
CN110829473A (zh) 考虑功率四象限输出的配电网储能优化配置方法及***
CN104332985A (zh) 基于混合控制策略的直流配网运行控制与优化调度方法
CN102904265B (zh) 一种基于区间潮流的变电站电压无功控制方法和***
Yiqin Optimal reactive power planning based on improved tabu search algorithm
CN105071397A (zh) 风电外送的多类型无功补偿设备的协调无功电压控制方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140101