CN103434959B - Method for hoisting mast in tower crane dead zone - Google Patents

Method for hoisting mast in tower crane dead zone Download PDF

Info

Publication number
CN103434959B
CN103434959B CN201310401594.2A CN201310401594A CN103434959B CN 103434959 B CN103434959 B CN 103434959B CN 201310401594 A CN201310401594 A CN 201310401594A CN 103434959 B CN103434959 B CN 103434959B
Authority
CN
China
Prior art keywords
pulley
mast
steel wire
wire rope
connects
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310401594.2A
Other languages
Chinese (zh)
Other versions
CN103434959A (en
Inventor
张春雷
何勇
孟祥毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING URBAN CONSTRUCTION JINGGONG STEEL STRUCTURE ENGINEERING Co Ltd
Original Assignee
BEIJING URBAN CONSTRUCTION JINGGONG STEEL STRUCTURE ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING URBAN CONSTRUCTION JINGGONG STEEL STRUCTURE ENGINEERING Co Ltd filed Critical BEIJING URBAN CONSTRUCTION JINGGONG STEEL STRUCTURE ENGINEERING Co Ltd
Priority to CN201310401594.2A priority Critical patent/CN103434959B/en
Publication of CN103434959A publication Critical patent/CN103434959A/en
Application granted granted Critical
Publication of CN103434959B publication Critical patent/CN103434959B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a method for hoisting a mast in a tower crane dead zone. The method comprises the following steps of hoisting a mast device to a floor needing hoisting by a tower crane, and setting up the mast device, wherein the mast device comprises masts, disk-shaped connecting sheets, a base, pulleys, steel wire ropes and winding engines, two masts are available, namely, a mast I and a mast II, the pulleys comprise a pulley I, a pulley II, a pulley III, a pulley IV, a pulley V, a pulley VI, a pulley VII, and a pulley VIII, a hinge, the pulley III and the pulley IV are connected at the lower part of the mast I, the four steel wire ropes comprise a steel wire rope I, a steel wire rope II, a steel wire rope III and a steel wire rope IV, and the winding engines comprise a winding engine I and a winding engine II. According to the method, the problem of hoisting of steel structure beam columns under the condition that hoisting machineries cannot be used in the tower crane dead zone is solved; in the implementation process, both use safety and the purposes of saving time and labor are taken into consideration.

Description

Mast hanging method in tower crane dead zone
Technical field
The present invention relates to the mast hanging method in a kind of tower crane dead zone, belong to steel building field of engineering technology.
Technical background
At the construction field (site), especially in city, vacant construction area is less, in field in addition to tower crane can be installed, it is impossible to again Enter other Large-scale Hoisting equipment.In the range of tower crane works, safty hoisting can be carried out, if construction surface is relatively big, at tower crane Without relating to part, just form tower crane dead zone.If without construction road, construction machinery can not cause steel in blind area near tower crane dead zone Structure can not use mechanical hoisting, causes ready-made installation cannot be carried out.
The content of invention
For overcoming the defect of prior art, the present invention provides mast hanging method in a kind of tower crane dead zone, solves tower crane dead zone endogenous cause of ill field The limited lifting problem that cannot use in the case of hoisting machinery in ground.
In order to solve above-mentioned technical problem, the invention provides following technical scheme:
Mast hanging method in a kind of tower crane dead zone, specifically comprises the following steps that
(1) mast installation is winched to the flooring of required lifting layer by tower crane, builds mast installation, and described mast installation includes mast, dish Shape connects sheet, base, pulley, steel wire rope and hoist engine;Described mast has two, for mast I and mast II;Pulley divides For pulley I, pulley II, pulley III, pulley IV, pulley V, pulley VI, pulley VII, pulley VIII, mast I bottom Connect and have hinge, pulley III and pulley V;Described steel wire rope has four, respectively cord I, steel wire rope II, steel wire rope III and steel wire rope IV;Hoist engine is divided into hoist engine I and hoist engine II;
(2) installation of base
1) surveying setting-out
Mast I position according to design carries out ground unwrapping wire;
2) floor installation
According to the mast I position after unwrapping wire, fixedly mount base;
(3) mast is installed
1) mast I installs
Using tower crane to carry out mast I and stand straight, make mast I stand in base top, mast and base are for being rotationally connected;
2) cable wind rope draws and sets and mast I adjustment
The top of mast I connects dish type and connects sheet, and the two is for being rotationally connected, and dish type connects and connects multiple draw ring on sheet, and draw ring is around dish Shape connects sheet, and draw ring connects cable wind rope, and cable wind rope is fixed on the flooring of required lifting layer;Dish type connects and connects pulley I on sheet;
3) mast II installs
One end of mast II is connected to mast I underneath hinges, and the top of mast II connects pulley II;
(4) hoist engine is installed
The concrete installation method of hoist engine is as follows: the practical situation arranged according to on-the-spot component, hoist engine is fixed on neighbouring concrete building plate; Using steel plate and steel welding to be connected into hoist engine basis, be firmly installed on concrete floor by hoist engine, Sling Rope is sliding through guiding Wheel vertical centering is to the center of lifting drum, and the welding of hoist engine chassis is smooth;
(5) pulley is installed on mast I and mast II and reeves
Pulley I and pulley II is connected by steel wire rope I, and pulley I and pulley II form laborsaving assembly pulley, steel wire rope I walk around pulley I, Lifting drum is connected after pulley II, pulley III;
Mast II top connects pulley IV, pulley IV and pulley VIII and forms laborsaving assembly pulley, and pulley VIII connects weight;Steel wire Rope II connects hoist engine II after walking around pulley IV, pulley VIII, pulley V;
Connecting steel wire ropes III and steel wire rope IV, steel wire rope III and steel wire rope IV are wound around pulley VI to both sides, mast II top respectively respectively It is fixedly connected on flooring fixing point by rope respectively with bottom pulley VII, pulley VI and pulley VII;
(6) anchoring of each fixing point, needed for fixing point includes hoist engine fixing required fixing point, fixed block VI and pulley VII Fixing point, the fixing required fixing point of base and fixed mast I needed for fixing point;
(7) lifting
Steel column and steel beam lifting, to nearest region in blind area, are moved horizontally to mast lifting region in blind area, use mast to install, Installation is divided into two stages, and the first stage is the steel column lifting stage in blind area, position, underground, treats that Steel Structure Installation is complete, civil engineering To first floor position, then carry out aerial parts and carry out steel column and the installation of girder steel in second stage blind area;
(8) remove
When mast is removed, hang mast I top, the connection of dismounting fixed point with tower crane, then remove the connection of mast I and base, Remove the connection of steel wire rope again.
A difficult problem for beam column of steel structure lifting in the case of hoisting machinery cannot be used in present method solves tower crane dead zone, implementing During both considered the safety of use, it is contemplated that time saving and energy saving.Dynamic, pulley room is away from about 20m.When avoiding lifting Speed is different, and hoist engine chassis requires that welding is smooth, does not allow, and the rto request that main rope passes through is unblocked, if any barrier Hinder and must remove.
Accompanying drawing explanation
Fig. 1 is mast mounting structure figure of the present invention;
Fig. 2 is mast II top of the present invention enlarged drawing;
Fig. 3 is enlarged drawing bottom one mast I of the present invention;
Fig. 4 is the embodiment of the present invention 1 tower crane areal map in one's power;
Fig. 5 is steel column scheme of installation in the embodiment of the present invention 1 first stage blind area;
Fig. 6 is steel column and steel girder erection schematic diagram in the embodiment of the present invention 1 second stage blind area;
Fig. 7 is understructure figure of the present invention;
Fig. 8 is that dish type connects sheet enlarged drawing.
Detailed description of the invention
As shown in Figure 1-Figure 3, first by the flooring of mast installation lifting to required lifting layer, mast installation, mast are installed Device include dish type connect sheet 1, pulley I2, pulley II3, pulley VIII4, hoist engine I5, hoist engine II6, pulley VI7, Pulley VII8, mast II9, base 29 and mast I11.
Using hinged connected mode between mast I11 and mast II9 two mast, the top of mast I connects has dish type to connect Sheet 1, installs pulley I2 and pulley II3;Mast I11 is vertical, is connected by top pulleys I2 and pulley II3, mast II9 around Pin joint rotates in vertical plane;Simultaneously because the motion of mast II9, band movable pulley VIII4 moves up and down.
The top of mast I connects has dish type to connect sheet 1, and the bottom of mast I11 connects two pulleys, for pulley III27 and pulley V28, dish type connects sheet 1 and connects pulley I2 by draw ring;Mast II9 top connects pulley II3.
Steel wire rope has four, respectively steel wire rope I23, steel wire rope II24, steel wire rope III25, steel wire rope IV26, steel One end fixed block I of cord I23, the other end is walked around pulley II3, pulley I2 and pulley III27 respectively, is connected to hoist engine I5 reel.
Connecting base 29 bottom described mast I11, spherical 17 is arranged at base 29 top, and mast rotates in spherical 17; The design of spherical makes mast I arbitrarily to rotate, therefore, in the range of same Liftable, it is not necessary to repeatedly dismounting can complete Multi-angle lifting task.
Described mast II9 connects pulley IV22, steel wire rope II24 and connects pulley IV22, walks around pulley VIII4, pulley successively IV22 and pulley V28, is connected to the reel of hoist engine II6, connects weight bottom pulley VIII4;Driven by hoist engine II The up and down motion of pulley VIII4, it is achieved the regulation of lifting desired height.Mast II can realize level around the rotation of pin joint simultaneously Direction and the adjustment of vertical direction displacement.
Both sides, described mast II9 top connecting steel wire ropes III25 and steel wire rope IV26, steel wire rope III25 and steel wire rope respectively IV26 is wound around respectively bottom pulley VI7 and pulley VII8, pulley VI7 and pulley VII8 and is connected by fixing steel wire rope respectively Fixing.The design of actually pulley VI7 and pulley VII8 is specially the displacement fine setting that a kind of hoist engine drives weight to move up and down, When hoist engine motion under pulley and mast drive, hoist engine I and hoist engine II for Electronic control, but as electric device, Installing during beam column, it is difficulty with the function of inching, now needs manually to regulate and is wrapped in pulley VI7 and pulley The steel wire rope of VII8, helps beam column installation site correct.
As shown in Figure 8, having hole in the middle of dish type connection sheet 1, hole is connected at the top shoulder of mast I11, and dish type connects sheet For being rotationally connected between 1 and mast I11.Dish type connection sheet 1 uses steel wire rope to be fixed on by whole mast I11 by draw ring and builds Build on thing, make mast I11 tilt.In mast I11 rotation process, do not affect it and rotate.
As it is shown in fig. 7, base includes base plate 19 and square base 18, square base 18 is fixed on base plate 19, base plate Being connected trapezoidal connecting plate 20 between 19 with square base 18, described trapezoidal connecting plate 20 is provided with four;Each trapezoidal connecting plate 20 Vertical connection inserted link 21, inserted link 21 connects draw ring 16, and draw ring 16 connects fixing steel wire rope;Square base 18 end face has ball Shape face 17.Base is connected on fixture 13 by static line 14, and base is provided with groove 15.
After above mast installation is installed, the anchoring of each fixing point;Lifting, steel column and steel beam lifting are to from blind again Nearest region in district, is moved horizontally to mast lifting region in blind area, uses mast installation to install, install and be divided into two rank Section, the first stage is the steel column lifting stage in blind area, position, underground, treats that Steel Structure Installation is complete, and civil engineering is to first floor position, so After carry out aerial parts and carry out steel column and the installation of girder steel in second stage blind area.
When mast is removed, hang mast I top with tower crane, then remove the connection node of mast I and anchor point.
Embodiment 1
As shown in Figure 4, this structural steelwork in version based on framework, combination member form, weight, on-station position and execute Work on-site actual situations, every lifting performance parameters of site setup tower crane, this engineering steel construction uses synthetic assembly method to carry out. Two tower cranes are H3/36B (R=60m), 2# as the main hanging device of steel construction, respectively 1# and 2# tower crane, 1# tower crane Tower crane is H3/36B (R=60m), a length of 60 meters of 2# tower arm, can cover major part construction area, in the tower crane dead zone of side, the southeast Main steel beam column in the region of A-B/15-16 axle, employing is led cable formula mast hanging method and is installed.
As shown in Figure 6, in 15~16/A~B axle blind areas, the lifting of cable formula mast is led in the lifting mainly employing of steel column and girder steel Method is installed.Steel column and steel beam lifting, to nearest region in blind area, are then moved horizontally to mast lifting region in blind area, Using mast to install, install and be divided into two stages, first segment is the steel column lifting stage in blind area, position, underground, treats steel Structure installs, civil engineering to first floor position, then carries out steel column and the installation of girder steel in aerial parts second stage blind area, Specific as follows:
1) first stage: 3 first segment steel columns of under ground portion install (as shown in Figure 5).
2) second stage: for the installation of 3 second section steel columns and two, three, four girder steels in aerial parts blind area (such as Fig. 6 Shown in).
(1) sequence of construction
According to on-the-spot practical situation, civil engineering to-1 floor panel, enter the first erection stage, at 15~16/A~B axles In the range of mast installation (having beams of concrete under base) is installed on-2 floor top boards, after until the first stage, three steel columns install, Removing with tower crane, allocation and transportation are to steel construction temporal material storage area.After first floor floor, enter the second erection stage, Mast installation (having beams of concrete under base) is installed on first floor floorboard in the range of 15~16/A~B axles, treats that second stage completes Second section steel column and corresponding steel girder erection, finally remove.
(2) construction process
Installation procedure:
First stage:
Tower crane mast installation is winched to the installation of-1 floor face → base → two masts install pulley → mast I upright → wear Fixing of steel wire rope → each fixing point;
Second stage:
Tower crane mast is winched to the installation of first floor floor face → base → two masts install pulley → masts upright → reeve Fixing of → each fixing point;
Dismounting flow process:
When mast is removed, hang mast I top with tower crane, then remove the connection node of mast I and anchor point, lifting steel wire rope Remove the dismounting of the dismounting → base of → two masts → two masts are placed ground → entruck and carry away.
Mast hanging method in this tower crane dead zone that the present invention relates to, it is possible to solve hanging of the steel beam column in tower crane dead zone Dress, this hanging method is simple, cost-effective, reliable relative to purely manual security.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, although with reference to aforementioned enforcement The present invention has been described in detail by example, and for a person skilled in the art, it still can be to foregoing embodiments institute The technical scheme recorded is modified, or wherein portion of techniques feature is carried out equivalent.All spirit in the present invention and former Within then, any modification, equivalent substitution and improvement etc. made, should be included within the scope of the present invention.

Claims (2)

1. the mast hanging method in a tower crane dead zone, it is characterised in that: the concrete steps of described hanging method are such as Under:
(1) mast installation is winched to the flooring of required lifting layer by tower crane, builds mast installation, described mast installation bag Include mast, dish type connects sheet, base, pulley, steel wire rope and hoist engine;Described mast has two, for mast Bar I and mast II;Pulley be divided into pulley I, pulley II, pulley III, pulley IV, pulley V, pulley VI, Pulley VII, pulley VIII, mast I bottom connects hinge, pulley III and pulley V;Described steel wire rope sling There are four, respectively cord I, steel wire rope II, steel wire rope III and steel wire rope IV;Hoist engine is divided into hoist engine I With hoist engine II;
(2) installation of base
1) surveying setting-out
Mast I position according to design carries out ground unwrapping wire;
2) floor installation
According to the mast I position after unwrapping wire, fixedly mount base;
(3) mast is installed
1) mast I installs
Using tower crane to carry out mast I and stand straight, make mast I stand in base top, mast and base are for being rotationally connected;
2) cable wind rope draws and sets and mast I adjustment
The top of mast I connects dish type and connects sheet, and the two is for being rotationally connected, and dish type connects and connects multiple draw ring on sheet, Draw ring connects sheet around dish type, and draw ring connects cable wind rope, and cable wind rope is fixed on the flooring of required lifting layer;Dish type Connect and on sheet, connect pulley I;
3) mast II installs
One end of mast II is connected to mast I underneath hinges, and the top of mast II connects pulley II;
(4) hoist engine is installed
The concrete installation method of hoist engine is as follows: the practical situation arranged according to on-the-spot component, near hoist engine is fixed on On concrete building plate;Use steel plate and steel welding to be connected into hoist engine basis, hoist engine is firmly installed on concrete floor On, Sling Rope is through the center of leading block vertical centering to lifting drum, and the welding of hoist engine chassis is smooth;
(5) pulley is installed on mast I and mast II and reeves
Pulley I and pulley II is connected by steel wire rope I, and pulley I and pulley II forms laborsaving assembly pulley, steel wire rope I Lifting drum is connected after walking around pulley I, pulley II, pulley III;
Mast II top connects pulley IV, pulley IV and pulley VIII and forms laborsaving assembly pulley, and pulley VIII connects Weight;Steel wire rope II connects hoist engine II after walking around pulley IV, pulley VIII, pulley V;
Connecting steel wire ropes III and steel wire rope IV, steel wire rope III and steel wire rope IV twine both sides, mast II top respectively respectively It is fixedly connected on flooring by rope respectively solid bottom pulley VI and pulley VII, pulley VI and pulley VII In fixed point;
(6) anchoring of each fixing point, fixing point includes hoist engine fixing required fixing point, fixed block VI and cunning Fixing point needed for the fixing required fixing point of fixing point needed for wheel VII, base and fixed mast I;
(7) lifting
Steel column and steel beam lifting, to nearest region in blind area, are moved horizontally to mast lifting region in blind area, use mast Bar is installed, and installs and is divided into two stages, and the first stage is the steel column lifting stage in blind area, position, underground, treats Steel Structure Installation is complete, and civil engineering, to first floor position, then carries out aerial parts and carries out steel in second stage blind area Post and the installation of girder steel;
(8) remove
When mast is removed, hang mast I top with tower crane, remove the connection of fixed point, then remove mast I and the end The connection of seat, then remove the connection of steel wire rope.
Mast hanging method in a kind of tower crane dead zone the most according to claim 1, it is characterised in that: described Base includes base plate and square base, and square base is fixed on base plate, is connected trapezoidal company between base plate with square base Fishplate bar, described trapezoidal connecting plate is provided with four;Each trapezoidal connecting plate vertically connects inserted link, and inserted link connects draw ring, Draw ring connects described steel wire rope;Described square base end face has spherical.
CN201310401594.2A 2013-09-06 2013-09-06 Method for hoisting mast in tower crane dead zone Expired - Fee Related CN103434959B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310401594.2A CN103434959B (en) 2013-09-06 2013-09-06 Method for hoisting mast in tower crane dead zone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310401594.2A CN103434959B (en) 2013-09-06 2013-09-06 Method for hoisting mast in tower crane dead zone

Publications (2)

Publication Number Publication Date
CN103434959A CN103434959A (en) 2013-12-11
CN103434959B true CN103434959B (en) 2017-01-11

Family

ID=49688713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310401594.2A Expired - Fee Related CN103434959B (en) 2013-09-06 2013-09-06 Method for hoisting mast in tower crane dead zone

Country Status (1)

Country Link
CN (1) CN103434959B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2028264A (en) * 1978-08-24 1980-03-05 Kawasaki Heavy Ind Ltd Cargo-handling machine for shipboard use
CN201024053Y (en) * 2007-04-10 2008-02-20 山东丰汇设备技术有限公司 Truss structure modular type super big mast type crane
CN101487233A (en) * 2009-03-03 2009-07-22 四川公路桥梁建设集团有限公司 Method for mounting temporary pier top beam section of large-span steel box girder cable-stayed bridge
CN101700855A (en) * 2009-10-31 2010-05-05 唐福强 Method and device for lifting weight on top floor of super high-rise building
CN202429923U (en) * 2011-11-30 2012-09-12 中建钢构有限公司 Travelling cable crane
CN202988609U (en) * 2012-10-31 2013-06-12 晋江市先锋机械制造有限公司 Diagonal bracing type derrick crane

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2028264A (en) * 1978-08-24 1980-03-05 Kawasaki Heavy Ind Ltd Cargo-handling machine for shipboard use
CN201024053Y (en) * 2007-04-10 2008-02-20 山东丰汇设备技术有限公司 Truss structure modular type super big mast type crane
CN101487233A (en) * 2009-03-03 2009-07-22 四川公路桥梁建设集团有限公司 Method for mounting temporary pier top beam section of large-span steel box girder cable-stayed bridge
CN101700855A (en) * 2009-10-31 2010-05-05 唐福强 Method and device for lifting weight on top floor of super high-rise building
CN202429923U (en) * 2011-11-30 2012-09-12 中建钢构有限公司 Travelling cable crane
CN202988609U (en) * 2012-10-31 2013-06-12 晋江市先锋机械制造有限公司 Diagonal bracing type derrick crane

Also Published As

Publication number Publication date
CN103434959A (en) 2013-12-11

Similar Documents

Publication Publication Date Title
CN105000482B (en) Tower crane with walking mechanism
US9701520B2 (en) Hoisting platform system
CN105692470B (en) Inner climbing crane tower and its operating method
CN106698208B (en) A kind of hanging device and hanging method for being transported outside high-rise building
CN201707453U (en) Auxiliary device for radar nondestructive detection used in wall of tunnel
CN205387439U (en) Mast hoisting accessory
JP2010121284A (en) Construction method of steel structure
CN106703416A (en) Lifting method of steel structure roof truss pulling bar in narrow space
CN109534215A (en) A kind of suspension type hoistway Work robot
JP5184311B2 (en) Steel structure construction method
CN205653086U (en) Tower crane who possesses climbing ladder and lift
CN204434116U (en) A kind of hanging device for interior courtyard lifting pipeline
CN201485194U (en) 60T walking type full-swing erecting crane
CN206562264U (en) A kind of hanging device for transport outside high-rise building
CN103821084B (en) Operational method at the bottom of implement at the bottom of beam and beam
CN107816209B (en) The large-scale Roof Truss construction technology of installation is lifted across outer two sides
CN106185618B (en) One kind is used for Generator Stator hoisting structure and its hanging method
CN203961317U (en) Slip list Pin and many truss structures moulding bed
CN105970981A (en) High slope construction lifting platform and construction method thereof
CN203684019U (en) Height and span adjustable track laying machine for subway construction
CN103434959B (en) Method for hoisting mast in tower crane dead zone
CN105155427A (en) Construction method for laying suspension bridge catwalk
CN103434948B (en) A kind of masts type hanging apparatus
CN104404888A (en) Large hoisting system allowing gradient to be adjusted in air and application
CN105200918B (en) Bridge detection structure and bridge detection method adopting same

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170111

Termination date: 20170906