CN103387835A - Coke oven heat-state pumping grouting construction method - Google Patents

Coke oven heat-state pumping grouting construction method Download PDF

Info

Publication number
CN103387835A
CN103387835A CN2013103351927A CN201310335192A CN103387835A CN 103387835 A CN103387835 A CN 103387835A CN 2013103351927 A CN2013103351927 A CN 2013103351927A CN 201310335192 A CN201310335192 A CN 201310335192A CN 103387835 A CN103387835 A CN 103387835A
Authority
CN
China
Prior art keywords
coke oven
slurry
mud
slip casting
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013103351927A
Other languages
Chinese (zh)
Other versions
CN103387835B (en
Inventor
刘忠宝
刘明
张华骞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201310335192.7A priority Critical patent/CN103387835B/en
Publication of CN103387835A publication Critical patent/CN103387835A/en
Application granted granted Critical
Publication of CN103387835B publication Critical patent/CN103387835B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Or Underwater Handling Of Building Materials (AREA)

Abstract

The invention provides a coke oven heat-state pumping grouting construction method. The coke oven heat-state pumping grouting construction method comprises the following construction steps: arranging a slurry mixer on a middle platform or an end platform, arranging a slurry storage box in the front of the slurry mixer, and arranging a vertical slurry pump in the storage box; putting up a support frame with the height of 500 to 600 mm on the top of a furnace, and fixing a main slurry pipeline on the support frame, wherein one end of the main slurry pipeline is connected with the vertical slurry pump; arranging grouting branch pipes at the two sides of the main slurry pipeline at intervals, and arranging stop valves between the grouting branch pipes and the main slurry pipeline; and in the whole grouting process, injecting slurry into each grouting branch pipe all the time, and controlling the stop valve on each grouting branch pipe so as to realize the control on grouting points; and after the periodical grouting is finished, pumping clean water by the vertical slurry pump so as to clean the pipeline. The coke oven heat-state pumping grouting construction method has the advantages that a conventional manual conveying manner is replaced by a manner of conveying the slurry by the pipelines, so that the labor intensity of workers is greatly alleviated, the setting rate of slurry is reduced, the working efficiency is improved, the construction cost is reduced, and the construction period is shortened.

Description

The hot pumping grout construction method of coke oven
Technical field
The present invention relates to a kind of coke oven grout construction method, specifically the hot pumping grout construction method of a kind of coke oven.
Background technology
In the coke oven construction process, the hot grouting of furnace roof and protecting sheet accounts for 70% of hot construction amount.Coke oven enters hot construction and indicates that coke oven is about to put into operation, and furnace roof and protecting sheet grouting are again the work that must complete before coke oven is gone into operation, and the heat that coke oven distributes is larger, and the mud setting rate is very fast, so the transportation of mud is comparatively arduous.Present transporting method mostly is artificial transportation, and because hot furnace roof and protecting sheet grouting operating ambient temperature is higher, workman's physical consumption is larger, and labour intensity is large, and inefficiency restricts whole construction speed.
Summary of the invention
The present invention be directed to the deficiency that exists in the hot grouting technique of present coke oven, provide a kind of and reduce the mud setting rate, need not manually to transport the hot pumping grout construction method of coke oven of mud.
Realize that the technical scheme that above-mentioned purpose adopts is: the hot pumping grout construction method of a kind of coke oven, construct according to following steps:
A, slurry mixer be arranged on coke oven one side between platform or the end platform on, a mud torage tank is set before slurry mixer, in this torage tank, Veritical mud pump is housed;
B, at the oven top of coke oven scaffolding height, be the bracing frame of 500-600mm, fixing mud main pipe line on bracing frame, an end of this mud main pipe line is connected with Veritical mud pump;
C, at the interval, both sides of mud main pipe line, the slip casting arm is set respectively, is provided with stopping valve between each slip casting arm and mud main pipe line;
D, start Veritical mud pump and be in the milk, in whole filling process, each slip casting arm keeps logical slurry, by controlling stopping valve on each slip casting arm, realizes control to slip casting point;
When e, the end of filling stage property, with Veritical mud pump pumping clear water, pipeline is cleaned.
Adopt the DN50 high-pressure air hose to connect between mud main pipe line and Veritical mud pump.
The mud main pipe line adopts the weldless steel tube of Φ 48.
Every five carbonizing chambers, a slip casting arm is set on the mud main pipe line.
The mud main pipe line is arranged along the horizontal center line of oven top of coke oven.
The slurry output end of each slip casting arm is installed respectively one section steel pipe.
The slip casting arm respectively evenly interval be arranged in the both sides of mud main pipe line, control one-sided slip casting or bilateral slip casting by each stopping valve.
This constructional method disclosed in this invention has substituted traditional artificial transportation with the pipeline slurry conveyed, greatly reduces workman's labour intensity, reduces the setting rate of mud, increases work efficiency, and reduces construction cost, the reduction of erection time.
Description of drawings
Fig. 1 is equipment layout schematic diagram of the present invention.
In figure: a platform 1, slurry mixer 2, mud torage tank 3, Veritical mud pump 4, mud main pipe line 5, slip casting arm 6, stopping valve 7, furnace roof 8, end platform 9.
Embodiment
The present invention will be further described below in conjunction with drawings and Examples.
Referring to accompanying drawing 1, the hot pumping grout construction method of this coke oven disclosed in this invention, construct according to following steps.
A, a platform 1 and end platform 9 are separately positioned on the both sides of coke oven, slurry mixer 2 be arranged on coke oven one side between on platform 1, a mud torage tank 3 is set before slurry mixer 2, the mud torage tank is generally rectangle, its size is according to the service condition field fabrication.Veritical mud pump 4 is housed in mud torage tank 3, and the present embodiment adopts the PNL Veritical mud pump.
B, at oven top of coke oven 8 scaffolding heights, be the bracing frame of 500-600mm, the scaffolding of working-yard gets final product, and fixing mud main pipe line 5 on bracing frame, be fixed on mud main pipe line 5 on bracing frame with web members such as tying up silk.The mud main pipe line is along the horizontal center line layout of oven top of coke oven 8, and an end of mud main pipe line 5 and Veritical mud pump 4 adopt the DN50 high-pressure air hoses to link together, and the mud main pipe line adopts the weldless steel tube of Φ 48.
C, at the interval, both sides of mud main pipe line 5, slip casting arm 6 is set respectively, is provided with stopping valve 7 between each slip casting arm 6 and mud main pipe line 5; Every five carbonizing chambers, a slip casting arm 6 is set on the mud main pipe line, the slurry output end of each slip casting arm 6 is installed respectively one section steel pipe, and is easy to use, and the length of slip casting arm 6 is definite according to having a lot of social connections.The slip casting arm generally adopts sebific duct, convenient mobile slip casting point.
D, start Veritical mud pump and be in the milk, in whole filling process, each slip casting arm keeps logical slurry, by controlling stopping valve on each slip casting arm, realizes control to slip casting point; Pulp absorbing hole at Veritical mud pump is wrapped with gauze, avoids the clod that does not stir to be inhaled into and causes line clogging.In the pumping filling process, if suspend slip casting, valve is turned down, forbid to shut, connect the mud of outflow with liquid dump bailer; If intermittently long-time or stage stops grouting, with Veritical mud pump pumping clear water, pipeline is cleaned, prevent from stopping up.
The slip casting arm respectively evenly interval be arranged in the both sides of mud main pipe line, be in the milk simultaneously by each stopping valve controlling machine, the one-sided grouting of coke side or bilateral.

Claims (7)

1. the hot pumping grout construction method of coke oven, is characterized in that, according to following steps, constructs:
A, slurry mixer be arranged on coke oven one side between platform or the end platform on, a mud torage tank is set before slurry mixer, in this torage tank, Veritical mud pump is housed;
B, to prolong coke oven medullary ray scaffolding height at oven top of coke oven be the bracing frame of 500-600mm, fixing mud main pipe line on bracing frame, and an end of this mud main pipe line is connected with Veritical mud pump;
The interval, both sides of c, mud main pipe line arranges respectively the slip casting arm, is provided with stopping valve between each slip casting arm and mud main pipe line;
D, start Veritical mud pump and be in the milk, in whole filling process, each slip casting arm keeps logical slurry, by controlling stopping valve on each slip casting arm, realizes control to slip casting point;
When e, the end of filling stage property, with Veritical mud pump pumping clear water, pipeline is cleaned.
2. the hot pumping grout construction method of coke oven according to claim 1, is characterized in that, adopts the DN50 high-pressure air hose to connect between mud main pipe line and Veritical mud pump.
3. the hot pumping grout construction method of coke oven according to claim 1, is characterized in that, described mud main pipe line adopts the weldless steel tube of Φ 48.
4. the hot pumping grout construction method of coke oven according to claim 1, is characterized in that, every five carbonizing chambers, a slip casting arm is set on the mud main pipe line.
5. the hot pumping grout construction method of coke oven according to claim 1, is characterized in that, the mud main pipe line is arranged along the horizontal center line of oven top of coke oven.
6. the hot pumping grout construction method of coke oven according to claim 1, is characterized in that, the slurry output end of each slip casting arm is installed respectively one section steel pipe.
7. the hot pumping grout construction method of coke oven according to claim 1, is characterized in that, the slip casting arm respectively evenly interval be arranged in the both sides of mud main pipe line, control one-sided slip casting or bilateral slip casting by each stopping valve.
CN201310335192.7A 2013-08-05 2013-08-05 Coke oven heat-state pumping grouting construction method Active CN103387835B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310335192.7A CN103387835B (en) 2013-08-05 2013-08-05 Coke oven heat-state pumping grouting construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310335192.7A CN103387835B (en) 2013-08-05 2013-08-05 Coke oven heat-state pumping grouting construction method

Publications (2)

Publication Number Publication Date
CN103387835A true CN103387835A (en) 2013-11-13
CN103387835B CN103387835B (en) 2014-06-11

Family

ID=49532258

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310335192.7A Active CN103387835B (en) 2013-08-05 2013-08-05 Coke oven heat-state pumping grouting construction method

Country Status (1)

Country Link
CN (1) CN103387835B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104789233A (en) * 2015-04-03 2015-07-22 中国五冶集团有限公司 Furnace top mud conveying system for coke oven hot construction and implementation method of furnace top mud conveying system
CN104848037A (en) * 2015-06-11 2015-08-19 中国二十二冶集团有限公司 Hot blast stove-unopened construction process masonry slurry automatic conveying system
CN112195032A (en) * 2020-09-30 2021-01-08 中国一冶集团有限公司 Inside fire-resistant mud conveying system of coke oven big-arch shelter

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2848853Y (en) * 2005-12-10 2006-12-20 攀枝花新钢钒股份有限公司 Fire brick building device of coke oven carbonation chamber bottom
CN101748894A (en) * 2009-12-08 2010-06-23 中国第一冶金建设有限责任公司 Auxiliary quick construction method of temporary light rail in coke furnace building thermal state project
CN201627375U (en) * 2010-04-16 2010-11-10 中国葛洲坝集团股份有限公司 Injection grouting construction device for inside corner position
CN101922150A (en) * 2009-06-11 2010-12-22 王毅 Method for manufacturing structure of riveting panel (wall) and device thereof
CN102296961A (en) * 2011-05-31 2011-12-28 中铁二十局集团有限公司 Karst tunnel large-scale cavern processing method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2848853Y (en) * 2005-12-10 2006-12-20 攀枝花新钢钒股份有限公司 Fire brick building device of coke oven carbonation chamber bottom
CN101922150A (en) * 2009-06-11 2010-12-22 王毅 Method for manufacturing structure of riveting panel (wall) and device thereof
CN101748894A (en) * 2009-12-08 2010-06-23 中国第一冶金建设有限责任公司 Auxiliary quick construction method of temporary light rail in coke furnace building thermal state project
CN201627375U (en) * 2010-04-16 2010-11-10 中国葛洲坝集团股份有限公司 Injection grouting construction device for inside corner position
CN102296961A (en) * 2011-05-31 2011-12-28 中铁二十局集团有限公司 Karst tunnel large-scale cavern processing method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104789233A (en) * 2015-04-03 2015-07-22 中国五冶集团有限公司 Furnace top mud conveying system for coke oven hot construction and implementation method of furnace top mud conveying system
CN104848037A (en) * 2015-06-11 2015-08-19 中国二十二冶集团有限公司 Hot blast stove-unopened construction process masonry slurry automatic conveying system
CN112195032A (en) * 2020-09-30 2021-01-08 中国一冶集团有限公司 Inside fire-resistant mud conveying system of coke oven big-arch shelter

Also Published As

Publication number Publication date
CN103387835B (en) 2014-06-11

Similar Documents

Publication Publication Date Title
CN104265302B (en) Jacking pipe joints stopping device
CN203308509U (en) Grid steel frame type filling siding wall
CN103387835B (en) Coke oven heat-state pumping grouting construction method
CN107191222B (en) A kind of device and method using pressure-air conveying lotion
CN106246209A (en) A kind of tunnel inner lining concrete insulated curing constructing device and construction method thereof
CN202417520U (en) Concrete pumping distribution device used in construction of secondary linings of tunnel
CN210686007U (en) Single-line tunnel window-by-window lining concrete pouring device
CN108612118A (en) A kind of construction method of the disposable horizontal backfill of pipe curtain steel pipe inner concrete
CN112253242A (en) Method for plugging end of working surface in underground coal mine
CN205475710U (en) Steel -pipe column concrete jacking interface turnover device
CN201599041U (en) Synchronous slip casting device for shielding machine
CN105114118A (en) Flat hole gas extraction structure and implementing method thereof
CN205329759U (en) Horizontal water pump siphon is supplied water system for wet -type ore dressing system
CN204921021U (en) Flat hole gas drainage structure
CN107313802A (en) Tailings liquefaction floating harvester
CN209041100U (en) A kind of pneumatic diaphragm pump leakage fluid dram pressure relief device
CN202170630U (en) Embedded fastener to wall for scaffold
CN219045419U (en) Prevent shield and construct section of jurisdiction come-up slip casting structure
CN207740040U (en) A kind of coal mine underground waste rock filling device
CN205777332U (en) A kind of vertical drain outlet system of construction of super highrise building
CN204199709U (en) Concrete distributing device
CN203582793U (en) Coke furnace hot grouting device
CN216741610U (en) Cooling water recycling system for fully mechanized coal mining face
CN210797569U (en) Vertical pipe laying pit backfilling device
CN209671760U (en) Gas field waterline corner lays A-frame

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant