CN103382732A - High-rise pressure-superposed water supply equipment - Google Patents

High-rise pressure-superposed water supply equipment Download PDF

Info

Publication number
CN103382732A
CN103382732A CN2012101353232A CN201210135323A CN103382732A CN 103382732 A CN103382732 A CN 103382732A CN 2012101353232 A CN2012101353232 A CN 2012101353232A CN 201210135323 A CN201210135323 A CN 201210135323A CN 103382732 A CN103382732 A CN 103382732A
Authority
CN
China
Prior art keywords
water supply
water
supercharging device
roof
underground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101353232A
Other languages
Chinese (zh)
Inventor
池学聪
谭红全
张娟娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Panda Machinery Group Co Ltd
Original Assignee
Shanghai Panda Machinery Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Panda Machinery Group Co Ltd filed Critical Shanghai Panda Machinery Group Co Ltd
Priority to CN2012101353232A priority Critical patent/CN103382732A/en
Publication of CN103382732A publication Critical patent/CN103382732A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

High-rise pressure-superposed water supply equipment is provided with an underground pressurizing device, a plurality of medium pressurizing devices and a roof reserve tank, wherein the underground pressurizing device is connected with the medium pressurizing devices through a pipeline; the medium pressurizing devices are connected with the roof reserve tank through a pipeline, and can be arranged for step-by-step pressurizing according to the height of a building; the underground pressurizing device is provided with a connector connected with a water source (tap water); the roof reserve tank is provided with a water supply connector. The pressure configuration of the underground booster pump group is only required to meet the requirement of the height of the medium pressurizing devices, and is pressurized to the roof reserve tank step by step through the medium pressurizing devices, so that the loading capacity of the whole water supply connecting pipeline is reduced effectively, and workers' labor intensity, equipment investment and occupied area are reduced.

Description

A kind of high-rise laminating water supply equipment
Technical field
The present invention relates to a kind of laminating water supply equipment, particularly a kind of super highrise building living water overlapped supercharging equipment.
Background technology
It is generally at architecture bottom layer, booster pump room to be set that Super High building construction in existing supplies water, top at building arranges storage tank, underground booster pump room is raised to the roof storage tank by pump with water extraction, and then supplied water to the user by attic tank, the pressure of pump is just very high like this, simultaneously the pipeline of connecting roof water tank must increase by thickness in order to increase bearing capacity, causes like this that installation strength is large, material cost is high.If the depth of building superelevation also has storage tank and middle booster water pump are set in the centre of building, fetch water to attic tank by intermediate booster pump, but increased so again equipment investment cost and a large amount of floor space.
Summary of the invention
The object of the invention is to: design a kind of laminating water supply equipment and realize laminating supercharging step by step, reach and reduce labor strength, minimizing equipment investment and floor space and energy-conservation purpose.The present invention adopts following structure to realize above-mentioned purpose: high-rise laminating water supply equipment setting is by underground water booster system and middle supercharging device and roof storage tank, underground water booster system be connected supercharging device and connect by pipeline, middle supercharging device is connected with the roof storage tank by pipeline, middle supercharging device can arrange a plurality of superchargings step by step of carrying out according to depth of building, underground water booster system is provided with the interface that same water source (tap water) connects, and storage tank is provided with water supply interface on the roof.
After adopting as above structure, the height of supercharging device in the middle of the pressure configuration of underground booster pump group only need to reach, and then be pressurized to step by step the roof storage tank by middle supercharging device, the bearing capacity of whole like this water supply connecting pipe has obtained effective reduction, reaches to reduce labor strength, minimizing equipment investment and floor space.
Description of drawings
Fig. 1, Fig. 2 are the invention process state diagram.
The specific embodiment
high-rise laminating water supply equipment as shown in Figure 1 is provided with underground water booster system 1 and middle supercharging device 2, roof storage tank 3, underground water booster system 1 is provided with water inlet 4 and the delivery port 5 that connects with tap water, middle supercharging device 2 is comprised of pump group 6 and pressure buffer tank 7, water inlet and water inlet that pressure buffer tank 7 is arranged on pump form in parallel, underground water booster system 1 passes through tube connector 8 and is connected supercharging device 2 connections, the lift of the water pump 9 in underground water booster system 1 only need to be by the height setting of middle supercharging device 2, middle supercharging device 2 connects with roof water tank 3 by pipeline 10, middle supercharging device 2 can arrange according to the height of building a plurality of superchargings step by step of carrying out, connect by tube connector 12 between water booster system 2 in the middle of each, roof storage tank 3 is provided with the water supply mouth of pipe 11 that connects with the user, equipment work is supercharging device 2 in the middle of the pump startup of underground water booster system 1 is transported to water, when middle device 2 detect inlet pressure reach start when requiring its pump group start carry out overlapped supercharging with water supercharging device 2(or roof storage tank 3 in the middle of the upper level) carry, in the middle of after roof storage tank 3 reaches the liquid level upper limit, supercharging device 2 and underground water booster system 1 are out of service, supercharging device 2 and underground water booster system 1 start after roof storage tank 3 reaches the liquid level lower limit, owing in middle supercharging device 2, pressure buffer tank 7 being installed, like this, supercharging device 2 and underground water booster system difference 1 start-up time can effectively be avoided, equipment work is safer.

Claims (3)

1. high-rise laminating water supply equipment, it is characterized in that: high-rise laminating water supply equipment setting is by underground water booster system and middle supercharging device and roof storage tank, underground water booster system be connected supercharging device and connect by pipeline, middle supercharging device is connected with the roof storage tank by pipeline, middle supercharging device can arrange a plurality of superchargings step by step of carrying out according to depth of building, underground water booster system is provided with the interface that same water source (tap water) connects, and storage tank is provided with water supply interface on the roof.
2. a kind of high-rise laminating water supply equipment according to claim 1, it is characterized in that: middle supercharging device disposes the pressure buffer tank.
3. middle supercharging device according to claim 2, is characterized in that: the water inlet of the pump of supercharging device in the middle of the pressure buffer tank is arranged on, same water inlet formation relation in parallel.
CN2012101353232A 2012-05-04 2012-05-04 High-rise pressure-superposed water supply equipment Pending CN103382732A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101353232A CN103382732A (en) 2012-05-04 2012-05-04 High-rise pressure-superposed water supply equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101353232A CN103382732A (en) 2012-05-04 2012-05-04 High-rise pressure-superposed water supply equipment

Publications (1)

Publication Number Publication Date
CN103382732A true CN103382732A (en) 2013-11-06

Family

ID=49490644

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101353232A Pending CN103382732A (en) 2012-05-04 2012-05-04 High-rise pressure-superposed water supply equipment

Country Status (1)

Country Link
CN (1) CN103382732A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104863214A (en) * 2015-05-18 2015-08-26 周科涵 Multilevel negative pressure type water tower

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07331711A (en) * 1994-06-14 1995-12-19 Hitachi Ltd Pressure intensifying water supply system for high middle layer building
EP0973082A1 (en) * 1998-07-16 2000-01-19 Ewald Hennel Method for controlling a fluid pressure
CN201078005Y (en) * 2007-07-31 2008-06-25 何仁真 Tall building pipe network overlying water-supply installation
CN201148639Y (en) * 2007-12-29 2008-11-12 北京威派格科技发展有限公司 Overlapped supercharging high position water-supply equipment
CN101876177A (en) * 2009-01-30 2010-11-03 株式会社日立产机*** Middle-high building thing supercharging water supply system
CN201843171U (en) * 2010-10-27 2011-05-25 山东中锐供水设备有限公司 Bidirectional compensation type laminating equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07331711A (en) * 1994-06-14 1995-12-19 Hitachi Ltd Pressure intensifying water supply system for high middle layer building
EP0973082A1 (en) * 1998-07-16 2000-01-19 Ewald Hennel Method for controlling a fluid pressure
CN201078005Y (en) * 2007-07-31 2008-06-25 何仁真 Tall building pipe network overlying water-supply installation
CN201148639Y (en) * 2007-12-29 2008-11-12 北京威派格科技发展有限公司 Overlapped supercharging high position water-supply equipment
CN101876177A (en) * 2009-01-30 2010-11-03 株式会社日立产机*** Middle-high building thing supercharging water supply system
CN201843171U (en) * 2010-10-27 2011-05-25 山东中锐供水设备有限公司 Bidirectional compensation type laminating equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104863214A (en) * 2015-05-18 2015-08-26 周科涵 Multilevel negative pressure type water tower

Similar Documents

Publication Publication Date Title
CN103382732A (en) High-rise pressure-superposed water supply equipment
CN103983045A (en) Hard-pipe type water outlet and return device in same water source well for water source heat pump central air conditioner
CN206607636U (en) A kind of collection of job site water and utilize device
CN204152745U (en) Tandem emulsion power pack
CN203971252U (en) A kind of hydrodynamic(al) type dry powder and foam mixing liquid mixing extinguishing device
CN201762737U (en) Shallow plate loading test modified device
CN202865922U (en) Building layering water-supplying system
CN209100087U (en) It is a kind of to chase after drainage system for mine perviousness
CN204456891U (en) Mortar hopper is adopted mortar concrete to be transported to the device of floor
CN206428753U (en) A kind of floor water system
CN203230400U (en) Split type multifunctional dosing device for oil field
CN205636914U (en) High -rise two -way constant pressure water supply equipment
CN210658522U (en) High-rise building construction fire control water supply equipment
CN202041362U (en) Static loading test system hydraulic device for micro-controlled railroad bridge
CN208733736U (en) A kind of fire-fighting water tower secondary pressurized pumping piping installation
CN201943120U (en) Water supply system formed by multiple-stage and multiple-outlet water pump in parallel connection with multiple-portion and multiple-stage water pump
CN106480933A (en) Peak regulation pumping plant
CN203583571U (en) Siphon water pumping, supplying and draining system
CN204510824U (en) Building support prepressing device
CN201883478U (en) Automatic water adding system for water pump
CN201932920U (en) Condensed water recovery device
CN203837877U (en) Flange-connection-type rapid pressing device
CN103643702B (en) A kind of Driven-in Pile Foundations static test loading structure and construction method thereof
CN202765229U (en) Ballast water management energy-saving device for bulk freighter
CN201546972U (en) High suction lift centrifugal pump device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20131106