CN103376765A - Equipment and method for priority ranking of subway signal faults - Google Patents
Equipment and method for priority ranking of subway signal faults Download PDFInfo
- Publication number
- CN103376765A CN103376765A CN 201210124283 CN201210124283A CN103376765A CN 103376765 A CN103376765 A CN 103376765A CN 201210124283 CN201210124283 CN 201210124283 CN 201210124283 A CN201210124283 A CN 201210124283A CN 103376765 A CN103376765 A CN 103376765A
- Authority
- CN
- China
- Prior art keywords
- fault
- operational amplifier
- read
- equipment
- subway
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Mobile Radio Communication Systems (AREA)
Abstract
The invention relates to equipment for priority ranking of subway signal faults. The equipment for the priority ranking of the subway signal faults comprises 512 memorizers, a read-write comparator and an operational amplifier, the 512 memorizers are respectively connected with the input end of the read-write comparator, the output end of the read-write comparator is connected with the input end of the operational amplifier, and the output end of the operational amplifier is connected with peripheral equipment. The invention further provides a method for the priority ranking of the subway signal faults. The equipment and the method for the priority ranking of the subway signal faults enable fault handling of subways to be faster and more reliable, efficiency and accuracy of emergency processing of emergencies in the subways are improved, and service quality of the subways is guaranteed.
Description
Technical field
The present invention relates to a kind of prioritization Apparatus and method for for the subway signal fault.
Background technology
The quality of subway operation quality directly affects social stability, economic development, and the research of this respect is all quite paid attention in countries in the world.
Existing subway signal fault processing system owing to lack effective prioritization equipment, so that the fault handling efficient of signal is low, speed is slow, has affected the quality of subway operation greatly.
Summary of the invention
The object of the invention is to overcome the defective of prior art and a kind of prioritization Apparatus and method for for the subway signal fault is provided, so that signal is processed more fast and reliable.
The object of the present invention is achieved like this:
A kind of prioritization equipment for the subway signal fault of the present invention comprises 512 storeies, read-write comparer and operational amplifier, wherein,
Described 512 storeies link to each other with the input end of described read-write comparer respectively;
The output terminal of described read-write comparer links to each other with the input end of described operational amplifier;
The output terminal of described operational amplifier links to each other with external unit.
The present invention also provides a kind of prioritization method for the subway signal fault, may further comprise the steps:
The storage failure number is come according to the severity level of malfunction in the address of S1:512 storer in order from 0 to 511, and wherein the most serious is 511, and signal 1 expression has this type of fault, and signal 0 expression does not have fault;
S2: the fault number of storing in read-write comparer collection 512 storeies, identify the storer with catastrophic failure code, and the data communication device of this storer crossed operational amplifier output;
S3: after fault handling is complete, the malfunction zero clearing in the respective memory;
S4: repeat above-mentioned steps S1 to S3, until all malfunctions are 0, system enters normal operation.
The present invention is used for the prioritization Apparatus and method for of subway signal fault, so that subway fault handling fast and reliable has more improved efficient and the accuracy of subway to the emergency processing of accident, has guaranteed subway operation quality.
Description of drawings
Fig. 1 is schematic diagram of the present invention.
Embodiment
The invention will be further described below in conjunction with accompanying drawing.
See also Fig. 1, there is shown the prioritization equipment that the present invention is used for the subway signal fault, comprise 512 storer S, read-write comparer G and operational amplifier A, wherein,
512 storer S link to each other with the input end of read-write comparer G respectively;
The output terminal of read-write comparer G links to each other with the input end of operational amplifier A;
The output terminal of operational amplifier A links to each other with fault handling equipment.
The present invention is used for the prioritization method of subway signal fault, may further comprise the steps:
The storage failure number is come according to the severity level of malfunction in the address of S1:512 storer S in order from 0 to 511, and wherein the most serious is 511, and signal 1 expression has this type of fault, and signal 0 expression does not have fault;
S2: read-write comparer G gathers the fault number of storing among 512 storer S, identifies the storer S with catastrophic failure code, and the data communication device of this storer S is crossed operational amplifier A output;
S3: after fault handling is complete, the malfunction zero clearing among the respective memory S;
S4: repeat above-mentioned steps S1 to S3, until all malfunctions are 0, system enters normal operation.
Above embodiment is only for explanation the present invention's, but not limitation of the present invention, person skilled in the relevant technique, in the situation that does not break away from the spirit and scope of the present invention, can also make various conversion or modification, therefore all technical schemes that are equal to also should belong to category of the present invention, should be limited by each claim.
Claims (2)
1. a prioritization equipment that is used for the subway signal fault is characterized in that, it comprises 512 storeies, read-write comparer and operational amplifier, wherein,
Described 512 storeies link to each other with the input end of described read-write comparer respectively;
The output terminal of described read-write comparer links to each other with the input end of described operational amplifier;
The output terminal of described operational amplifier links to each other with external unit.
2. a prioritization method that is used for the subway signal fault is characterized in that, may further comprise the steps:
The storage failure number is come according to the severity level of malfunction in the address of S1:512 storer in order from 0 to 511, and wherein the most serious is 511, and signal 1 expression has this type of fault, and signal 0 expression does not have fault;
S2: the fault number of storing in read-write comparer collection 512 storeies, identify the storer with catastrophic failure code, and the data communication device of this storer crossed operational amplifier output;
S3: after fault handling is complete, the malfunction zero clearing in the respective memory;
S4: repeat above-mentioned steps S1 to S3, until all malfunctions are 0, system enters normal operation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201210124283 CN103376765A (en) | 2012-04-25 | 2012-04-25 | Equipment and method for priority ranking of subway signal faults |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201210124283 CN103376765A (en) | 2012-04-25 | 2012-04-25 | Equipment and method for priority ranking of subway signal faults |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103376765A true CN103376765A (en) | 2013-10-30 |
Family
ID=49462031
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201210124283 Pending CN103376765A (en) | 2012-04-25 | 2012-04-25 | Equipment and method for priority ranking of subway signal faults |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103376765A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109858746A (en) * | 2018-12-26 | 2019-06-07 | 阳光电源股份有限公司 | A kind of fault ticket distributing method and fault ticket management system |
-
2012
- 2012-04-25 CN CN 201210124283 patent/CN103376765A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109858746A (en) * | 2018-12-26 | 2019-06-07 | 阳光电源股份有限公司 | A kind of fault ticket distributing method and fault ticket management system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104246521A (en) | Method and device for automatic test of relay protection function of intelligent susbstation | |
CN106463996A (en) | Power adapter, terminal, and method for processing exception of charging loop | |
CN103559124A (en) | Fast fault detection method and device | |
CN103227662A (en) | Safety detection method and system of electric power communication equipment based on state control | |
CN103487276A (en) | State monitoring and fault diagnosis universal platform based on CAN bus | |
CN102768561B (en) | Design method for twinbridge piece mainboard redundancy | |
CN104794870A (en) | Electric power optical cable maintenance pre-warning system and method | |
CN104750057B (en) | Sample processing pipeline control system | |
US9053245B2 (en) | Partial redundancy for I/O modules or channels in distributed control systems | |
CN107884687B (en) | System and method for online monitoring of operating state of spark gap for series compensation | |
CN103376765A (en) | Equipment and method for priority ranking of subway signal faults | |
CN103558819A (en) | Slicing machine fault diagnosis system | |
KR101655282B1 (en) | Apparatus for managing dual level reset of microgrid gateway for new regeneration energy management system and method thereof | |
CN115883340B (en) | HPLC (high Performance liquid chromatography) and HRF (high performance liquid chromatography) based dual-mode communication fault processing method and device | |
CN204631168U (en) | A kind of industrial current transformer remote diagnosis and maintenance system | |
CN111252114A (en) | Method, device and equipment for monitoring total wind pressure of rail transit vehicle | |
CN106547958A (en) | A kind of graphical analysis method and device of mobile unit data | |
CN103731316A (en) | Flow monitoring device and method | |
CN103392304A (en) | Alarming inhibiting method and optical network device | |
CN104391756A (en) | Chain SVG (Scalable Vector Graphics) fault-grading fault-tolerant processing method based on multi-channel serial communication | |
CN103543730A (en) | Fault diagnosis system for chip mounters | |
CN105629913A (en) | Railway machine room signal power supply and environment monitoring system | |
CN105700996A (en) | Log output method and apparatus | |
CN105631965B (en) | Vehicle-mounted WTB message accountings instrument | |
CN203396895U (en) | Cable fault diagnosis system and hydraulic support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20131030 |