CN103376765A - Equipment and method for priority ranking of subway signal faults - Google Patents

Equipment and method for priority ranking of subway signal faults Download PDF

Info

Publication number
CN103376765A
CN103376765A CN 201210124283 CN201210124283A CN103376765A CN 103376765 A CN103376765 A CN 103376765A CN 201210124283 CN201210124283 CN 201210124283 CN 201210124283 A CN201210124283 A CN 201210124283A CN 103376765 A CN103376765 A CN 103376765A
Authority
CN
China
Prior art keywords
fault
operational amplifier
read
equipment
subway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201210124283
Other languages
Chinese (zh)
Inventor
李新育
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ELECTRICAL AUTOMATION DESIGN INST CO Ltd
Original Assignee
SHANGHAI ELECTRICAL AUTOMATION DESIGN INST CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ELECTRICAL AUTOMATION DESIGN INST CO Ltd filed Critical SHANGHAI ELECTRICAL AUTOMATION DESIGN INST CO Ltd
Priority to CN 201210124283 priority Critical patent/CN103376765A/en
Publication of CN103376765A publication Critical patent/CN103376765A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The invention relates to equipment for priority ranking of subway signal faults. The equipment for the priority ranking of the subway signal faults comprises 512 memorizers, a read-write comparator and an operational amplifier, the 512 memorizers are respectively connected with the input end of the read-write comparator, the output end of the read-write comparator is connected with the input end of the operational amplifier, and the output end of the operational amplifier is connected with peripheral equipment. The invention further provides a method for the priority ranking of the subway signal faults. The equipment and the method for the priority ranking of the subway signal faults enable fault handling of subways to be faster and more reliable, efficiency and accuracy of emergency processing of emergencies in the subways are improved, and service quality of the subways is guaranteed.

Description

A kind of prioritization Apparatus and method for for the subway signal fault
Technical field
The present invention relates to a kind of prioritization Apparatus and method for for the subway signal fault.
Background technology
The quality of subway operation quality directly affects social stability, economic development, and the research of this respect is all quite paid attention in countries in the world.
Existing subway signal fault processing system owing to lack effective prioritization equipment, so that the fault handling efficient of signal is low, speed is slow, has affected the quality of subway operation greatly.
Summary of the invention
The object of the invention is to overcome the defective of prior art and a kind of prioritization Apparatus and method for for the subway signal fault is provided, so that signal is processed more fast and reliable.
The object of the present invention is achieved like this:
A kind of prioritization equipment for the subway signal fault of the present invention comprises 512 storeies, read-write comparer and operational amplifier, wherein,
Described 512 storeies link to each other with the input end of described read-write comparer respectively;
The output terminal of described read-write comparer links to each other with the input end of described operational amplifier;
The output terminal of described operational amplifier links to each other with external unit.
The present invention also provides a kind of prioritization method for the subway signal fault, may further comprise the steps:
The storage failure number is come according to the severity level of malfunction in the address of S1:512 storer in order from 0 to 511, and wherein the most serious is 511, and signal 1 expression has this type of fault, and signal 0 expression does not have fault;
S2: the fault number of storing in read-write comparer collection 512 storeies, identify the storer with catastrophic failure code, and the data communication device of this storer crossed operational amplifier output;
S3: after fault handling is complete, the malfunction zero clearing in the respective memory;
S4: repeat above-mentioned steps S1 to S3, until all malfunctions are 0, system enters normal operation.
The present invention is used for the prioritization Apparatus and method for of subway signal fault, so that subway fault handling fast and reliable has more improved efficient and the accuracy of subway to the emergency processing of accident, has guaranteed subway operation quality.
Description of drawings
Fig. 1 is schematic diagram of the present invention.
Embodiment
The invention will be further described below in conjunction with accompanying drawing.
See also Fig. 1, there is shown the prioritization equipment that the present invention is used for the subway signal fault, comprise 512 storer S, read-write comparer G and operational amplifier A, wherein,
512 storer S link to each other with the input end of read-write comparer G respectively;
The output terminal of read-write comparer G links to each other with the input end of operational amplifier A;
The output terminal of operational amplifier A links to each other with fault handling equipment.
The present invention is used for the prioritization method of subway signal fault, may further comprise the steps:
The storage failure number is come according to the severity level of malfunction in the address of S1:512 storer S in order from 0 to 511, and wherein the most serious is 511, and signal 1 expression has this type of fault, and signal 0 expression does not have fault;
S2: read-write comparer G gathers the fault number of storing among 512 storer S, identifies the storer S with catastrophic failure code, and the data communication device of this storer S is crossed operational amplifier A output;
S3: after fault handling is complete, the malfunction zero clearing among the respective memory S;
S4: repeat above-mentioned steps S1 to S3, until all malfunctions are 0, system enters normal operation.
Above embodiment is only for explanation the present invention's, but not limitation of the present invention, person skilled in the relevant technique, in the situation that does not break away from the spirit and scope of the present invention, can also make various conversion or modification, therefore all technical schemes that are equal to also should belong to category of the present invention, should be limited by each claim.

Claims (2)

1. a prioritization equipment that is used for the subway signal fault is characterized in that, it comprises 512 storeies, read-write comparer and operational amplifier, wherein,
Described 512 storeies link to each other with the input end of described read-write comparer respectively;
The output terminal of described read-write comparer links to each other with the input end of described operational amplifier;
The output terminal of described operational amplifier links to each other with external unit.
2. a prioritization method that is used for the subway signal fault is characterized in that, may further comprise the steps:
The storage failure number is come according to the severity level of malfunction in the address of S1:512 storer in order from 0 to 511, and wherein the most serious is 511, and signal 1 expression has this type of fault, and signal 0 expression does not have fault;
S2: the fault number of storing in read-write comparer collection 512 storeies, identify the storer with catastrophic failure code, and the data communication device of this storer crossed operational amplifier output;
S3: after fault handling is complete, the malfunction zero clearing in the respective memory;
S4: repeat above-mentioned steps S1 to S3, until all malfunctions are 0, system enters normal operation.
CN 201210124283 2012-04-25 2012-04-25 Equipment and method for priority ranking of subway signal faults Pending CN103376765A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201210124283 CN103376765A (en) 2012-04-25 2012-04-25 Equipment and method for priority ranking of subway signal faults

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201210124283 CN103376765A (en) 2012-04-25 2012-04-25 Equipment and method for priority ranking of subway signal faults

Publications (1)

Publication Number Publication Date
CN103376765A true CN103376765A (en) 2013-10-30

Family

ID=49462031

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201210124283 Pending CN103376765A (en) 2012-04-25 2012-04-25 Equipment and method for priority ranking of subway signal faults

Country Status (1)

Country Link
CN (1) CN103376765A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109858746A (en) * 2018-12-26 2019-06-07 阳光电源股份有限公司 A kind of fault ticket distributing method and fault ticket management system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109858746A (en) * 2018-12-26 2019-06-07 阳光电源股份有限公司 A kind of fault ticket distributing method and fault ticket management system

Similar Documents

Publication Publication Date Title
CN104246521A (en) Method and device for automatic test of relay protection function of intelligent susbstation
CN106463996A (en) Power adapter, terminal, and method for processing exception of charging loop
CN103559124A (en) Fast fault detection method and device
CN103227662A (en) Safety detection method and system of electric power communication equipment based on state control
CN103487276A (en) State monitoring and fault diagnosis universal platform based on CAN bus
CN102768561B (en) Design method for twinbridge piece mainboard redundancy
CN104794870A (en) Electric power optical cable maintenance pre-warning system and method
CN104750057B (en) Sample processing pipeline control system
US9053245B2 (en) Partial redundancy for I/O modules or channels in distributed control systems
CN107884687B (en) System and method for online monitoring of operating state of spark gap for series compensation
CN103376765A (en) Equipment and method for priority ranking of subway signal faults
CN103558819A (en) Slicing machine fault diagnosis system
KR101655282B1 (en) Apparatus for managing dual level reset of microgrid gateway for new regeneration energy management system and method thereof
CN115883340B (en) HPLC (high Performance liquid chromatography) and HRF (high performance liquid chromatography) based dual-mode communication fault processing method and device
CN204631168U (en) A kind of industrial current transformer remote diagnosis and maintenance system
CN111252114A (en) Method, device and equipment for monitoring total wind pressure of rail transit vehicle
CN106547958A (en) A kind of graphical analysis method and device of mobile unit data
CN103731316A (en) Flow monitoring device and method
CN103392304A (en) Alarming inhibiting method and optical network device
CN104391756A (en) Chain SVG (Scalable Vector Graphics) fault-grading fault-tolerant processing method based on multi-channel serial communication
CN103543730A (en) Fault diagnosis system for chip mounters
CN105629913A (en) Railway machine room signal power supply and environment monitoring system
CN105700996A (en) Log output method and apparatus
CN105631965B (en) Vehicle-mounted WTB message accountings instrument
CN203396895U (en) Cable fault diagnosis system and hydraulic support

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20131030