CN103321410A - Overhang diagonal form at exposed corner and method for erecting form - Google Patents

Overhang diagonal form at exposed corner and method for erecting form Download PDF

Info

Publication number
CN103321410A
CN103321410A CN2013102640667A CN201310264066A CN103321410A CN 103321410 A CN103321410 A CN 103321410A CN 2013102640667 A CN2013102640667 A CN 2013102640667A CN 201310264066 A CN201310264066 A CN 201310264066A CN 103321410 A CN103321410 A CN 103321410A
Authority
CN
China
Prior art keywords
encorbelmenting
iron
diagonal member
diagonal
embedded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102640667A
Other languages
Chinese (zh)
Other versions
CN103321410B (en
Inventor
李兆龙
贾杨
李世俊
刘鹏
崔同垒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongqing Jianan Construction Group Co Ltd
Qingdao Zhongjia Construction Group Co Ltd
Original Assignee
QINGDAO DONGYA CONSTRUCTION DECORATION Co Ltd
Qingdao Jianan Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGDAO DONGYA CONSTRUCTION DECORATION Co Ltd, Qingdao Jianan Construction Group Co Ltd filed Critical QINGDAO DONGYA CONSTRUCTION DECORATION Co Ltd
Priority to CN201310264066.7A priority Critical patent/CN103321410B/en
Publication of CN103321410A publication Critical patent/CN103321410A/en
Application granted granted Critical
Publication of CN103321410B publication Critical patent/CN103321410B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses an overhang diagonal form at an exposed corner. The overhang diagonal form comprises embedded steel plates, an I-shaped steel platform, a diagonal member anchoring end and a diagonal member lower end. The embedded steel plates are embedded in two adjacent side surfaces of a concrete corner column, the I-shaped steel platform is welded into the embedded steel plates, the diagonal member anchoring end is embedded in a floor structural surface, and the diagonal member lower end is fixed onto the I-shaped steel platform and is connected with the diagonal member anchoring end by a straight threaded sleeve. The invention further discloses a method for erecting the overhang diagonal form. The overhang diagonal form at the exposed corner and the method have the advantages that the overhang diagonal form is low in manufacturing cost, and an overhang scaffold can be stably mounted by the aid of the overhang diagonal form; by the method for erecting the diagonal form, operate is convenient, and the construction speed is high.

Description

A kind of external corner place encorbelment oblique pull mould and mold method
Technical field
The present invention relates to the realm of building construction, relate in particular to a kind of for the encorbelment mold method of oblique pull mould and this oblique pull mould of the external corner place that builder's jack is installed in this field.
Background technology
In recent years, along with the quickening of urbanization process, high-rise, super highrise building increases increasingly, and the application of builder's jack is more prevalent, and how quick, stable installation builder's jack becomes the anxious technical issues that need to address.
Summary of the invention
Technical problem to be solved by this invention just provide a kind of can be fast, the encorbelment mold method of oblique pull mould and this oblique pull mould of the stable external corner place that builder's jack is installed.
The present invention adopts following technical scheme:
A kind of external corner place oblique pull mould of encorbelmenting comprises the pre-embedded steel slab that is embedded in the concrete corner post two adjacent sides, is soldered to the i iron platform in the pre-embedded steel slab; Also comprise the diagonal member anchored end that is embedded in the floor structure face, be fixed on the diagonal member lower end on the i iron platform, described diagonal member lower end adopts straight screw sleeve to be connected with the diagonal member anchored end.
Further, described i iron platform comprises three i iron of encorbelmenting that are welded in a bit, and two adjacent angles of encorbelmenting between the i iron are 45 °, and are connected with reinforcing rib.
Further, the angle steel hole is set on the i iron of encorbelmenting, after the diagonal member lower end passes this angle steel hole, fastening by straight screw sleeve and steel plate washer.
Further, described steel plate washer thickness is 14mm.
Further, the every i iron of encorbelmenting is by two diagonal member drawknots.
A kind of external corner place oblique pull mould mold method of encorbelmenting comprises the steps:
(1) when the concrete corner post is constructed, imbeds pre-embedded steel slab;
(2) when the floor structure surface construction, imbed the diagonal member anchored end;
(3) welding H-bar platform, described i iron platform comprise three i iron of encorbelmenting that are welded in a bit, and two adjacent angles of encorbelmenting between the i iron are 45 °, and are connected with reinforcing rib;
(4) the i iron platform welding that step (3) is obtained is to pre-embedded steel slab;
(5) adopt diagonal member lower end and diagonal member anchored end straight screw sleeve to be connected;
(6) the diagonal member lower end is passed the angle steel hole that arranges on the i iron of encorbelmenting after, fastening with straight screw sleeve and steel plate washer and the i iron of encorbelmenting again.
The invention has the beneficial effects as follows:
The external corner disclosed in this invention place oblique pull mould of encorbelmenting, cost of manufacture is low, can stablize the installation builder's jack; The mold method of oblique pull mould disclosed in this invention, easy to operate, speed of application is fast.
Description of drawings
Fig. 1 is the disclosed structural representation that is soldered to the i iron platform behind the pre-embedded steel slab of the embodiment of the invention 1;
Fig. 2 is the connection diagram of the embodiment of the invention 1 disclosed encorbelment i iron and pre-embedded steel slab;
Fig. 3 is the connection diagram of the embodiment of the invention 1 disclosed diagonal member lower end and diagonal member anchored end;
Fig. 4 is the connection diagram of the embodiment of the invention 1 disclosed diagonal member lower end and the i iron of encorbelmenting.
The specific embodiment
In order to make purpose of the present invention, technical scheme and advantage clearer, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the present invention, is not intended to limit the present invention.
Embodiment 1, please refer to Fig. 1-4, and the present embodiment discloses a kind of external corner place oblique pull mould of encorbelmenting, and comprises the pre-embedded steel slab 1 that is embedded in 2 liang of adjacent sides of concrete corner post, is soldered to the i iron platform in the pre-embedded steel slab; Also comprise the diagonal member anchored end 7 that is embedded in the floor structure face 6, be fixed on the diagonal member lower end 8 on the i iron platform, described diagonal member lower end adopts straight screw sleeve 9 to be connected with the diagonal member anchored end.
Described i iron platform comprises that three i iron 3, two adjacent angles of encorbelmenting between the i iron of encorbelmenting that are welded in any are 45 °, and is connected with reinforcing rib 4.
Encorbelmenting arranges angle steel hole 10 on the i iron, after the diagonal member lower end passes this angle steel hole, fastening by straight screw sleeve 11 and steel plate washer 12.
Described steel plate washer thickness is 14mm.
The every i iron of encorbelmenting is by two diagonal member drawknots.
The present embodiment also discloses a kind of external corner place oblique pull mould mold method of encorbelmenting, and comprises the steps:
(1) when the concrete corner post is constructed, imbeds pre-embedded steel slab;
(2) when the floor structure surface construction, imbed the diagonal member anchored end;
(3) welding H-bar platform, described i iron platform comprise three i iron of encorbelmenting that are welded in a bit, and two adjacent angles of encorbelmenting between the i iron are 45 °, and are connected with reinforcing rib;
(4) the i iron platform welding that step (3) is obtained is to pre-embedded steel slab;
(5) adopt diagonal member lower end and diagonal member anchored end straight screw sleeve to be connected;
(6) the diagonal member lower end is passed the angle steel hole that arranges on the i iron of encorbelmenting after, fastening with straight screw sleeve and steel plate washer and the i iron of encorbelmenting again.
The disclosed external corner of the present embodiment place oblique pull mould of encorbelmenting, cost of manufacture is low, can stablize the installation builder's jack; The mold method of the disclosed oblique pull mould of the present embodiment, easy to operate, speed of application is fast.

Claims (6)

1. external corner place oblique pull mould of encorbelmenting is characterized in that: comprise the pre-embedded steel slab that is embedded in the concrete corner post two adjacent sides, be soldered to the i iron platform in the pre-embedded steel slab; Also comprise the diagonal member anchored end that is embedded in the floor structure face, be fixed on the diagonal member lower end on the i iron platform, described diagonal member lower end adopts straight screw sleeve to be connected with the diagonal member anchored end.
2. the external corner according to claim 1 place oblique pull mould of encorbelmenting, it is characterized in that: described i iron platform comprises three i iron of encorbelmenting that are welded in a bit, two adjacent angles of encorbelmenting between the i iron are 45 °, and are connected with reinforcing rib.
3. the external corner according to claim 2 place oblique pull mould of encorbelmenting is characterized in that: the angle steel hole is set on the i iron of encorbelmenting, and after the diagonal member lower end passes this angle steel hole, fastening by straight screw sleeve and steel plate washer.
4. the external corner according to claim 3 place oblique pull mould of encorbelmenting, it is characterized in that: described steel plate washer thickness is 14mm.
5. the external corner place that states the according to claim 3 oblique pull mould of encorbelmenting, it is characterized in that: the every i iron of encorbelmenting is by two diagonal member drawknots.
6. external corner place oblique pull mould mold method of encorbelmenting is characterized in that, comprises the steps:
(1) when the concrete corner post is constructed, imbeds pre-embedded steel slab;
(2) when the floor structure surface construction, imbed the diagonal member anchored end;
(3) welding H-bar platform, described i iron platform comprise three i iron of encorbelmenting that are welded in a bit, and two adjacent angles of encorbelmenting between the i iron are 45 °, and are connected with reinforcing rib;
(4) the i iron platform welding that step (3) is obtained is to pre-embedded steel slab;
(5) adopt diagonal member lower end and diagonal member anchored end straight screw sleeve to be connected;
(6) the diagonal member lower end is passed the angle steel hole that arranges on the i iron of encorbelmenting after, fastening with straight screw sleeve and steel plate washer and the i iron of encorbelmenting again.
CN201310264066.7A 2013-06-26 2013-06-26 Encorbelment oblique pull mould and mold method in a kind of external corner place Active CN103321410B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310264066.7A CN103321410B (en) 2013-06-26 2013-06-26 Encorbelment oblique pull mould and mold method in a kind of external corner place

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310264066.7A CN103321410B (en) 2013-06-26 2013-06-26 Encorbelment oblique pull mould and mold method in a kind of external corner place

Publications (2)

Publication Number Publication Date
CN103321410A true CN103321410A (en) 2013-09-25
CN103321410B CN103321410B (en) 2015-08-05

Family

ID=49190432

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310264066.7A Active CN103321410B (en) 2013-06-26 2013-06-26 Encorbelment oblique pull mould and mold method in a kind of external corner place

Country Status (1)

Country Link
CN (1) CN103321410B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107354946A (en) * 2017-08-16 2017-11-17 中铁第四勘察设计院集团有限公司 A kind of supporting construction of encorbelmenting for foundation pit steel support
CN106121225B (en) * 2016-08-24 2018-05-11 仇国辉 Suspension active erecting device is chosen outside cast-in-place concrete eaves
CN113719109A (en) * 2021-09-06 2021-11-30 中国建筑第五工程局有限公司 Overhanging I-steel single-anchor buried construction method for external shear wall
CN114837394A (en) * 2022-03-28 2022-08-02 中国五冶集团有限公司 Construction method of combined type external corner profile steel cantilever frame

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03156059A (en) * 1989-11-14 1991-07-04 Norihide Imagawa Overhanging chord construction and pre-stress introducing method in overhanging chord beam construction
JPH0932106A (en) * 1995-07-21 1997-02-04 Nichiha Corp Drain structure of overhang part of building
RU2163958C1 (en) * 1999-08-09 2001-03-10 Горшков Игорь Александрович Prefabricated three-dimensional building block
JP2001214546A (en) * 2000-01-31 2001-08-10 Sumitomo Forestry Co Ltd Joint structure for exterior wall panel and gasket
CN201649604U (en) * 2010-03-24 2010-11-24 陕西建工集团第一建筑工程有限公司 I-steel overhanging type scaffold for floor corner construction
CN102296798A (en) * 2011-06-14 2011-12-28 中国建筑第五工程局有限公司 Bracket bearing structure at external corner part of segmented erection type scaffold
CN102392491A (en) * 2011-07-29 2012-03-28 上海交通大学 Connecting joint for beam, column and inclined strut of box section of boiler steel frame and construction method thereof
CN102720358A (en) * 2012-06-15 2012-10-10 河南省第一建筑工程集团有限责任公司 Forming method of upward pull type overhanging joist steel moudle frame stressing platform
CN203403673U (en) * 2013-06-26 2014-01-22 青岛建安建设集团有限公司 Overhang inclined drawing die at external corner

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03156059A (en) * 1989-11-14 1991-07-04 Norihide Imagawa Overhanging chord construction and pre-stress introducing method in overhanging chord beam construction
JPH0932106A (en) * 1995-07-21 1997-02-04 Nichiha Corp Drain structure of overhang part of building
RU2163958C1 (en) * 1999-08-09 2001-03-10 Горшков Игорь Александрович Prefabricated three-dimensional building block
JP2001214546A (en) * 2000-01-31 2001-08-10 Sumitomo Forestry Co Ltd Joint structure for exterior wall panel and gasket
CN201649604U (en) * 2010-03-24 2010-11-24 陕西建工集团第一建筑工程有限公司 I-steel overhanging type scaffold for floor corner construction
CN102296798A (en) * 2011-06-14 2011-12-28 中国建筑第五工程局有限公司 Bracket bearing structure at external corner part of segmented erection type scaffold
CN102392491A (en) * 2011-07-29 2012-03-28 上海交通大学 Connecting joint for beam, column and inclined strut of box section of boiler steel frame and construction method thereof
CN102720358A (en) * 2012-06-15 2012-10-10 河南省第一建筑工程集团有限责任公司 Forming method of upward pull type overhanging joist steel moudle frame stressing platform
CN203403673U (en) * 2013-06-26 2014-01-22 青岛建安建设集团有限公司 Overhang inclined drawing die at external corner

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
孙军利: "高空悬挑斜拉模板支撑架的施工技术", 《建筑技术》, no. 11, 25 November 2012 (2012-11-25), pages 1086 - 1087 *
房敏戈: "型钢悬挑脚手架在工程中的应用", 《工程技术》, no. 3, 20 June 2013 (2013-06-20), pages 99 - 101 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106121225B (en) * 2016-08-24 2018-05-11 仇国辉 Suspension active erecting device is chosen outside cast-in-place concrete eaves
CN107354946A (en) * 2017-08-16 2017-11-17 中铁第四勘察设计院集团有限公司 A kind of supporting construction of encorbelmenting for foundation pit steel support
CN113719109A (en) * 2021-09-06 2021-11-30 中国建筑第五工程局有限公司 Overhanging I-steel single-anchor buried construction method for external shear wall
CN114837394A (en) * 2022-03-28 2022-08-02 中国五冶集团有限公司 Construction method of combined type external corner profile steel cantilever frame

Also Published As

Publication number Publication date
CN103321410B (en) 2015-08-05

Similar Documents

Publication Publication Date Title
CN203613690U (en) Curtain wall connecting structure
CN103174166B (en) A kind of recreation facility built-in fitting of complete integral installation and mounting method thereof
CN103352564B (en) Horizontal structure shuttering system and construction method
CN103321410B (en) Encorbelment oblique pull mould and mold method in a kind of external corner place
CN102235034A (en) Prefabricated part and construction method for connecting prefabricated part with main structure
CN204139459U (en) Regeneration concrete hetermorphiscal column
CN102003046B (en) Steel structure staircase for multi-storied industrialized house
CN203403673U (en) Overhang inclined drawing die at external corner
CN204040450U (en) A kind of for angle connector in tools type section steel builder's jack
CN103669831B (en) A kind of transformer station's cast-in-situ wall combined steel and construction method thereof
CN204152113U (en) Masonry panel balustrade pre-buried structure
CN203878718U (en) Joint structure of cover plate of trench and pipe trench
CN203514521U (en) Wall crown tie
CN103410345A (en) Reinforced concrete column reinforcement device and method
CN203080931U (en) Shear wall outer wall formwork bearing device
CN104863347A (en) Building scaffold wall connecting structure and construction process
CN205791363U (en) A kind of electrical engineering positioning installation apparatus
CN204728475U (en) A kind of secondary structure steel tie bar embedded part device
CN204212385U (en) Scaffold strengthened by truss
CN209767088U (en) Prefabricated wallboard reserved electrical pipe joint
CN203878607U (en) Construction joint structure of trench wall concrete of trench and pipe trench
CN204299142U (en) A kind of unloading-structure of builder's jack
CN103967208B (en) The light steel of Z-section-timber with small diameter combination bearing column and making method
CN202689567U (en) Pump pipe handrail for concrete pouring
CN203626247U (en) Aluminum alloy formwork base for pouring upper-storey wall/column

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: QINGDAO EAST ASIA BUILDING DECORATION CO., LTD.

Effective date: 20140326

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20140326

Address after: 266071 Shandong Province, Qingdao city Shandong Road No. 16 building sunshine TAIDING

Applicant after: Qingdao Jianan Construction Group Co., Ltd.

Address before: 266071 Shandong Province, Qingdao city Shandong Road No. 16 building sunshine TAIDING

Applicant before: Qingdao Jianan Construction Group Co., Ltd.

Applicant before: Qingdao Dongya Construction Decoration Co., Ltd.

ASS Succession or assignment of patent right

Owner name: QINGDAO DONGYA DECORATION CO., LTD.

Free format text: FORMER OWNER: QINGDAO JIANAN CONSTRUCTION GROUP CO., LTD.

Effective date: 20140416

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 266071 QINGDAO, SHANDONG PROVINCE TO: 266012 QINGDAO, SHANDONG PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20140416

Address after: 266012 Shandong province Qingdao City, Liaoning Road No. 228

Applicant after: QINGDAO DONGYA DECORATION CO., LTD.

Address before: 266071 Shandong Province, Qingdao city Shandong Road No. 16 building sunshine TAIDING

Applicant before: Qingdao Jianan Construction Group Co., Ltd.

ASS Succession or assignment of patent right

Owner name: QINGDAO JIANAN CONSTRUCTION GROUP CO., LTD.

Free format text: FORMER OWNER: QINGDAO DONGYA DECORATION CO., LTD.

Effective date: 20150707

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20150707

Address after: 266000 Shandong Province, Qingdao city Shandong Road No. 16 building 26

Applicant after: Qingdao Jianan Construction Group Co., Ltd.

Address before: 266012 Shandong province Qingdao City, Liaoning Road No. 228

Applicant before: QINGDAO DONGYA DECORATION CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200323

Address after: 266000 A, Shandong Road, Qingdao City, Shandong Province

Co-patentee after: ZHONGQING JIANAN CONSTRUCTION GROUP Co.,Ltd.

Patentee after: QINGDAO ZHONGJIA CONSTRUCTION GROUP Co.,Ltd.

Address before: 266000 Shandong Province, Qingdao city Shandong Road No. 16 building 26

Patentee before: QINGDAO JIANAN CONSTRUCTION GROUP Co.,Ltd.