CN103291040B - The installation method of building wall finishing material - Google Patents
The installation method of building wall finishing material Download PDFInfo
- Publication number
- CN103291040B CN103291040B CN201310221046.1A CN201310221046A CN103291040B CN 103291040 B CN103291040 B CN 103291040B CN 201310221046 A CN201310221046 A CN 201310221046A CN 103291040 B CN103291040 B CN 103291040B
- Authority
- CN
- China
- Prior art keywords
- suspension member
- panel
- finishing material
- building wall
- flange
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Finishing Walls (AREA)
Abstract
The invention belongs to building wall decoration technique field, it is related to the installation method of building wall finishing material, comprises the following steps:Make panel and oblique notched on the design attitude of panel or skewed slot and straight trough, beat back of the body bolt installing blind;Metal hanger is installed:In the direct expandable filler of back side of panel or stickup packing material for installing suspension member;The finishing material of above-mentioned making is arranged on wall with setscrew, and fluid sealant is expired in full-filling in the gap between adjacent finishing material, advantage is:The various mechanical performances of finishing material of the present invention are high, and good heat insulation, production cost is low, the consumption of stone material and steel skeleton is few, compared to traditional dry-hanging method cost-effective 40-50%, saves duration rate 60% or so, weight is reduced than 50% or so, it is adaptable to indoor and outdoor wall patcher's method of new and old buildingses.
Description
Technical field
The invention belongs to building wall decoration technique field, a kind of installation method of building wall finishing material is refered in particular to.
Background technology
At present, the installation method of many stone curtain walls, commonly uses mounting method and dry-hanging method, although the simple side of mounting method construction
Just, but because its thickness is big, weight big, its reliability is bad, easily comes off;So-called dry-hanging method is first to be set on metope
Built-in fitting, then steel joist is installed on built-in fitting, finally finishing material is fixed on steel joist, it is disadvantageous in that it consumes
The steel taken are more, and production cost is high, and heat-insulating property is also bad;And for slim inner-outer wall finishing material, particularly less than 25mm
The panels such as stone material, the ceramic tile of thickness, it is to fully rely on enough thickness to ensure its intensity to hang patch due to tradition, therefore current specifications
Limitation is used.
The content of the invention
It is an object of the invention to provide a kind of building wall facing of construct quick and easy, saving steel and finishing material material
The installation method of material.
The object of the present invention is achieved like this:
The installation method of building wall finishing material, comprises the following steps:
(1)Make panel and oblique notched on the design attitude of panel or skewed slot and straight trough, beat back of the body bolt installing blind;
(2)Metal hanger is installed:
1)By the exposed connecting portion of suspension member one upward, the inclined hook of suspension member one is hung on described skewed slot, uses back of the body bolt
It is fixed on through the mounting hole on suspension member one on panel;
2)Suspension member two and the transverse part of the upper end of suspension member one is fitted, the upper overturning laminating of inner side, then with screw by suspension member two
On the transverse part of the upper end of suspension member one;
(3)In the direct expandable filler of back side of panel or stickup packing material for installing suspension member, and make the He of suspension member two
The transverse part of the upper end of suspension member one, the upper overturning of inner side are exposed;
(4)Step is passed through with screw(3)Mounting hole on suspension member two and the inner upper overturning of the transverse part of suspension member one is screwed in L-type
Suspension member four kink screwed hole on, be set with spring on the screw between the upper overturning and suspension member four of suspension member one;
(5)Rule and punch on wall, step is passed through with setscrew(4)Mounting hole on the kink of suspension member four of installation
By step(4)What is made is arranged on wall, is screwed in set screw through the bar hole on suspension member two and the transverse part of suspension member one
On screwed hole on the transverse part of suspension member four, after the preceding surface neat and consistent for adjusting panel, set screw is screwed, by step(5)
Method to when installing finishing material on wall, be first transversely mounted finishing material, then finishing material is installed from down to up, and in phase
The full fluid sealant of full-filling in gap between adjacent finishing material.
Step(1)Described fluting is to be oblique notched at the back side of panel, or is oblique notched and in panel at the back side of panel
Upper and lower end face opens straight trough respectively.
Above-mentioned step(2)Metal hanger is installed also to comprise the following steps:
3)The right angle flange of the outer end of suspension member two be one on the side flange, opposite side downward flange when, first by suspension member two to
Under flange first insert in the straight trough of panel upper surface, then suspension member two be screwed with suspension member one be connected;Or
When the right angle flange of the outer end of suspension member two is only upward flange, the suspension member of only kink and inclined hook is additionally provided with
Three, the inclined hook of suspension member three is hung over upward on the skewed slot on the downside of suspension member one, fixed with back of the body bolt through the mounting hole on suspension member three
On panel.
When suspension member three being installed on above-mentioned panel and being arranged on suspension member three on wall, reserved between two adjacent surfaces plate big
During seam, the company of being screwed between the exposed portion of the downside of suspension member three of upper panel and the upward flange of the suspension member two of downside panel
Connect.
Above-mentioned packing material is insulation material or mortar material.
Above-mentioned panel is made of natural material or artificial material, such as the slabstone of cutting or the ceramic tile of firing.
The present invention is prominent and beneficial compared with prior art to be had the technical effect that:
1st, skewed slot is opened in the middle part of panel by the present invention, and suspension member one or/and suspension member four utilize the hook of end, middle part
The upper, middle and lower portion that the load-bearing of suspension member one or/and suspension member four is dispersed in panel is lifted in back of the body bolt and lower end, panel is uniformly held
Weight, can further be reduced the thickness of panel, the thickness of panel be conducive to again in turn after reducing the suspension of panel install and
The firmness of installation.
2nd, the first mounting suspension member in the back side of the invention in panel, then relatively thin(≤25mm)Panel on shaping or paste upper bullet
The expandable filler of property, greatly improves the various mechanical performances of panel, while making panel possess heat insulation function again, subtracts significantly
The consumption of few stone material and steel skeleton, production cost is substantially reduced, compared to traditional dry-hanging method cost-effective 40-50%, saves work
Phase rate 60% or so, reduces weight than 50% or so, due to without construction site foam-in-place insulation material again, being reduced or avoided
The generation of fire.
3rd, packing material of the invention is insulation material or mortar etc., and panel is natural material, artificial material etc., metal
Suspension member is metal material, can factorial praluction, noise, the pollution such as dust are reduced in scene.4th, the present invention is simple in construction, manufactures
Easily, easy construction, saving steel, stone material or ceramic material, it is adaptable to indoor and outdoor wall patcher's method of new and old buildingses.
Brief description of the drawings
Fig. 1 is the engineering method step decomposing schematic representation of the embodiment of the present invention 1.
Fig. 2 is the schematic perspective view that metal hanger is arranged on panel by the embodiment of the present invention 1.
Fig. 3 is the schematic perspective view of the metal hanger of the embodiment of the present invention 1.
Fig. 4 is the engineering method step decomposing schematic representation of the embodiment of the present invention 2.
Fig. 5 is the schematic perspective view that metal hanger is arranged on panel by the embodiment of the present invention 2.
Fig. 6 is the schematic perspective view of the metal hanger of the embodiment of the present invention 2.
Embodiment
With specific embodiment, the invention will be further described below in conjunction with the accompanying drawings:
Embodiment 1, referring to Fig. 1-Fig. 3:
The installation method of building wall finishing material, comprises the following steps:
(1)Make panel 10 and oblique notched on the design attitude of panel 10 11 or skewed slot 11 and straight trough 13, beat back of the body bolt pacify
Fill blind hole 12;
(2)Metal hanger is installed:
1)By the exposed transverse part 22 of suspension member 1 upward, the inclined hook 24 of suspension member 1 is hung over to described skewed slot 11
On, fixed on the faceplate 10 through the mounting hole on suspension member 1 with back of the body bolt 41;
2)First make that suspension member 2 30 and the transverse part 32 of the upper end of suspension member 1 are fitted with 22, the upper overturning 31 of inner side is fitted with 21,
Suspension member 2 30 is arranged on the transverse part 22 of the upper end of suspension member 1 with screw 42 again;
(3)Installing the direct expandable filler in the back side of panel 10 of suspension member or pasting packing material 50, and making suspension member
2 30 and the upper end of suspension member 1 transverse part 32,22, the upper overturning 21,31 of inner side it is exposed;
(4)Step is passed through with screw 44(3)Installation on suspension member 2 30 and the inner upper overturning 21,31 of the transverse part of suspension member 1
Hole is screwed on the screwed hole of the kink 61 of the suspension member 4 60 of L-type, between the upper overturning 21 and suspension member 4 60 of suspension member 1
Spring 45 is set with screw 44;
(5)Rule and punch on wall 70, step is passed through with setscrew 46(4)On the kink 61 of suspension member 4 60 of installation
Mounting hole by step(4)The finishing material of making is arranged on wall 70, and suspension member 2 30 and suspension member are passed through with set screw 43
Bar hole 37 on one 20 transverse parts 32,22 is screwed on the screwed hole on the transverse part 62 of suspension member 4 60, adjusts the preceding table of panel
After the neat and consistent of face, set screw 43 is screwed, by step(5)Method to when installing finishing material on wall 70, first horizontal peace
Decorative cover material, then finishing material is installed from down to up, and the full fluid sealant of full-filling in the gap between adjacent finishing material
91。
Step(1)Described fluting 12 and is opened respectively to be oblique notched at the back side of panel 11 in the upper and lower end face of panel 10
Straight trough 13.
Above-mentioned step(2)Metal hanger is installed also to comprise the following steps:
3)The right angle flange of the outer end of suspension member 2 30 is a downward flange 34 of flange 33, opposite side on the side, first by suspension member
2 30 downward flange 34 are first inserted in the straight trough 13 of the upper surface of panel 10, then suspension member 2 30 is consolidated with suspension member 1 with screw 42
Fixed connection, wherein:Described right angle flange is approximate 90 degree of flange, not refers in particular to 90 degree of flange, for example:Right angle flange
Angle is 95-90 degree or 85-90 degree or 90 degree;
Above-mentioned packing material 50 is insulation material or mortar material, for example:Cement foamed packing material or expansion polyphenyl
Plate or extruded sheet or phenolic aldehyde packing material or rock cotton board.
Above-mentioned panel 10 is made of natural material or artificial material, the slabstone of such as cutting or the ceramic tile of firing
Deng.
Embodiment 2, referring to Fig. 4-Fig. 6:
The structure of the structure of embodiment 2 and embodiment 1 is essentially identical, and difference is:
Step(1)Described fluting is only oblique notches 12 at the back side of panel 10.
The right angle flange of the described outer end of suspension member 2 30 is only upward flange 38, is additionally provided with only kink 81 and oblique
On the suspension member 3 80 of hook 82, the skewed slot 12 that the inclined hook 82 of suspension member 3 80 is hung over to the downside of suspension member 1 upward, with back of the body bolt 41
Fixed on the faceplate 10 through the mounting hole on suspension member 3 80, wherein:Described right angle flange is approximate 90 degree of flange, not
90 degree of flange is refered in particular to, for example:The angle of right angle flange is 95-90 degree or 85-90 degree or 90 degree.
When suspension member 3 80 being installed on above-mentioned panel and being arranged on suspension member 3 80 on wall 70, between two adjacent surfaces plate
During reserved big seam, between the exposed portion of the downside of suspension member 3 80 of upper panel and the upward flange 38 of the suspension member 2 30 of downside panel
It is fixedly connected with screw 90.
Above-described embodiment is only presently preferred embodiments of the present invention, is not limited the scope of the invention according to this, therefore:It is all according to
The equivalence changes that structure, shape, the principle of the present invention is done, all should be covered by within protection scope of the present invention.
Claims (6)
1. the installation method of building wall finishing material, it is characterised in that:Comprise the following steps:
(1)Make panel and oblique notched on the design attitude of panel or skewed slot and straight trough, beat back of the body bolt installing blind;
(2)Metal hanger is installed:
1)By the exposed transverse part of suspension member one upward, the inclined hook of suspension member one is hung on described skewed slot, is passed through and hung with back of the body bolt
Mounting hole on part one is fixed on panel;
2)Suspension member two and the transverse part of the upper end of suspension member one is first set to fit, the upper overturning of inner side is fitted, then installed suspension member two with screw
On the transverse part of the upper end of suspension member one;
(3)In the direct expandable filler of back side of panel or stickup packing material for installing suspension member, and make suspension member two and suspension member
The transverse part of one upper end, the upper overturning of inner side are exposed;
(4)Step is passed through with screw(3)Mounting hole on suspension member two and the inner upper overturning of the transverse part of suspension member one is screwed in the extension of L-type
On the screwed hole of the vertical portion of part four, spring is set with the screw between the upper overturning and suspension member four of suspension member one;
(5)Rule and punch on wall, step is passed through with setscrew(4)Mounting hole on the vertical portion of suspension member four of installation will be walked
Suddenly(4)The finishing material of making is arranged on wall, is revolved with set screw through the bar hole on suspension member two and the transverse part of suspension member one
It is connected on the screwed hole on the transverse part of suspension member four, after the preceding surface neat and consistent for adjusting finishing material, screws set screw, press
Step(5)Method to when installing finishing material on wall, be first transversely mounted finishing material, then veneer material is installed from down to up
Expect, and the full fluid sealant of full-filling in the gap between adjacent finishing material.
2. the installation method of building wall finishing material according to claim 1, it is characterised in that:Step(1)Described
Slot and oblique notched for the back side in panel, or oblique notched at the back side of panel and open straight trough respectively in the upper and lower end face of panel.
3. the installation method of building wall finishing material according to claim 2, it is characterised in that:Described step(2)
Metal hanger is installed also to comprise the following steps:
3)The right angle flange of the outer end of suspension member two be one on the side flange, opposite side downward flange when, it is first that suspension member two is downward
Flange is first inserted in the straight trough of panel upper surface, then suspension member two is screwed with suspension member one is connected;Or
When the right angle flange of the outer end of suspension member two is only upward flange, the suspension member three of only vertical portion and inclined hook is additionally provided with,
On the skewed slot that the inclined hook of suspension member three is hung over to the downside of suspension member one upward, face is fixed on through the mounting hole on suspension member three with back of the body bolt
On plate.
4. the installation method of building wall finishing material according to claim 3, it is characterised in that:Described finishing material
On suspension member three is installed and when suspension member three is arranged on wall, when reserving big seam between adjacent two finishing material, upper panel
The exposed portion of the downside of suspension member three and the upward flange of suspension member two of downside panel between be screwed connection.
5. the installation method of building wall finishing material according to claim 1, it is characterised in that:Described packing material
It is insulation material or mortar material.
6. the installation method of the building wall finishing material according to any one of claim 1-5, it is characterised in that:It is described
Panel be made of natural material or artificial material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310221046.1A CN103291040B (en) | 2013-06-05 | 2013-06-05 | The installation method of building wall finishing material |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310221046.1A CN103291040B (en) | 2013-06-05 | 2013-06-05 | The installation method of building wall finishing material |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103291040A CN103291040A (en) | 2013-09-11 |
CN103291040B true CN103291040B (en) | 2017-07-21 |
Family
ID=49092523
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310221046.1A Active CN103291040B (en) | 2013-06-05 | 2013-06-05 | The installation method of building wall finishing material |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103291040B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103485508A (en) * | 2013-10-15 | 2014-01-01 | 王春山 | Combined suspender of thermal insulating-decorating integrated board |
CN103498540A (en) * | 2013-10-15 | 2014-01-08 | 山东春天建材科技有限公司 | Heat insulating and decorating integrated plate |
CN105822031A (en) * | 2015-01-05 | 2016-08-03 | 杨守明 | Insulation decorative plate, insulation decorative plate assembly, installation method and wall surface formed by same |
CN105822032A (en) * | 2015-01-05 | 2016-08-03 | 杨守明 | Building wall surface insulation decoration composite board and assembly, and installation method |
CN104695666A (en) * | 2015-02-20 | 2015-06-10 | 吴红平 | Mounting method of insulation and decoration composite board assembly for building wall |
TWI681100B (en) * | 2019-05-29 | 2020-01-01 | 陳奕帆 | Fixing mechanism and j-shaped fixing method for building wall materials |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202500297U (en) * | 2012-02-18 | 2012-10-24 | 梁启生 | Stone hanging member |
CN202672592U (en) * | 2012-06-25 | 2013-01-16 | 朱虹 | Stone anchoring structure |
CN202936979U (en) * | 2012-11-15 | 2013-05-15 | 朱雄 | Mounting fastener for thermal-insulating decorative plate |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003253848A (en) * | 2002-02-28 | 2003-09-10 | Oonuma Kk | Fixing structure for wall material |
-
2013
- 2013-06-05 CN CN201310221046.1A patent/CN103291040B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202500297U (en) * | 2012-02-18 | 2012-10-24 | 梁启生 | Stone hanging member |
CN202672592U (en) * | 2012-06-25 | 2013-01-16 | 朱虹 | Stone anchoring structure |
CN202936979U (en) * | 2012-11-15 | 2013-05-15 | 朱雄 | Mounting fastener for thermal-insulating decorative plate |
Also Published As
Publication number | Publication date |
---|---|
CN103291040A (en) | 2013-09-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103291040B (en) | The installation method of building wall finishing material | |
CN103291043B (en) | The installation suspension assembly of finishing material | |
CN203361505U (en) | Thermal insulation type wall facing material | |
CN205314423U (en) | Back rib hangs decorative board futilely | |
CN204738432U (en) | Prevent double layer plaster tablet furred ceiling of fracture in winter | |
CN205314449U (en) | Building decorative board dogging formula connecting device | |
CN103362313B (en) | The assemble method of modularized combination type heat insulating curtain wall panel | |
CN103290963B (en) | Modularized combination type heat insulating curtain wall panel | |
CN103291037B (en) | Thermal-insulating type wall space finish material | |
CN205025027U (en) | Wallboard of getting ready | |
CN213868375U (en) | Light mortar veneer heat preservation decorates intergral template outer thermal insulation system | |
CN203583821U (en) | Polyphenyl granule inorganic insulation decorative sheet | |
CN203626183U (en) | Easy-to-adjust keel for dry hanging of lightweight decorative plate | |
CN203462685U (en) | Dry hanger of insulation decorative board | |
CN202299260U (en) | Middle adjustable mounting connector for outer wall heat-insulation board | |
CN102173116B (en) | With the production method of the calcium silicate board of groove and the composite plate of cement plate | |
CN103382757A (en) | Thin-stone combined heat-insulating decorative board, as well as production and mounting methods thereof | |
CN201460112U (en) | Sticker mounting structure with composite ceramic plates | |
CN203594187U (en) | Thermal-insulation and decorative integrated plate assembly with milling holes | |
CN205822533U (en) | A kind of component type curtain wall system | |
CN211499408U (en) | Assembled design super large ceiling decorative panel structure | |
CN203514684U (en) | Compound heat-preservation exposed corner for building outer wall | |
CN210086701U (en) | Power generation heat preservation and decoration integrated board | |
CN203462688U (en) | Dry hanging connecting piece of insulation decorative board | |
CN112443094B (en) | Wall internal corner ceramic tile mounting structure and mounting method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant |