CN103249147B - The resource allocation method and system of Physical Uplink Control Channel - Google Patents
The resource allocation method and system of Physical Uplink Control Channel Download PDFInfo
- Publication number
- CN103249147B CN103249147B CN201210022532.6A CN201210022532A CN103249147B CN 103249147 B CN103249147 B CN 103249147B CN 201210022532 A CN201210022532 A CN 201210022532A CN 103249147 B CN103249147 B CN 103249147B
- Authority
- CN
- China
- Prior art keywords
- parameter
- user equipment
- pucch
- control channel
- resource
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Mobile Radio Communication Systems (AREA)
Abstract
The present invention relates to a kind of resource allocation method of Physical Uplink Control Channel and system, this method includes:Base station issues the parameter or added bits configured for determining physical uplink control channel resource for the user equipment to user equipment;The user equipment receives the parameter or added bits, and the resource distribution of the Physical Uplink Control Channel is determined according to the parameter or added bits.Physical Uplink Control Channel of the present invention can flexibly, simply realize the resource distribution of Physical Uplink Control Channel.
Description
Technical field
The present invention relates to the communications fields, in particular to a kind of Physical Uplink Control Channel (PUCCH, Physical
Uplink Control Channel) resource allocation method and system.
Background technology
The uplink physical channel of long evolving system (LTE, Long Term Evolution) is believed comprising physics random access
Road (PRACH, Physical Random Access Channel), Physical Shared Channel (PUSCH, Physical uplink
Shared channel), Physical Uplink Control Channel (PUCCH, Physical Uplink Control Channel).
In LTE R8/R9/R10 protocol versions, PUCCH channel formats can be divided into three categories, totally seven kinds:The first kind includes
Three kinds of formats, i.e. format1, format1a, format1b, the second class equally also include three kinds of formats, i.e. format2,
Format2a, format2b, third class include a kind of format format3.First kind PUCCH be used for transmission scheduling request (SR,
Scheduling Request) and confirmation (ACK, Acknowledgement)/non-acknowledgement (NACK, Negative
Acknowledgement) signaling.Second class PUCCH is mainly used for transmitting channel state information (CSI, Channel State
Information).Third class PUCCH is mainly used for transmitting multiple ACK/NACK signalings under carrier aggregation scene.Such as Fig. 1, it is
The resource allocation schematic diagrames of PUCCH over a slot, wherein mixing RB expressions both have format1/1a/1b in this RB
There is format2/2a/2b again, in a time slot mixing RB it is most there are one,Indicate the PRB that format2/2a/2b is occupied
Quantity, this parameter configures by high-level signaling.It mixes in RB, the number of the cyclic shift for sending first kind PUCCHBy
High-level signaling configures, and value range is { 0,1,2 ..., 7 }, also,Value to beMultiple, whenWhen, it indicates without mixing RB.The parameter configured by high-level signaling, indicate physical significance be it is same just
It hands under code (OC), PUCCH channels CG-CAZAC (the constant amplitude zero auto-correlation that computer generates, computer-generated
Constant Amplitude Zero Auto-Correlation) sequence cyclic shift interval,Value range be
{ 1,2,3 }.
For first kind PUCCH, available resource n_r is by four sub- resource representations:(n_u, n_cs, n_oc,
n_PRB).Wherein, n_u represents root sequence (base sequences) index, and n_cs represents the resource of cyclically shifted sequences (CS)
Serial number, n_oc represent the resource sequence number of orthogonal code (OC), and n_PRB represents the resource sequence number of Physical Resource Block (PRB).For second
For class PUCCH, available resource n_r is by three sub- resource representations:(n_u, n_cs, n_PRB).For third class PUCCH
For, available resource n_r is by two sub- resource representations:(n_oc, n_PRB).The available resources of PUCCH are according to cell mark
Know,CP (Cyclic Prefix, cyclic prefix) type and resource index etc. is calculated.Its is medium and small
Area's mark, CP types are cell-specific parameters, and resource index is user's special parameters.Therefore each
The PUCCH available resources of user equipment (UE, User Equipment) and the resource index one-to-one correspondence for giving oneself.Resource rope
DrawWithThe first kind, the second class and third class PUCCH are corresponded to respectively.ACK/ in first kind PUCCH
It is semi-static and two kinds dynamic, the initial position in the regions dynamic ACK/NACK that NACK, which is divided to,It is configured by high level.
In LTE R8/R9/R10 protocol versions, a user equipment corresponds to a PUCCH channel, and PUCCH is believed
Road, different UE is by code division multiplexing (CDM, Code Division Multiplexing) or frequency division multiplexing in cell
What the mode of (FDM, Frequency Division Multiplexing) was multiplexed, frequency division multiplexing is assigned to different
Physical Resource Block (PRB, Physical Resource Block), code division multiplexing use different cyclically shifted sequences (CS)
Or different orthogonal code (OC).Here different cyclically shifted sequences refer to the corresponding different cyclic shifts of same root sequence.
Root sequence is CG-CAZAC (the constant amplitude zero auto-correlation that computer generates, the computer-generated of length=12
Constant Amplitude Zero Auto-Correlation) sequence, it is orthogonal between the different cyclic shifts of same root sequence,
It is nonopiate between different root sequences.According to current PUCCH signaling configuration methods, the sequence group # of PUCCH is by u=(fgh
(ns)+fss) mod30 (f thereinssAlso f is writess PUCCH) determine, wherein sequential shift pattern (sequence-shift
Pattern it) is defined as:For sequence hopping pattern (group-hopping pattern) fgh
(ns), when sequence hopping frequency hopping is enabled, fgh(ns) determined by cell ID, when group frequency hopping does not enable, fgh(ns)=0, if
It is enabled to be notified by high-level signaling, it is cell-specific parameters.Therefore the sequence group # of PUCCH is determined by cell ID.Therefore PUCCH
Root sequence corresponded with cell ID.Therefore, achievable orthogonal between the PUCCH in same cell, when cell ID differences, cell
Between PUCCH it is nonopiate.
LTE defines PDCCH (Physical downlink control channel, Physical Downlink Control Channel) and holds
Dispatching distribution and other control information are carried, each PDCCH is by several CCE (Control Channel Element, control letters
Road unit) it forms, the CCE numbers of each subframe are determined by the quantity and downlink bandwidth of PDCCH.
UE by search space blind Detecting obtain PDCCH, search space is divided into public search space and the special (UE of UE
Specific) search space, public search space refer to the region that all UE can be searched, and what this space carried is cell
Special (cell specific) information.Dedicated search space is the spatial dimension that single UE can be searched, and the special of multiple UE is searched
Rope space is possible to be overlapped, and only general initial searching position is different.Before blind examination, UE operating modes are notified by high-level signaling
With cyclic redundancy check (Cyclic Redundancy Check, CRC) scrambled radio network temporary identifier for PDCCH
(Radio Network Temporary Identity, RNTI) type.
Search spaceRelationship between aggregation level L and candidate PDCCH quantity M (L) is shown in Table 2.Aggregation level is
The CCE number that PDCCH is occupied.When user's dedicated search space carries out blind Detecting, user equipment is first according to user identifier (UE
ID) and subframe numbers etc. calculate blind examination initial position Yk, then it is detected in search space, oneself is given until detecting
PDCCH until.
Table 2.PDCCH Candidate Sets
The correspondence of relative position of the first control channel unit of aggregation level and PDCCH in user's dedicated search space
Relationship is shown in Table 3.Relative position of the first control channel unit of PDCCH in user's dedicated search space refers to PDCCH occupancy
First CCE indexes nCCEWith blind examination initial position YkRelative position, use n hereinCCE, offsetIt indicates, nCCE, offset=nCCE-
Yk, nCCE, offsetValue range be 0~6,8,10.As shown in figure 3, for UE dedicated search space, possible first CCE
It sets and its schematic diagram of corresponding aggregation level.
The correspondence of table 3 aggregation level and first position CCE
Aggregation level | Relative positions of first CCE in user's dedicated search space |
L=1 | nCCE, offset=0/1/2/3/4/5 |
L=2 | nCCE, offset=0/2/4/6/8/10 |
L=3 | nCCE, offset=0/4 |
L=4 | nCCE, offset=0/8 |
Cooperative multipoint transmission (Coordinated Multi Point Transmission/Reception, CoMP) technology
It is the higher capacity and transmitting that Radio Link at cell edge is realized using the transmitting antenna cooperation transmission of multiple cells,
Cell edge interference problem can effectively be solved.CoMP technologies be divided into DLCoMP (down collaboration multi-point) and UL CoMP (on
Row cooperative multipoint transmission) technology, it both can largely improve the average spectral efficiency (ase) and cell edge use of cell
The service quality at family.CoMP points are following four scene:
Scene 1:(intra-site) CoMP in isomorphism website.
Scene 2:The homogenous networks of high transmitting power RRHs (Remote radio head, far end radio frequency head).
Scene 3:There are the heterogeneous networks of low-power RRHs in macrocell coverage area, and the cell ID of RRHs and macrocell is not
Together.
Scene 4:There are the heterogeneous network of low-power RRHs in macrocell coverage area, and the cell ID phases of RRHs and macrocell
Together.
Downlink CoMP can be divided into:Joint sends (Joint Transmission, referred to as JT), dynamic node selection
(Dynamic point selection, DPS) and cooperative scheduling/wave beam forming (Coordinated Scheduling/
Beamforming, referred to as CS/CB).In JT, data are sent simultaneously from multiple cells;In DPS, data transmitting node can
Dynamic change;In CS/CB, only serving cell is to UE transmission datas, and scheduling and wave beam forming information are in CoMP collaboration sets
Interaction.
CoMP points of UL receives (JR, Joint Reception) and CS/CB for joint, in JR, what user equipment was sent
Data are combined by multiple nodes to be received.In CS/CB, minizone cooperative scheduling and wave beam forming are to reduce interference.
Fig. 4 is the schematic diagram of the JR of the UL CoMP of the relevant technologies, as shown in figure 4, cell 1 and the joint of cell 2 receive UE1
PUCCH, UE1 is using corresponding with cell 1ID sequence, and therefore, the PUCCH of UE1 and UE2 are nonopiate, when UE1 with
UE2 occupies identical frequency domain resource, can cause larger interference between each other, keep the PUCCH qualities of reception very poor, seriously affect simultaneously
CoMP gains.If identical sequence can be configured, it can be achieved that minizone is orthogonal, reduction is interfered, but is also required to consideration pair simultaneously
Orthogonality between this community user.Due to the mobility of UE and the variation of wireless environment, the interference that UE is subject to is also dynamic change
, the inter-cell interference that may be subject in n-th frame is larger, need using minizone orthogonal manner send, (n+1) frame by
Inter-cell interference it is smaller, only need to use the quasi- orthogonal manner in minizone.In LTE-Advanced, descendant node is according to connecing
Power is received to select, it is ensured that downlink reception quality, upstream node are selected according to path loss, and such UE can save power and open
Pin, it is thus possible to uplink and downlink corresponds to different nodes, and especially under heterogeneous network scene, not only uplink and downlink node is different by UE, and on
Row node may be needed in multiple inter-cell transitions.This dynamic is cannot be satisfied using resource allocation method in the prior art to become
The demand of change.In COMP scenes 4, macro base station is identical as the cell ID of the low power nodes below macro base station, between all UE just
It hands over, and number of users can be bigger under this scene, the multiplexing capacity of PUCCH is also likely to be present problem.
Lack a kind of resource allocation method and system of flexibly easy Physical Uplink Control Channel in the prior art.
Invention content
The technical problem to be solved in the present invention is to provide a kind of resource allocation method of Physical Uplink Control Channel and system,
Flexibly, simply to realize the resource distribution of Physical Uplink Control Channel.
In order to solve the above technical problems, the present invention provides a kind of resource allocation method of Physical Uplink Control Channel, it should
Method includes:
Base station is issued for the user equipment to user equipment for determining what physical uplink control channel resource configured
Parameter or added bits;
The user equipment receives the parameter or added bits, and determines the object according to the parameter or added bits
Manage the resource distribution of uplink control channel.
In order to solve the above technical problems, the present invention also provides the resource distribution sides of another Physical Uplink Control Channel
Method, this method include:
Base station and user equipment are pre-configured with dynamic BTS configuration instruction information with one or a set of for determining physically
The mapping relations of the parameter of row control channel resource distribution, the dynamic BTS configuration instruction information includes following any or more
Kind information:One or a set of Downlink Control Information parameter, the specific bit position of some Downlink Control Information parameter, added bits;
The base station is issued for the user equipment to the user equipment for determining that Physical Uplink Control Channel provides
The alternative parameter of source configuration, the user equipment receive the alternative parameter;
The base station issues the dynamic resource for the user equipment to the user equipment by down control channel and matches
Instruction information is set, the user equipment receives the dynamic BTS configuration and indicates information;
The user equipment determines corresponding with dynamic BTS configuration instruction information alternative according to the mapping relations
Parameter is actual parameter, and the resource distribution of the Physical Uplink Control Channel is determined according to the actual parameter.
Correspondingly, the present invention also provides a kind of resource configuration system of Physical Uplink Control Channel, which includes:
The sending module of base station, for being issued to user equipment for the user equipment for determining physical uplink control
The parameter or added bits of channel resource configuration;
The receiving module of the user equipment, for receiving the parameter or added bits;
The resource distribution determining module of the user equipment, for determining institute according to the parameter or added bits of reception
State the resource distribution of Physical Uplink Control Channel.
In order to solve the above technical problems, the present invention also provides the resource distribution systems of another Physical Uplink Control Channel
System, the system include:
The configuration module of base station and user equipment, for be pre-configured with dynamic BTS configuration instruction information with it is one or a set of
Mapping relations for the parameter for determining physical uplink control channel resource configuration, the dynamic BTS configuration instruction information include
Any one or more information below:The specific ratio of one or a set of Downlink Control Information parameter, some Downlink Control Information parameter
Special position, added bits;
The sending module of the base station, for being issued to the user equipment for determining physical uplink control channel resource
The alternative parameter of configuration and for the user equipment dynamic BTS configuration indicate information;
The receiving module of the user equipment, it is described for determining physical uplink control channel resource configuration for receiving
Alternative parameter and for the user equipment dynamic BTS configuration indicate information;
The resource distribution determining module of the user equipment, for according to the mapping relations of the configuration module, determine with
The corresponding alternative parameter of dynamic BTS configuration instruction information received is actual parameter, and true according to the actual parameter
The resource distribution of the fixed Physical Uplink Control Channel.
Preferably, in the present invention, same base station or different base station need the use of orthogonal different community after negotiation
Family device configuration is identical for determining the parameter of PUCCH sequence group #, or for user device configuration it is different for determining
The parameter of PUCCH sequence group #.
Compared to the prior art, the resource allocation method of Physical Uplink Control Channel of the invention and system flexibly and are realized
It is easy, especially when using second method, can also be achieved the dynamic configuration of physical uplink control channel resource.In addition, may be used also
It is to need the user device configuration of orthogonal different community identical for determining PUCCH sequence group # according to specific demand
Parameter, or be user device configuration it is different for determining the parameter of PUCCH sequence group #, to realize resource it is orthogonal or
Capacity-sharing.
Description of the drawings
Fig. 1 is the resource allocation schematic diagram of the PUCCH of the relevant technologies;
Fig. 2 is the resource distribution schematic diagram of the first kind PUCCH of the relevant technologies;
Fig. 3 is user's dedicated search space schematic diagram in the related technology;
Fig. 4 is the schematic diagram that the joint of the uplink coordinated multiple spot of the relevant technologies receives;
Fig. 5 is the schematic diagram of the resource allocation method one of Physical Uplink Control Channel of the present invention;
Fig. 6 is the modular structure schematic diagram of the resource configuration system one of Physical Uplink Control Channel of the present invention;
Fig. 7 is the schematic diagram of the resource allocation method two of Physical Uplink Control Channel of the present invention;
Fig. 8 is the schematic diagram that the present invention carries out implicit indication using aggregation level and first position CCE;
Fig. 9 is the schematic diagram that the present invention carries out implicit indication using first position CCE;
Figure 10, which is that the present invention is real, combines another schematic diagram that first position CCE carries out implicit indication using aggregation level;
Figure 11 is the modular structure schematic diagram of the resource configuration system two of Physical Uplink Control Channel of the present invention.
Specific implementation mode
To make the objectives, technical solutions, and advantages of the present invention clearer, by the following examples and with reference to attached drawing, right
The present invention is further described.It should be noted that in the absence of conflict, in the embodiment and embodiment in the application
Feature can be combined with each other.
The present invention provides the resource preparation method of two kinds of Physical Uplink Control Channel, a kind of method be by base station it is direct under
For hair in the parameter or added bits that determine physical uplink control channel resource configuration, another method is to issue instruction by base station
Information and multiple alternative parameters, user equipment are selected from alternative parameter according to instruction information for determining physical uplink control letter
The actual parameter of road resource distribution.
Method one:
The resource allocation method of Physical Uplink Control Channel of the present invention corresponds to following example 1-6, as shown in figure 5, should
Method includes:
Step 101:Base station is issued for the user equipment to the user equipment for determining physical uplink control letter
The parameter or added bits of road resource distribution;
Step 102:User equipment receives the parameter or added bits, and determines institute according to the parameter or added bits
State the resource distribution of Physical Uplink Control Channel.
The resource distribution of ascending control information described in the present invention includes at least PUCCH sequences group # or PUCCH resource
Index,
It is wherein used to determine that the parameter of PUCCH sequence group # can be following any group of parameter:
1.PUCCH sequence group #;
2. sequential shift pattern and sequence hopping pattern;
3. virtual subdistrict mark/cell ID and the enabled instruction of sequence hopping;
4. virtual subdistrict mark/cell ID and sequence hopping pattern;
5. virtual subdistrict mark/cell ID and sequential shift pattern, while sequence hopping is enabled;
6. sequential shift pattern, while sequence hopping does not enable;
7. virtual subdistrict identifies;
8. the dedicated sequential shift pattern of user;
For determining that the parameter of PUCCH resource index can be following any group of parameter:
1.PUCCH resource indexes;
2. the initial position in the regions dynamic ACK/NACK of cell-specific;
3. the regions the dynamic ACK/NACK starting location offset value of cell-specific, the i.e. dedicated dynamic ACK/ of second community
Resource bias of the regions the NACK initial position relative to the first community regions dedicated dynamic ACK/NACK initial position.It can manage
Xie Di, when the regions the dynamic ACK/NACK starting location offset value using cell-specific determines PUCCH resource index, it is also necessary to
The initial position in the regions dynamic ACK/NACK of cell-specific.
4. the user regions dedicated dynamic ACK/NACK initial position;
5. the regions user dedicated dynamic ACK/NACK starting location offset value, the i.e. areas user dedicated dynamic ACK/NACK
Resource bias of the domain initial position relative to the regions the dynamic ACK/NACK starting point of cell-specific.Understandably, use is being utilized
When the family regions dedicated dynamic ACK/NACK starting location offset value determines PUCCH resource index, it is also necessary to which cell-specific is moved
The initial position in the regions state ACK/NACK.
In order to realize that different effects, same base station or different base station can be the user equipment of different community after negotiation
Configure the identical or different parameter for determining PUCCH sequence group #.
In order to realize orthogonal, same base station or the different base station of the ascending control information resource of user equipment between different community
Can be to need the user device configuration of orthogonal different community identical for determining PUCCH sequence group # after negotiation
Parameter.In order to realize capacity-sharing, same base station or different base station, which can be that user device configuration is different after negotiation, to be used for
Determine the parameter of PUCCH sequence group #.
Embodiment 1
The present embodiment is directed to CoMP scenes 3, and high-level signaling configuration pin is to user equipment for determining that PUCCH sequence groups are compiled
Number parameter.
1 method of the present embodiment includes the following steps:
Step 201:Base station is that user terminal is configured to determine the parameter of PUCCH sequence group # by high-level signaling,
Such as 1 virtual subdistrict ID and 1 dedicated sequence hopping of user enable instruction.When in the presence of the use for needing minizone orthogonal
When the equipment of family, the base station of different community is that the user equipment for needing minizone orthogonal distributes identical virtual subdistrict ID and user is special
The enabled instruction of sequence hopping.
Step 202:After user equipment receives the parameter of base station notice, according to virtual subdistrict ID and the dedicated sequence of user
The dedicated sequence group # of user is calculated in the enabled instruction of group frequency hopping, and user equipment uses the dedicated sequence group # of this user
To send ascending control information.
In this way, may make the user equipment for needing minizone orthogonal that identical sequence group # can be calculated, to
Realize that minizone is orthogonal.
For determining the parameter of PUCCH sequence group # in addition to embodiment 1 can be that virtual subdistrict ID and user are dedicated
Except the enabled instruction of sequence hopping, following any group of parameter can also be:
1.PUCCH sequence group #;
2. sequential shift pattern and sequence hopping pattern;
3. cell ID and the enabled instruction of sequence hopping;
4. virtual subdistrict mark/cell ID and sequence hopping pattern;
5. virtual subdistrict mark/cell ID and sequential shift pattern, while sequence hopping is enabled;
6. sequential shift pattern, while sequence hopping does not enable;
7. virtual subdistrict identifies;
8. the dedicated sequential shift pattern of user;
Convertiblely, in order to which the ascending control information resource for reaching two inter-cell user equipment is orthogonal, same base station or
Can be that orthogonal user equipment is needed to distribute the identical ginseng for determining PUCCH sequence group # after different base stations is negotiated
Number.
Embodiment 2
The present embodiment is directed under CoMP scenes 4, and high-level signaling configuration pin is to user equipment for determining PUCCH sequences
The parameter of group #.
2 method of the present embodiment includes the following steps:
Step 301:Base station is that user terminal is configured to determine the parameter of PUCCH sequence group # by high-level signaling,
Such as 1 virtual subdistrict ID.
In this embodiment, the real cell mark between different RRH is identical, and base station can be the user equipment of different community
Different virtual subdistrict ID is distributed, to obtain different PUCCH sequence group #, increases PUCCH capacity.
Step 302:After user equipment receives the parameter of base station notice, it is special user can be calculated according to virtual subdistrict ID
Sequence group #, user equipment send ascending control information using the dedicated sequence group # of this user.
In this way, may make the user equipment between different RRH that different sequence group # is calculated, hold to improve multiplexing
Amount.
Embodiment 3
The present embodiment is used to determine PUCCH sequences come configuration pin for Downlink Control Information added bits to user equipment
The parameter of group #.
3 method of the present embodiment includes the following steps:
Step 401:Base station is that user terminal is configured to determine PUCCH sequence groups by Downlink Control Information added bits
The parameter of number, such as 1 virtual subdistrict ID.
Step 402:After user equipment receives the parameter of base station notice, it is special user can be calculated according to virtual subdistrict ID
Sequence group #, user equipment send ascending control information using the dedicated sequence group # of this user.
Embodiment 4
It is inclined that the present embodiment configures the regions newly-increased dynamic ACK/NACK initial position for Downlink Control Information added bits
Shifting value.
4 method of the present embodiment includes the following steps:
Step 501:Base station is that user terminal configuration increases the areas dynamic ACK/NACK newly by Downlink Control Information added bits
Domain starting location offset value.
Step 502:After user equipment receives the parameter of base station notice, according to the regions newly-increased dynamic ACK/NACK start bit
It sets deviant and the regions newly-increased dynamic ACK/NACK initial position, user is calculated in the former regions dynamic ACK/NACK initial position
Dynamic ACK/NACK resource indexes are calculated using this newly-increased regions dynamic ACK/NACK initial position in equipment, for sending
Row control information.
Embodiment 5
The present embodiment increases the regions dynamic ACK/NACK initial position newly for high-level signaling configuration.
5 method of the present embodiment includes the following steps:
Step 601:Base station is that user terminal configuration increases the regions dynamic ACK/NACK initial position newly by high-level signaling.
Step 602:After user equipment receives the parameter of base station notice, user equipment is using this newly-increased dynamic ACK/NACK
Dynamic ACK/NACK resource indexes are calculated in region initial position, for sending ascending control information.
Embodiment 6
The present embodiment configures the regions newly-increased dynamic ACK/NACK initial position for Downlink Control Information added bits.
6 method of the present embodiment includes the following steps:
Step 701:Base station is that user terminal configuration increases the areas dynamic ACK/NACK newly by Downlink Control Information added bits
Domain initial position.
Step 702:After user equipment receives the parameter of base station notice, user equipment is using this newly-increased dynamic ACK/NACK
Dynamic ACK/NACK resource indexes are calculated in region initial position, for sending ascending control information.
Corresponding to preceding method one and embodiment 1 to 6, the present invention also provides a kind of resources of Physical Uplink Control Channel
Configuration system, as shown in fig. 6, the system includes:
The sending module of base station, for being issued to user equipment for the user equipment for determining physical uplink control
The parameter or added bits of channel resource configuration;
The receiving module of the user equipment, for receiving the parameter or added bits;
The resource distribution determining module of the user equipment, for determining institute according to the parameter or added bits of reception
State the resource distribution of Physical Uplink Control Channel.
Further, the resource distribution of the ascending control information includes at least PUCCH sequences group # or PUCCH resource
Index, wherein for determining that the parameter of PUCCH sequence group # can be following any group of parameter:
PUCCH sequence group #;
Sequential shift pattern and sequence hopping pattern;
Virtual subdistrict mark/cell ID and the enabled instruction of sequence hopping;
Virtual subdistrict mark/cell ID and sequence hopping pattern;
Virtual subdistrict mark/cell ID and sequential shift pattern, while sequence hopping is enabled;
Sequential shift pattern, while sequence hopping does not enable;
Virtual subdistrict identifies;
The dedicated sequential shift pattern of user;
For determining that the parameter of PUCCH resource index can be following any group of parameter:
PUCCH resource indexes;
The initial position in the regions dynamic ACK/NACK of cell-specific;
The regions the dynamic ACK/NACK starting location offset value of cell-specific;
The user regions dedicated dynamic ACK/NACK initial position;
The regions user dedicated dynamic ACK/NACK starting location offset value.
Preferably, the base station further includes configuration module, for carrying out physical uplink control channel resource configuration, for reality
Existing inter-cell user device resource is orthogonal, and same base station or different base station need the use of orthogonal different community after negotiation
The identical parameter for determining PUCCH sequence group # of family device configuration;In order to realize capacity-sharing, same base station or difference
Base station is the identical parameter for determining PUCCH sequence group # of user device configuration after negotiation.
Method two
The resource allocation method of Physical Uplink Control Channel of the present invention corresponds to following example 7-25, as shown in fig. 7,
This method includes:
Step 801:Base station and user equipment are pre-configured with dynamic BTS configuration instruction information with one or a set of for true
Determine the mapping relations of the parameter of physical uplink control channel resource configuration, the dynamic BTS configuration instruction information includes following
One or more information:The specific bit position, new of one or a set of Downlink Control Information parameter, some Downlink Control Information parameter
Increase bit;
Further, one or one group of Downlink Control Information parameter includes following any one or more parameters:It is poly-
Close rank, first positions CCE, subframe numbers, System Frame Number.
Specifically, the specific bit position of the Downlink Control Information parameter refers to:All bits of the solicited message of SRS,
High 1 or 2 high of high 1 of resource block assignment information or 2 high, modulation coding scheme and redundancy versions instruction information, not
All bits, the Physical Uplink Control Channel of the instruction information of the enabled corresponding modulation coding scheme of transmission block and redundancy versions
Emissive power control command all bits.
Step 802:The base station is issued for the user equipment to the user equipment for determining physical uplink control
The alternative parameter of channel resource configuration processed, the user equipment receive the alternative parameter;
Alternative parameter in step 802 within period certain time effective (such as the parameter issued by high-level signaling) or
Permanently effective (such as real cell ID) can reduce the number that alternative parameter issues in this way.
Step 803:The base station is issued to the user equipment for the dynamic of the user equipment by down control channel
State resource distribution indicates that information, the user equipment receive the dynamic BTS configuration and indicates information;
The dynamic BTS configuration instruction information is carried on user's dedicated search space.
The downlink control channel format includes below one or more:DCI format1, DCI format1a, DCI
Format1b, DCI format1c, DCI format1d, DCI format2, DCI format2a, DCI format2b, DCI
format2c。
Step 804:The user equipment determines according to the mapping relations and indicates information pair with the dynamic BTS configuration
The alternative parameter answered is actual parameter, and the resource distribution of the Physical Uplink Control Channel is determined according to the actual parameter.
In following embodiment, the resource distribution of the ascending control information includes at least PUCCH sequences group # or PUCCH
Resource index, wherein for determining that the parameter of PUCCH sequence group # can be following any group of parameter:
PUCCH sequence group #;
Sequential shift pattern and sequence hopping pattern;
Virtual subdistrict mark/cell ID and the enabled instruction of sequence hopping;
Virtual subdistrict mark/cell ID and sequence hopping pattern;
Virtual subdistrict mark/cell ID and sequential shift pattern, while sequence hopping is enabled;
Sequential shift pattern, while sequence hopping does not enable;
Virtual subdistrict identifies;
The dedicated sequential shift pattern of user;
For determining that the parameter of PUCCH resource index can be following any group of parameter:
PUCCH resource indexes;
The initial position in the regions dynamic ACK/NACK of cell-specific;
The regions the dynamic ACK/NACK starting location offset value of cell-specific;
The user regions dedicated dynamic ACK/NACK initial position;
The regions user dedicated dynamic ACK/NACK starting location offset value.
In order to realize that different effects, same base station or different base station can be the user equipment of different community after negotiation
Configure the identical or different parameter for determining PUCCH sequence group #.According to this method, it is actually used in determining PUCCH sequences
The parameter of row group # indicates that information and alternative parameter determine by specific dynamic BTS configuration.
In order to realize orthogonal, same base station or the different base station of the ascending control information resource of user equipment between different community
Can be to need the user device configuration of orthogonal different community identical for determining PUCCH sequence group # after negotiation
Parameter.In order to realize capacity-sharing, same base station or different base station, which can be that user device configuration is different after negotiation, to be used for
Determine the parameter of PUCCH sequence group #.
Embodiment 7
The present embodiment is directed under CoMP scenes 3, and high-level signaling configuration combines the mode of Downlink Control Information instruction, to determine
PUCCH sequence group #.Aggregation level and first Downlink Control Information parameter of the positions CCE two is wherein used to determine effectively ginseng
It counts, in the embodiment 5, base station and user equipment are pre-configured with Downlink Control Information parameter (aggregation level and first CCE
Set) and one or a set of mapping relations for determining the parameter of physical uplink control channel resource configuration.
7 method of the present embodiment includes the following steps:
Step 901:Base station is that user device configuration is used to determine the first standby of PUCCH sequence group # by high-level signaling
It selects parameter, such as virtual subdistrict ID, is also that user device configuration is used to determine the of PUCCH sequence group # by other message
Two alternative parameters, such as actual cell ID, user equipment receive the first, second alternative parameter.
In the embodiment, the real cell mark between different RRH (Remote Radio Head, distally without the end of a thread) is different,
Base station is that the user equipment of different community distributes identical virtual subdistrict ID as the second alternative parameter, to realize minizone just
It hands over.
Step 902:Base station to user equipment by down control channel configurating downlink control information parameter (aggregation level and
First position CCE), implicit indication user equipment goes out 1 from 2 dynamic selects in alternative and is finally actually used as this UE
Parameter.For the user equipment for needing minizone orthogonal, base station may indicate that user equipment uses virtual subdistrict ID as effectively ginseng
Number, and virtual subdistrict ID is identical, it should be to obtain identical PUCCH sequences group #, the use orthogonal for not needing minizone
Family equipment may indicate that user equipment uses virtual or real cell ID as actual parameter, but virtual subdistrict ID and real cell
It is all different between ID, to obtain different PUCCH sequence group #.
Step 903:User equipment obtains the above aggregation level, first CCE by the blind Detecting to Downlink Control Information
Position;
User terminal is so as to obtaining 2 sets of alternative parameters for determining PUCCH sequence group #.
The Downlink Control Information parameter is carried on user's dedicated search space (UE-specific Search
space)。
The descending control information format includes below one or more:DCI format1, DCI format1a, DCI
Format1b, DCI format1c, DCI format1d, DCI format2, DCI format2a, DCI format2b, DCI
format2c。
Step 904:The L and n that user equipment is obtained according to PDCCH blind DetectingsCCE, offsetAnd preset mapping relations choosing
Which select out using the set in 2 sets of alternative parameters, and sequence group #, Jin Erfa are calculated according to the actual parameter selected
Send ascending control information.
Using the aggregation level of Downlink Control Information and first control channel unit in user's dedicated search space
Relative position nCCE, offsetJoint carries out implicit indication.For example, mapping relations are:As L=1 and nCCE, offset=0/1/2 or L=
2 and nCCE, offset=2/4/6/8 or L=4 and nCCE, offset=0 or L=8 and nCCE, offset=0, select the first alternative parameter
Calculate PUCCH sequence group #;As L=1 and nCCE, offset=3/4/5 or L=2 and nCCE, offset=0/10 or L=4 and
nCCE, offset=4 or L=8 and nCCE, offset=8, select the second alternative parameter to calculate PUCCH sequence group #, such as Fig. 8.It is needing
Realize it is orthogonal in the case of, user equipment will select the second alternative parameter that identical PUCCH is calculated between different community
Sequence group # is that is, identical as the resource distribution of base station.
In this embodiment, virtual subdistrict mark is that the first alternative parameter or second are alternative for user equipment
Parameter is not key, as long as what the user equipment of different community indicated that information obtains according to its dynamic BTS configuration is all identical
Virtual subdistrict mark, you can obtain identical PUCCH sequences group #, and then realize that minizone is orthogonal.
Embodiment 8
The present embodiment is directed under CoMP scenes 4, and high-level signaling is configured to determine the parameter of sequence group #, wherein often
A parameter sends 2 values, and by Downlink Control Information indicate it is currently used wherein which.Wherein use aggregation level and the
One Downlink Control Information parameter of the positions CCE two determines actual parameter.In the embodiment 6, base station and user equipment are matched in advance
Downlink Control Information parameter (aggregation level and first position CCE) is set with one or a set of for determining that physical uplink control is believed
The mapping relations of the parameter of road resource distribution
8 method of the present embodiment includes the following steps:
Step 1001:Base station by high-level signaling be user terminal be configured to determine PUCCH sequence group # first,
Second alternative parameter, such as 2 virtual subdistrict ID, user equipment receive the first, second alternative parameter.
In this embodiment, the real cell mark between different RRH is identical, and base station can be the user equipment of different community
Different virtual subdistrict ID is distributed as the second alternative parameter, to obtain different PUCCH sequence group #, increases PUCCH and holds
Amount.
Step 1002:Base station is by down control channel to user device configuration Downlink Control Information parameter (aggregation level
With first position CCE), implicit indication user equipment from 2 it is alternative in dynamic selects go out 1 conduct this UE and finally actually use
Parameter.
In order to realize that capacity-sharing, base station may indicate that user equipment uses the second alternative virtual subdistrict ID as effectively ginseng
Number, virtual subdistrict ID is different, to obtain different PUCCH sequence group #.
Step 1003:User equipment obtains the above aggregation level, first CCE by the blind Detecting to Downlink Control Information
Position;
User terminal identifies ID1 and ID2 so as to obtain 2 alternative virtual subdistricts.
The Downlink Control Information parameter is carried on user's dedicated search space (UE-specific Search
space)。
The downlink control channel format includes below one or more:DCI format1, DCI format1 a,
DCI format1b, DCI format1c, DCI format1d, DCI format2, DCI format2a, DCI format2b,
DCI format2c。
Step 1004:The L and n that user equipment is obtained according to PDCCH blind DetectingsCCE, offsetAnd preset mapping relations choosing
Which select out using the set in 2 sets of alternative parameters, and sequence group #, Jin Erfa are calculated according to the actual parameter selected
Send ascending control information.
Using the aggregation level of Downlink Control Information and first control channel unit in user's dedicated search space
Relative position nCCE, offsetJoint carries out implicit indication.Such as mapping relations are:As L=1 and nCCE, offset=0/1/2 or L=2
And nCCE, offset=2/4/6/8 or L=4 and nCCE, offset=0 or L=8 and nCCE, offset=0, select the first alternative parameter
ID1;As L=1 and nCCE, offset=3/4/5 or L=2 and nCCE, offset=0/1 0 or L=4 and nCCE, offset=4 or L=8
And nCCE, offset=8, select the second alternative parameter ID2, such as Fig. 8.In the embodiment, multiple user equipmenies select second alternative
Parameter is as actual parameter, and the second alternative virtual subdistrict ID is different, to obtain different PUCCH sequence group #, i.e., with
The resource distribution of base station is identical.
In this embodiment, different virtual subdistrict identifies for user equipment, is the first alternative parameter or the
Two alternative parameters are not key, as long as what different user devices indicated that information obtains according to its dynamic BTS configuration is all different
Virtual subdistrict mark, you can obtain different PUCCH sequence group #, and then realize capacity-sharing.
Embodiment 9
The present embodiment is configured to determine the parameter of sequence group # for high-level signaling, wherein each parameter sends 2
Value, and by Downlink Control Information indicate it is currently used wherein which.Wherein use first positions CCE this downlink control
Information parameter determines in the actual parameter embodiments 7 that base station and user equipment are pre-configured with Downlink Control Information parameter (first
A positions CCE) and one or a set of mapping relations for determining the parameter of physical uplink control channel resource configuration.
9 method of the present embodiment includes the following steps:
Step 1101:Base station by high-level signaling be user terminal be configured to determine PUCCH sequence group # first,
Second alternative parameter, such as 2 PUCCH sequence group # u1 and u2, user equipment receive the first, second alternative parameter.
Step 1102:Base station is by down control channel to user device configuration Downlink Control Information parameter (aggregation level
With first position CCE), it is finally practical that implicit indication user equipment dynamic select from 2 alternative parameters goes out 1 conduct this UE
The parameter used.
Step 1103:User equipment obtains the above aggregation level, first CCE by the blind Detecting to Downlink Control Information
Position;
Base station goes out 1 from 2 alternative middle dynamic selects by Downlink Control Information implicit indication user equipment and is used as this UE
The PUCCH sequence group # finally actually used.
The Downlink Control Information is carried on user's dedicated search space (UE-specific Search space).
The downlink control channel format includes below one or more:DCI format1, DCI format1a, DCI
Format1b, DCI format1c, DCI format1d, DCI format2, DCI format2a, DCI format2b, DCI
format2c。
Step 1104:First positions CCE n that user equipment is obtained according to PDCCH blind DetectingsCCE, offsetAnd it is preset
Mapping relations are selected using which set in 2 sets of alternative parameters, and sequence group are calculated according to the actual parameter selected
Number, and then send ascending control information.
Use relative position of the first control channel unit of Downlink Control Information in user's dedicated search space
nCCE, offsetImplicit indication is for example, such as mapping relations are to work as nCCE, offset=0~3, the first alternative parameter u1 is selected, when
nCCE, offset=4,5,6,8,10, select the second alternative parameter u2, such as Fig. 9.
Embodiment 10
The present embodiment is configured to determine the parameter of sequence group # for high-level signaling, wherein each parameter sends 2
Value, and by Downlink Control Information indicate it is currently used wherein which.Wherein use subframe numbers and first position CCE this two
A Downlink Control Information parameter determines actual parameter, and in the embodiment 8, base station and user equipment are pre-configured with Downlink Control Information
Parameter (subframe numbers and first position CCE) and one or a set of parameter for determining physical uplink control channel resource configuration
Mapping relations.
10 method of the present embodiment includes the following steps:
Step 1201:Base station is that user terminal is configured to determine the first of PUCCH sequence group # by high-level signaling
With the second alternative parameter, such as the dedicated sequential shift pattern of 2 usersKnowUser equipment receives first, the
Two alternative parameters.
Step 1202:Base station is by down control channel to user device configuration Downlink Control Information parameter (aggregation level
With first position CCE), implicit indication user equipment from 2 it is alternative in dynamic selects go out 1 conduct this UE and finally actually use
Parameter.
Step 1203:User equipment obtains the above aggregation level, first CCE by the blind Detecting to Downlink Control Information
Position;
Base station goes out 1 from 2 alternative middle dynamic selects by Downlink Control Information implicit indication user equipment and is used as this UE
The parameter finally actually used.
The Downlink Control Information parameter is carried on user's dedicated search space (UE-specific Search
space)。
The downlink control channel format includes below one or more:DCI format1, DCI format1a, DCI
Format1b, DCI format1c, DCI format1d, DCI format2, DCI format2a, DCI format2b, DCI
format2c。
Step 1204:User equipment is according to the subframe numbers n where PDCCHsFirst position CCE obtained with blind Detecting
nCCE, offsetIt selects using which of 2 alternative parameters, and PUCCH resource is calculated according to selected parameter, in turn
Send ascending control information.
Use the corresponding subframe numbers n of Downlink Control InformationsWith first control channel unit in user's dedicated search space
In relative position nCCE, offsetJoint carries out implicit indication, for example, mapping relations are:Odd numbered sub-frames and nCCE, offset=0~3,
Or even subframe and nCCE, offset=4,5,6,8,10, select the first alternative parameterOdd numbered sub-frames and nCCE, offset=4,
5,6,8,10 or even subframe and nCCE, offset=0~3, select the second alternative parameter
Embodiment 11
The present embodiment is configured to determine the parameter of sequence group # for high-level signaling, wherein each parameter sends 2
Value, and by Downlink Control Information indicate it is currently used wherein which.Wherein use this Downlink Control Information of aggregation level
Parameter determines actual parameter, and in the embodiment 9, base station and user equipment are pre-configured with Downlink Control Information parameter (aggregation level)
With one or a set of mapping relations for determining the parameter of physical uplink control channel resource configuration.
11 method of the present embodiment includes the following steps:
Step 1301:Base station by high-level signaling be user terminal be configured to determine PUCCH sequence group # first,
Second alternative parameter, such as 2 virtual subdistrict ID, user equipment receive the first, second alternative parameter.
Step 1302:Base station is by down control channel to user device configuration Downlink Control Information parameter (polymer grade
Not), implicit indication user equipment goes out 1 parameter finally actually used as this UE from 2 alternative middle dynamic selects.
Step 1303:User equipment obtains the above aggregation level by the blind Detecting to Downlink Control Information;
User terminal identifies ID1 and ID2 so as to obtain 2 alternative virtual subdistricts.
The Downlink Control Information is carried on user's dedicated search space (UE-specific Search space).
The downlink control channel format includes below one or more:DCI format1, DCI format1a, DCI
Format1b, DCI format1c, DCI format1d, DCI format2, DCI format2a, DCI format2b, DCI
format2c。
Step 1304:The L and preset mapping relations that user equipment is obtained according to PDCCH blind Detectings are selected using 2
Which set in alternative parameter is covered, and sequence group # is calculated according to the actual parameter selected, and then sends uplink control
Information processed.
Using the aggregation level implicit indication of Downlink Control Information, for example, mapping relations are:It is selected when aggregation level L=1/3
Select the first alternative parameter ID1, when aggregation level L=2/4 selects the second alternative parameter ID2.
Embodiment 12
The present embodiment is configured to determine the parameter of sequence group # for high-level signaling, wherein each parameter sends 2
Value, and by Downlink Control Information indicate it is currently used wherein which.Wherein use System Frame Number and aggregation level joint two
A Downlink Control Information parameter determines actual parameter, and in the embodiment 10, base station and user equipment are pre-configured with downlink control letter
Breath parameter (System Frame Number and aggregation level joint) is with one or a set of for determining physical uplink control channel resource configuration
The mapping relations of parameter.
12 method of the present embodiment includes the following steps:
Step 1401:Base station by high-level signaling be user terminal be configured to determine PUCCH sequence group # first,
Second alternative parameter, such as 2 virtual subdistrict ID, user equipment receive the first, second alternative parameter.
Step 1402:Base station is by down control channel to user device configuration Downlink Control Information parameter (System Frame Number
And aggregation level), implicit indication user equipment goes out 1 ginseng finally actually used as this UE from 2 alternative middle dynamic selects
Number.
Step 1403:User equipment obtains the above aggregation level by the blind Detecting to Downlink Control Information;
User terminal identifies ID1 and ID2 so as to obtain 2 alternative virtual subdistricts.
The Downlink Control Information is carried on user's dedicated search space (UE-specific Search space).
The downlink control channel format includes below one or more:DCI format1, DCI format1a, DCI
Format1b, DCI format1c, DCI format1d, DCI format2, DCI format2a, DCI format2b, DCI
format2c。
Step 1404:The L and preset mapping that user equipment is obtained according to the System Frame Number where PDCCH, blind Detecting
Relationship is selected using which set in 2 sets of alternative parameters, and sequence group # is calculated according to the actual parameter selected,
And then send ascending control information.
Implicit indication is carried out using the corresponding System Frame Numbers of PDCCH and aggregation level joint, for example, mapping relations are:Very
Number system frame number and aggregation level L=1/3 or even number system frame number and aggregation level L=2/4 select the first alternative parameter
ID1;Odd system frame number and aggregation level L=2/4 or even number system frame number and aggregation level L=1/3, selection second are alternative
Parameter ID2.
Embodiment 13
The present embodiment is configured to determine the parameter of sequence group # for high-level signaling, wherein each parameter sends 2
Value, and by Downlink Control Information indicate it is currently used wherein which.Wherein use two downlinks of subframe numbers and aggregation level
Control information parameter determines actual parameter, and in the embodiment 11, base station and user equipment are pre-configured with Downlink Control Information parameter
(subframe numbers and aggregation level) is with one or a set of for determining that the mapping of the parameter of physical uplink control channel resource configuration is closed
System.
13 method of the present embodiment includes the following steps:
Step 1501:Base station by high-level signaling be user terminal be configured to determine PUCCH sequence group # first,
Second alternative parameter, such as 2 virtual subdistrict ID, user equipment receive the first, second alternative parameter.
Step 1502:Base station by down control channel to user device configuration Downlink Control Information parameter (subframe numbers and
Aggregation level), implicit indication user equipment goes out 1 parameter finally actually used as this UE from 2 alternative middle dynamic selects.
Step 1503:User equipment obtains the above aggregation level by the blind Detecting to Downlink Control Information;
User terminal identifies ID1 and ID2 so as to obtain 2 alternative virtual subdistricts.
The Downlink Control Information parameter is carried on user's dedicated search space (UE-specific Search
space)。
The downlink control channel format includes below one or more:DCI format1, DCI format1a, DCI
Format1b, DCI format1c, DCI format1d, DCI format2, DCI format2a, DCI format2b, DCI
format2c。
Step 1504:The L and preset mapping that user equipment is obtained according to the subframe numbers where PDCCH, blind Detecting are closed
System is selected using which set in 2 sets of alternative parameters, and sequence group # is calculated according to the actual parameter selected, into
And send ascending control information.
Implicit indication is carried out using the corresponding subframe numbers of PDCCH and aggregation level joint, such as mapping relations are:Odd number
Frame number and aggregation level L=1/3 or even subframe number and aggregation level L=2/4 select the first alternative parameter ID1;Odd number
Frame number and aggregation level L=2/4 or even subframe number and aggregation level L=1/3 select the second alternative parameter ID2.
Embodiment 14
The present embodiment is configured to determine the parameter of sequence group # for high-level signaling, wherein each parameter sends 2
Value, and by Downlink Control Information indicate it is currently used wherein which.Wherein using subframe numbers, aggregation level and first
The Downlink Control Information parameter of the positions CCE three determines actual parameter, and in the embodiment 12, base station and user equipment are pre-configured with down
Row control information parameter (subframe numbers, aggregation level and first position CCE) is with one or a set of for determining physical uplink control
The mapping relations of the parameter of channel resource configuration processed.
14 method of the present embodiment includes the following steps:
Step 1601:Base station by high-level signaling be user terminal be configured to determine PUCCH sequence group # first,
Second alternative parameter, such as 2 virtual subdistrict ID, user equipment receive the first, second alternative parameter.
Step 1602:By down control channel, to user device configuration Downlink Control Information parameter, (subframe numbers gather for base station
Close rank and first position CCE), implicit indication user equipment from 2 it is alternative in dynamic selects to go out 1 conduct this UE finally real
The parameter that border uses.
Step 1603:User equipment obtains the above aggregation level, first CCE by the blind Detecting to Downlink Control Information
Position;
User terminal identifies ID1 and ID2 so as to obtain 2 alternative virtual subdistricts.
The Downlink Control Information parameter is carried on user's dedicated search space (UE-specific Search
space)。
The downlink control channel format includes below one or more:DCI format1, DCI format1a, DCI
Format1b, DCI format1c, DCI format1d, DCI format2, DCI format2a, DCI format2b, DCI
format2c。
Step 1604:The L and n that user equipment is obtained according to the subframe numbers where PDCCH, blind DetectingCCE, offsetAnd it is pre-
The mapping relations set are selected using which set in 2 sets of alternative parameters, and sequence are calculated according to the actual parameter selected
Row group #, and then send ascending control information.
Implicit indication is carried out using the corresponding subframe numbers of PDCCH and aggregation level and first positions CCE joint, for example,
Mapping relations are:Odd numbered sub-frames number and L=1 and nCCE, offset=0/1/2 or odd numbered sub-frames number and L=2 and nCCE, offset=
2/4/6/8 or odd numbered sub-frames number and or L=4 and nCCE, offset=0 or odd numbered sub-frames number and or L=8 and nCCE, offset=
0 or even subframe number and L=1 and nCCE, offset=3/4/5 or even subframe number and L=2 and nCCE, offset=0/1 0,
Or even subframe number and L=4 and nCCE, offset=4 or even subframe number and L=8 and nCCE, offset=8, selection first is standby
Select parameter ID1;Even subframe number and L=1 and nCCE, offset=0/1/2 or even subframe number and L=2 and nCCE, offset=2/
4/6/8 or even subframe number and or L=4 and nCCE, offset=0 or even subframe number and or L=8 and nCCE, offset=0,
Or odd numbered sub-frames number and L=1 and nCCE, offset=3/4/5 or odd numbered sub-frames number and L=2 and nCCE, offset=0/10, or
Person's odd numbered sub-frames number and L=4 and nCCE, offset=4 or odd numbered sub-frames number and L=8 and nCCE, offset=8, selection second is alternative
Parameter ID2;
Embodiment 15
The present embodiment is configured to determine the parameter of sequence group # for high-level signaling, wherein each parameter sends 2
Value, and by Downlink Control Information indicate it is currently used wherein which.It uses subframe numbers this downlink control information parameter
Determine actual parameter, in the embodiment 13, base station and user equipment are pre-configured with Downlink Control Information parameter (subframe numbers) and one
A or one group of parameter for determining physical uplink control channel resource configuration mapping relations.
15 method of the present embodiment includes the following steps:
Step 1701:Base station by high-level signaling be user terminal be configured to determine PUCCH sequence group # first,
Second alternative parameter, such as 2 virtual subdistrict ID, user equipment receive the first, second alternative parameter.
Step 1702:Base station by down control channel to user device configuration Downlink Control Information parameter (subframe numbers),
Implicit indication user equipment goes out 1 parameter finally actually used as this UE from 2 alternative middle dynamic selects.
Step 1703:User equipment receives Downlink Control Information parameter;
User terminal identifies ID1 and ID2 so as to obtain 2 alternative virtual subdistricts.
The Downlink Control Information parameter is carried on user's dedicated search space (UE-specific Search
space)。
The downlink control channel format includes below one or more:DCI format1, DCI format1a, DCI
Format1b, DCI format1c, DCI format1d, DCI format2, DCI format2a, DCI format2b, DCI
format2c。
Step 1704:User equipment according to where PDCCH subframe numbers and preset mapping relations select using 2 sets
Which set in alternative parameter, and sequence group # is calculated according to the actual parameter selected, and then send upload control
Information.
Implicit indication is carried out using the subframe numbers where Downlink Control Information, such as mapping relations are:Odd numbered sub-frames number, choosing
Select the first alternative parameter ID1;Even subframe number selects the second alternative parameter ID2.
Embodiment 16
The present embodiment is configured to determine the parameter of sequence group # for high-level signaling, wherein each parameter sends 2
Value, and by Downlink Control Information indicate it is currently used wherein which.Wherein use the spy of some Downlink Control Information parameter
Determine bit and determine actual parameter, in the embodiment 14, base station and user equipment are pre-configured with some Downlink Control Information parameter
Specific bit position with it is one or a set of for determine physical uplink control channel resource configuration parameter mapping relations.
16 method of the present embodiment includes the following steps:
Step 1801:Base station by high-level signaling be user terminal be configured to determine PUCCH sequence group # first,
Second alternative parameter, such as 2 virtual subdistrict ID, user equipment receive the first, second alternative parameter.
User terminal identifies ID1 and ID2 so as to obtain 2 alternative virtual subdistricts.
Step 1802:Base station is by the specific bit position of some Downlink Control Information parameter of down control channel to user
Equipment issues dynamic instruction information, and dynamic select goes out 1 conduct this UE during instruction user equipment is identified from 2 alternative virtual subdistricts
Finally it is actually used in the cell ID used when determining PUCCH resource.
The Downlink Control Information parameter is carried on user's dedicated search space (UE-specific Search
space)。
The downlink control channel format includes below one or more:DCI format1, DCI format1a, DCI
Format1b, DCI format1c, DCI format1d, DCI format2, DCI format2a, DCI format2b, DCI
format2c。
The specific bit position of some Downlink Control Information parameter, including it is following in it is one or more:The solicited message of SRS
All bits, high 1 of resource block assignment information or 2 high, modulation coding scheme and redundancy versions instruction information it is high by 1
All bits, the physics of position or instruction information that is 2 high, being not enabled on the corresponding modulation coding scheme of transmission block and redundancy versions
All bits of the emissive power control command of uplink control channel.
Step 1803:User equipment receives Downlink Control Information parameter;
Step 1804:User equipment is selected according to the specific bit position of Downlink Control Information parameter using 2 alternative ginsengs
Which of number, and PUCCH resource is calculated according to selected parameter, and then send ascending control information.
Preferably, indicate user from two alternative PUCCH using the emissive power control command of Physical Uplink Control Channel
The one of PUCCH sequence group # as the actual use of this user equipment of dynamic select in sequence group #.2 bit informations
Represent 4 kinds of states:00,01,10,11, it 2 kinds of states therein can be used to indicate the first alternative parameter ID1 of selection, remaining 2
Kind state indicates the first alternative parameter ID2 of selection.For example, when 2 bit information states are 00 or 01, ID1 is selected, when 2 bits
When information is 10 or 11, ID2 is selected.
Or it uses high 1 of resource block assignment information or indicates the height of information using modulation coding scheme and redundancy versions
1 or carry out dynamic instruction using high 1 of the instruction information for being not enabled on the corresponding modulation coding scheme of transmission block and redundancy versions
User equipment dynamic select from 2 alternative PUCCH sequence group # goes out 1 and is finally actually used as this user equipment
PUCCH sequence group #.Such as high 1 then select ID1 when being 0, high 1 then selects ID2 when being 1.
Embodiment 17
The present embodiment is configured to determine the parameter of sequence group # for high-level signaling, wherein each parameter sends 2
Value, and by Downlink Control Information indicate it is currently used wherein which.Actual parameter is wherein determined using newly-increased K bit, it should
In embodiment 15, base station and user equipment are pre-configured with added bits with one or a set of for determining Physical Uplink Control Channel
The mapping relations of the parameter of resource distribution.
17 method of the present embodiment includes the following steps:
Step 1901:Base station by high-level signaling be user terminal be configured to determine PUCCH sequence group # first,
Second alternative parameter, such as 2 virtual subdistrict ID, user equipment receive the first, second alternative parameter.
User terminal identifies ID1 and ID2 so as to obtain 2 alternative virtual subdistricts.
Step 1902:By the added bits in down control channel, instruction user equipment is alternative virtual small from 2 for base station
Dynamic select goes out 1 cell ID used when being finally actually used in determining PUCCH resource as this UE in area's mark.
The down control channel is carried on user's dedicated search space (UE-specific Search space).
The downlink control channel format includes below one or more:DCI format1, DCI format1a, DCI
Format1b, DCI format1c, DCI format1d, DCI format2, DCI format2a, DCI format2b, DCI
format2c。
Step 1903:User equipment receives added bits;
Step 1904:User equipment is selected standby using 2 according to the added bits instruction information in Downlink Control Information
Which of parameter is selected, and PUCCH resource is calculated according to selected parameter, and then sends ascending control information.
K bit instruction information in Downlink Control Information is added bits, for example, mapping relations are:Added bits it is high by 1
When position is 0, the first alternative parameter ID1 is selected, high 1 of added bits when being 1, selects the second alternative parameter ID2.
Embodiment 18
The present embodiment is configured to determine the parameter of PUCCH resource index for high-level signaling, wherein each parameter sends 4
A value, and by Downlink Control Information indicate it is currently used wherein which.Wherein use K bit and Downlink Control Information parameter
Common to determine actual parameter, in the embodiment 16, base station and user equipment are pre-configured with K bit and Downlink Control Information parameter
(such as aggregation level and first position CCE) and one or a set of parameter for determining physical uplink control channel resource configuration
Mapping relations.
Wherein K bit can be the specific bit position of some existing Downlink Control Information parameter in the prior art, can also
It is the added bits in Downlink Control Information.The specific bit position of some Downlink Control Information parameter include it is following in one kind or
It is a variety of:All bits of the solicited message of SRS, high 1 of resource block assignment information or 2 high, modulation coding scheme and superfluous
High 1 or 2 high of remaining version indication information, be not enabled on the instruction letters of the corresponding modulation coding scheme of transmission block and redundancy versions
All bits of all bits of breath, the emissive power control command of Physical Uplink Control Channel.
18 method of the present embodiment includes the following steps:
Step 2001:Base station by high-level signaling be user terminal be configured to determine PUCCH resource index first to
4th alternative parameter, such as 4 PUCCH resource index values, user equipment receive first to fourth alternative parameter.
Step 2002:Base station issues configuration K bit to user equipment by down control channel and Downlink Control Information is joined
Number (such as aggregation level and first position CCE).
User terminal is so as to obtaining 4 alternative PUCCH resource index value nPUCCH1, nPUCCH2, nPUCCH3, nPUCCH4。
Wherein PUCCH resource index value can be the resource index value of first kind PUCCH, can also be the second class or third
Class PUCCH resource index value.
Base station indicates user equipment from 4 alternative by way of the K bit combination implicit indication of Downlink Control Information
Dynamic select goes out 1 parameter finally actually used as this UE.Can first according to K bit indicate using 4 it is alternative in
Wherein 2, then selected using wherein 1 parameter be used as UE and finally actually used in this 2 by implicit indication, or
Wherein 2 using 4 in alternative are first selected according to implicit indication, then by K bit select using in this 2 wherein
1 parameter finally actually used as UE.
The Downlink Control Information is carried on user's dedicated search space (UE-specific Search space).
The downlink control channel format includes below one or more:DCI format1, DCI format1a, DCI
Format1b, DCI format1c, DCI format1d, DCI format2, DCI format2a, DCI format2b, DCI
format2c。
Step 2003:User equipment receives K bit and Downlink Control Information parameter;
Step 2004:User equipment is according to the K bit and the obtained aggregation level of PDCCH blind Detectings in Downlink Control Information
The position n of L and first CCECCE, offsetIt selects using which of 4 alternative parameters, and is calculated according to selected parameter
PUCCH resource is obtained, and then sends ascending control information.
Preferably, mapping relations can be layered realization, for example use high 1 of resource block assignment information or use modulating-coding
Mode and redundancy versions instruction high 1 of information or using being not enabled on the corresponding modulation coding scheme of transmission block and redundancy versions
Indicate that high 1 of information carrys out dynamic instruction user equipment dynamic select from 4 alternative parameters and goes out 2 conduct this user equipmenies
Further alternative parameter.For example, first wherein 2 indicated according to K bit using 4 in alternative, then pass through implicit indication
(i.e. Downlink Control Information parameter) is selected using wherein 1 parameter finally actually used as UE in this 2.
Such as high 1 of K bit be 0 when then select nPUCCH1And nPUCCH2, high 1 then selects n when being 1PUCCH3And nPUCCH4。
At this point, there are 2 alternative parameters for user equipment, then by implicit indication from 2 it is alternative in select wherein 1 be used as it is final
The actual parameter of actual use, there are various ways for implicit indication, herein to use the aggregation level and of Downlink Control Information
Relative position n of one control channel unit in user's dedicated search spaceCCE, offsetJoint carries out for implicit indication.It is false
If having selected n by K bitPUCCH1And nPUCCH2Alternately parameter, such as:As L=1 and nCCE, offset=0/1/2 or L=2
And nCCE, offset=2/4/6/8 or L=4 and nCCE, offset=0 or L=8 and nCCE, offset=0, select the first alternative parameter
nPUCCH1;As L=1 and nCCE, offset=3/4/5 or L=2 and nCCE, offset=0/10 or L=4 and nCCE, offset=4 or L=
8 and nCCE, offset=8, select the second alternative parameter nPUCCH2。
Above example 5-18 is illustrated for determining the actual parameter of PUCCH sequence group #, real below
Example 19 is applied to be illustrated for determining the actual parameter of PUCCH resource index.
Embodiment 19
The present embodiment is configured to determine the parameter of PUCCH resource index for high-level signaling, wherein each parameter sends 4
A value, and by Downlink Control Information indicate it is currently used wherein which.Using aggregation level and first position CCE two
Downlink Control Information parameter determines actual parameter, and in the embodiment 17, base station and user equipment are pre-configured with Downlink Control Information
Parameter (aggregation level and first position CCE) and one or a set of ginseng for determining physical uplink control channel resource configuration
Several mapping relations.
19 method of the present embodiment includes the following steps:
Step 2101:Base station issues configurating downlink to user equipment and controls information parameter (aggregation level and first CCE
Set), and be that user terminal is configured to determine first to fourth alternative parameter of PUCCH resource index, example by high-level signaling
Such as 4 PUCCH resource values, user equipment receives first to fourth alternative parameter.
User terminal is so as to obtaining 4 alternative PUCCH resource value nPUCCH1, nPUCCH2, nPUCCH3, nPUCCH4。
Step 2102:Base station is by the Downlink Control Information parameter implicit indication user equipment of down control channel from 4
Dynamic select goes out 1 PUCCH parameter finally actually used as this UE in alternative.
The Downlink Control Information parameter is carried on user's dedicated search space (UE-specific Search
space)。
The downlink control channel format includes below one or more:DCI format1, DCI format1a, DCI
Format1b, DCI format1c, DCI format1d, DCI format2, DCI format2a, DCI format2b, DCI
format2c。
Step 2103:User equipment receives the above aggregation level and first position CCE;
Step 2104:The L and n that user equipment is obtained according to PDCCH blind DetectingsCCE, offsetIt selects using 4 alternative ginsengs
Which of number, and PUCCH resource is calculated according to selected parameter, and then send ascending control information.
Using the aggregation level L of Downlink Control Information and first control channel unit in user's dedicated search space
Relative position nCCE, offsetJoint carries out implicit indication.Another manifestation mode of mapping relations is given below:
According to (L, nCCE, offset) be combined, available combination is as follows:(1,0), (1,1), (1,2), (1,3), (1,
4), (1,5), (2,0), (2,2), (2,4), (2,6), (2,8), (2,10), (4,0), (4,4), (8,0), (8,8), will more than
Ascending order number is M=0~15 successively for combination, and the result of M mod N is enabled to correspond to corresponding sequence group # respectively, i.e., number is 0,
4,8,12 combination corresponds to nPUCCH1, the combination of number 1,5,9,13 corresponds to nPUCCH2, the combination correspondence of number 2,6,10,14
nPUCCH3, the combination of number 3,7,11,15 corresponds to nPUCCH4.Such as Figure 10.Such as:L=1, nCCE, offset=4, that is, combine (1,
4), M=4, (M mod N)=1 select n at this timePUCCH2;Work as L=4, nCCE, offset=0, that is, (4,0) are combined, at this time M=12,
(M mod N)=0 selects nPUCCH1;Work as L=2, nCCE, offset=4, that is, (2,4) are combined, at this time M=8, (M mod N)=2,
Select nPUCCH3;Work as L=8, nCCE, offset=8, that is, (8,8) are combined, at this time M=15, (M mod N)=3 selects nPUCCH4。
Certainly, the above mapping relations can also be provided by way of exclusive list.
Embodiment 20
The present embodiment is configured to the parameter for determining PUCCH resource index for high-level signaling, wherein each ginseng
Number send 2 value, and by Downlink Control Information indicate it is currently used wherein which.Wherein use aggregation level and first
The Downlink Control Information parameter of the positions CCE two determines actual parameter, and in the embodiment 18, base station and user equipment are pre-configured with down
Row control information parameter (aggregation level and first position CCE) is with one or a set of for determining that Physical Uplink Control Channel provides
The mapping relations of the parameter of source configuration.
20 method of the present embodiment includes the following steps:
Step 2201:Base station is that user terminal is configured to determine first, the of PUCCH resource index by high-level signaling
Two alternative parameters, such as 2 regions user dedicated dynamic ACK/NACK starting location offset value Δs1And Δ2, user equipment connects
Receive the first, second alternative parameter.
Understandably, before step 801, base station is the regions the dynamic ACK/NACK starting that cell-specific is set in user's establishing
Position.
Step 2202:Base station is by down control channel to user device configuration Downlink Control Information parameter (aggregation level
With first position CCE), implicit indication user equipment from 2 it is alternative in dynamic selects go out 1 conduct this UE and finally actually use
Parameter.
Step 2203:User equipment receives Downlink Control Information parameter;
User terminal is so as to obtaining 2 regions alternative user dedicated dynamic ACK/NACK starting location offset values
Δ1And Δ2。
The Downlink Control Information parameter is carried on user's dedicated search space (UE-specific Search
space)。
The downlink control channel format includes below one or more:DCI format1, DCI format1a, DCI
Format1b, DCI format1c, DCI format1d, DCI format2, DCIformat2a, DCI format2b, DCI
format2c。
Step 2204:Aggregation level that user equipment is obtained according to PDCCH blind Detectings and first position CCE and preset
Mapping relations select using which set in 2 sets of alternative parameters, and PUCCH is calculated according to the actual parameter selected
Resource index, and then send ascending control information.
Using the aggregation level of Downlink Control Information and first control channel unit in user's dedicated search space
Relative position nCCE, offsetJoint carries out implicit indication.For example, mapping relations are:As L=1 and nCCE, offset=0/1/2 or L=
2 and nCCE, offset=2/4/6/8 or L=4 and nCCE, offset=0 or L=8 and nCCE, offset=0, select the first alternative parameter;
As L=1 and nCCE, offset=3/4/5 or L=2 and nCCE, offset=0/10 or L=4 and nCCE, offset=4 or L=8 and
nCCE, offset=8, select second alternative parameter, such as Fig. 8.
Embodiment 21
The present embodiment is configured to the parameter for determining PUCCH resource index for high-level signaling, wherein each ginseng
Number send 2 value, and by Downlink Control Information indicate it is currently used wherein which.Wherein use aggregation level and first
The Downlink Control Information parameter of the positions CCE two determines actual parameter, and in the embodiment 18, base station and user equipment are pre-configured with down
Row control information parameter (aggregation level and first position CCE) is with one or a set of for determining that Physical Uplink Control Channel provides
The mapping relations of the parameter of source configuration.
21 method of the present embodiment includes the following steps:
Step 2301:Base station is that user terminal is configured to determine first, the of PUCCH resource index by high-level signaling
Two alternative parameters, such as 2 regions dynamic ACK/NACK initial position, user equipment receive the first, second alternative parameter.
Step 2302:Base station is by down control channel to user device configuration Downlink Control Information parameter (aggregation level
With first position CCE), implicit indication user equipment from 2 it is alternative in dynamic selects go out 1 conduct this UE and finally actually use
Parameter.
Step 2303:User equipment receives Downlink Control Information parameter;
User terminal is so as to obtaining the 2 alternative regions dynamic ACK/NACK initial positions.
The Downlink Control Information parameter is carried on user's dedicated search space (UE-specific Search
space)。
The downlink control channel format includes below one or more:DCI format1, DCI format1a, DCI
Format1b, DCI format1c, DCI format1d, DCI format2, DCI format2a, DCI format2b, DCI
format2c。
Step 2304:Aggregation level that user equipment is obtained according to PDCCH blind Detectings and first position CCE and preset
Mapping relations select using which set in 2 sets of alternative parameters, and PUCCH is calculated according to the actual parameter selected
Resource index, and then send ascending control information.
Using the aggregation level of Downlink Control Information and first control channel unit in user's dedicated search space
Relative position nCCE, offsetJoint carries out implicit indication.For example, mapping relations are:As L=1 and nCCE, offset=0/1/2 or L=
2 and nCCE, offset=2/4/6/8 or L=4 and nCCE, offset=0 or L=8 and nCCE, offset=0, select the first alternative parameter;
As L=1 and nCCE, offset=3/4/5 or L=2 and nCCE, offset=0/10 or L=4 and nCCE, offset=4 or L=8 and
nCCE, offset=8, select second alternative parameter, such as Fig. 8.
Embodiment 22
The present embodiment is configured to the parameter for determining PUCCH resource index for high-level signaling, wherein each ginseng
Number send 4 value, and by Downlink Control Information indicate it is currently used wherein which.Wherein use aggregation level and first
The Downlink Control Information parameter of the positions CCE two determines actual parameter, and in the embodiment 18, base station and user equipment are pre-configured with down
Row control information parameter (aggregation level and first position CCE) is with one or a set of for determining that Physical Uplink Control Channel provides
The mapping relations of the parameter of source configuration.
22 method of the present embodiment includes the following steps:
Step 2401:Base station is that user terminal is configured to determine first, the of PUCCH resource index by high-level signaling
Two alternative parameters, such as 4 regions dynamic ACK/NACK initial position, user equipment receive the first, second alternative parameter.
Step 2402:Base station is by down control channel to user device configuration Downlink Control Information parameter (aggregation level
With first position CCE), implicit indication user equipment from 4 it is alternative in dynamic selects go out 1 conduct this UE and finally actually use
Parameter.
Step 2403:User equipment receives Downlink Control Information parameter;
User terminal is so as to obtaining the 4 alternative regions dynamic ACK/NACK initial positions.
The Downlink Control Information parameter is carried on user's dedicated search space (UE-specific Search
space)。
The downlink control channel format includes below one or more:DCI format1, DCI format1a, DCI
Format1b, DCI format1c, DCI format1d, DCI format2, DCI format2a, DCI format2b, DCI
format2c。
Step 2404:Aggregation level that user equipment is obtained according to PDCCH blind Detectings and first position CCE and preset
Mapping relations select using which set in 4 sets of alternative parameters, and PUCCH is calculated according to the actual parameter selected
Resource index, and then send ascending control information.
Using the aggregation level of Downlink Control Information and first control channel unit in user's dedicated search space
Relative position nCCE, offsetJoint carries out implicit indication.For example, mapping relations are:As L=1 and nCCE, offset=0/4 or L=2
And nCCE, offset=4 or L=4 and nCCE, offsetWhen=0, first alternative parameter is selected;As L=1 and nCCE, offset=1/5,
Or L=2 and nCCE, offset=6 or L=4 and nCCE, offset=4, select the second alternative parameter;As L=1 and nCCE, offset=2,
Or L=2 and nCCE, offset=0/8 or L=8 and nCCE, offset=0, select third alternative parameter;As L=1 and nCCE, offset=
3 or L=2 and nCCE, offset=2/10 or L=8 and nCCE, offset=8, select the 4th alternative parameter.
Embodiment 23
The present embodiment is multiple alternative for determining the parameter of resource index and for determining sequence group # for configuring
Parameter, and currently used parameter value is indicated by Downlink Control Information.Wherein use aggregation level and first position CCE
Two Downlink Control Information parameters determine actual parameter, and in the embodiment 19, base station and user equipment are pre-configured with downlink control
Information parameter (aggregation level and first position CCE) is with one or a set of for determining that physical uplink control channel resource configures
Parameter mapping relations.
23 method of the present embodiment includes the following steps:
Step 2501:Base station is that user terminal is configured to determine the alternative parameter of PUCCH sequence group # and for true
Determine the alternative parameter of PUCCH resource index, such as determining that the alternative parameter of the dedicated PUCCH sequences group # of user includes
1 virtual subdistrict mark and a real cell ID, for determining that the alternative parameter of PUCCH resource index is the dynamic of cell-specific
The regions the dynamic ACK/NACK starting location offset value of the regions state ACK/NACK initial position and newly-increased cell-specific, user equipment
Receive the first, second alternative parameter for determining PUCCH sequence group # and for determining PUCCH resource index
One, the second alternative parameter.
User terminal so as to respectively by actual cell ID and virtual subdistrict mark be calculated 2 it is alternative
PUCCH sequence group #, while the regions the dynamic ACK/NACK initial position of 2 cell-specifics is calculated, one is cell
The regions dedicated dynamic ACK/NACK initial position, one be according to the regions the dynamic ACK/NACK initial position of cell-specific and
The regions another dynamic ACK/NACK initial position that the regions the dynamic ACK/NACK starting location offset of cell-specific is worth to.
Step 2502:Base station issues configurating downlink to user equipment by down control channel and controls information parameter (polymerization
Rank and first position CCE);
Base station goes out 1 from 2 alternative middle dynamic selects by Downlink Control Information implicit indication user equipment and is used as this UE
Final be actually used in sends the actual parameter that ascending control information uses.
The Downlink Control Information parameter is carried on user's dedicated search space (UE-specific Search
space)。
The downlink control channel format includes below one or more:DCI format1, DCI format1a, DCI
Format1b, DCI format1c, DCI format1d, DCI format2, DCI format2a, DCI format2b, DCI
format2c。
Step 2503:User equipment obtains aggregation level and first position CCE by PDCCH blind Detectings;
Step 2504:The L and n that user equipment is obtained according to PDCCH blind DetectingsCCE, offsetIt selects using 2 alternative ginsengs
Which of number, and PUCCH resource is calculated according to selected parameter, and then send ascending control information.
Using the aggregation level of Downlink Control Information and first control channel unit in user's dedicated search space
Relative position nCCE, offsetJoint carries out implicit indication.For example, mapping relations are:As L=1 and nCCE, offset=0/1/2 or L=
2 and nCCE, offset=2/4/6/8 or L=4 and nCCE, offset=0 or L=8 and nCCE, offset=0, select actual cell mark
Know and determines PUCCH resource with the former initial positions dynamic ACK/NACK;As L=1 and nCCE, offset=3/4/5 or L=2 and
nCCE, offset=0/10 or L=4 and nCCE, offset=4 or L=8 and nCCE, offset=8, select virtual subdistrict mark, cell special
The regions the dynamic ACK/NACK starting location offset value of the initial positions dynamic ACK/NACK and cell-specific determines PUCCH
Resource, such as Fig. 8.
Embodiment 24
The present embodiment configures multiple alternative for determining the parameter of resource index and for determining sequence for high-level signaling
The parameter of row group #, and currently used parameter value is indicated by Downlink Control Information.It wherein uses, first position CCE
Two Downlink Control Information parameters determine actual parameter, and in the embodiment 20, base station and user equipment are pre-configured with downlink control
Information parameter (first position CCE) is with one or a set of for determining reflecting for the parameter of physical uplink control channel resource configuration
Penetrate relationship.
24 method of the present embodiment includes the following steps:
Step 2601:Base station is that user terminal is configured to determine the dedicated PUCCH sequences group of user by high-level signaling
The alternative parameter of number and the alternative parameter indexed for determining PUCCH resource, such as determining the dedicated PUCCH sequences of user
The alternative parameter of row group # is that 2 virtual subdistricts identify ID1 and ID2, for determining that the parameter of PUCCH resource index includes 2
A regions dedicated dynamic ACK/NACK starting location offset value Δ that Adds User1And Δ2, user equipment reception is for determining
First, second alternative parameter of PUCCH sequence group # and the first, second alternative ginseng indexed for determining PUCCH resource
Number.
Before step 2601, base station issues the regions the ACK/NACK initial position of cell-specific to user equipment.
User terminal identifies and 2 dedicated dynamic ACK/ that Add User so as to obtain 2 alternative virtual subdistricts
The regions NACK initial position bias.
Step 2602:Base station issues configurating downlink control information parameter (first position CCE) to user equipment;
By Downlink Control Information implicit indication user equipment, the dynamic select from 2 alternative parameters goes out 1 and is used as base station
The PUCCH parameters that this UE is finally actually used.
The Downlink Control Information is carried on user's dedicated search space (UE-specific Search space).
The downlink control channel format includes below one or more:DCI format1, DCI format1a, DCI
Format1b, DCI format1c, DCI format1d, DCI format2, DCI format2a, DCI format2b, DCI
format2c。
Step 2603:User equipment obtains aggregation level and first position CCE by PDCCH blind Detectings;
Step 2604:The n that user equipment is obtained according to PDCCH blind DetectingsCCE, offsetIt selects using in 2 alternative parameters
Which, and PUCCH resource is calculated according to selected parameter, and then send ascending control information.
Using Downlink Control Information first control channel unit (Control Channel Element, CCE) with
Relative position n in the dedicated search space of familyCCE, offsetImplicit indication, nCCE, offsetIt indicates in user's dedicated search space, downlink
Control first control channel unit index n that information occupiesCCEWith blind examination initial position YkRelative position, nCCE, offset=
nCCE-Yk.For example, mapping relations are:Work as nCCE, offset=0~3, select ID1 and Δ1, work as nCCE, offset=4,5,6,8,10, choosing
Select parameter ID2 and Δ2, such as Fig. 9.
Embodiment 25
The present embodiment configures multiple alternative for determining the parameter of resource index and for determining sequence for high-level signaling
The parameter of row group #, and currently used parameter value is indicated by Downlink Control Information.Wherein use subframe numbers and first
The Downlink Control Information parameter of the positions CCE two determines actual parameter, and in the embodiment 21, base station and user equipment are pre-configured with down
Row control information parameter (subframe numbers and first position CCE) is with one or a set of for determining physical uplink control channel resource
The mapping relations of the parameter of configuration.
25 method of the present embodiment includes the following steps:
Step 2701:Base station is that user terminal is configured to determine the dedicated PUCCH sequences group of user by high-level signaling
The parameter of number and the parameter indexed for PUCCH resource, such as determining the standby of the dedicated PUCCH sequences group # of user
It includes being identified for 2 virtual subdistricts to select parameter, for determining that the alternative parameter of PUCCH resource index includes that 2 users are dedicated
The regions dynamic ACK/NACK initial position, user equipment receive the first, second alternative ginseng for determining PUCCH sequence group #
Number and the first, second alternative parameter indexed for determining PUCCH resource.
User terminal is compiled so as to which 2 alternative PUCCH sequence groups are calculated by 2 virtual subdistrict marks respectively
Number, while 2 user regions dedicated dynamic ACK/NACK initial position is calculated.
Step 2702:Base station issues configurating downlink to user equipment and controls information parameter (subframe numbers and first CCE
Set) base station by Downlink Control Information implicit indication user equipment from 2 it is alternative in dynamic selects go out 1 to be used as this UE finally real
Border is for sending the actual parameter that ascending control information uses.
The Downlink Control Information is carried on user's dedicated search space (UE-specific Search space).
The downlink control channel format includes below one or more:DCI format1, DCI format1a, DCI
Format1b, DCI format1c, DCI format1d, DCI format2, DCI format2a, DCI format2b, DCI
format2c。
Step 2703:User equipment obtains the subframe numbers where PDCCH and first position CCE by blind Detecting;
Step 2704:User equipment is according to the subframe numbers n where PDCCHsThe n obtained with PDCCH blind DetectingsCCE, offsetChoosing
It selects out using which of 2 alternative parameters, and PUCCH resource is calculated according to selected parameter, and then send uplink control
Information processed.
Use the corresponding subframe numbers n of Downlink Control InformationsWith first control channel unit in user's dedicated search space
In relative position nCCE, offsetJoint carries out implicit indication for example, odd numbered sub-frames and nCCE, offset=0~3 or even subframe and
nCCE, offset=4,5,6,8,10, select the first virtual subdistrict mark and the dedicated dynamic ACK/NACK start bits of first user
It sets to determine PUCCH resource;Odd numbered sub-frames and nCCE, offset=4,5,6,8,10 or even subframe and nCCE, offset=0~3, choosing
Select the second virtual subdistrict mark, second initial position user dedicated dynamic ACK/NACK.
Corresponding to preceding method two and embodiment 7 to 25, the present invention also provides a kind of moneys of Physical Uplink Control Channel
Source configures system, and as shown in figure 11, which includes:
The configuration module of base station and user equipment, for be pre-configured with dynamic BTS configuration instruction information with it is one or a set of
Mapping relations for the parameter for determining physical uplink control channel resource configuration, the dynamic BTS configuration instruction information include
Any one or more information below:The specific ratio of one or a set of Downlink Control Information parameter, some Downlink Control Information parameter
Special position, added bits;
The sending module of the base station, for being issued to the user equipment for determining physical uplink control channel resource
The alternative parameter of configuration and for the user equipment dynamic BTS configuration indicate information;
The receiving module of the user equipment, it is described for determining physical uplink control channel resource configuration for receiving
Alternative parameter and for the user equipment dynamic BTS configuration indicate information;
The resource distribution determining module of the user equipment, for according to the mapping relations of the configuration module, determine with
The corresponding alternative parameter of dynamic BTS configuration instruction information received is actual parameter, and true according to the actual parameter
The resource distribution of the fixed Physical Uplink Control Channel.
Further, one or one group of Downlink Control Information parameter includes following any one or more parameters:It is poly-
Close rank, first positions CCE, subframe numbers, System Frame Number.
Preferably, the specific bit position of the Downlink Control Information parameter refers to:All bits of the solicited message of SRS,
High 1 or 2 high of high 1 of resource block assignment information or 2 high, modulation coding scheme and redundancy versions instruction information, not
All bits, the Physical Uplink Control Channel of the instruction information of the enabled corresponding modulation coding scheme of transmission block and redundancy versions
Emissive power control command all bits.
Preferably, the resource distribution of the ascending control information includes at least PUCCH sequences group # or PUCCH resource rope
Draw, wherein for determining that the parameter of PUCCH sequence group # can be following any parameter:
PUCCH sequence group #;
Sequential shift pattern and sequence hopping pattern;
Virtual subdistrict mark/cell ID and the enabled instruction of sequence hopping;
Virtual subdistrict mark/cell ID and sequence hopping pattern;
Virtual subdistrict mark/cell ID and sequential shift pattern, while sequence hopping is enabled;
Sequential shift pattern, while sequence hopping does not enable;
Virtual subdistrict identifies;
The dedicated sequential shift pattern of user;
For determining that the parameter of PUCCH resource index can be following any group of parameter:
PUCCH resource indexes;
The initial position in the regions dynamic ACK/NACK of cell-specific;
The regions the dynamic ACK/NACK starting location offset value of cell-specific;
The user regions dedicated dynamic ACK/NACK initial position;
The regions user dedicated dynamic ACK/NACK starting location offset value.
Preferably, the configuration module of the base station is additionally operable to carry out physical uplink control channel resource configuration, in order to realize
Inter-cell user device resource is orthogonal, and same base station or different base station need the user of orthogonal different community after negotiation
The identical parameter for determining PUCCH sequence group # of device configuration;In order to realize capacity-sharing, same base station or different bases
It stands after negotiation as the identical parameter for determining PUCCH sequence group # of user device configuration.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field
For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, any made by repair
Change, equivalent replacement, improvement etc..The relevant method of PUCCH resource distribution method that is all and using herein, should be included in the present invention
Protection domain within.
Claims (12)
1. a kind of resource allocation method of Physical Uplink Control Channel, which is characterized in that this method includes:
Base station issues the parameter configured for determining physical uplink control channel resource for the user equipment to user equipment
Or added bits;
The user equipment receives the parameter or added bits, and according to the parameter or added bits determine described in physically
The resource distribution of row control channel;
The resource distribution of the uplink control channel includes at least PUCCH sequences group # or PUCCH resource indexes;For determining
The parameter of PUCCH sequence group # can be following any group of parameter:
PUCCH sequence group #;
Virtual subdistrict identifies and the enabled instruction of sequence hopping;
Virtual subdistrict identifies and sequence hopping pattern;
Virtual subdistrict identifies and sequential shift pattern, while sequence hopping is enabled;
Virtual subdistrict identifies;
The dedicated sequential shift pattern of user;
For determining that the parameter of PUCCH resource index can be following any group of parameter:
PUCCH resource indexes;
The initial position in the regions dynamic ACK/NACK of cell-specific;
The regions the dynamic ACK/NACK starting location offset value of cell-specific;
The user regions dedicated dynamic ACK/NACK initial position;
The regions user dedicated dynamic ACK/NACK starting location offset value.
2. the method as described in claim 1, it is characterised in that:Same base station or different base station need orthogonal after negotiation
Different community user device configuration it is identical for determining the parameter of PUCCH sequence group #, or be user device configuration
The different parameters for determining PUCCH sequence group #.
3. a kind of resource allocation method of Physical Uplink Control Channel, which is characterized in that this method includes:
Base station and user equipment are pre-configured with dynamic BTS configuration instruction information with one or a set of for determining physical uplink control
The mapping relations of the parameter of channel resource configuration processed, the dynamic BTS configuration instruction information includes following any one or more letters
Breath:One or a set of Downlink Control Information parameter, the specific bit position of some Downlink Control Information parameter, added bits;It is described
One or a set of Downlink Control Information parameter includes following any one or more parameters:Aggregation level, subframe numbers, system-frame
Number;The specific bit position of the Downlink Control Information parameter refers to:All bits, the resource block distribution letter of the solicited message of SRS
High 1 of breath or 2 high, modulation coding scheme and redundancy versions instruction high 1 or 2 high of information are not enabled on transmission block pair
The transmission power control of all bits, Physical Uplink Control Channel of the instruction information of the modulation coding scheme and redundancy versions answered
Make all bits of order;
The base station is issued for the user equipment to the user equipment for determining that physical uplink control channel resource is matched
The alternative parameter set, the user equipment receive the alternative parameter;
The base station issues the dynamic BTS configuration for the user equipment to the user equipment by down control channel and refers to
Show that information, the user equipment receive the dynamic BTS configuration and indicates information;
The user equipment determines alternative parameter corresponding with dynamic BTS configuration instruction information according to the mapping relations
For actual parameter, and determine according to the actual parameter resource distribution of the Physical Uplink Control Channel;
The resource distribution of the ascending control information includes at least PUCCH sequences group # or PUCCH resource indexes.
4. method as claimed in claim 3, it is characterised in that:It is special that the dynamic BTS configuration instruction information is carried on user
With search space (UE-specific Search space).
5. method as claimed in claim 3, it is characterised in that:The downlink control channel format includes below a kind of or more
Kind:DCI format1, DCI format1a, DCI format1b, DCI format1c, DCI format1d, DCI
Format2, DCI format2a, DCI format2b, DCI format2c.
6. method as claimed in claim 3, it is characterised in that:For determine the parameter of PUCCH sequence group # can be with
Under any group of parameter:
PUCCH sequence group #;
Sequential shift pattern and sequence hopping pattern;
Virtual subdistrict mark/cell ID and the enabled instruction of sequence hopping;
Virtual subdistrict mark/cell ID and sequence hopping pattern;
Virtual subdistrict mark/cell ID and sequential shift pattern, while sequence hopping is enabled;
Sequential shift pattern, while sequence hopping does not enable;
Virtual subdistrict identifies;
The dedicated sequential shift pattern of user;
For determining that the parameter of PUCCH resource index can be following any group of parameter:
PUCCH resource indexes;
The initial position in the regions dynamic ACK/NACK of cell-specific;
The regions the dynamic ACK/NACK starting location offset value of cell-specific;
The user regions dedicated dynamic ACK/NACK initial position;
The regions user dedicated dynamic ACK/NACK starting location offset value.
7. method as claimed in claim 3, it is characterised in that:Same base station or different base station need orthogonal after negotiation
Different community user device configuration it is identical for determining the parameter of PUCCH sequence group #, or be user device configuration
The different parameters for determining PUCCH sequence group #.
8. a kind of resource configuration system of Physical Uplink Control Channel, which is characterized in that the system includes:
The sending module of base station, for being issued to user equipment for the user equipment for determining Physical Uplink Control Channel
The parameter or added bits of resource distribution;
The receiving module of the user equipment, for receiving the parameter or added bits;
The resource distribution determining module of the user equipment, for determining the object according to the parameter or added bits of reception
Manage the resource distribution of uplink control channel;
The resource distribution of the ascending control information includes at least PUCCH sequences group # or PUCCH resource indexes;For determining
The parameter of PUCCH sequence group # can be following any group of parameter:
PUCCH sequence group #;
Virtual subdistrict identifies and the enabled instruction of sequence hopping;
Virtual subdistrict identifies and sequence hopping pattern;
Virtual subdistrict identifies and sequential shift pattern, while sequence hopping is enabled;
Virtual subdistrict identifies;
The dedicated sequential shift pattern of user;
For determining that the parameter of PUCCH resource index can be following any group of parameter:
1PUCCH resource indexes;
The initial position in the regions dynamic ACK/NACK of cell-specific;
The regions the dynamic ACK/NACK starting location offset value of cell-specific;
The user regions dedicated dynamic ACK/NACK initial position;
The regions user dedicated dynamic ACK/NACK starting location offset value.
9. system as claimed in claim 8, it is characterised in that:The base station further includes configuration module, for carrying out physically
Row control channel resource distribution, same base station or different base station need the user equipment of orthogonal different community after negotiation
Configure it is identical for determining the parameter of PUCCH sequence group #, or for user device configuration it is different for determining PUCCH sequences
The parameter of row group #.
10. a kind of resource configuration system of Physical Uplink Control Channel, which is characterized in that the system includes:
The configuration module of base station and user equipment is used for for being pre-configured with dynamic BTS configuration instruction information with one or a set of
Determine the mapping relations of the parameter of physical uplink control channel resource configuration, the dynamic BTS configuration instruction information includes following
Any one or more information:One or a set of Downlink Control Information parameter, some Downlink Control Information parameter specific bit position,
Added bits;One or one group of Downlink Control Information parameter includes following any one or more parameters:Aggregation level, son
Frame number, System Frame Number;The specific bit position of the Downlink Control Information parameter refers to:All bits of the solicited message of SRS, money
High 1 or 2 high of source block distribution high 1 of information or 2 high, modulation coding scheme and redundancy versions instruction information, do not make
It can all bits of instruction information of the corresponding modulation coding scheme of transmission block and redundancy versions, Physical Uplink Control Channel
All bits of emissive power control command;
The sending module of the base station, for being issued to the user equipment for determining that physical uplink control channel resource configures
Alternative parameter and for the user equipment dynamic BTS configuration indicate information;
The receiving module of the user equipment, it is described for determining the alternative of physical uplink control channel resource configuration for receiving
Parameter and for the user equipment dynamic BTS configuration indicate information;
The resource distribution determining module of the user equipment is determined and is received for the mapping relations according to the configuration module
The corresponding alternative parameter of dynamic BTS configuration instruction information be actual parameter, and institute is determined according to the actual parameter
State the resource distribution of Physical Uplink Control Channel;
The resource distribution of the ascending control information includes at least PUCCH sequences group # or PUCCH resource indexes.
11. system as claimed in claim 10, it is characterised in that:For determining that the parameter of PUCCH sequence group # can be
Any parameter below:
PUCCH sequence group #;
Sequential shift pattern and sequence hopping pattern;
Virtual subdistrict mark/cell ID and the enabled instruction of sequence hopping;
Virtual subdistrict mark/cell ID and sequence hopping pattern;
Virtual subdistrict mark/cell ID and sequential shift pattern, while sequence hopping is enabled;
Sequential shift pattern, while sequence hopping does not enable;
Virtual subdistrict identifies;
The dedicated sequential shift pattern of user;
For determining that the parameter of PUCCH resource index can be following any group of parameter:
1PUCCH resource indexes;
The initial position in the regions dynamic ACK/NACK of cell-specific;
The regions the dynamic ACK/NACK starting location offset value of cell-specific;
The user regions dedicated dynamic ACK/NACK initial position;
The regions user dedicated dynamic ACK/NACK starting location offset value.
12. system as claimed in claim 10, it is characterised in that:The configuration module of the base station is additionally operable to carry out physically
Row control channel resource distribution, same base station or different base station need the user equipment of orthogonal different community after negotiation
The identical parameter for determining PUCCH sequence group # is configured, or is used to determine PUCCH sequences with different for user equipment
The parameter of group #.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210022532.6A CN103249147B (en) | 2012-02-01 | 2012-02-01 | The resource allocation method and system of Physical Uplink Control Channel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210022532.6A CN103249147B (en) | 2012-02-01 | 2012-02-01 | The resource allocation method and system of Physical Uplink Control Channel |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103249147A CN103249147A (en) | 2013-08-14 |
CN103249147B true CN103249147B (en) | 2018-07-24 |
Family
ID=48928304
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210022532.6A Active CN103249147B (en) | 2012-02-01 | 2012-02-01 | The resource allocation method and system of Physical Uplink Control Channel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103249147B (en) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5878594B2 (en) * | 2014-07-11 | 2016-03-08 | 株式会社Nttドコモ | User terminal, wireless communication method, and wireless communication system |
JP5878595B2 (en) * | 2014-07-11 | 2016-03-08 | 株式会社Nttドコモ | User terminal, radio communication system, and radio communication method |
CN106714205B (en) * | 2015-11-18 | 2020-04-03 | 上海诺基亚贝尔股份有限公司 | Method and apparatus for communicating in a heterogeneous network |
CN107135046B (en) | 2016-02-26 | 2020-02-14 | 华为技术有限公司 | Information transmission method and device |
CN108271174A (en) * | 2016-12-30 | 2018-07-10 | 华为技术有限公司 | The methods, devices and systems of uplink |
CN108811107A (en) | 2017-05-04 | 2018-11-13 | 华为技术有限公司 | Communication means, terminal device and the network equipment |
CN109152010B (en) * | 2017-06-14 | 2021-01-08 | 维沃移动通信有限公司 | Resource allocation method, base station, terminal and computer readable storage medium |
CN109391385A (en) * | 2017-08-02 | 2019-02-26 | 北京奇虎科技有限公司 | Physical Uplink Control Channel setting method and user equipment |
CN113541905B (en) * | 2018-05-11 | 2022-11-15 | 中兴通讯股份有限公司 | Channel configuration method, power control method, channel configuration device, power control device, user equipment, base station and storage medium |
CN112242892B (en) * | 2019-07-19 | 2022-02-08 | 大唐移动通信设备有限公司 | Resource allocation method and device for physical uplink control channel |
CN115119306A (en) * | 2021-03-19 | 2022-09-27 | 维沃移动通信有限公司 | Method for determining physical uplink control channel resources, terminal and network side equipment |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101505498A (en) * | 2009-03-17 | 2009-08-12 | 中兴通讯股份有限公司 | Downlink control information sending method, related system and apparatus |
CN101778419A (en) * | 2009-01-09 | 2010-07-14 | 华为技术有限公司 | Configuration and sending method of PUCCH (Physical Uplink Control Channel) resources as well as device thereof |
WO2010110598A3 (en) * | 2009-03-25 | 2010-12-23 | Lg Electronics Inc. | Method and apparatus of transmitting ack/nack |
CN101978642A (en) * | 2008-03-28 | 2011-02-16 | 高通股份有限公司 | Dynamic assignment of ack resource in a wireless communication system |
CN102026298A (en) * | 2009-09-22 | 2011-04-20 | 中兴通讯股份有限公司 | Method and system for eliminating SRS interference between different cell users in multi-point coordination |
CN102195703A (en) * | 2010-03-17 | 2011-09-21 | 华为技术有限公司 | Method and equipment for generating information of R-PUCCH (Relay Link Physical Uplink Control Channel) |
CN102223726A (en) * | 2011-06-10 | 2011-10-19 | 中兴通讯股份有限公司 | Method and system for sending SRS (survey reference signal) |
CN102316595A (en) * | 2011-09-30 | 2012-01-11 | 中兴通讯股份有限公司 | Resource determination method and device for physical uplink control channel (PUCCH) of large-band-width system |
-
2012
- 2012-02-01 CN CN201210022532.6A patent/CN103249147B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101978642A (en) * | 2008-03-28 | 2011-02-16 | 高通股份有限公司 | Dynamic assignment of ack resource in a wireless communication system |
CN101778419A (en) * | 2009-01-09 | 2010-07-14 | 华为技术有限公司 | Configuration and sending method of PUCCH (Physical Uplink Control Channel) resources as well as device thereof |
CN101505498A (en) * | 2009-03-17 | 2009-08-12 | 中兴通讯股份有限公司 | Downlink control information sending method, related system and apparatus |
WO2010110598A3 (en) * | 2009-03-25 | 2010-12-23 | Lg Electronics Inc. | Method and apparatus of transmitting ack/nack |
CN102026298A (en) * | 2009-09-22 | 2011-04-20 | 中兴通讯股份有限公司 | Method and system for eliminating SRS interference between different cell users in multi-point coordination |
CN102195703A (en) * | 2010-03-17 | 2011-09-21 | 华为技术有限公司 | Method and equipment for generating information of R-PUCCH (Relay Link Physical Uplink Control Channel) |
CN102223726A (en) * | 2011-06-10 | 2011-10-19 | 中兴通讯股份有限公司 | Method and system for sending SRS (survey reference signal) |
CN102316595A (en) * | 2011-09-30 | 2012-01-11 | 中兴通讯股份有限公司 | Resource determination method and device for physical uplink control channel (PUCCH) of large-band-width system |
Also Published As
Publication number | Publication date |
---|---|
CN103249147A (en) | 2013-08-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103249147B (en) | The resource allocation method and system of Physical Uplink Control Channel | |
US10356762B2 (en) | System and method for multiple point communications | |
KR102011823B1 (en) | Method for transmitting signal between terminals and apparatus for same | |
US10863367B2 (en) | Reference signal sequence configuration method and network device | |
EP2730041B1 (en) | System and method for signaling and transmitting uplink reference signals | |
CN103095395B (en) | PUCCH resource allocation method, transmission method, device and system | |
CN105075144B (en) | Dispensing device and control signal mapping method | |
KR101589563B1 (en) | Method for receiving uplink signal, base station, method for transmitting uplink signal and user equipment | |
KR102110214B1 (en) | Method for device to device communication based on partial operation control of device | |
CN103891232B (en) | Apparatus and method for UE-specific demodulation reference signal scrambling | |
JP2020533891A (en) | Uplink transmission and downlink reception methods, devices, and systems in wireless communication systems | |
JP6308394B2 (en) | Wireless communication terminal and wireless communication method | |
EP2705712B1 (en) | Dynamic allocation of identifiers to common and dedicated reference signals in hybrid cell identifier scenarios | |
CN108141336A (en) | For receiving the method for down link control information and user equipment and for sending the method for down link control information and base station | |
CN104066194B (en) | Data transmission scheduling and data transmission method and equipment | |
US20150223216A1 (en) | Physical downlink shared channel transmission method and system | |
CN105472745A (en) | Sounding reference signal resource allocation method and equipment | |
CN104272846A (en) | Method for resource multiplexing of distributed and localized transmission in enhanced physical downlink control channel | |
CN104488342A (en) | Wireless communications method, wireless communications system, and wireless base station | |
CN104662827A (en) | Method and device for receiving or transmitting downlink control signal in wireless communication system | |
CN104272614A (en) | Method for allocating resources for downlink control channel in wireless communication system and device for same | |
CN105474728A (en) | Terminal, base station, and communication method | |
CN105379391A (en) | Terminal, base station, and communication method | |
CN105453679A (en) | Signal transmission method in device-to-device communication and apparatus therefor | |
CN105453680A (en) | Terminal, base station, and communication method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |