CN103224199A CN201210021316XA CN201210021316A CN103224199A CN 103224199 A CN103224199 A CN 103224199A CN 201210021316X A CN201210021316X A CN 201210021316XA CN 201210021316 A CN201210021316 A CN 201210021316A CN 103224199 A CN103224199 A CN 103224199A
Authority
CN
China
Prior art keywords
crane
tower
installation
place
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210021316XA
Other languages
English (en)
Inventor
汤小伟
范水清
孙猛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI PANGYUAN MACHINERY RENTAL CO Ltd
Original Assignee
SHANGHAI PANGYUAN MACHINERY RENTAL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI PANGYUAN MACHINERY RENTAL CO Ltd filed Critical SHANGHAI PANGYUAN MACHINERY RENTAL CO Ltd
Priority to CN201210021316XA priority Critical patent/CN103224199A/zh
Publication of CN103224199A publication Critical patent/CN103224199A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

本发明公开了一种塔式起重机快速安装方法,所述快速安装方法如下步骤:I、在陆地上按照如下顺序进行装配,行走机构、行走底架、基础节及斜撑杆、压重;II、在陆地上按照如下顺序进行装配,标准节、上下支座、回转塔身、塔帽、驾驶室、平衡臂、配重;III、通过浮吊将步骤I中所述装配完成的塔吊部分运输到安装地点进行第一次吊装;IV、通过浮吊将步骤II中所述装配完成的塔吊部分运输到安装地点进行第二次吊装;V、通过浮吊将起重臂运输到安装地点进行第三次吊装,其优点是现场安装速度快,时间短,降低涌浪对安装的影响。每台塔吊只需要一次安装和拆除作业即可,塔式起重机作业时,吊钩比较平稳,不受涌浪影响,设备安装安全系数较高。

Description

一种塔式起重机快速安装方法
技术领域
本发明涉及桥梁建筑施工的技术领域,具体的说是一种塔式起重机快速安装方法,特别涉及其机械连接结构。 
背景技术
在常规安装塔式起重机时,利用汽车吊、履带吊等辅助起重设备逐个部件安装(如基础处理、安装轨道、行走机构、行走底架、基础节及斜撑杆、压重、标准节、外套架、上下支座、回转塔身、塔帽、驾驶室、平衡臂、部分配重、起重臂及剩余配重),该安装程序,所选用的辅助起重设备每吊所吊重量轻,吨位小,但安装时间长。在海面进行施工时,塔式起重机初次安装需要用浮吊,因项目所处位置涌浪大,吊钩每次就位比较困难,设备安装风险系数较高。 
发明内容
本发明的目的在于提供一种塔式起重机快速安装方法,在陆地上将被安装塔式起重机按照三次吊装完成进行拼装,并分别用支架进行保护,然后通过浮吊运输到安装地点,用浮吊三次吊装完成安装任务,现场安装速度快,时间短,降低涌浪对安装的影响,克服了现有施工技术中存在的缺点和不足。 
为了实现上述目的,本发明的技术方案是:一种塔式起重机快速安装方法,其特征在于:所述快速安装方法如下步骤: 
  
Figure 201210021316X100002DEST_PATH_IMAGE001
、在陆地上按照如下顺序进行装配,行走机构、行走底架、基础节及斜撑杆、压重;
、在陆地上按照如下顺序进行装配,标准节、上下支座、回转塔身、塔帽、驾驶室、平衡臂、配重;
、通过浮吊将步骤
Figure 222400DEST_PATH_IMAGE001
中所述装配完成的塔吊部分运输到安装地点进行第一次吊装;
Figure 959412DEST_PATH_IMAGE004
、通过浮吊将步骤中所述装配完成的塔吊部分运输到安装地点进行第二次吊装;
Figure 201210021316X100002DEST_PATH_IMAGE005
、通过浮吊将起重臂运输到安装地点进行第三次吊装。
本发明公开了一种塔式起重机快速安装方法,其优点是现场安装速度快,时间短,降低涌浪对安装的影响。每台塔吊只需要一次安装和拆除作业即可,塔式起重机作业时,吊钩比较平稳,不受涌浪影响,设备安装安全系数较高。 
具体实施方式
下面对本发明进一步进行描述。 
本发明为一种塔式起重机快速安装方法,其区别于现有技术在于:所述快速安装方法如下步骤: 
 
Figure 283614DEST_PATH_IMAGE001
、在陆地上按照如下顺序进行装配,行走机构、行走底架、基础节及斜撑杆、压重;
Figure 525239DEST_PATH_IMAGE002
、在陆地上按照如下顺序进行装配,标准节、上下支座、回转塔身、塔帽、驾驶室、平衡臂、配重;
Figure 738046DEST_PATH_IMAGE003
、通过浮吊将步骤
Figure 381517DEST_PATH_IMAGE001
中所述装配完成的塔吊部分运输到安装地点进行第一次吊装;
Figure 654366DEST_PATH_IMAGE004
、通过浮吊将步骤
Figure 383288DEST_PATH_IMAGE002
中所述装配完成的塔吊部分运输到安装地点进行第二次吊装;
Figure 898320DEST_PATH_IMAGE005
、通过浮吊将起重臂运输到安装地点进行第三次吊装。
以上内容是结合具体的优选实施方式对本发明所作的进一步详细说明,不能认定本发明具体实施只局限于上述这些说明。对于本发明所属技术领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干简单推演或替换,都应当视为属于本发明的保护范围。 

Claims (1)

1.一种塔式起重机快速安装方法,其特征在于:所述快速安装方法如下步骤: 
Figure 219590DEST_PATH_IMAGE001
、在陆地上按照如下顺序进行装配,行走机构、行走底架、基础节及斜撑杆、压重;
、在陆地上按照如下顺序进行装配,标准节、上下支座、回转塔身、塔帽、驾驶室、平衡臂、配重;
Figure 904966DEST_PATH_IMAGE003
、通过浮吊将步骤
Figure 708056DEST_PATH_IMAGE001
中所述装配完成的塔吊部分运输到安装地点进行第一次吊装;
Figure 536335DEST_PATH_IMAGE004
、通过浮吊将步骤
Figure 333390DEST_PATH_IMAGE002
中所述装配完成的塔吊部分运输到安装地点进行第二次吊装;
Figure 879909DEST_PATH_IMAGE005
、通过浮吊将起重臂运输到安装地点进行第三次吊装。
CN201210021316XA 2012-01-31 2012-01-31 一种塔式起重机快速安装方法 Pending CN103224199A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210021316XA CN103224199A (zh) 2012-01-31 2012-01-31 一种塔式起重机快速安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210021316XA CN103224199A (zh) 2012-01-31 2012-01-31 一种塔式起重机快速安装方法

Publications (1)

Publication Number Publication Date
CN103224199A true CN103224199A (zh) 2013-07-31

Family

ID=48834881

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210021316XA Pending CN103224199A (zh) 2012-01-31 2012-01-31 一种塔式起重机快速安装方法

Country Status (1)

Country Link
CN (1) CN103224199A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110104568A (zh) * 2019-05-20 2019-08-09 山东中建众力设备租赁有限公司 一种塔式起重机安装自检评估方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101985917A (zh) * 2010-10-08 2011-03-16 中交第一航务工程局有限公司 海上风力发电机组分体安装施工方法及其设备
CN102134832A (zh) * 2011-01-18 2011-07-27 中铁大桥局集团第五工程有限公司 活动支架辅助不变幅架梁吊机架设钢箱梁方法及活动支架

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101985917A (zh) * 2010-10-08 2011-03-16 中交第一航务工程局有限公司 海上风力发电机组分体安装施工方法及其设备
CN102134832A (zh) * 2011-01-18 2011-07-27 中铁大桥局集团第五工程有限公司 活动支架辅助不变幅架梁吊机架设钢箱梁方法及活动支架

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
刘佩衡: "《第三讲 塔式起重机安装、拆卸、顶升、附着与内爬》", 《工程机械》 *
刘道杰: "《GZT40塔机的安装与拆卸》", 《建筑机械化》 *
梁伟: "《K50/50型塔式起重机安装及安全使用》", 《建筑安全》 *
王枫林: "《40吨塔式起重机快速安装》", 《建筑技术》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110104568A (zh) * 2019-05-20 2019-08-09 山东中建众力设备租赁有限公司 一种塔式起重机安装自检评估方法

Similar Documents

Publication Publication Date Title
CN101880010B (zh) 具有自安装支撑装置的伸缩起重机和安装支撑装置的方法
CN102019998B (zh) 上下水边舱总组搭载方法
CN200988745Y (zh) 一种专用于风力发电机安装的吊装装置
CN103318768B (zh) 低姿态岸桥的装配方法
CN102071644A (zh) 一种桥梁拱肋整体提升安装方法
CN103303807A (zh) 一种自提升式风力发电机组起重机
CN104876131A (zh) 一种利用小型塔吊拆除大型塔吊的方法
CN103086276B (zh) 一种吊装高层井塔型建筑物内桥式起重机的施工方法
CN103663297A (zh) 内锥转动单臂可伸缩吊篮
CN104989111A (zh) 钢结构高层吊装施工方法
CN103991800A (zh) 建筑用屋面吊机
CN103224199A (zh) 一种塔式起重机快速安装方法
CN104234636A (zh) 自升式平台井架安装方法
CN109477457A (zh) 用于设立风能设备的方法和用于安装风能设备的转子叶片的升降梁
CN204897238U (zh) 一种起重机可移动驾驶室防坠落结构
CN202465213U (zh) 用于斜面施工的吊篮***
CN201762053U (zh) 简易自动起重吊杆
CN105970988A (zh) 于筏板基础中安装电梯井侧壁钢筋的施工方法
CN103171972B (zh) 塔架组装吊装工艺
CN207244453U (zh) 一种悬索桥轻型锚碇门架装置
CN203728366U (zh) 一种多功能底架的施工升降机
CN103101843B (zh) 一种起吊装置
CN102733612B (zh) 电动葫芦轨道安装方法
CN204825670U (zh) 偏心箱梁防扭偏吊梁架装置
CN104192723B (zh) 用于fast望远镜反射面单元的维护方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20130731

RJ01 Rejection of invention patent application after publication