CN103208813A - 一种准确计及风电影响的电力***日调峰能力评估方法 - Google Patents

一种准确计及风电影响的电力***日调峰能力评估方法 Download PDF

Info

Publication number
CN103208813A
CN103208813A CN2013100211385A CN201310021138A CN103208813A CN 103208813 A CN103208813 A CN 103208813A CN 2013100211385 A CN2013100211385 A CN 2013100211385A CN 201310021138 A CN201310021138 A CN 201310021138A CN 103208813 A CN103208813 A CN 103208813A
Authority
CN
China
Prior art keywords
wind
peak regulation
wind power
powered electricity
peak
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100211385A
Other languages
English (en)
Other versions
CN103208813B (zh
Inventor
王兴刚
张虹
吴政声
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GRID PLANNING RESEARCH CENTER YUNNAN GRID Co Ltd
Original Assignee
GRID PLANNING RESEARCH CENTER YUNNAN GRID Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GRID PLANNING RESEARCH CENTER YUNNAN GRID Co Ltd filed Critical GRID PLANNING RESEARCH CENTER YUNNAN GRID Co Ltd
Priority to CN201310021138.5A priority Critical patent/CN103208813B/zh
Publication of CN103208813A publication Critical patent/CN103208813A/zh
Application granted granted Critical
Publication of CN103208813B publication Critical patent/CN103208813B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects

Landscapes

  • Wind Motors (AREA)
  • Control Of Eletrric Generators (AREA)

Abstract

一种准确计及风电影响的电力***日调峰能力评估方法,该方法包括下列步骤:(1)首先定义1个用于日调峰能力评估的风电出力特性指标;(2)通过短期负荷预测,确定日负荷曲线,其中调峰控制时段负荷值为Pc;(3)若ΔP≥Pwv,则***调峰能力可以满足全部风电接入要求;若ΔP<Pwv,则***调峰能力不能满足全部风电接入要求,需要增开水电机组或者切除部分风电机组。本发明以风电历史数据为基础,通过定义和计算风电场有效出力指标来准确计算风电需要的真实调峰容量,具有物理意义明确、准确度高、计算速度快的优点。

Description

一种准确计及风电影响的电力***日调峰能力评估方法
技术领域
本发明属于电力***运行控制领域,是一种可以准确计及风电影响的电力***日调峰能力评估方法。 
背景技术
风力发电是目前发展速度最快的新能源产业。由于风电具有随机性、波动性的特点,传统电力***调峰能力评估中,或者针对全部风电装机预留调峰容量,或者依据经验给出一个比例系数,按照该比例系数预留调峰容量。前者会使***预留过多的备用容量造成浪费,后者有可能造成调峰能力评估结果偏差太大,甚至不能满足调峰能力要求。 
特别值得关注的是,如果大量风电场分散分布于幅员较为辽阔的地域时,考虑到风电场之间的集群效应,更应该采用更加准确的方法考虑风电对于调峰能力的影响。 
在调峰能力评估中准确计及风电影响的主要难点在于:目前尚没有提出合适的指标来量化评估风电出力对调峰能力的影响,也没有提出具体的分析方法。 
发明内容
本发明的目的是:提供一种可以准确计及风电影响的电力***日调峰能力评估方法。 
本发明目的是通过下列步骤实现的: 
(1)    首先定义1个用于日调峰能力评估的风电出力特性指标:保证率为95%的风电场有效出力Pwv。从能量管理***EMS得到已投产风电场过去一年时间的出力数据,计算该段时期的Pwv;
(2)    通过短期负荷预测,确定日负荷曲线,其中调峰控制时段(一般为凌晨4点)负荷值为Pc;从EMS获得当前负荷值Pn,水电开机容量Nh,水电出力Ph,火电开机容量Nt,火电出力Pt;计算水电最小出力Phm和火电强制出力Ptm,计算调峰控制时段***调峰裕度ΔP=(Ph-Phm)+(Pt-Ptm)-(Pn-Pc);
(3)    若ΔP≥Pwv,则***调峰能力可以满足全部风电接入要求;若ΔP<Pwv,则***调峰能力不能满足全部风电接入要求,需要增开水电机组或者切除部分风电机组。
上述第1步骤中Pwv的计算步骤如下: 
(1)    假设EMS提供的风电场运行数据为每5分钟一个有功出力数据,全年共有12×24×365=105120个数据点。
风电场有效出力(保证率95%)Pwv:将该段时期负荷低谷时段出力数据按从小到大排序,取保证率95%对应的出力。如图2所示。 
方法应用效果说明:
若按照传统方法,需要把风电全部容量作为需调峰容量,也就是需要为风电预留456万千瓦的调峰容量,而根据上面计算,1月10日***调峰能力只有290万千瓦,这就必须提前切除166万千瓦的风电,造成大量的浪费。而根据本发明方法,在准确计及风电影响后,***调峰容量可以满足456万千瓦风电接入的需要,不需要切除风电机组。
本发明“一种准确计及风电影响的电力***日调峰能力评估方法”是一种可以准确计及风电影响的电力***日调峰能力评估方法,该方法以风电历史数据为基础,通过定义和计算风电场有效出力指标来准确计算风电需要的真实调峰容量,具有物理意义明确、准确度高、计算速度快的优点。 
下面结合附图和具体实施方式对本发明做进一步解释。 
附图说明
图1给出了一种可以准确计及风电影响的电力***日调峰能力评估方法的整体实施流程图。 
图2为风电场有效出力示意图。 
具体实施方式
图1给出了本发明方法的整体实施流程,从电力***得到包括风电场历史出力等基础数据,利用本发明方法开展电力***日调峰能力评估,再根据评估结果调整***运行方式。 
下面给出具体实施方式: 
(1)    第一部分“电力***”:需要调度自动化***新增从EMS后台自动导出风电出力历史数据的功能,其余各部分均不需要进行改动。
(2)    第二部分“数据准备”和第三部分“电力电量平衡”:这是本发明的核心内容,依据本发明方法编制电力***日调峰能力评估模块,该模块可以直接集成在现有EMS***中,也可以单独布置一台计算机作为计算平台。 
(3)    第四部分“反馈”:通过调度运行人员实施,这是本发明方法对于电力***的实施结果。 
下面以某省电网为例进一步说明本方法的实施。 
该省电网1月10日负荷及电源装机条件如下:预计当日最大负荷3000万千瓦,电源装机共计8073万千瓦,其中水电6173万千瓦,火电1444万千瓦,风电456万千瓦。评估该省当天的调峰能力。 
(一)数据准备:
(1)前一年风电年发电量100亿千瓦时。从EMS获得前一年该省风电场出力数据,每5分钟一个有功出力数据,如下表所示。
Figure 495063DEST_PATH_IMAGE002
计算1月份保证率为95%的风电场有效出力Pwv: 
{Pwv}1=273万千瓦
(2)短期负荷预测得到调峰控制时段(凌晨4点)负荷为1440万千瓦。
(3)EMS得到当前(1月9日21点)负荷及电源开机情况:负荷2850万千瓦,水电开机2600万千瓦,水电出力1800万千瓦,火电开机1300万千瓦,火电出力1100万千瓦。 
(二)调峰能力评估:
计算水电最小出力:按每个电站至少保留1台机组,Phm=550万千瓦;
计算火电强制出力:火电开机方式不变,机组最小出力50%考虑,Ptm=650万千瓦;
计算调峰控制时段***调峰裕度:
ΔP  =(Ph-Phm)+(Pt-Ptm)-(Pn-Pc)
=(1800-550)+(1100-650)-(2850-1440)=290万千瓦
判断:ΔP≥Pwv=273万千瓦,因此***调峰能力可以满足全部风电接入要求。

Claims (1)

1.一种准确计及风电影响的电力***日调峰能力评估方法,其特征在于,该方法包括下列步骤:
1)首先定义1个用于日调峰能力评估的风电出力特性指标:保证率为95%的风电场有效出力Pwv;从能量管理***EMS得到已投产风电场过去一年时间的出力数据,计算该段时期的Pwv;
2)通过短期负荷预测,确定日负荷曲线,其中调峰控制时段负荷值为Pc;从EMS获得当前负荷值Pn,水电开机容量Nh,水电出力Ph,火电开机容量Nt,火电出力Pt;计算水电最小出力Phm和火电强制出力Ptm,计算调峰控制时段***调峰裕度ΔP=(Ph-Phm)+(Pt-Ptm)-(Pn-Pc);
3)若ΔP≥Pwv,则***调峰能力可以满足全部风电接入要求;若ΔP<Pwv,则***调峰能力不能满足全部风电接入要求,需要增开水电机组或者切除部分风电机组。
CN201310021138.5A 2013-01-21 2013-01-21 一种准确计及风电影响的电力***日调峰能力评估方法 Active CN103208813B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310021138.5A CN103208813B (zh) 2013-01-21 2013-01-21 一种准确计及风电影响的电力***日调峰能力评估方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310021138.5A CN103208813B (zh) 2013-01-21 2013-01-21 一种准确计及风电影响的电力***日调峰能力评估方法

Publications (2)

Publication Number Publication Date
CN103208813A true CN103208813A (zh) 2013-07-17
CN103208813B CN103208813B (zh) 2015-03-25

Family

ID=48755940

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310021138.5A Active CN103208813B (zh) 2013-01-21 2013-01-21 一种准确计及风电影响的电力***日调峰能力评估方法

Country Status (1)

Country Link
CN (1) CN103208813B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103578044A (zh) * 2013-11-05 2014-02-12 国家电网公司 基于需求侧响应的新能源发电并网综合调峰能力评估模型
CN103854069A (zh) * 2014-02-20 2014-06-11 深圳供电局有限公司 基于分布式能源站接入的调峰评估方法及***
CN104135036A (zh) * 2014-07-24 2014-11-05 华北电力大学 一种基于时域和集群效应分析间歇性能源出力的方法
CN106684928A (zh) * 2016-11-26 2017-05-17 国网河南省电力公司电力科学研究院 一种基于调峰成本的电网调峰裕度计算方法
CN109424858A (zh) * 2017-08-29 2019-03-05 中国石油天然气股份有限公司 一种确定管道调峰能力的方法
CN111475772A (zh) * 2020-03-27 2020-07-31 微梦创科网络科技(中国)有限公司 一种容量评估方法及装置
CN111525615A (zh) * 2020-04-30 2020-08-11 贵州电网有限责任公司 一种基于保证率的山地光伏电站出力特性评估方法及***
CN114912721A (zh) * 2022-07-18 2022-08-16 国网江西省电力有限公司经济技术研究院 一种储能调峰需求的预测方法及***
CN117578532A (zh) * 2024-01-15 2024-02-20 深圳市思特克电子技术开发有限公司 一种智能电力调峰***

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101707378A (zh) * 2009-11-24 2010-05-12 西北电网有限公司 一种基于大规模风电并网的电网调峰能力的调度方法
CN102075014A (zh) * 2011-01-06 2011-05-25 清华大学 消纳风电接入的大电网实时调度方法
CN102097828A (zh) * 2010-12-30 2011-06-15 中国电力科学研究院 一种基于功率预测的风电优化调度方法
CN202126703U (zh) * 2011-06-15 2012-01-25 中国电力科学研究院 一种风电优化调度计划***
EP2493046A2 (en) * 2011-02-28 2012-08-29 General Electric Company System and method for load forecasting
CN102738835A (zh) * 2012-07-17 2012-10-17 太原电力高等专科学校 基于多智能体的“风-火-水”协同调度方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101707378A (zh) * 2009-11-24 2010-05-12 西北电网有限公司 一种基于大规模风电并网的电网调峰能力的调度方法
CN102097828A (zh) * 2010-12-30 2011-06-15 中国电力科学研究院 一种基于功率预测的风电优化调度方法
CN102075014A (zh) * 2011-01-06 2011-05-25 清华大学 消纳风电接入的大电网实时调度方法
EP2493046A2 (en) * 2011-02-28 2012-08-29 General Electric Company System and method for load forecasting
CN202126703U (zh) * 2011-06-15 2012-01-25 中国电力科学研究院 一种风电优化调度计划***
CN102738835A (zh) * 2012-07-17 2012-10-17 太原电力高等专科学校 基于多智能体的“风-火-水”协同调度方法

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103578044A (zh) * 2013-11-05 2014-02-12 国家电网公司 基于需求侧响应的新能源发电并网综合调峰能力评估模型
CN103578044B (zh) * 2013-11-05 2017-01-18 国家电网公司 基于需求侧响应的新能源发电并网综合调峰能力评估方法
CN103854069A (zh) * 2014-02-20 2014-06-11 深圳供电局有限公司 基于分布式能源站接入的调峰评估方法及***
CN104135036A (zh) * 2014-07-24 2014-11-05 华北电力大学 一种基于时域和集群效应分析间歇性能源出力的方法
CN106684928A (zh) * 2016-11-26 2017-05-17 国网河南省电力公司电力科学研究院 一种基于调峰成本的电网调峰裕度计算方法
CN106684928B (zh) * 2016-11-26 2020-03-10 国网河南省电力公司电力科学研究院 一种基于调峰成本的电网调峰裕度计算方法
CN109424858A (zh) * 2017-08-29 2019-03-05 中国石油天然气股份有限公司 一种确定管道调峰能力的方法
CN109424858B (zh) * 2017-08-29 2020-02-14 中国石油天然气股份有限公司 一种确定管道调峰能力的方法
CN111475772A (zh) * 2020-03-27 2020-07-31 微梦创科网络科技(中国)有限公司 一种容量评估方法及装置
CN111475772B (zh) * 2020-03-27 2023-12-15 微梦创科网络科技(中国)有限公司 一种容量评估方法及装置
CN111525615A (zh) * 2020-04-30 2020-08-11 贵州电网有限责任公司 一种基于保证率的山地光伏电站出力特性评估方法及***
CN111525615B (zh) * 2020-04-30 2021-08-06 贵州电网有限责任公司 一种基于保证率的山地光伏电站出力特性评估方法及***
CN114912721A (zh) * 2022-07-18 2022-08-16 国网江西省电力有限公司经济技术研究院 一种储能调峰需求的预测方法及***
CN114912721B (zh) * 2022-07-18 2022-12-13 国网江西省电力有限公司经济技术研究院 一种储能调峰需求的预测方法及***
CN117578532A (zh) * 2024-01-15 2024-02-20 深圳市思特克电子技术开发有限公司 一种智能电力调峰***
CN117578532B (zh) * 2024-01-15 2024-05-07 深圳市思特克电子技术开发有限公司 一种智能电力调峰***

Also Published As

Publication number Publication date
CN103208813B (zh) 2015-03-25

Similar Documents

Publication Publication Date Title
CN103208813B (zh) 一种准确计及风电影响的电力***日调峰能力评估方法
Torreglosa et al. Control based on techno-economic optimization of renewable hybrid energy system for stand-alone applications
Konopinski et al. Extended reactive capability of DFIG wind parks for enhanced system performance
CN101707378B (zh) 一种基于大规模风电并网的电网调峰能力的调度方法
CN104882905A (zh) 一种考虑暂态安全约束的新能源接纳能力评估方法
CN107276122B (zh) 适应大规模可再生能源并网的调峰资源调用决策方法
CN104156887A (zh) 一种基于电网约束的区域新能源开发规模及布局分析方法
CN103208086B (zh) 一种准确计及风电贡献的电力电量平衡方法
CN104993523A (zh) 使含风电电网***优化运行的抽水蓄能电站特性精确模拟方法
CN103997039A (zh) 基于概率区间预测的计及风电接纳的旋转备用区间预测方法
CN103401232A (zh) 电力***暂态安全稳定在线紧急控制策略的集群计算方法
CN102255337B (zh) 一种电网接纳风电场能力的计算方法
Chen et al. Robust unit commitment for large-scale wind generation and run-off-river hydropower
Zhang et al. Mid-long term optimal dispatching method of power system with large-scale wind-photovoltaic-hydro power generation
CN101950980A (zh) 用于分布式光伏电源并网调控的储能装置容量配置方法
CN116823000B (zh) 水电补偿调峰分析评价方法及其装置
Lannoye et al. Assessing power system flexibility for variable renewable integration: A flexibility metric for long-term system planning
CN105140967A (zh) 一种含新能源电力***调峰需求的评估方法
Qian et al. Benefits of energy storage in power systems with high level of intermittent generation
CN103632045B (zh) 一种评估省级电网发电调度理想度的计算方法
CN107834543B (zh) 一种基于两阶段混合整数规划的电力***运行模拟方法
CN117649119A (zh) 基于vcg理论的清洁能源碳减排价值评估方法
CN105631527A (zh) 一种电力***的调峰补偿费用获取方法及***
Crossley Defining the Greatest Legal and Policy Obstacle to" Energy Storage"
Wang et al. Generation-expansion planning with linearized primary frequency response constraints

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant