CN102075014A - 消纳风电接入的大电网实时调度方法 - Google Patents

消纳风电接入的大电网实时调度方法 Download PDF

Info

Publication number
CN102075014A
CN102075014A CN2011100015747A CN201110001574A CN102075014A CN 102075014 A CN102075014 A CN 102075014A CN 2011100015747 A CN2011100015747 A CN 2011100015747A CN 201110001574 A CN201110001574 A CN 201110001574A CN 102075014 A CN102075014 A CN 102075014A
Authority
CN
China
Prior art keywords
wind
real
unit
time
delta
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011100015747A
Other languages
English (en)
Other versions
CN102075014B (zh
Inventor
张伯明
吴文传
孙宏斌
郭庆来
陈建华
沈伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsinghua University
Original Assignee
Tsinghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsinghua University filed Critical Tsinghua University
Priority to CN2011100015747A priority Critical patent/CN102075014B/zh
Publication of CN102075014A publication Critical patent/CN102075014A/zh
Application granted granted Critical
Publication of CN102075014B publication Critical patent/CN102075014B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/123Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving renewable energy sources

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Control Of Eletrric Generators (AREA)
  • Wind Motors (AREA)

Abstract

本发明涉及一种消纳风电接入的大电网实时调度方法,属于电力***运行和控制技术领域。该方法首先根据风电和负荷波动的特点和机组的控制特性,将全网机组分类,然后从***获得机组的日前计划、实时出力、联络线计划及数值天气预报等相关信息,进行超短期负荷预测及风电出力预测,求得下一时刻实时调度机组的出力调节量并构建弃风损失最小的有功实时调度模型,采用单纯形法求得包括风电机组的实时调度机组出力调整量,对火电机组将出力调整量直接下发,对风电机组给出下一时刻的出力最大值。本发明对风电和传统机组实施联合优化调度,超前地消除风力发电预测偏差及负荷预测偏差,在保证电网运行经济性的同时,最大限度提高电网对风电的接纳能力。

Description

消纳风电接入的大电网实时调度方法
技术领域
本发明属于电力***运行和控制技术领域,特别涉及一种消纳风电接入的大电网实时调度方法,
背景技术
传统火电机组造成的环境污染、全球气候变暖等因素的影响,使得以风电为代表的可再生能源近年来得到了较大发展。随着风电比重的不断增长,其对电网正常的调度运行造成的影响也变得越来越重要。目前电力***中将包括火电机组、水电机组及风电机组在内的所有机组称全网机组。
目前电网中一般包含几个风电场,多台风电机组组成一个风电场。由于风电存在的随机性和波动性等固有特性,传统的调度方式无法适应大规模风电接入后的电网调度控制。传统调度方主要采用日前计划加实时的自动发电控制(AGC)的模式,该调度模式主要存在以下问题:(1)由于风电日前预测结果与实际出力往往存在很大偏差,使得日前计划在执行中和实际情况之间存在很大偏差,使得有的风电场出力计划过小而造成较大的弃风损失,而有的风电场出力计划过大造成***的发电负荷偏差拉大,加重了AGC机组的负担。(2)由于AGC机组的控制能力有限,为了保证功率平衡,调度员不得不根据功率的不平衡量临时调整调度策略,工作量很大,而且此种调度模式使得***的安全性和电能质量难以保证。(3)由于风电的反调峰特性,进一步增加了AGC机组的负担,会经常出现AGC调节裕度不足的问题,影响了***的安全性和电能质量。
当前电力***中采用由各种预测算法组成的日前负荷预测***对第二日的***负荷进行预测。采用数据采集与监视控制***(SCADA)实时读取全网所有发电机的实时出力值,电网公司中的调度中心负责安排机组出力计划的部门,所有发电机组都要实时将其出力上报到调度中心,并按照调度中心给出的指令发电。
发明内容
本发明的目的是为解决大规模风电场集中接入后的有功调度控制难题,提出一种消纳风电接入的大电网实时调度方法,该方法基于预测引入以15分钟为周期超前有功控制,可降低电网运行风险,最大限度提高电网对风电的消纳能力,提高运行经济性。
本发明提出的消纳风电接入的大电网实时调度方法,其特征在于,该方法以15分钟为一个调度时段,全天分为96个调度时段,包括以下步骤:
(1)根据风电和负荷波动的特点和机组的控制特性,将全网机组分为多个计划机组、多个实时调度机组及多个自动发电控制机组三部分,所有风电机组均划为实时调度机组;计划机组跟踪日前调度计划,实时调度机组跟踪实时调度计划,自动发电控制机组负责实时平衡电网中的发电负荷不平衡量;
(2)从日前预测***读取发电机组的日前计划、联络线计划,并从数据采集与监视控制***实时读取全网所有发电机的实时出力值;
(3)从电力***的历史负荷数据库中读取历史负荷的信息,采用日周期多点外推法预测下一个调度时段的负荷值
Figure BDA0000042841840000021
及其增量
Figure BDA0000042841840000022
(4)在每一调度时段的初始时刻,对每个风电场采集数值天气预报的数据(风速、空气密度、风向、温度等)并上报调度中心,调度中心根据接收到的信息,采用基于人工神经网络的模型,通过对历史数据的训练得到风电场的输出与输入的非线性关系,并预测出下一个调度时段的第j个风电场出力值
Figure BDA0000042841840000023
j为正整数;
(5)下一个调度时段初始时刻的实时调度机组出力的总调节量ΔP:
ΔP = ΔP D n - ΔP T n - ΔP sche n - ΔP AGC n
其中,
Figure BDA0000042841840000025
是超短期负荷预测值的增量、
Figure BDA0000042841840000026
是联络线计划的下一时刻增量、
Figure BDA0000042841840000027
是日前计划机组出力下一时刻增量、
Figure BDA0000042841840000028
是AGC机组下一时刻的出力调整量,下一时刻的AGC机组出力计划按来取,其中Pmaz为机组给定的出力上限,Pmin为机组给定的出力下限;
(6)计算下一个调度时段初始时刻的各个实时调度机组出力计划:
根据上一步计算得到总调节量ΔP后,根据实时调度机组的上、下调整容量,发电成本系数等综合分配给各个机组调整,建立式(a)-(d)的弃风最小的有功实时调度模型:
min Σ i r i | ΔP i | Σ j w j ΔP j w , i ∈ N G rt ( a ) s . t . Σ i ∉ N G wind ΔP i + Σ j ∈ N G wind ( P j For - P j 0 - ΔP j w ) = ΔP ( b ) Σ i ∉ N G wind S ij ΔP i + Σ k ∈ N G wind S kj ΔP k w ≤ T j ‾ - T j , j ∈ M tie ( c ) Δ P ‾ i ≤ ΔP i ≤ Δ P ‾ i , i ∈ N G rt ( d ) ΔP j w ≥ 0
其中,ri是传统发电机i当前的发电单位调整成本;wj是风电场j弃风电成本,为了减少弃风,一般wj≥100ri
ΔP为实时调度机组下一时刻的出力调节总量;
ΔPi为下一时段实时调度机组i的调整量,
Figure BDA0000042841840000032
为全网除风电机组外的实时调度机组的个数;
是风电场j的弃风电力,它等于下一时段预测的风电出力预测值
Figure BDA0000042841840000034
与下一时段实时调度计划值的差值;
Figure BDA0000042841840000036
为风电场j的当前出力值;
Sij发电出力对断面的灵敏度;
(c)中Mtie表示电网安全功率传输断面集合,
Figure BDA0000042841840000037
为断面的功率传输上限,该值从所述历史负荷数据库中读取,Tj为断面的当前传输功率,该不等式约束保证传输断面不过载;
采用单纯形法求解实时调度模型,得出实时调度机组i的调整量ΔPi和下一个调度时段初始时刻风电场j的弃风电力
Figure BDA0000042841840000038
(7)将实时计划下发,对实时调度机组中的火电机组给出下一个调度时段初始时刻的调整量ΔPi,对风电场j给出下一个调度时段初始时刻的最大计划出力值
Figure BDA0000042841840000039
风电场接收到最大计划出力值后,制定本风电场内的发电计划;同时,风电场将本风场场内的电气量、风机运行状态等实时传送至调度中心。
本发明的特点及有益效果
本发明针对由于风电的随机性和预测困难,提出在风电的日前计划与AGC控制之间增加实时调度控制(以15分钟为周期),以弃风损失最小为优化目标,在超短期负荷预测及下一时刻风电预测基础上,建立有功实时调度模型,对风电和传统机组实施联合优化调度,超前地消除风力发电预测偏差及负荷预测偏差。可降低电网运行风险,最大限度提高电网对风电的消纳能力,提高运行经济性。
附图说明
图1是本发明方法的流程框图。
具体实施方式
本发明提出的消纳风电接入的大电网实时调度方法,其流程框图如图1所示,其特征在于,该方法以15分钟为一个调度时段,全天分为96个调度时段(实验表明,15分钟的风速预测结果能够较好地符合实际风速,大于15分钟误差将会变大),包括以下步骤:
(1)机组角色划分:根据风电和负荷波动的特点和机组的控制特性,将全网机组分为多个计划机组、多个实时调度机组及多个自动发电控制(AGC)机组三部分,所有风电机组均划为实时调度机组;计划机组跟踪日前调度计划,实时调度机组跟踪实时调度计划,AGC机组负责实时平衡电网中的发电负荷不平衡量;
(2)相关数据的获取:从日前预测***读取发电机组的日前计划、联络线计划,并从数据采集与监视控制(SCADA)***实时读取全网所有发电机的实时出力值;
(3)超短期负荷预测:从电力***的历史负荷数据库中读取历史负荷的信息,采用已知的日周期多点外推法预测下一个调度时段初始时刻的负荷值
Figure BDA0000042841840000041
及其增量
Figure BDA0000042841840000042
(4)风电出力预测:在每一调度时段的初始时刻,对每个风电场采集数值天气预报的数据(风速、空气密度、风向、温度等)并上报调度中心,调度中心根据接收到的信息,采用基于已知的人工神经网络的模型,通过对已有的风电场历史出力数据的训练得到风电场的输出与输入的非线性关系,并预测出下一个调度时段初始时刻的第j个风电场出力值
Figure BDA0000042841840000043
在数值天气预报信息因故不能正确获取时,启动传统的基于数理统计的预测方法预测出下一个调度时段初始时刻的第j个风电场出力值
Figure BDA0000042841840000044
j为正整数(在数值天气预报信息因故不能正确获取时,启动传统的基于数理统计的预测方法);
(5)计算机组的出力调节量:计算下一个调度时段初始时刻的实时调度机组出力的总调节量ΔP:
ΔP = ΔP D n - ΔP T n - ΔP sche n - ΔP AGC n
其中,
Figure BDA0000042841840000052
是超短期负荷预测值的增量、
Figure BDA0000042841840000053
是联络线计划的下一时刻增量、
Figure BDA0000042841840000054
是日前计划机组出力下一个调度时段初始时刻增量、
Figure BDA0000042841840000055
是AGC机组下一个调度时段初始时刻的出力调整量,为了保证AGC机组旋转备用容量,一般下一个调度时段初始时刻的AGC机组出力计划按
Figure BDA0000042841840000056
来取,其中Pmaz为机组给定的出力上限,Pmin为机组给定的出力下限;
(6)计算下一个调度时段初始时刻的各个实时调度机组出力计划:
根据上一步计算得到总调节量ΔP后,根据实时调度机组的上、下调整容量(上调容量等于机组的出力上限减去当前时刻的出力,下调容量等于机组的当前出力减去机组出力下限),发电成本系数综合分配给各个机组调整,建立弃风最小的有功实时调度模型(式(a)-(d)):
min Σ i r i | ΔP i | Σ j w j ΔP j w , i ∈ N G rt ( a ) s . t . Σ i ∉ N G wind ΔP i + Σ j ∈ N G wind ( P j For - P j 0 - ΔP j w ) = ΔP ( b ) Σ i ∉ N G wind S ij ΔP i + Σ k ∈ N G wind S kj ΔP k w ≤ T j ‾ - T j , j ∈ M tie ( c ) Δ P ‾ i ≤ ΔP i ≤ Δ P ‾ i , i ∈ N G rt ( d ) ΔP j w ≥ 0
其中,ri是传统发电机i当前的发电单位调整成本;wj是风电场j弃风电成本,为了减少弃风,一般wj≥100ri
ΔP为实时调度机组下一个调度时段初始时刻的出力调节总量;
ΔPi为模型计算得到的下一个调度时段初始时刻实时调度机组i的调整量,
Figure BDA0000042841840000058
为全网实时调度机组(除风电机组外)的个数;
是风电场j的弃风电力,它等于下一个调度时段初始时刻预测的风电出力预测值与下一个调度时段初始时刻实时调度计划值
Figure BDA0000042841840000063
的差值;
Figure BDA0000042841840000064
为风电场j的当前出力值;
Sij发电出力对断面的灵敏度;
(c)式中Mtie表示电网安全功率传输断面集合,
Figure BDA0000042841840000065
为断面的功率传输上限,该值从历史负荷数据库中读取,Tj为断面的当前传输功率,该不等式约束保证传输断面不过载;
采用已知的单纯形法求解有功实时调度模型(式(a)-(d)),得出实时调度机组i的调整量ΔPi和下一个调度时段初始时刻风电场j的弃风电力
Figure BDA0000042841840000066
(7)计划的下发及跟踪:将步骤(6)得到的实时调度机组下一个调度时段初始时刻的出力调节量及风电场的弃风电力下发给各个电厂,对实时调度机组中的火电机组给出下一个调度时段初始时刻的调整量ΔPi,对风电场j给出下一时刻的最大计划出力值
Figure BDA0000042841840000067
风电场j接收到最大计划出力值后,制定本风电场内的发电计划(可以通过改变桨距角或者启停风机的措施,进行有功控制,紧跟最大计划出力值运行);同时,风电场将本风场场内的电气量、风机运行状态实时传送至调度中心。

Claims (1)

1.一种消纳风电接入的大电网实时调度方法,其特征在于,该方法以15分钟为一个调度时段,全天分为96个调度时段,包括以下步骤:
(1)根据风电和负荷波动的特点和机组的控制特性,将全网机组分为多个计划机组、多个实时调度机组及多个自动发电控制机组三部分,所有风电机组均划为实时调度机组;计划机组跟踪日前调度计划,实时调度机组跟踪实时调度计划,自动发电控制机组负责实时平衡电网中的发电负荷不平衡量;
(2)从日前预测***读取发电机组的日前计划、联络线计划,并从数据采集与监视控制***实时读取全网所有发电机的实时出力值;
(3)从电力***的历史负荷数据库中读取历史负荷的信息,采用日周期多点外推法预测下一个调度时段的负荷值
Figure FDA0000042841830000011
及其增量
Figure FDA0000042841830000012
(4)在每一调度时段的初始时刻,对每个风电场采集数值天气预报的数据(风速、空气密度、风向、温度等)并上报调度中心,调度中心根据接收到的信息,采用基于人工神经网络的模型,通过对历史数据的训练得到风电场的输出与输入的非线性关系,并预测出下一个调度时段的第j个风电场出力值
Figure FDA0000042841830000013
j为正整数;
(5)下一个调度时段初始时刻的实时调度机组出力的总调节量ΔP:
ΔP = ΔP D n - ΔP T n - ΔP sche n - ΔP AGC n
其中,
Figure FDA0000042841830000015
是超短期负荷预测值的增量、
Figure FDA0000042841830000016
是联络线计划的下一时刻增量、
Figure FDA0000042841830000017
是日前计划机组出力下一时刻增量、
Figure FDA0000042841830000018
是AGC机组下一时刻的出力调整量,下一时刻的AGC机组出力计划按
Figure FDA0000042841830000019
来取,其中Pmaz为机组给定的出力上限,Pmin为机组给定的出力下限;
(6)计算下一个调度时段初始时刻的各个实时调度机组出力计划:
根据上一步计算得到总调节量ΔP后,根据实时调度机组的上、下调整容量,发电成本系数等综合分配给各个机组调整,建立式(a)-(d)的弃风最小的有功实时调度模型:
min Σ i r i | ΔP i | Σ j w j ΔP j w , i ∈ N G rt ( a ) s . t . Σ i ∉ N G wind ΔP i + Σ j ∈ N G wind ( P j For - P j 0 - ΔP j w ) = ΔP ( b ) Σ i ∉ N G wind S ij ΔP i + Σ k ∈ N G wind S kj ΔP k w ≤ T j ‾ - T j , j ∈ M tie ( c ) Δ P ‾ i ≤ ΔP i ≤ Δ P ‾ i , i ∈ N G rt ( d ) ΔP j w ≥ 0
其中,ri是传统发电机i当前的发电单位调整成本;wj是风电场j弃风电成本,为了减少弃风,一般wj≥100ri
ΔP为实时调度机组下一时刻的出力调节总量;
ΔPi为下一时段实时调度机组i的调整量,
Figure FDA0000042841830000022
为全网除风电机组外的实时调度机组的个数;
Figure FDA0000042841830000023
是风电场j的弃风电力,它等于下一时段预测的风电出力预测值
Figure FDA0000042841830000024
与下一时段实时调度计划值
Figure FDA0000042841830000025
的差值;
Figure FDA0000042841830000026
为风电场j的当前出力值;
Sij发电出力对断面的灵敏度;
(c)中Mtie表示电网安全功率传输断面集合,
Figure FDA0000042841830000027
为断面的功率传输上限,该值从所述历史负荷数据库中读取,Tj为断面的当前传输功率,该不等式约束保证传输断面不过载;
采用单纯形法求解实时调度模型,得出实时调度机组i的调整量ΔPi和下一个调度时段初始时刻风电场j的弃风电力
Figure FDA0000042841830000028
(7)将实时计划下发,对实时调度机组中的火电机组给出下一个调度时段初始时刻的调整量ΔPi,对风电场j给出下一个调度时段初始时刻的最大计划出力值
Figure FDA0000042841830000029
风电场接收到最大计划出力值后,制定本风电场内的发电计划;同时,风电场将本风场场内的电气量、风机运行状态等实时传送至调度中心。
CN2011100015747A 2011-01-06 2011-01-06 消纳风电接入的大电网实时调度方法 Active CN102075014B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100015747A CN102075014B (zh) 2011-01-06 2011-01-06 消纳风电接入的大电网实时调度方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100015747A CN102075014B (zh) 2011-01-06 2011-01-06 消纳风电接入的大电网实时调度方法

Publications (2)

Publication Number Publication Date
CN102075014A true CN102075014A (zh) 2011-05-25
CN102075014B CN102075014B (zh) 2013-02-13

Family

ID=44033408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100015747A Active CN102075014B (zh) 2011-01-06 2011-01-06 消纳风电接入的大电网实时调度方法

Country Status (1)

Country Link
CN (1) CN102075014B (zh)

Cited By (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102510091A (zh) * 2011-12-01 2012-06-20 国电南瑞科技股份有限公司 适应大规模光伏并网后实时调度与agc的协调控制方法
CN102545268A (zh) * 2012-02-10 2012-07-04 清华大学 一种在风电受限状态下的大电网有功功率实时控制方法
CN102593855A (zh) * 2012-02-17 2012-07-18 合肥工业大学 平抑电力***中可再生能源电源输出功率波动的方法
CN102868155A (zh) * 2012-08-28 2013-01-09 深圳蓝波幕墙及光伏工程有限公司 一种电力负荷预测控制***及控制方法
CN102969740A (zh) * 2012-11-15 2013-03-13 南京南瑞继保电气有限公司 一种电厂实时发电计划修正方法
CN102969728A (zh) * 2012-10-18 2013-03-13 中国电力科学研究院 一种电池储能***减少风电场弃风的控制方法
CN103077430A (zh) * 2013-01-16 2013-05-01 国电南瑞科技股份有限公司 风火协调调度模式下日前调度计划优化辅助分析方法
CN103138256A (zh) * 2011-11-30 2013-06-05 国网能源研究院 一种新能源电力消纳全景分析***及方法
CN103208813A (zh) * 2013-01-21 2013-07-17 云南电网公司电网规划研究中心 一种准确计及风电影响的电力***日调峰能力评估方法
CN103248048A (zh) * 2013-05-22 2013-08-14 国家电网公司 一种弃风电量预估方法
CN103280830A (zh) * 2013-04-27 2013-09-04 南京南瑞集团公司 一种适用于大规模风电集中接入的过载控制方法
CN103532172A (zh) * 2013-10-23 2014-01-22 华北电力大学 一种基于机组动态分类的多级备用协调方法
CN103679284A (zh) * 2013-11-18 2014-03-26 上海交通大学 一种消纳风电接入的定区间滚动调度方法
CN103828170A (zh) * 2011-07-15 2014-05-28 第一太阳能有限公司 实时光伏电厂控制***
CN104124710A (zh) * 2014-08-11 2014-10-29 四川慧盈科技有限责任公司 一种基于功率预测的风电并网运行控制方法
CN104143839A (zh) * 2013-11-06 2014-11-12 国家电网公司 基于功率预测的风电场集群限出力有功功率分配方法
CN104269889A (zh) * 2014-10-28 2015-01-07 武汉大学 一种计及多种能源接入的分散协调agc控制方法
CN104615821A (zh) * 2015-01-30 2015-05-13 长春工业大学 汽车线束串扰的预估计方法
CN105048499A (zh) * 2015-07-24 2015-11-11 中国农业大学 基于模型预测控制的风电并网实时调度方法及装置
CN105226678A (zh) * 2015-09-21 2016-01-06 华北电力科学研究院有限责任公司 ***调频容量分析方法及装置
CN105656025A (zh) * 2015-12-03 2016-06-08 国网江苏省电力公司经济技术研究院 提高风电消纳能力的方法
CN106339772A (zh) * 2016-08-11 2017-01-18 清华大学 基于供热管网储热效益的热‑电联合优化调度方法
CN106451553A (zh) * 2016-11-22 2017-02-22 安徽工程大学 一种多时间尺度的光伏微网区间优化调度方法
CN106505635A (zh) * 2016-09-20 2017-03-15 北京恒泰实达科技股份有限公司 弃风最小的有功调度模型及调度***
CN106998077A (zh) * 2017-03-09 2017-08-01 国网新疆电力公司 一种长距离输电型电网光伏最大消纳能力的确定方法
CN108197809A (zh) * 2017-12-28 2018-06-22 浙江工业大学 基于维度最优转换的权值共享深度网络的实时调度方法
CN108390417A (zh) * 2018-03-09 2018-08-10 国网辽宁省电力有限公司 一种agc的柔性负荷调度控制方法
CN108599273A (zh) * 2018-05-11 2018-09-28 南方电网科学研究院有限责任公司 一种基于人工智能的电网调控方法及装置
CN108845492A (zh) * 2018-05-23 2018-11-20 上海电力学院 一种基于cps评价标准的agc***智能预测控制方法
CN109066738A (zh) * 2018-09-28 2018-12-21 国网湖南省电力有限公司 一种基于动态负荷平衡的联络线消纳量测算方法及其***
CN109845063A (zh) * 2016-08-12 2019-06-04 仁能研究中心国家电网股份公司 用于电力网络的日前运行计划的风力发电削减优化的方法和设备
CN109888839A (zh) * 2019-01-22 2019-06-14 清华大学 电厂机组的负荷平衡能力评价方法及***
CN110365110A (zh) * 2019-07-09 2019-10-22 广东埃文低碳科技股份有限公司 一种分布能源互联网的管理终端
CN110880786A (zh) * 2019-11-24 2020-03-13 华南理工大学 一种消纳大规模风电的电-气互联***鲁棒区间调度方法
CN111416396A (zh) * 2020-03-31 2020-07-14 清华大学 辅助服务市场中考虑电采暖的火电与风电联合调度方法
CN112260267A (zh) * 2020-09-22 2021-01-22 汕头大学 一种包含风电的电网调度控制方法及装置
CN113612258A (zh) * 2021-08-10 2021-11-05 国网江苏省电力有限公司苏州供电分公司 一种基于电动汽车聚合模型的配电网风电最大消纳方法
CN114243742A (zh) * 2022-02-18 2022-03-25 南方电网数字电网研究院有限公司 一种基于5g技术的储能消纳地区风电的调控方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108039728B (zh) * 2017-12-21 2020-10-09 国网湖南省电力有限公司 提升电网清洁能源消纳能力的实时调度方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101707378A (zh) * 2009-11-24 2010-05-12 西北电网有限公司 一种基于大规模风电并网的电网调峰能力的调度方法
CN101764413A (zh) * 2009-11-25 2010-06-30 中国电力科学研究院 一种大规模风电集中接入电网的***仿真方法
CN101794996A (zh) * 2010-02-10 2010-08-04 华东电网有限公司 风电场出力实时预测方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101707378A (zh) * 2009-11-24 2010-05-12 西北电网有限公司 一种基于大规模风电并网的电网调峰能力的调度方法
CN101764413A (zh) * 2009-11-25 2010-06-30 中国电力科学研究院 一种大规模风电集中接入电网的***仿真方法
CN101794996A (zh) * 2010-02-10 2010-08-04 华东电网有限公司 风电场出力实时预测方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《电力***自动化》 20100910 高宗和等 适应大规模风电接入的互联电网有功调度与控制方案 37-41 1 第34卷, 第17期 *

Cited By (60)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103828170A (zh) * 2011-07-15 2014-05-28 第一太阳能有限公司 实时光伏电厂控制***
CN103138256B (zh) * 2011-11-30 2015-09-02 国网能源研究院 一种新能源电力消纳全景分析***及方法
CN103138256A (zh) * 2011-11-30 2013-06-05 国网能源研究院 一种新能源电力消纳全景分析***及方法
CN102510091A (zh) * 2011-12-01 2012-06-20 国电南瑞科技股份有限公司 适应大规模光伏并网后实时调度与agc的协调控制方法
CN102545268A (zh) * 2012-02-10 2012-07-04 清华大学 一种在风电受限状态下的大电网有功功率实时控制方法
CN102593855A (zh) * 2012-02-17 2012-07-18 合肥工业大学 平抑电力***中可再生能源电源输出功率波动的方法
CN102868155A (zh) * 2012-08-28 2013-01-09 深圳蓝波幕墙及光伏工程有限公司 一种电力负荷预测控制***及控制方法
CN102969728A (zh) * 2012-10-18 2013-03-13 中国电力科学研究院 一种电池储能***减少风电场弃风的控制方法
CN102969728B (zh) * 2012-10-18 2015-12-02 中国电力科学研究院 一种电池储能***减少风电场弃风的控制方法
CN102969740A (zh) * 2012-11-15 2013-03-13 南京南瑞继保电气有限公司 一种电厂实时发电计划修正方法
CN102969740B (zh) * 2012-11-15 2015-08-12 南京南瑞继保电气有限公司 一种电厂实时发电计划修正方法
CN103077430A (zh) * 2013-01-16 2013-05-01 国电南瑞科技股份有限公司 风火协调调度模式下日前调度计划优化辅助分析方法
CN103077430B (zh) * 2013-01-16 2016-08-10 国电南瑞科技股份有限公司 风火协调调度模式下日前调度计划优化辅助分析方法
WO2014110878A1 (zh) * 2013-01-16 2014-07-24 国电南瑞科技股份有限公司 风火协调调度模式下日前调度计划优化辅助分析方法
CN103208813A (zh) * 2013-01-21 2013-07-17 云南电网公司电网规划研究中心 一种准确计及风电影响的电力***日调峰能力评估方法
CN103208813B (zh) * 2013-01-21 2015-03-25 云南电网公司电网规划研究中心 一种准确计及风电影响的电力***日调峰能力评估方法
CN103280830A (zh) * 2013-04-27 2013-09-04 南京南瑞集团公司 一种适用于大规模风电集中接入的过载控制方法
CN103248048A (zh) * 2013-05-22 2013-08-14 国家电网公司 一种弃风电量预估方法
CN103532172B (zh) * 2013-10-23 2015-06-24 华北电力大学 一种基于机组动态分类的多级备用协调方法
CN103532172A (zh) * 2013-10-23 2014-01-22 华北电力大学 一种基于机组动态分类的多级备用协调方法
CN104143839A (zh) * 2013-11-06 2014-11-12 国家电网公司 基于功率预测的风电场集群限出力有功功率分配方法
CN104143839B (zh) * 2013-11-06 2016-03-09 国家电网公司 基于功率预测的风电场集群限出力有功功率分配方法
CN103679284A (zh) * 2013-11-18 2014-03-26 上海交通大学 一种消纳风电接入的定区间滚动调度方法
CN104124710B (zh) * 2014-08-11 2016-03-02 四川慧盈科技有限责任公司 一种基于功率预测的风电并网运行控制方法
CN104124710A (zh) * 2014-08-11 2014-10-29 四川慧盈科技有限责任公司 一种基于功率预测的风电并网运行控制方法
CN104269889A (zh) * 2014-10-28 2015-01-07 武汉大学 一种计及多种能源接入的分散协调agc控制方法
CN104615821A (zh) * 2015-01-30 2015-05-13 长春工业大学 汽车线束串扰的预估计方法
CN105048499A (zh) * 2015-07-24 2015-11-11 中国农业大学 基于模型预测控制的风电并网实时调度方法及装置
CN105226678A (zh) * 2015-09-21 2016-01-06 华北电力科学研究院有限责任公司 ***调频容量分析方法及装置
CN105226678B (zh) * 2015-09-21 2018-04-27 华北电力科学研究院有限责任公司 ***调频容量分析方法及装置
CN105656025A (zh) * 2015-12-03 2016-06-08 国网江苏省电力公司经济技术研究院 提高风电消纳能力的方法
CN105656025B (zh) * 2015-12-03 2018-06-15 国网江苏省电力公司经济技术研究院 提高风电消纳能力的方法
CN106339772A (zh) * 2016-08-11 2017-01-18 清华大学 基于供热管网储热效益的热‑电联合优化调度方法
CN106339772B (zh) * 2016-08-11 2019-06-18 清华大学 基于供热管网储热效益的热-电联合优化调度方法
CN109845063A (zh) * 2016-08-12 2019-06-04 仁能研究中心国家电网股份公司 用于电力网络的日前运行计划的风力发电削减优化的方法和设备
CN106505635A (zh) * 2016-09-20 2017-03-15 北京恒泰实达科技股份有限公司 弃风最小的有功调度模型及调度***
CN106505635B (zh) * 2016-09-20 2020-05-12 北京恒泰实达科技股份有限公司 弃风最小的有功调度模型及调度***
CN106451553B (zh) * 2016-11-22 2019-01-04 安徽工程大学 一种多时间尺度的光伏微网区间优化调度方法
CN106451553A (zh) * 2016-11-22 2017-02-22 安徽工程大学 一种多时间尺度的光伏微网区间优化调度方法
CN106998077A (zh) * 2017-03-09 2017-08-01 国网新疆电力公司 一种长距离输电型电网光伏最大消纳能力的确定方法
CN108197809B (zh) * 2017-12-28 2021-06-08 浙江工业大学 基于维度最优转换的权值共享深度网络的实时调度方法
CN108197809A (zh) * 2017-12-28 2018-06-22 浙江工业大学 基于维度最优转换的权值共享深度网络的实时调度方法
CN108390417B (zh) * 2018-03-09 2019-06-07 国网辽宁省电力有限公司 一种agc的柔性负荷调度控制方法
CN108390417A (zh) * 2018-03-09 2018-08-10 国网辽宁省电力有限公司 一种agc的柔性负荷调度控制方法
CN108599273B (zh) * 2018-05-11 2020-04-03 南方电网科学研究院有限责任公司 一种基于人工智能的电网调控方法及装置
CN108599273A (zh) * 2018-05-11 2018-09-28 南方电网科学研究院有限责任公司 一种基于人工智能的电网调控方法及装置
CN108845492A (zh) * 2018-05-23 2018-11-20 上海电力学院 一种基于cps评价标准的agc***智能预测控制方法
CN109066738A (zh) * 2018-09-28 2018-12-21 国网湖南省电力有限公司 一种基于动态负荷平衡的联络线消纳量测算方法及其***
CN109066738B (zh) * 2018-09-28 2021-04-23 国网湖南省电力有限公司 一种基于动态负荷平衡的联络线消纳量测算方法及其***
CN109888839A (zh) * 2019-01-22 2019-06-14 清华大学 电厂机组的负荷平衡能力评价方法及***
CN109888839B (zh) * 2019-01-22 2020-11-24 国家电网公司华中分部 电厂机组的负荷平衡能力评价方法及***
CN110365110A (zh) * 2019-07-09 2019-10-22 广东埃文低碳科技股份有限公司 一种分布能源互联网的管理终端
CN110880786A (zh) * 2019-11-24 2020-03-13 华南理工大学 一种消纳大规模风电的电-气互联***鲁棒区间调度方法
CN110880786B (zh) * 2019-11-24 2023-11-14 华南理工大学 一种消纳大规模风电的电-气互联***鲁棒区间调度方法
CN111416396A (zh) * 2020-03-31 2020-07-14 清华大学 辅助服务市场中考虑电采暖的火电与风电联合调度方法
CN112260267B (zh) * 2020-09-22 2022-06-17 汕头大学 一种包含风电的电网调度控制方法及装置
CN112260267A (zh) * 2020-09-22 2021-01-22 汕头大学 一种包含风电的电网调度控制方法及装置
CN113612258A (zh) * 2021-08-10 2021-11-05 国网江苏省电力有限公司苏州供电分公司 一种基于电动汽车聚合模型的配电网风电最大消纳方法
CN113612258B (zh) * 2021-08-10 2024-04-12 国网江苏省电力有限公司苏州供电分公司 一种基于电动汽车聚合模型的配电网风电最大消纳方法
CN114243742A (zh) * 2022-02-18 2022-03-25 南方电网数字电网研究院有限公司 一种基于5g技术的储能消纳地区风电的调控方法

Also Published As

Publication number Publication date
CN102075014B (zh) 2013-02-13

Similar Documents

Publication Publication Date Title
CN102075014B (zh) 消纳风电接入的大电网实时调度方法
CN103138256B (zh) 一种新能源电力消纳全景分析***及方法
CN102003337B (zh) 风电并网后主站端风电场有功功率控制方法
CN105006846B (zh) 一种风电场场站级有功功率优化方法
CN102289566B (zh) 独立运行模式下的微电网多时间尺度能量优化调度方法
CN103151803B (zh) 一种含风电***机组及备用配置的优化方法
CN102545268B (zh) 一种在风电受限状态下的大电网有功功率实时控制方法
CN108039737B (zh) 一种源网荷协调运行模拟***
CN112186811B (zh) 一种基于深度强化学习的agc机组动态优化方法
CN103762617B (zh) 一种考虑风电机组运行健康程度的风电场优化调度方法
CN104037805B (zh) 一种计及电网安全约束的光伏电站可发电裕度分配方法
CN102856925A (zh) 一种风电场功率综合分配方法
CN110159484B (zh) 基于风电场场级能量控制的风电机群启停机控制方法
CN103473393B (zh) 一种考虑随机概率的输电裕度控制模型建模方法
CN103699941A (zh) 一种电力***调度运行年方案的制定方法
CN104166877A (zh) 基于改进二进制粒子群优化算法的微网优化运行方法
CN106602613B (zh) 一种省地两级调度断面协调控制方法
CN108321853B (zh) 兼顾调节特性和经济环保性能的电网有功实时控制方法
CN106026198B (zh) “风-水”打捆外送的agc协调控制***及控制方法
CN102003349A (zh) 风电受限状态下的大规模风电有功优化方法
CN104467029A (zh) 一种区域小水电、风电日内联合优化调度的方法
CN201369575Y (zh) 一种风电调度决策支持装置
CN103248050B (zh) 一种基于竞争博弈的风电爬坡协同控制方法
CN102184468A (zh) 间歇性能源发电有功调度方法
CN105305485A (zh) 一种消纳大规模间歇性能源的安全约束经济调度方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant