CN103174418A - Advanced detection system and method for excavation hazards - Google Patents

Advanced detection system and method for excavation hazards Download PDF

Info

Publication number
CN103174418A
CN103174418A CN201310045425XA CN201310045425A CN103174418A CN 103174418 A CN103174418 A CN 103174418A CN 201310045425X A CN201310045425X A CN 201310045425XA CN 201310045425 A CN201310045425 A CN 201310045425A CN 103174418 A CN103174418 A CN 103174418A
Authority
CN
China
Prior art keywords
electromagnetic wave
signal
development machine
controller
wave detector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310045425XA
Other languages
Chinese (zh)
Other versions
CN103174418B (en
Inventor
童紫原
童敏明
唐守锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201310045425.XA priority Critical patent/CN103174418B/en
Publication of CN103174418A publication Critical patent/CN103174418A/en
Priority to PCT/CN2013/090629 priority patent/WO2014121643A1/en
Application granted granted Critical
Publication of CN103174418B publication Critical patent/CN103174418B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C35/00Details of, or accessories for, machines for slitting or completely freeing the mineral from the seam, not provided for in groups E21C25/00 - E21C33/00, E21C37/00 or E21C39/00
    • E21C35/04Safety devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

The invention discloses advanced detection system and method for excavation hazards, and belongs to methods and systems for monitoring geologic hazards of mine or underground constructions. The system comprises an electromagnetic wave detector, a signal collection amplifier, a controller, an inclination sensor, a vibration sensor, a wireless communication circuit, a wireless base station, a gateway, an industrial ethernet, and a monitoring host computer. The method comprises the steps of: controlling the electromagnetic wave detector to work by the controller according to signals of the inclination sensor and the vibration sensor; detecting an electromagnetic wave reflecting signal in a forward excavation direction; transmitting the electromagnetic wave reflecting signal to the monitoring host computer through the signal collection amplifier, the wireless communication circuit, the wireless base station, the gateway and the industrial ethernet, and respectively analyzing all received signals by the monitoring host computer; and judging whether abnormal conditions such as stress accumulation and geological structural abnormality exist in the forward excavation direction, and early warning the geologic hazards in a mine or culvert tunnel in the forward excavation direction.

Description

Driving disaster forward probe system and method
Technical field
The present invention relates to detection method and system, the driving disaster forward probe method and system of the driving front geological disaster real-time detection early warning of particularly using in a kind of mine or underground passage.
Technical background
When mine or underground culvert excavation operation, the geological disaster of gushing water and bump often can occur.For a long time, the method that people adopt is first to adopt geophysical prospecting method first to verify the geological condition in driving the place ahead, but this artificial detection method, owing to asking most investigation depth, the accuracy of surveying is not ideal enough, some disaster hidden danger is difficult to find, causes to occur accident in driving, causes casualties and economic loss.
Summary of the invention
The objective of the invention is to provide a kind of can be in tunneling process the method and system of real-time detection the place ahead disaster, realize the Monitoring and forecasting system in real-time of driving the place ahead disaster, avoid the generation of driving face geological disaster.
for achieving the above object, the system of driving disaster forward probe of the present invention, comprise the forward probe device that is located on development machine, the forward probe device is connected with the Signal Collection and amplify device, the Signal Collection and amplify device is connected with radio communication circuit, radio communication circuit is connected with the wireless base station by wireless signal, the wireless base station connects gateway, gateway connects the monitoring main frame by Industrial Ethernet, described forward probe device comprises electromagnetic wave detector, electromagnetic wave detector is provided with controller, on controller respectively be located at the development machine cantilever on inclination sensor be connected with vibrating sensor, the input of inclination sensor and vibrating sensor output access controller wherein, the input of the output termination electromagnetic wave detector of controller, the input of the output termination Signal Collection and amplify device of electromagnetic wave detector, the input of the output termination radio communication circuit of Signal Collection and amplify device, the wireless base station receives the signal of radio communication circuit, the output signal of wireless base station is by gateway and Industrial Ethernet and monitoring host communication.
Described electromagnetic wave detector contains electromagnetic wave radiating circuit and electromagnetic wave receiving circuit, the electromagnetic wave radiating circuit is made of with the transmitting antenna that is connected the variable frequency oscillator that is connected with controller, the electromagnetic wave receiving circuit is made of the reception antenna that is linked in sequence, preamplifier and bandpass filter, and bandpass filter gathers amplifier with model and is connected; Variable frequency oscillator in described electromagnetic wave radiating circuit can produce the electromagnetic wave signal of 250KHz, 560KHz and three different frequencies of 820KHz.
A kind of driving disaster forward probe method of using said system comprises the steps:
A. will be fixed on by the forward probe device that electromagnetic wave detector, Signal Collection and amplify device, controller and radio communication circuit consist of on the fuselage of development machine, described inclination sensor and vibrating sensor closely will be fixed on the development machine cantilever;
B. when development machine is started working, information when inclination sensor and vibrating sensor begin to gather the work of development machine cantilever, and the information that collects is sent in controller, the information that controller collects according to inclination sensor and vibrating sensor judges whether development machine is in and sweeps the opportunity that stops headwork after the basic skill or training does;
C. in the time that takes a break after end end-of-job is swept in the development machine pick, electromagnetic wave radiating circuit in electromagnetic wave detector is to the electromagnetism wave-wave signal of driving the place ahead emission different frequency, the reflection of electromagnetic wave signal that the electromagnetic wave signal of emission enters the place ahead rock mass or the generation of coal seam back reflection is received by electromagnetic wave receiving circuit in electromagnetic wave detector, and the reflection of electromagnetic wave signal arrives the monitoring main frame by Signal Collection and amplify device, radio communication circuit, wireless base station, gateway and the Industrial Ethernet that is linked in sequence;
D. monitor main frame all reflection of electromagnetic wave signals that receive are carried out respectively the waveform rapid analysis, the reflection of electromagnetic wave signal that collects according to pre-stored signal waveform and the receiving circuit in electromagnetic wave detector compares, if find that the amplitude of result of detection is abnormal with the variation appearance of frequency, can tentatively judge driving front geological structure abnormal, thereby judge that development machine tunnels the situations such as whether the place ahead exists stress to gather, geologic structure is abnormal, can send early warning information to operating personnel when the monitoring main frame draws when the geological disaster situation appears in the place ahead.
beneficial effect, owing to having adopted such scheme, the forward probe device that is arranged on development machine can be in tunneling process, utilize heading end to sweep the off time of end driving downwards, the geologic structure of real-time detection driving rock stratum, the place ahead or coal petrography inside, this detection is owing to not pursuing investigation depth, variable frequency oscillator can produce 250KHz, three different frequencies of 560KHz and 820KHz are gone out by transmission antennas transmit, realize the detection scanning of the section structure of the inner different depth in rock stratum, the place ahead, the accuracy of surveying improves greatly than traditional geophysical prospecting method, can in time find the danger of geological disaster, to take measures, avoid the generation of accident.It is simple in structure, and is easy for operation, surveys accuracy high, and the accident that can effectively avoid development machine to occur in tunneling process has practicality widely.
Description of drawings
Fig. 1 is forward probe system principle structure chart of the present invention.
Fig. 2 is the electromagnetic wave detector structure chart of forward probe device of the present invention
Fig. 3 is that forward probe device of the present invention is arranged on the schematic diagram on development machine.
Fig. 4 is the schematic diagram that forward probe device of the present invention is worked on development machine.
In figure, the 1-electromagnetic wave detector; 2-Signal Collection and amplify device; The 3-controller; The 4-inclination sensor; The 5-vibrating sensor; The 6-radio communication circuit; The 7-wireless base station; The 8-gateway; The 9-Industrial Ethernet; 10-monitors main frame; The 11-variable frequency oscillator; The 12-transmitting antenna; The 13-reception antenna; The 14-preamplifier; The 15-bandpass filter; 16-forward probe device; The 17-development machine; 18-development machine cantilever; The 19-heading end.
The specific embodiment
as shown in Figure 1, driving disaster forward probe of the present invention system, comprise the forward probe device 16 that is located on development machine 17, forward probe device 16 is connected with Signal Collection and amplify device 2, Signal Collection and amplify device 2 is connected with radio communication circuit 6, radio communication circuit 6 is connected with wireless base station 7 by wireless signal, wireless base station 7 connects gateway 8, gateway 8 connects monitoring main frame 10 by Industrial Ethernet 9, as shown in Figure 2, described forward probe device comprises electromagnetic wave detector 1, electromagnetic wave detector 1 contains electromagnetic wave radiating circuit and electromagnetic wave receiving circuit, wherein the electromagnetic wave radiating circuit is made of with the transmitting antenna 12 that is connected the variable frequency oscillator 11 that is connected with controller, variable frequency oscillator 11 in described electromagnetic wave radiating circuit can produce 250KHz, the electromagnetic wave signal of 560KHz and three different frequencies of 820KHz, the electromagnetic wave receiving circuit is made of the reception antenna 13 that is linked in sequence, preamplifier 1 and bandpass filter 15, and described transmitting antenna 12 and reception antenna 13 are the annular orientation antenna, bandpass filter 15 is connected with Signal Collection and amplify device 2, electromagnetic wave detector 1 is provided with controller 3, on controller 3 respectively be located at development machine cantilever 18 on inclination sensor 4 be connected with vibrating sensor 5, the input of inclination sensor 4 and vibrating sensor 5 output access controllers 3 wherein, the input of the output termination electromagnetic wave detector 1 of controller 3, the input of the output termination Signal Collection and amplify device 2 of electromagnetic wave detector 1, the input of the output termination radio communication circuit 6 of Signal Collection and amplify device 2, wireless base station 7 receives the signal of radio communication circuit 6, the output signal of wireless base station 7 is by gateway 8 and Industrial Ethernet 9 and 10 communications of monitoring main frame.
Described inclination sensor 4 models are MT-90, vibrating sensor 5 models are VT9285, controller 3 models are ATMEGA16, Signal Collection and amplify device 2 models are JBDT-3, the model of radio communication circuit 6 is RF950, the model of preamplifier 14 is VT120, and the model of bandpass filter 15 is BF32, and the model of variable frequency oscillator is AD9620; Described variable frequency oscillator can produce the electromagnetic wave signal of 250KHz, 560KHz and three different frequencies of 820KHz, realizes the detection scanning of the section structure of the inner different depth in rock stratum, the place ahead.
As described in Figure 3, forward probe device of the present invention is arranged on development machine 17, the forward probe device 16 that is consisted of by electromagnetic wave detector 1, Signal Collection and amplify device 2, controller 3 and radio communication circuit 6, be fixed on the fuselage of development machine 17, inclination sensor 4 and vibrating sensor 5 are fixed on development machine cantilever 18.
As described in Figure 4, forward probe device of the present invention is on development machine, and when heading end 19 was swept the end downwards, development machine cantilever 18 can not stop that forward probe device 16 sends and receive the signal of electromagnetism wave-wave, and the forward probe device is started working, and carries out forward probe.
A kind of driving disaster forward probe method of said system of using is as follows:
A. will be fixed on by the forward probe device that electromagnetic wave detector 1, Signal Collection and amplify device 2, controller 3 and radio communication circuit 6 consist of on the fuselage of development machine 17, described inclination sensor 5 and vibrating sensor 6 closely will be fixed on development machine cantilever 18;
B. when development machine 17 is started working, information when inclination sensor 5 and vibrating sensor 6 begin to gather 18 work of development machine cantilever, and the information that collects is sent in controller 3, the information that controller collects according to inclination sensor 5 and vibrating sensor 6 judges whether development machine 17 is in and sweeps the opportunity that stops headwork after the basic skill or training does;
C. in the time that takes a break after development machine 17 is swept end end-of-job, electromagnetic wave radiating circuit in electromagnetic wave detector 1 is to the electromagnetism wave-wave signal of driving the place ahead emission different frequency, the reflection of electromagnetic wave signal that the electromagnetic wave signal of emission enters the place ahead rock mass or the generation of coal seam back reflection is received by electromagnetic wave receiving circuit in electromagnetic wave detector 1, and the reflection of electromagnetic wave signal arrives monitoring main frames 10 by Signal Collection and amplify device, radio communication circuit 6, wireless base station 7, gateway 8 and the Industrial Ethernet 9 that is linked in sequence;
d. monitor 10 pairs of all reflection of electromagnetic wave signals that receive of main frame and carry out respectively the waveform rapid analysis, the reflection of electromagnetic wave signal that collects according to the receiving circuit in pre-stored signal waveform and electromagnetic wave detector 1 compares, if find that the amplitude of result of detection is abnormal with the variation appearance of frequency, can tentatively judge driving front geological structure abnormal, thereby judge that development machine 17 tunnels the place ahead and whether exists stress to gather, the situations such as geologic structure is abnormal, when drawing, the monitoring main frame can send early warning information to operating personnel when the geological disaster situation appears in the place ahead.
the course of work: electromagnetic wave detector 1, Signal Collection and amplify device 2, controller 3 and radio communication circuit 6 are installed one, consist of forward probe device 16, be fixed on the fuselage of development machine 17, inclination sensor 4 and vibrating sensor 5 are fixed on development machine cantilever 18, controller 3 is controlled electromagnetic wave detector 1 work according to the heading end 19 of inclination sensor 4 judgement development machines 17 and the development machine cantilever 18 electromagnetism wave-wave signal of block electromagnetic wave detector 1 emission not, signal according to vibrating sensor 5, judgement heading end 19 is in the driving rest period, then control electromagnetic wave detector 1 to tunneling the place ahead emitting electromagnetic wave ripple, and the electromagnetism wave-wave signal that reflects in reception rock or coal petrography, electromagnetic wave wave reflection signal is by Signal Collection and amplify device 2, radio communication circuit 6, wireless base station 7, gateway 8 and Industrial Ethernet 9 arrive monitoring main frame 10, 10 pairs of all signals that receive of monitoring main frame are analyzed respectively, whether judgement driving the place ahead exists stress to gather, the situations such as geologic structure is abnormal, to mine or culvert tunnelling front geological disaster gushing water for example, gas, the situations such as bump are carried out early warning.

Claims (4)

1. driving disaster forward probe system, it is characterized in that: system comprises the forward probe device (16) that is located on development machine (17), be connected with Signal Collection and amplify device (2) on forward probe device (16), Signal Collection and amplify device (2) is connected with radio communication circuit (6), radio communication circuit (6) is connected with wireless base station (7) by wireless signal, wireless base station (7) connects gateway (8), gateway (8) connects monitoring main frame (10) by Industrial Ethernet (9), described forward probe device (16) comprises electromagnetic wave detector (1), electromagnetic wave detector (1) is provided with controller (3), on controller (3) respectively be located at development machine cantilever (17) on inclination sensor (4) be connected with vibrating sensor (5), the input of inclination sensor (4) and vibrating sensor (5) output access controller (3) wherein, the input of the output termination electromagnetic wave detector (1) of controller (3), the input of the output termination Signal Collection and amplify device (2) of electromagnetic wave detector (1), the input of the output termination radio communication circuit (6) of Signal Collection and amplify device (2), wireless base station (7) receives the signal of radio communication circuit (6), the output signal of wireless base station (7) is by gateway (8) and Industrial Ethernet (9) and the communication of monitoring main frame (10).
2. driving disaster forward probe according to claim 1 system, it is characterized by: described electromagnetic wave detector (1) contains electromagnetic wave radiating circuit and electromagnetic wave receiving circuit, the electromagnetic wave radiating circuit is made of with the transmitting antenna that is connected (12) the variable frequency oscillator that is connected with controller (11), the electromagnetic wave receiving circuit is made of the reception antenna that is linked in sequence (13), preamplifier (14) and bandpass filter (15), and bandpass filter (15) gathers amplifier (2) with model and is connected.
3. driving disaster forward probe according to claim 1 system, it is characterized by: the variable frequency oscillator (11) in described electromagnetic wave radiating circuit can produce the electromagnetic wave signal of 250KHz, 560KHz and three different frequencies of 820KHz.
4. a right to use requires the driving disaster forward probe method of 1 described system, it is characterized in that comprising the steps:
A. will be fixed on the fuselage of development machine (17) by the forward probe device (16) that electromagnetic wave detector (1), Signal Collection and amplify device (2), controller (3) and radio communication circuit (6) consist of, described inclination sensor (5) and vibrating sensor (6) closely are fixed on development machine cantilever (18);
B. when development machine (17) when starting working, information when inclination sensor (5) and vibrating sensor (6) begin to gather development machine cantilever (18) work, and the information that collects is sent in controller (3), the information that controller collects according to inclination sensor (5) and vibrating sensor (6) judges whether development machine (17) is in and sweeps the opportunity that stops headwork after the basic skill or training does;
C. in the time that takes a break after development machine (17) is swept end end-of-job, electromagnetic wave radiating circuit in electromagnetic wave detector (1) is to the electromagnetism wave-wave signal of driving the place ahead emission different frequency, the reflection of electromagnetic wave signal that the electromagnetic wave signal of emission enters the place ahead rock mass or the generation of coal seam back reflection is received by electromagnetic wave receiving circuit in electromagnetic wave detector (1), and the reflection of electromagnetic wave signal arrives monitoring main frame (10) by Signal Collection and amplify device, radio communication circuit (6), wireless base station (7), gateway (8) and the Industrial Ethernet (9) that is linked in sequence;
d. monitor main frame (10) all reflection of electromagnetic wave signals that receive are carried out respectively the waveform rapid analysis, the reflection of electromagnetic wave signal that collects according to the receiving circuit in pre-stored signal waveform and electromagnetic wave detector (1) compares, if find that the amplitude of result of detection is abnormal with the variation appearance of frequency, can tentatively judge driving front geological structure abnormal, thereby judge that development machine (17) tunnels the place ahead and whether exists stress to gather, the situations such as geologic structure is abnormal, when drawing, the monitoring main frame can send early warning information to operating personnel when the geological disaster situation appears in the place ahead.
CN201310045425.XA 2013-02-05 2013-02-05 Driving disaster forward probe system and method Expired - Fee Related CN103174418B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201310045425.XA CN103174418B (en) 2013-02-05 2013-02-05 Driving disaster forward probe system and method
PCT/CN2013/090629 WO2014121643A1 (en) 2013-02-05 2013-12-27 Advanced detection system and method for tunnelling disasters

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310045425.XA CN103174418B (en) 2013-02-05 2013-02-05 Driving disaster forward probe system and method

Publications (2)

Publication Number Publication Date
CN103174418A true CN103174418A (en) 2013-06-26
CN103174418B CN103174418B (en) 2015-08-19

Family

ID=48634552

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310045425.XA Expired - Fee Related CN103174418B (en) 2013-02-05 2013-02-05 Driving disaster forward probe system and method

Country Status (2)

Country Link
CN (1) CN103174418B (en)
WO (1) WO2014121643A1 (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103775073A (en) * 2014-01-22 2014-05-07 中国矿业大学 Mining working face ground stress distribution characteristic detection method
CN103901503A (en) * 2014-03-25 2014-07-02 中冶集团武汉勘察研究院有限公司 Comprehensive detection method for front unfavorable geologic bodies in mine underground roadway tunneling
WO2014121643A1 (en) * 2013-02-05 2014-08-14 中国矿业大学 Advanced detection system and method for tunnelling disasters
CN104267441A (en) * 2014-10-10 2015-01-07 中国矿业大学(北京) Real-time forecasting method and warning system for water disaster in front of excavation roadway
CN107939449A (en) * 2018-01-12 2018-04-20 河南理工大学 A kind of old sky of short range seam mining lets out intelligent early-warning system and method for early warning under water
CN109319105A (en) * 2018-10-26 2019-02-12 武汉科技大学 A kind of unmanned monitoring device of the mining underground space
CN109916555A (en) * 2019-03-12 2019-06-21 中国矿业大学 A kind of calibrating installation of electromagnetic wave gas pressure detector
CN109931072A (en) * 2019-03-14 2019-06-25 中铁工程装备集团隧道设备制造有限公司 Tunneling machine cutting control device, method and cantilever excavator
CN110376659A (en) * 2019-06-10 2019-10-25 中交一公局桥隧工程有限公司 Tunnel advance geology forecasting device and system thereof
CN112901159A (en) * 2021-01-29 2021-06-04 中国矿业大学 Environment monitoring device and method for mine tunneling robot
CN114046914A (en) * 2021-10-25 2022-02-15 煤炭科学研究总院 Surrounding rock stress detection method and device and electronic equipment
CN114495431A (en) * 2022-01-14 2022-05-13 深圳市地质局 Physical detection system for detecting geological structure

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387167A (en) * 2017-08-30 2017-11-24 福建省高速公路有限责任公司 Shallow tunnel advance core extrudes system for monitoring displacement and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4160970A (en) * 1977-11-25 1979-07-10 Sperry Rand Corporation Electromagnetic wave telemetry system for transmitting downhole parameters to locations thereabove
CN87211945U (en) * 1987-08-15 1988-03-30 煤炭工业部煤炭科学研究院重庆研究所 Radar detector for geology of mine
JP3117661B2 (en) * 1997-08-07 2000-12-18 株式会社テックス Base station equipment for electromagnetic wave observation system
CN201339487Y (en) * 2009-01-20 2009-11-04 北京工商大学 Real-time monitoring system for coal mine underground environmental safety based on wireless sensor network
CN202455542U (en) * 2011-10-17 2012-09-26 山西潞安集团司马煤业有限公司 Monitoring system based on wireless sensor network
CN102865075A (en) * 2012-10-08 2013-01-09 中国矿业大学 Remote monitor method and system for coal cutter

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201116471Y (en) * 2007-11-14 2008-09-17 三一重型装备有限公司 Arm cutting resistant collision shovel plate device
JP2010216183A (en) * 2009-03-18 2010-09-30 Shimizu Corp Drilling machine
CN102681004A (en) * 2012-05-14 2012-09-19 中国矿业大学(北京) Tunnel heading-along earthquake advanced detection device taking heading machine as earthquake focus and method thereof
CN103174418B (en) * 2013-02-05 2015-08-19 中国矿业大学 Driving disaster forward probe system and method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4160970A (en) * 1977-11-25 1979-07-10 Sperry Rand Corporation Electromagnetic wave telemetry system for transmitting downhole parameters to locations thereabove
CN87211945U (en) * 1987-08-15 1988-03-30 煤炭工业部煤炭科学研究院重庆研究所 Radar detector for geology of mine
JP3117661B2 (en) * 1997-08-07 2000-12-18 株式会社テックス Base station equipment for electromagnetic wave observation system
CN201339487Y (en) * 2009-01-20 2009-11-04 北京工商大学 Real-time monitoring system for coal mine underground environmental safety based on wireless sensor network
CN202455542U (en) * 2011-10-17 2012-09-26 山西潞安集团司马煤业有限公司 Monitoring system based on wireless sensor network
CN102865075A (en) * 2012-10-08 2013-01-09 中国矿业大学 Remote monitor method and system for coal cutter

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李松荣: "用地球物理方法探测掘进机前方地质情况", 《隧道译丛》, no. 5, 15 May 1994 (1994-05-15), pages 38 - 44 *
薛夫振等: "基于组态软件的悬臂式掘进机远程监控***设计", 《煤矿机械》, no. 12, 15 December 2010 (2010-12-15), pages 135 - 136 *

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014121643A1 (en) * 2013-02-05 2014-08-14 中国矿业大学 Advanced detection system and method for tunnelling disasters
CN103775073B (en) * 2014-01-22 2016-04-13 中国矿业大学 A kind of getting working face geostatic stress distribution characteristics detection method
CN103775073A (en) * 2014-01-22 2014-05-07 中国矿业大学 Mining working face ground stress distribution characteristic detection method
CN103901503A (en) * 2014-03-25 2014-07-02 中冶集团武汉勘察研究院有限公司 Comprehensive detection method for front unfavorable geologic bodies in mine underground roadway tunneling
CN104267441A (en) * 2014-10-10 2015-01-07 中国矿业大学(北京) Real-time forecasting method and warning system for water disaster in front of excavation roadway
CN107939449A (en) * 2018-01-12 2018-04-20 河南理工大学 A kind of old sky of short range seam mining lets out intelligent early-warning system and method for early warning under water
CN107939449B (en) * 2018-01-12 2019-05-03 河南理工大学 A kind of old sky of short range seam mining is underwater to let out intelligent early-warning system and method for early warning
CN109319105A (en) * 2018-10-26 2019-02-12 武汉科技大学 A kind of unmanned monitoring device of the mining underground space
CN109916555A (en) * 2019-03-12 2019-06-21 中国矿业大学 A kind of calibrating installation of electromagnetic wave gas pressure detector
CN109931072B (en) * 2019-03-14 2023-11-14 中铁工程装备集团隧道设备制造有限公司 Cutting control device and method of heading machine and cantilever heading machine
CN109931072A (en) * 2019-03-14 2019-06-25 中铁工程装备集团隧道设备制造有限公司 Tunneling machine cutting control device, method and cantilever excavator
CN110376659A (en) * 2019-06-10 2019-10-25 中交一公局桥隧工程有限公司 Tunnel advance geology forecasting device and system thereof
WO2022161197A1 (en) * 2021-01-29 2022-08-04 中国矿业大学 Environmental monitoring apparatus and method for mine tunneling robot
GB2610321A (en) * 2021-01-29 2023-03-01 Univ China Mining Environmental monitoring apparatus and method for mine tunneling robot
JP7258394B1 (en) 2021-01-29 2023-04-17 中国砿業大学 Environment monitoring device and method for mining robot
JP2023517399A (en) * 2021-01-29 2023-04-25 中国砿業大学 Environment monitoring device and method for mining robot
GB2610321B (en) * 2021-01-29 2023-08-02 Univ China Mining Environmental monitoring apparatus and method for mine tunneling robot
US11761334B2 (en) 2021-01-29 2023-09-19 China University Of Mining And Technology Environmental monitoring apparatus and method for mine tunneling robot
CN112901159A (en) * 2021-01-29 2021-06-04 中国矿业大学 Environment monitoring device and method for mine tunneling robot
CN114046914A (en) * 2021-10-25 2022-02-15 煤炭科学研究总院 Surrounding rock stress detection method and device and electronic equipment
CN114046914B (en) * 2021-10-25 2022-07-26 煤炭科学研究总院有限公司 Surrounding rock stress detection method and device and electronic equipment
CN114495431A (en) * 2022-01-14 2022-05-13 深圳市地质局 Physical detection system for detecting geological structure

Also Published As

Publication number Publication date
CN103174418B (en) 2015-08-19
WO2014121643A1 (en) 2014-08-14

Similar Documents

Publication Publication Date Title
CN103174418B (en) Driving disaster forward probe system and method
US9817148B2 (en) Borehole while drilling electromagnetic tomography advanced detection apparatus and method
CN103410565B (en) Bump many reference amounts process monitoring system and method for early warning
CN105697023B (en) A kind of tunnel geology exploitation method, system and mini-sized tunnelling machine
CN106437854B (en) Distributed coal rock dynamic disaster acoustic-electric synchronous monitoring system and method
AU2017375855A1 (en) Acousto-electric and gas real-time automatic monitoring system and method for coal-rock dynamic disaster
CN103122764B (en) Automatic mobile type transient electromagnetic field detection method and device
CN102997914A (en) Three-dimensional locating and detecting device and method for coal cutter
CN111208555B (en) Active and passive detection and positioning method for underground coal fire danger sound waves
CN108732612A (en) A kind of Preceding geology predictor and method based on tunnel excavation blast signal
CN105089646A (en) Logging-while-drilling resistivity measuring device with data transmission function and method
CN105604557A (en) Shield construction boulder detection method based on seismic CT
CN110821475B (en) Drilling resistivity monitoring method for coal mine working face bottom plate and cable pushing device
CN106907145A (en) A kind of apparent resistivity measuring system and method with brill advanced prediction
CN104500136A (en) Local ground stress distribution characteristic fine detection method
CN104088668A (en) Ultra-low frequency electromagnetic induction monitoring and early warning system and method for coal or rock dynamic disasters
CN104459807A (en) One-sending and multi-receiving radio wave tunnel penetration field strength measuring system and method between double roadways
CN104912552A (en) Coal-rock mass ground stress distribution feature detection method and coal-rock mass ground stress distribution feature detection device
CN103775073B (en) A kind of getting working face geostatic stress distribution characteristics detection method
CN105301645A (en) Advanced geological forecasting method of shield construction
CN110738825A (en) open TBM broken stratum early warning method and system
CN203337830U (en) Monitoring device using tunnel face blasting as seismic source
CN109026111A (en) A kind of coal mining control system, coal mining system and hydraulic support
CN109738964B (en) Tunnel prediction device, tunneling machine and method for seismic wave and electromagnetic wave joint inversion
CN112112624A (en) Coal mine underground multi-parameter drilling geophysical prospecting fine remote detection device and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150819

Termination date: 20160205

CF01 Termination of patent right due to non-payment of annual fee