CN103171972A - 塔架组装吊装工艺 - Google Patents

塔架组装吊装工艺 Download PDF

Info

Publication number
CN103171972A
CN103171972A CN2013100655418A CN201310065541A CN103171972A CN 103171972 A CN103171972 A CN 103171972A CN 2013100655418 A CN2013100655418 A CN 2013100655418A CN 201310065541 A CN201310065541 A CN 201310065541A CN 103171972 A CN103171972 A CN 103171972A
Authority
CN
China
Prior art keywords
pylon
door machine
tower body
shackle
tower frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100655418A
Other languages
English (en)
Other versions
CN103171972B (zh
Inventor
陈飞
钟炳贵
韦正实
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Zhenhua Heavy Equipment Manufacturing Co Ltd
Original Assignee
SHANGHAI ZHENHUA HEAVY INDUSTRY GROUP (NANTONG) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ZHENHUA HEAVY INDUSTRY GROUP (NANTONG) Co Ltd filed Critical SHANGHAI ZHENHUA HEAVY INDUSTRY GROUP (NANTONG) Co Ltd
Priority to CN201310065541.8A priority Critical patent/CN103171972B/zh
Publication of CN103171972A publication Critical patent/CN103171972A/zh
Application granted granted Critical
Publication of CN103171972B publication Critical patent/CN103171972B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

本发明公开了一种塔架组装吊装工艺,其特征在于:在场地上直接将塔架安装好,同时塔架顶端配有供吊装的吊耳,然后通过两台门机配合将安装好的塔架吊起扶正,最后安装固定。采用这样的方法,使得塔架安装变得简单而且安全,不需要多余的工作架,节约了人力和成本,加大了工作效率。

Description

塔架组装吊装工艺
技术领域
本发明涉及一种塔架组装吊装的工艺,先在场地组装塔架,后用门机配合扶正安装。
背景技术
装船机在安装的时候,塔架支撑的安装十分重要。塔架支撑是装船机的骨架装船机能否安全的运作,与塔架支撑的安装的工艺和强度有很大的关系。装船机塔架主要包含门架前撑、门架后撑、门架左右侧横梁和司机室支撑横梁四个大部件,传统的塔架安装是直接将塔架各部件通过门机吊到船上指定位置,然后直接进行安装焊接。这样的方法由于塔架部件体积大,重量大,因此操作麻烦,而且需要设置其他的支撑平台供技术工人操作安装,并且空中作业危险性大,操作困难。
发明内容
本发明所要解决的技术问题是提供一种操作简单,安全性高的塔架组装吊装工艺。
为解决上述技术问题,本发明所采用的技术方案是:
一种塔架组装吊装工艺,其特征在于包含以下步骤:
1)          在场地上组装塔架,先组装塔架前撑和后撑,然后安装上侧左右横梁和下侧左右横梁,再安装司机室支撑梁,斜梯和平台暂不安装;
2)          用两条钢丝绳分别一端连接一侧的吊耳,两条钢丝绳的另一端通过卸扣连接在一起;
3)          用另一条钢丝绳两端分别固定在塔架的下侧两边,钢丝绳上再安装一个活动卸扣;
4)          第一台门机吊钩勾在卸扣上,第二台门机吊钩勾在活动卸扣上;
5)          两台门机同时上吊将塔架抬起;
6)          翻身时,第一台门机向上缓缓吊动,第二台门机不动;
7)          当塔架抬起高度大于塔架自身竖直高度时,此时第二台门机缓缓下降;
8)          塔体扶正平衡后,在塔体下放置枕木,然后缓缓将塔体放置在枕木上;
9)          在塔体上安装斜梯和平台。
通过这样的工艺,直接在空场地上先将塔体安装好,再通过门机吊起扶正后安装,在场地上安装操作方便,而且安全,加大了工作效率。
 
附图说明
图1是本发明塔架组装吊装工艺的塔架示意图。
图2是本发明塔架组装吊装工艺的吊装示意图。
图3是本发明塔架组装吊装工艺的吊装扶正后的示意图。
图4是本发明塔架组装吊装工艺的塔架部件图。
图5是本发明塔架组装吊装工艺的塔架安装侧视图。
 
具体实施方式
首先按照图1和图4所示的塔架的结构在场地上进行安装,先组装塔架的前撑10和后撑11,然后安装上侧的左右横梁12和下侧的左右横梁13,最后安装好司机室支撑梁,斜梯1和平台2先不安装,以免在吊装扶正的时候碰坏。然后用两条钢丝绳4分别一端连接一侧的吊耳3,然后两条钢丝绳4的另一端用卸扣7连接在一起。再用另一条钢丝绳8分别固定在塔架的下侧两边,钢丝绳上再安装一个活动卸扣9,门机勾住卸扣9时自动选择吊点。
如图5所示,第一台门机5吊钩勾在卸扣7上,第二台门机6吊钩勾在卸扣9上,两台门机同时向上缓缓抬动将塔架抬起。
如图2所示,塔架翻身时,第一台门机5向上缓缓吊动,第二台门机6不动;当塔架被上抬的高度大于塔架自身竖直后的高度时,此时第二台门机6缓缓下降。
如图3所示,塔体扶正平衡后,在塔体下放置枕木,然后缓缓将塔体放置在枕木上。最后在塔体上安装斜梯和平台。
通过这样的过程,直接在场地上安装好塔架,然后再吊起扶正后安置,这样安装时不用像往常那样搭工作架,节约了人力物力,同时地面作业安全简单,提高了工作效率,增加了安全系数。

Claims (1)

1.一种塔架组装吊装工艺,其特征在于包含以下步骤:
1) 在场地上组装塔架,先组装塔架前撑(10)和后撑(11),然后安装上侧左右横梁(12)和下侧左右横梁(13),再安装司机室支撑梁(14),斜梯(1)和平台(2)暂不安装;
2) 用两条钢丝绳(4)分别一端连接一侧的吊耳(3),两条钢丝绳(4)的另一端通过卸扣(7)连接在一起;
3)用另一条钢丝绳(8)两端分别固定在塔架的下侧两边,钢丝绳上再安装一个活动卸扣(9);
4) 第一台门机(5)吊钩勾在卸扣(7)上,第二台门机(6)吊钩勾在活动卸扣(9)上;
5) 两台门机(5,6)同时上吊将塔架抬起;
6) 翻身时,第一台门机(5)向上缓缓吊动,第二台门机(6)不动;
7) 当塔架抬起高度大于塔架自身竖直高度时,此时第二台门机(6)缓缓下降;
8) 塔体扶正平衡后,在塔体下放置枕木,然后缓缓将塔体放置在枕木上;
9) 在塔体上安装斜梯(1)和平台(2)。
CN201310065541.8A 2013-03-01 2013-03-01 塔架组装吊装工艺 Active CN103171972B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310065541.8A CN103171972B (zh) 2013-03-01 2013-03-01 塔架组装吊装工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310065541.8A CN103171972B (zh) 2013-03-01 2013-03-01 塔架组装吊装工艺

Publications (2)

Publication Number Publication Date
CN103171972A true CN103171972A (zh) 2013-06-26
CN103171972B CN103171972B (zh) 2015-06-17

Family

ID=48632261

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310065541.8A Active CN103171972B (zh) 2013-03-01 2013-03-01 塔架组装吊装工艺

Country Status (1)

Country Link
CN (1) CN103171972B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104627830A (zh) * 2014-12-26 2015-05-20 大连中远船务工程有限公司 浮式生产储存卸货装置船大型火炬塔吊装方法
CN113511597A (zh) * 2021-05-17 2021-10-19 上海振华重工(集团)股份有限公司 门框组件的吊装方法及吊装***

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101293599A (zh) * 2007-04-27 2008-10-29 上海振华港口机械(集团)股份有限公司 船厂龙门起重机整机卸船至船坞的方法
CN101429928A (zh) * 2007-11-09 2009-05-13 中国海洋石油总公司 风力发电机组海上整体吊装的方法
CN102182203A (zh) * 2010-08-19 2011-09-14 天津道达渤海新能源开发有限公司 一种钢排式测风塔基础及测风塔结构
US20110318159A1 (en) * 2010-06-29 2011-12-29 Mikkel Verner Krogh Arrangement for Lifting a Tower Wall Portion of a Wind Turbine and Method for Lifting a Tower Wall Portion of a Wind Turbine
CN202322091U (zh) * 2011-12-02 2012-07-11 华锐风电科技(集团)股份有限公司 吊装设备
CN102674136A (zh) * 2012-05-09 2012-09-19 中国海洋石油总公司 一种大型塔类设备的吊装方法
CN102817341A (zh) * 2012-08-23 2012-12-12 中国十七冶集团有限公司 海上测风塔分段安装与高空散件组装结合的施工方法
CN202657825U (zh) * 2012-05-18 2013-01-09 湖北省输变电工程公司 吊车整体组立拉线塔起吊装置
CN202729605U (zh) * 2012-06-19 2013-02-13 国家核电技术有限公司 翻转大型工件时使用的支撑装置

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101293599A (zh) * 2007-04-27 2008-10-29 上海振华港口机械(集团)股份有限公司 船厂龙门起重机整机卸船至船坞的方法
CN101429928A (zh) * 2007-11-09 2009-05-13 中国海洋石油总公司 风力发电机组海上整体吊装的方法
US20110318159A1 (en) * 2010-06-29 2011-12-29 Mikkel Verner Krogh Arrangement for Lifting a Tower Wall Portion of a Wind Turbine and Method for Lifting a Tower Wall Portion of a Wind Turbine
CN102182203A (zh) * 2010-08-19 2011-09-14 天津道达渤海新能源开发有限公司 一种钢排式测风塔基础及测风塔结构
CN202322091U (zh) * 2011-12-02 2012-07-11 华锐风电科技(集团)股份有限公司 吊装设备
CN102674136A (zh) * 2012-05-09 2012-09-19 中国海洋石油总公司 一种大型塔类设备的吊装方法
CN202657825U (zh) * 2012-05-18 2013-01-09 湖北省输变电工程公司 吊车整体组立拉线塔起吊装置
CN202729605U (zh) * 2012-06-19 2013-02-13 国家核电技术有限公司 翻转大型工件时使用的支撑装置
CN102817341A (zh) * 2012-08-23 2012-12-12 中国十七冶集团有限公司 海上测风塔分段安装与高空散件组装结合的施工方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104627830A (zh) * 2014-12-26 2015-05-20 大连中远船务工程有限公司 浮式生产储存卸货装置船大型火炬塔吊装方法
CN113511597A (zh) * 2021-05-17 2021-10-19 上海振华重工(集团)股份有限公司 门框组件的吊装方法及吊装***
CN113511597B (zh) * 2021-05-17 2023-08-22 上海振华重工(集团)股份有限公司 门框组件的吊装方法及吊装***

Also Published As

Publication number Publication date
CN103171972B (zh) 2015-06-17

Similar Documents

Publication Publication Date Title
CN102019998B (zh) 上下水边舱总组搭载方法
CN101693502B (zh) 一种履带起重机主机后配重自装卸方法
CN204899274U (zh) 一种装配式混凝土结构***护架
CN103171972B (zh) 塔架组装吊装工艺
CN103420281B (zh) 起重机及其附属结构的拆装装置、拆卸方法及安装方法
CN201703776U (zh) 储罐倒装提升装置
CN104670418A (zh) 海洋平台的直升机甲板的总装工艺
CN104989111A (zh) 钢结构高层吊装施工方法
CN105621225A (zh) 一种用于叉车起重***总成吊装的可自动拆卸吊具
CN201901515U (zh) 船舶清仓机械专用吊具
CN103991800A (zh) 建筑用屋面吊机
CN208732495U (zh) 一种小炮车
CN104030176B (zh) 吊装平台桁架的平衡梁及其吊装方法
CN102587676A (zh) 安装核电站核岛内主梁结构的方法
CN204508549U (zh) 一种自动挂和摘钩吊装***
CN205442374U (zh) 一种用于叉车起重***总成吊装的可自动拆卸吊具
CN210658016U (zh) 用于移动式拆装桥梁护栏模板的小车
CN203428743U (zh) 一种非道路行驶工程机械的吊装装置
CN207737870U (zh) 一种大型储罐倒装提升装置
CN214242084U (zh) 一种牵引电机吊运输保护架
CN103397772A (zh) 一种吊篮配重支撑结构
CN211254953U (zh) 一种用于起吊电控房的紧固装置
CN205387444U (zh) 一种高空吊装门架装置
CN208716778U (zh) 一种用于叉车的吊装装置
CN211545661U (zh) 一种用于矿用卡车轮马达吊装的装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170309

Address after: Farm of Nantong Development Zone in Jiangsu Province, Nantong City, 226000 River Road No. 1

Patentee after: Nantong Zhenhua Heavy Equipment Manufacturing Co., Ltd.

Address before: 226010 Zhenhua Road, Nantong Development Zone, Jiangsu, Nantong, China, 1

Patentee before: Shanghai Zhenhua Heavy Industry Group (Nantong) Co., Ltd.