CN103161484B - A kind of lotion fixed length anchoring support method - Google Patents

A kind of lotion fixed length anchoring support method Download PDF

Info

Publication number
CN103161484B
CN103161484B CN201310093906.8A CN201310093906A CN103161484B CN 103161484 B CN103161484 B CN 103161484B CN 201310093906 A CN201310093906 A CN 201310093906A CN 103161484 B CN103161484 B CN 103161484B
Authority
CN
China
Prior art keywords
lotion
slurries
anchor pole
rope
boring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310093906.8A
Other languages
Chinese (zh)
Other versions
CN103161484A (en
Inventor
张农
薛飞
阚甲广
赵一鸣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201310093906.8A priority Critical patent/CN103161484B/en
Publication of CN103161484A publication Critical patent/CN103161484A/en
Priority to PCT/CN2013/081725 priority patent/WO2014146392A1/en
Application granted granted Critical
Publication of CN103161484B publication Critical patent/CN103161484B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/02Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/028Devices or accesories for injecting a grouting liquid in a bore-hole
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00474Uses not provided for elsewhere in C04B2111/00
    • C04B2111/00715Uses not provided for elsewhere in C04B2111/00 for fixing bolts or the like
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00474Uses not provided for elsewhere in C04B2111/00
    • C04B2111/00724Uses not provided for elsewhere in C04B2111/00 in mining operations, e.g. for backfilling; in making tunnels or galleries
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/70Grouts, e.g. injection mixtures for cables for prestressed concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Structural Engineering (AREA)
  • Ceramic Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Inorganic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Organic Chemistry (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

A kind of lotion fixed length anchoring support method, adopt site prefabrication lotion slurries as Anchor Agent, plastic flexible pipe is inserted in boring, grouting pump is utilized to inject in boring by the lotion slurries configured by plastic flexible pipe, anchor pole/rope is inserted in boring, install pallet, ball pad, anti-attrition pad, nut/ground tackle successively at the revealed section of anchor pole/rope, after lotion grout cures, use stretch-draw instrument to add anchor pole/Suo Jinhang pretension turn round.The lotion slurries adopted have good thixotropy and pumping, relative to traditional packaged type resin anchoring agent, an anchoring difficult problem for breaking surrounding rock can be solved, require low to the jacking force of construction equipment, simultaneously can according to requirement of engineering, the flexible anchorage length selecting to need, and the full length fastening of anchor pole/rope can be realized, make anchor pole/rope to surrouding rock deformation and absciss layer very sensitive, absciss layer and the slip of country rock can be suppressed in time, enhance the compliance of Bolt System to large deformation country rock, solve a deep high stress tunnel supporting difficult problem.

Description

A kind of lotion fixed length anchoring support method
Technical field
The present invention relates to a kind of anchoring support method, especially a kind of lotion fixed length anchoring support method being applicable to roadway surrounding rock.
Background technology
Bolt support is as a kind of important support form of colliery tunnel support, the supporting effect in tunnel is significantly improved compared with traditional shed ding support, reduce roadway support cost, alleviate labor strength, the Bolt System development comprising monomer anchor pole, anchor beam (band), anchor beam (band) net and bolting and rope support taking anchor pole as basic supporting form is rapid, be widely used in home and abroad colliery roadway support, become colliery and realize one of requisite key technology of high-yield and high-efficiency.
In recent years along with adopting dark increase, roadway surrounding rock stress increases, a lot of roadway surrounding rock is made to become engineering soft rock, show strong dilatation and strain softening or lasting rheology characteristic, roadway deformation speed is fast, deflection is large, and current Bolt System is usually to hold anchor or to lengthen anchor, anchorage length is limited, thus suitable for surrounding rock large deformation feature is difficult to, surrouding rock deformation was lost efficacy more than starting during more than 200mm, destroy, surrouding rock deformation can not get effective control, part repair of laneway is caused to reach more than 90%, considerably increase support cost, have a strong impact on the safe and efficient production of mine.
Traditional Bolt System adopts resin anchoring agent as main anchorage style, has adhesion strength large, quick solidifying, security reliability advantages of higher.But its anchoring effect depends on the time of the stirring resistance that rig can provide and stirring, and anchorage length limits to some extent, cannot realize the anchoring of longer scope, be difficult to when rock crusher install simultaneously.And when adopting cementing slurry processes to realize full length fastening, there is the problems such as hole-sealing technology complexity, easily race, spillage, therefore cannot realize the anchoring of anchor pole especially in anchor cable length range.Above-mentioned phenomenon has a strong impact on the Surrounding Rock Control effect of Bolt System, particularly cannot solve a supporting difficult problem for deep large deformation soft-rock tunnel.
Summary of the invention
Technical problem: the object of the invention is the weak point overcome in prior art, provides simple, the easy construction of a kind of method, effective lotion fixed length anchoring support method.
Technical scheme: lotion fixed length anchoring support method of the present invention, is included in boring on the scar of tunnel, clear hole, also comprises the steps:
A, prepare lotion slurries at the scene;
Insert plastic flexible pipe in b, boring on the scar of described tunnel, and plastic flexible pipe is inserted the bottom of boring;
C, according to boring, anchor pole/rope diameter and design anchorage length calculate required lotion slurries injection rate, starting grouting pump injects in boring by the lotion slurries configured by plastic flexible pipe, lotion slurries injection rate is controlled by the metering device on grouting pump, inject while plastic flexible pipe is slowly extracted out, fill up the space of extracting plastic flexible pipe out to make lotion slurries;
D, inserted in boring anchor pole/rope, the lotion slurries extruded are filled in the annulus around anchor pole/rope, install pallet, ball pad, anti-attrition pad, nut/ground tackle successively at the revealed section of anchor pole/rope;
E, after lotion grout cures, use stretch-draw instrument to anchor pole/Suo Jinhang pretension.
Described lotion slurries are configured in mass ratio formed by water, cement, anchoring additive, accelerating admixture, and Qi Zhongshui, cement ratio is 0.25 ~ 0.35, and anchoring additive is 3% ~ 5% of cement amount, and accelerating admixture is 2% ~ 3% of cement amount.
Beneficial effect: the lotion injection slurry adopted in the present invention is different from ordinary Portland cement slurries, there is good thixotropy and mobility, its Marsh funnel viscosity value can reach about 50s, stream pendant phenomenon can not be there is because of gravity effect, thus the anchor note of deep hole is particularly suitable for, do not need extra hole-sealing technology, ordinary Portland cement slurries can be effectively avoided easily to run problem leakage, arbitrarily anchorage length can be adjusted by controlling grouting amount, realize fixed length anchoring, especially the anchoring in anchor pole/rope length range can be realized in the high stress tunnel of deep, effectively improve the compliance of anchor pole/rope to large deformation, enhance the system stiffness of bolt support.Lotion slurries of the present invention require low without the need to stirring to the working resistance of construction equipment, can according to requirement of engineering, the anchorage length that flexible selection is applicable to, and the full length fastening of anchor pole/rope can be realized, make anchor pole/rope to surrouding rock deformation and absciss layer very sensitive, absciss layer and the slip of country rock can be suppressed in time, enhance the compliance of Bolt System to large deformation country rock, effectively can improve the supporting effect in tunnel, solve a deep high stress tunnel supporting difficult problem.The anchoring that the present invention both can be used for bottom tunnel and portion of side holes, also can be used for the anchoring of top plate drilling, is also applicable in the surrounding rock supporting of other geotechnical engineerings.Effectively can solve that the anchorage length that existing bolt support technology exists is limited, the problem of the deformation of the surrounding rock in tunnel that can not adapt under the condition of high ground stress of deep.Its method is simple, easy to operate, effective, has practicality widely.
Accompanying drawing explanation
Fig. 1 is slip casting process schematic of the present invention;
Fig. 2 is anchor pole/rope scheme of installation.
In figure: 1. tunnel scar, 2. hole, 3. plastic flexible pipe, 4. lotion slurries, 5. anchor pole/rope, 6. pallet, 7. ball pad, 8. anti-attrition pad, 9. nut/ground tackle.
Detailed description of the invention
Below in conjunction with accompanying drawing, embodiments of the invention are further described:
Embodiment 1,
(1) prepare lotion slurries 4 at the scene, be 0.25 carry out mixing slurry by water, cement quality ratio, get cement 2000 grams, 500 grams, water, the FLOWCABLE anchoring additive 60 grams produced by BASF AG, accelerating admixture 40 grams, namely obtains required lotion slurries 4 after stirring completely;
(2) at tunnel scar 1 construction drill 2, bore diameter is 28mm, and drilling depth is 2750mm, and clear hole;
(3) be the bottom that 22mm plastic flexible pipe 3 inserts boring 2 by internal diameter 15mm external diameter;
(4) according to diameter and the anchorage length of boring 2, anchor pole/rope 5, required lotion slurries injection rate is calculated by following formula,
In formula s-lotion slurries injection rate;
d-bore diameter;
d-anchor pole/rope diameter;
l-anchorage length
Get that bore diameter is 28mm, anchor pole/rope diameter is 22mm, design anchorage length is 1800mm, lotion slurries injection rate can be obtained and be about 0.42L, start grouting pump by the lotion slurries 4 that configure by plastic flexible pipe 3 injection hole 2, lotion slurries 4 injection rate is controlled by the metering device on grouting pump, inject while plastic flexible pipe 3 is slowly extracted out, fill up the space of extracting plastic flexible pipe 3 out to make lotion slurries 4;
(5) anchor pole/rope 5 of to be 22mm length by diameter be 2800mm inserts in boring 2, and the lotion slurries 4 extruded just are filled in the annulus around anchor pole/rope 5, install pallet 6, ball pad 7, anti-attrition pad 8, nut 9 successively at the revealed section of anchor pole/rope 5;
(6) after lotion slurries 4 solidify, with pneumatic impact wrench or stretch-draw instrument, pretightning force is applied to anchor pole/rope again after about 30min.
Embodiment 2,
Substantially the same manner as Example 1, exist together mutually slightly.Difference: be 0.3 carry out mixing slurry by water ash mass ratio, get cement 2000 grams, 600 grams, water, the FLOWCABLE anchoring additive 60 grams produced by BASF AG, accelerating admixture 40 grams, namely obtains required lotion slurries 4 after stirring completely.
Embodiment 3,
Substantially the same manner as Example 1, exist together mutually slightly.Difference: be 0.35 carry out mixing slurry by water ash mass ratio, get cement 2000 grams, 700 grams, water, the FLOWCABLE anchoring additive 60 grams produced by BASF AG, accelerating admixture 40 grams, namely obtains required lotion slurries 4 after stirring completely.

Claims (1)

1. a lotion fixed length anchoring support method, is included in the upper boring (2) of tunnel scar (1), clear hole, it is characterized in that:
A, prepare lotion slurries (4) at the scene, described lotion slurries are configured in mass ratio formed by water, cement, anchoring additive, accelerating admixture, wherein water, cement ratio are 0.25 ~ 0.35, and anchoring additive is 3% ~ 5% of cement amount, and accelerating admixture is 2% ~ 3% of cement amount;
Insert plastic flexible pipe (3) in b, boring on described tunnel scar (1), and plastic flexible pipe (3) is inserted the bottom of boring (2);
C, according to boring (2), the diameter of anchor pole/rope (5) and anchorage length, calculate required lotion slurries injection rate by following formula,
In formula: s-lotion slurries injection rate, d-bore diameter, d-anchor pole/rope diameter, l-anchorage length;
Start grouting pump by the lotion slurries (4) that configure by plastic flexible pipe (3) injection hole (2), lotion slurries (4) injection rate is controlled by the metering device on grouting pump, inject while plastic flexible pipe (3) is slowly extracted out, fill up the space of extracting plastic flexible pipe (3) out to make lotion slurries (4);
D, by anchor pole/rope (5) insert boring in, the lotion slurries (4) extruded are filled in anchor pole/rope (5) annulus around, install pallet (6), ball pad (7), anti-attrition pad (8), nut/ground tackle (9) successively at the revealed section of anchor pole/rope (5);
E, solidify rear use stretch-draw instrument until lotion slurries (4) pretension is carried out to anchor pole/rope (5).
CN201310093906.8A 2013-03-22 2013-03-22 A kind of lotion fixed length anchoring support method Active CN103161484B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201310093906.8A CN103161484B (en) 2013-03-22 2013-03-22 A kind of lotion fixed length anchoring support method
PCT/CN2013/081725 WO2014146392A1 (en) 2013-03-22 2013-08-19 Paste fixed-length anchoring supporting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310093906.8A CN103161484B (en) 2013-03-22 2013-03-22 A kind of lotion fixed length anchoring support method

Publications (2)

Publication Number Publication Date
CN103161484A CN103161484A (en) 2013-06-19
CN103161484B true CN103161484B (en) 2015-08-19

Family

ID=48584979

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310093906.8A Active CN103161484B (en) 2013-03-22 2013-03-22 A kind of lotion fixed length anchoring support method

Country Status (2)

Country Link
CN (1) CN103161484B (en)
WO (1) WO2014146392A1 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103161484B (en) * 2013-03-22 2015-08-19 中国矿业大学 A kind of lotion fixed length anchoring support method
CN103758549B (en) * 2014-01-09 2016-09-28 中国矿业大学 Anchor prestressing force full-length anchorage support method after a kind of first filling based on ointment material
CN105257325A (en) * 2015-11-02 2016-01-20 新汶矿业集团有限责任公司协庄煤矿 Anchor rod anchoring device for surrounding rock of roadway and anchoring method of anchor rod anchoring device
CN105863693A (en) * 2016-05-09 2016-08-17 美亚高新材料股份有限公司 Full-length anchoring supporting method for deep high-stress roadway
CN111022848B (en) * 2019-12-03 2021-10-26 北京中科富海低温科技有限公司 Fixing device and cold box
CN112922651A (en) * 2021-04-23 2021-06-08 辽宁工程技术大学 Anchor rod supporting process for driving face

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4140429A (en) * 1977-02-19 1979-02-20 Dyckerhoff & Widmann Aktiengesellschaft Corrosion protected tensioning member for a prestressable anchor in solid rock
CN101200904A (en) * 2007-12-10 2008-06-18 山西建筑工程(集团)总公司 Anti-floating construction method by combination of bar-planting and anchoring-bolt
CN102003194A (en) * 2010-10-30 2011-04-06 中国矿业大学 Rapid installation process of resin anchor bar and device thereof

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FI79597C (en) * 1985-11-07 1990-01-10 Tampella Oy Ab Method and apparatus for feeding concrete in a borehole during concrete aeration of rock.
AU664186B2 (en) * 1991-08-30 1995-11-09 Technological Resources Pty Limited Rock bolt load sensor
CN1448363A (en) * 2003-05-01 2003-10-15 东南大学 High-strength anchor grouting agent
CA2504058A1 (en) * 2005-04-11 2006-10-11 Mansour Mining Inc. Mine roof support system having torque indicating washer
CN1830882A (en) * 2006-04-17 2006-09-13 张京泉 Roofbolt anchoring agent and roofbolt pin-timbering method therewith
CN101949294A (en) * 2010-08-13 2011-01-19 山西潞安环保能源开发股份有限公司常村煤矿 Prestressed full-length anchorage support method
CN102503324B (en) * 2011-11-22 2014-07-09 中建材中岩科技有限公司 Anchoring grouting material as well as preparation method and application thereof
CN103161484B (en) * 2013-03-22 2015-08-19 中国矿业大学 A kind of lotion fixed length anchoring support method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4140429A (en) * 1977-02-19 1979-02-20 Dyckerhoff & Widmann Aktiengesellschaft Corrosion protected tensioning member for a prestressable anchor in solid rock
CN101200904A (en) * 2007-12-10 2008-06-18 山西建筑工程(集团)总公司 Anti-floating construction method by combination of bar-planting and anchoring-bolt
CN102003194A (en) * 2010-10-30 2011-04-06 中国矿业大学 Rapid installation process of resin anchor bar and device thereof

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
两河口水电站锚杆锚固质量控制与无损检测总结;苏智光;《云南水力发电》;20111015;第27卷(第05期);全文 *
向家坝水电站尾水洞出口预应力锚杆施工技术;徐永明等;《人民长江》;20110114;第42卷(第01期);全文 *
向家坝电站地下厂房岩壁梁锚杆施工技术与工艺;田源等;《四川水力发电》;20090815;第28卷(第04期);正文第35页右栏上部分第4行-第36页右栏倒数第3行,附图2 *
溪洛渡水电站右岸泄洪洞预应力锚杆施工;邓良超;《人民长江》;20080405;第39卷(第07期);正文第15页3.1节、第16页3.2.8小节和3.2.9小节,附图1 *

Also Published As

Publication number Publication date
WO2014146392A1 (en) 2014-09-25
CN103161484A (en) 2013-06-19

Similar Documents

Publication Publication Date Title
CN103161484B (en) A kind of lotion fixed length anchoring support method
CN102146673A (en) Anchoring structure for liquid-injection corrosion-resistant anchor rod or anchor cable and construction method thereof
CN103758549B (en) Anchor prestressing force full-length anchorage support method after a kind of first filling based on ointment material
CN205689230U (en) A kind of recyclable pressure grouting anchor cable that allows
CN104500115B (en) A kind of prestressing force Bolt method for protecting support
CN102322273A (en) A kind of roadway floor anchor is annotated integrated reinforcement means
CN103711507B (en) A kind of many steel strand wires combination supporting device controls the method for big relaxation zone roadway deformation
CN103089276B (en) Deep-shallow hole and high-low pressure coupling grouting technology
CN205025479U (en) Administer bottom plate support system of soft rock tunnel pucking
CN103147777B (en) Pumping paste prestress full bolting anchor rod/cable supporting method
CN201650323U (en) Grouting anchor rope
CN205530282U (en) Prestressed anchorage cable
CN103883339B (en) A kind of cable bolting method repeating Shi Hanzhang
CN102182481B (en) Anchor rope grouting-stop plug
CN103573280A (en) Method for supporting porous ooze invasion compound roof roadway
CN202132060U (en) Anchoring structure for liquid-filled corrosion resistant anchor rod or anchor rope
CN102286979A (en) Construction method for deep foundation pit supporting by adopting steel pipe piles-self-drilling prestressed anchor bars
CN201588643U (en) Multi-corrosion resistant anchor rod
CN204327134U (en) A kind of prestressing force balance anchor cable
CN204163750U (en) A kind of anchor cable improving anchored force
CN202989919U (en) Pressure-bearing water-sand-layer anchor rod mounting structure
CN203189049U (en) Anchorage top-pouring pre-stressed anchor cable strengthening device of mine roadway bottom plate
CN215520930U (en) Novel multi-functional inflation slip casting stock
CN201158818Y (en) Anti-corrosion anchor bar with centering slurry guiding tube
CN102877869A (en) Grout plugging yielding tray for grouting anchor rod or anchor cable and usage method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant