CN103093400A - Adjacent building safety quantitative evaluation method in tunnel construction - Google Patents
Adjacent building safety quantitative evaluation method in tunnel construction Download PDFInfo
- Publication number
- CN103093400A CN103093400A CN2013100266848A CN201310026684A CN103093400A CN 103093400 A CN103093400 A CN 103093400A CN 2013100266848 A CN2013100266848 A CN 2013100266848A CN 201310026684 A CN201310026684 A CN 201310026684A CN 103093400 A CN103093400 A CN 103093400A
- Authority
- CN
- China
- Prior art keywords
- evaluation
- safety
- buildings
- evaluation index
- close
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310026684.8A CN103093400B (en) | 2013-01-24 | 2013-01-24 | Adjacent building safety quantitative evaluation method in tunnel construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310026684.8A CN103093400B (en) | 2013-01-24 | 2013-01-24 | Adjacent building safety quantitative evaluation method in tunnel construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103093400A true CN103093400A (en) | 2013-05-08 |
CN103093400B CN103093400B (en) | 2017-04-26 |
Family
ID=48205937
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310026684.8A Active CN103093400B (en) | 2013-01-24 | 2013-01-24 | Adjacent building safety quantitative evaluation method in tunnel construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103093400B (en) |
Cited By (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105740603A (en) * | 2016-01-24 | 2016-07-06 | 辽宁工程技术大学 | Method for determining change trend of system cloudization fault probability distribution |
CN106372420A (en) * | 2016-08-31 | 2017-02-01 | 辽宁工程技术大学 | Evaluation method for data uncertainty in reliability analysis |
CN106530717A (en) * | 2016-12-26 | 2017-03-22 | 长安大学 | Construction road section risk evaluating method based on cloud model |
CN106547960A (en) * | 2016-10-20 | 2017-03-29 | 华中科技大学 | A kind of tunnel closes on the construction method of Historical Buildings |
CN106779296A (en) * | 2016-11-22 | 2017-05-31 | 华中科技大学 | A kind of constructing tunnel Adjacent Buildings safe early warning method based on multisensor |
CN106919784A (en) * | 2017-01-19 | 2017-07-04 | 上海隧道工程有限公司 | A kind of shield tunnel military service method of evaluating performance based on variable weight |
CN108171432A (en) * | 2018-01-04 | 2018-06-15 | 南京大学 | Ecological risk evaluating method based on Multidimensional Cloud Model-fuzzy support vector machine |
CN108520355A (en) * | 2018-04-09 | 2018-09-11 | 中铁十二局集团第二工程有限公司 | Building As-Is Assessment method is worn under complex conditions hydraulic tunnel |
CN108921432A (en) * | 2018-07-03 | 2018-11-30 | 黄震 | A kind of shield tunnel construction Risk Comprehensive Evaluation method |
CN109537418A (en) * | 2018-12-10 | 2019-03-29 | 鄂宇 | It crosses and wears construction of the highway building method for supporting |
CN110210776A (en) * | 2019-06-11 | 2019-09-06 | 青岛理工大学 | Tunnel construction dynamic risk assessment method based on monitoring measurement |
CN110222961A (en) * | 2019-05-24 | 2019-09-10 | 南京师范大学 | A kind of Power Generation market forces evaluation method based on entropy assessment and cloud model |
CN110442979A (en) * | 2019-08-08 | 2019-11-12 | 山东大学 | The full Deformation Prediction method and system in the shield-tunneling construction tunnel based on BP neural network |
CN110852560A (en) * | 2019-09-24 | 2020-02-28 | 天津大学 | Comprehensive evaluation method for green construction of subway in limited space |
CN110889588A (en) * | 2019-10-21 | 2020-03-17 | 铜陵学院 | Method for evaluating risk level of shield tunnel construction adjacent building by using factor judgment matrix |
CN111473768A (en) * | 2020-03-20 | 2020-07-31 | 淮阴工学院 | Building safety intelligent detection system |
CN112200478A (en) * | 2020-10-20 | 2021-01-08 | 长春工程学院 | Method and system for processing frost heaving risk information of cohesive soil field |
CN112270503A (en) * | 2020-11-18 | 2021-01-26 | 中铁第五勘察设计院集团有限公司 | Construction risk evolution system, construction method and construction risk assessment method |
CN112699559A (en) * | 2020-12-31 | 2021-04-23 | 青岛理工大学 | Safety evaluation method and system based on settling rate information entropy safety value |
CN112837182A (en) * | 2020-12-29 | 2021-05-25 | 长春工程学院 | Method for evaluating safety and stability of shield tunneling |
CN112837184A (en) * | 2021-02-22 | 2021-05-25 | 辽宁科技学院 | Project management system suitable for building engineering |
CN113468627A (en) * | 2020-12-04 | 2021-10-01 | 广东省建筑设计研究院有限公司 | Novel concrete structure building group safety assessment method |
CN113486502A (en) * | 2021-06-24 | 2021-10-08 | 天津大学 | Cruise ship glass curtain wall risk analysis method based on composite empowerment cloud model |
CN116011222A (en) * | 2023-01-04 | 2023-04-25 | 西南交通大学 | Tunnel structure safety evaluation method based on subjective and objective weighting cloud model |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101498221A (en) * | 2009-02-23 | 2009-08-05 | 北京交通大学 | City underground engineering construction safety risk dynamic control method |
KR101132640B1 (en) * | 2010-04-30 | 2012-04-02 | 한국표준과학연구원 | Safety evaluation method for soil shearing work |
-
2013
- 2013-01-24 CN CN201310026684.8A patent/CN103093400B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101498221A (en) * | 2009-02-23 | 2009-08-05 | 北京交通大学 | City underground engineering construction safety risk dynamic control method |
KR101132640B1 (en) * | 2010-04-30 | 2012-04-02 | 한국표준과학연구원 | Safety evaluation method for soil shearing work |
Non-Patent Citations (3)
Title |
---|
吴贤国 等: "地铁隧道施工邻近建筑物安全风险等级评价", 《施工技术》 * |
范洁: "某地铁江积区间工程施工风险管控研究", 《万方数据库》 * |
辛制高 等: "给予云模型的建筑工程质量等级评价", 《科技与管理》 * |
Cited By (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105740603A (en) * | 2016-01-24 | 2016-07-06 | 辽宁工程技术大学 | Method for determining change trend of system cloudization fault probability distribution |
CN106372420B (en) * | 2016-08-31 | 2019-01-25 | 辽宁工程技术大学 | The evaluation method of data uncertainty in a kind of fail-safe analysis |
CN106372420A (en) * | 2016-08-31 | 2017-02-01 | 辽宁工程技术大学 | Evaluation method for data uncertainty in reliability analysis |
CN106547960A (en) * | 2016-10-20 | 2017-03-29 | 华中科技大学 | A kind of tunnel closes on the construction method of Historical Buildings |
CN106779296A (en) * | 2016-11-22 | 2017-05-31 | 华中科技大学 | A kind of constructing tunnel Adjacent Buildings safe early warning method based on multisensor |
CN106530717B (en) * | 2016-12-26 | 2019-02-05 | 长安大学 | The dangerous state evaluation method of construction section driving based on cloud model |
CN106530717A (en) * | 2016-12-26 | 2017-03-22 | 长安大学 | Construction road section risk evaluating method based on cloud model |
CN106919784A (en) * | 2017-01-19 | 2017-07-04 | 上海隧道工程有限公司 | A kind of shield tunnel military service method of evaluating performance based on variable weight |
CN108171432A (en) * | 2018-01-04 | 2018-06-15 | 南京大学 | Ecological risk evaluating method based on Multidimensional Cloud Model-fuzzy support vector machine |
CN108520355A (en) * | 2018-04-09 | 2018-09-11 | 中铁十二局集团第二工程有限公司 | Building As-Is Assessment method is worn under complex conditions hydraulic tunnel |
CN108921432A (en) * | 2018-07-03 | 2018-11-30 | 黄震 | A kind of shield tunnel construction Risk Comprehensive Evaluation method |
CN109537418A (en) * | 2018-12-10 | 2019-03-29 | 鄂宇 | It crosses and wears construction of the highway building method for supporting |
CN110222961A (en) * | 2019-05-24 | 2019-09-10 | 南京师范大学 | A kind of Power Generation market forces evaluation method based on entropy assessment and cloud model |
CN110210776B (en) * | 2019-06-11 | 2022-11-15 | 青岛理工大学 | Tunnel construction dynamic risk assessment method based on monitoring measurement |
CN110210776A (en) * | 2019-06-11 | 2019-09-06 | 青岛理工大学 | Tunnel construction dynamic risk assessment method based on monitoring measurement |
CN110442979A (en) * | 2019-08-08 | 2019-11-12 | 山东大学 | The full Deformation Prediction method and system in the shield-tunneling construction tunnel based on BP neural network |
CN110442979B (en) * | 2019-08-08 | 2021-04-13 | 山东大学 | BP neural network-based shield construction tunnel total deformation prediction method and system |
CN110852560A (en) * | 2019-09-24 | 2020-02-28 | 天津大学 | Comprehensive evaluation method for green construction of subway in limited space |
CN110889588A (en) * | 2019-10-21 | 2020-03-17 | 铜陵学院 | Method for evaluating risk level of shield tunnel construction adjacent building by using factor judgment matrix |
CN111473768A (en) * | 2020-03-20 | 2020-07-31 | 淮阴工学院 | Building safety intelligent detection system |
CN111473768B (en) * | 2020-03-20 | 2021-10-29 | 淮阴工学院 | Building safety intelligent detection system |
CN112200478A (en) * | 2020-10-20 | 2021-01-08 | 长春工程学院 | Method and system for processing frost heaving risk information of cohesive soil field |
CN112270503A (en) * | 2020-11-18 | 2021-01-26 | 中铁第五勘察设计院集团有限公司 | Construction risk evolution system, construction method and construction risk assessment method |
CN113468627A (en) * | 2020-12-04 | 2021-10-01 | 广东省建筑设计研究院有限公司 | Novel concrete structure building group safety assessment method |
CN112837182A (en) * | 2020-12-29 | 2021-05-25 | 长春工程学院 | Method for evaluating safety and stability of shield tunneling |
CN112699559A (en) * | 2020-12-31 | 2021-04-23 | 青岛理工大学 | Safety evaluation method and system based on settling rate information entropy safety value |
CN112837184A (en) * | 2021-02-22 | 2021-05-25 | 辽宁科技学院 | Project management system suitable for building engineering |
CN113486502A (en) * | 2021-06-24 | 2021-10-08 | 天津大学 | Cruise ship glass curtain wall risk analysis method based on composite empowerment cloud model |
CN113486502B (en) * | 2021-06-24 | 2023-04-07 | 天津大学 | Cruise ship glass curtain wall risk analysis method based on composite empowerment cloud model |
CN116011222A (en) * | 2023-01-04 | 2023-04-25 | 西南交通大学 | Tunnel structure safety evaluation method based on subjective and objective weighting cloud model |
Also Published As
Publication number | Publication date |
---|---|
CN103093400B (en) | 2017-04-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103093400A (en) | Adjacent building safety quantitative evaluation method in tunnel construction | |
WO2022227129A1 (en) | Road transportation risk assessment method and system for hazardous chemical | |
CN106021875B (en) | Multi-scale debris flow risk assessment method for seismic disturbance zone | |
CN105035902B (en) | A kind of elevator safety condition evaluation method | |
CN103971523B (en) | A kind of mountain road traffic safety dynamic early-warning system | |
CN112100727B (en) | Early warning prevention and control method for water burst of water-rich tunnel under influence of fault fracture zone | |
CN104281920A (en) | Tailing pond layered index safety assessment and early-warning method and system | |
CN104408925A (en) | Array radar based intersection running state evaluation method | |
CN102289734A (en) | Dynamic risk evaluation and management method for foundation pit engineering | |
CN104732286A (en) | Method for sensing safety situation of urban rail transit station | |
CN104616496B (en) | Power network based on catastrophe theory is had a power failure on a large scale traffic congestion degree appraisal procedure | |
Yang et al. | Vulnerability evaluation of the highway transportation system against meteorological disasters | |
CN114881396A (en) | Tunnel collapse risk assessment method based on AHP and TOPSIS | |
CN111445165A (en) | Tunnel structure health monitoring online grading early warning evaluation method | |
CN106384507A (en) | Travel time real-time estimation method based on sparse detector | |
CN116341891A (en) | Emergency management system based on watershed hydropower risk prevention and control | |
CN117238126A (en) | Traffic accident risk assessment method under continuous flow road scene | |
Ching et al. | Predicting rainfall-induced landslide potential along a mountain road in Taiwan | |
CN104966404A (en) | Single-point self-optimization signal control method and device based on array radars | |
CN110084460A (en) | A kind of quantization assessment method of obstacle free airspace condition | |
Nie et al. | Diagnosis of Critical Risk Sources in the Operation Safety of the Central Route Project of South‐to‐North Water Diversion Based on the Improved FMEA Method | |
CN105070074A (en) | Region self-optimization signal control method based on array radar and device | |
CN105070075A (en) | Trunk line self-optimization signal control method based on array radar and device | |
Li et al. | Risk analysis and management for highway operations safety using a covariate-balanced determinant detector | |
Li et al. | Study on evaluation method of expressway operation safety risk based on grey incidence analysis and AHP |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhang Limao Inventor after: Wu Xianguo Inventor after: Chen Hongyu Inventor after: Ji Haizhou Inventor after: Ding Baojun Inventor after: Liu Qian Inventor after: Zhang Qingying Inventor after: Jiang Zhou Inventor after: Wang Yanhong Inventor before: Wu Xianguo Inventor before: Zhang Limao Inventor before: Cao Jing Inventor before: Ji Haizhou Inventor before: Jiang Xue Inventor before: Li Shuqin Inventor before: Zhou Geqian |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: WU XIANGUO ZHANG LIMAO CAO JING QU HAIZHOU JIANG XUE LI SHUQIN ZHOU GEQIAN TO: ZHANG LIMAO WU XIANGUO CHEN HONGYU QU HAIZHOU DING BAOJUN LIU QIAN ZHANG QINGYING JIANG ZHOU WANG YANHONG |
|
GR01 | Patent grant | ||
GR01 | Patent grant |