CN103081290B - 次级能源对电网的贡献的调节 - Google Patents
次级能源对电网的贡献的调节 Download PDFInfo
- Publication number
- CN103081290B CN103081290B CN201180020603.2A CN201180020603A CN103081290B CN 103081290 B CN103081290 B CN 103081290B CN 201180020603 A CN201180020603 A CN 201180020603A CN 103081290 B CN103081290 B CN 103081290B
- Authority
- CN
- China
- Prior art keywords
- energy storage
- storage medium
- energy
- output
- electrical network
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
- H02J3/32—Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/34—Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
- H02J7/35—Parallel operation in networks using both storage and other dc sources, e.g. providing buffering with light sensitive cells
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Abstract
能量存储介质与向配电网供电的次级能源结合。控制能量存储介质的充电和放电行为,使得次级能源的输出的快速增长被存储***吸收,而通过把保存的能量释放到电网,补偿次级源的输出的快速下降。次级源和能量存储***的组合贡献确保不超过限定水平的变化率。可以确定次级源的最大和最小输出功率水平以定义正常工作范围。当次级输出功率水平超过或者低于限定范围的限制时,还进行能量存储***的充电或放电。
Description
技术领域
本公开涉及利用次级能源向配电网贡献电能,尤其涉及由这种源向电网供给的全部电能以及这种电能的瞬间增大或降低的调节。
背景技术
一般来说,公用事业公司从一个或多个主电力产生源,比如燃气、燃煤、核能和/或水力发电厂获得电能,以通过配电网输送给消费者。利用这些源供给的电能较稳定,并且能够容易地调节以满足消费者的需求,同时符合关于这种电能的标准,比如额定电压水平和额定频率水平。为了补充利用这些主源供给的电能,日益常见的是将次级能源,比如太阳能板和风力发电机连接到配电网。除了别的优点之外,与天然气、煤和核能源相反,这些次级形式的能量是可再生的,并且还有助于减少不利地影响气候条件的温室气体的排放。
当把次级能源连接到电网时,公用事业公司运营商期望次级能源的贡献在一定水平之内,使得其能够被充分考虑到,并相应地调整主源的输出。不过,和主源的相对稳定的输出不同,次级源产生的能量的大小会在相对较短的时间间隔(例如,以秒计的时间间隔)中,在较大的范围内变化。例如,太阳能板的输出不仅随着时辰变化,而且会由于诸如遮挡直射阳光的云彩的突然出现和飘过之类的气象事件而变化。同样地,风力发电场的输出常遭受风速的瞬间狂风和间歇。
次级源的输出的突然下降被电网吸收,并且需要通过增大一个或多个主源的输出来被适应。不利地,次级输出的突然剧增会超过现场设备的输送能力,在主源能够被削减之前,会导致产生的电能的损失。这些突然变化限制了次级能源在源的整个群体内的有效贡献。利用的次级源的数目越多,供给的电能的变化就越大,这导致这种源的可靠性的降低,和/或需要快速响应的主发电单元。后一要求会在主发电厂导致额外费用,比如增加的维护要求,和与在非最佳设定点的运行相关的额外燃料费用。
电压的较大摇摆还可能超过配电***对正常运行的响应能力。传统的发电设备通常不能足够迅速地对突然的变化作出反应,当试图足够迅速地对突然的变化作出反应时,会引起额外的燃料和维护成本。
发明内容
按照所公开的本发明的实施例,通过控制在能量方面耦接到电网的一个或多个能量存储***的充电和放电行为,使得次级能源的输出的快速增长被存储***吸收,而通过将存储的能量释放到电网来补偿次级源的输出的快速下降,解决了这些顾虑。实际上,能量存储***调和或者“掩饰”次级源的输出中的变化,使得可以可靠地把提供给电网和电网提供的功率维持在适当的水平。
能量存储***的充电和放电可被控制,使得次级源和能量存储***的组合贡献确保不超过规定水平的变化率。可以确定次级源的最大和最小输出功率水平以定义正常工作范围。只有当次级源输出功率水平超过或者低于规定范围的限制时,才实现能量存储***的充电或放电。
参考下面的详细说明和附图,可以更好地理解本发明的原理和优点。
附图说明
图1是图解说明相对于目标功率带的次级能源的功率输出的曲线图。
图2A-2C是图解说明按照本发明获得的结果的时间曲线图。
图3是连接到电网的能量存储***的一般方框图,所述能量存储***被控制以调节次级能源的输出的变化率等因素。
图4是用于调节次级能源的输出功率的控制模块的更详细方框图。
图5、6、7和图8A-8B是图解说明控制能量存储***以调节次级能源的输出的变化率的方法的流程图。
具体实施方式
为了更容易地理解成为本发明的基础的原理,下面关于使用太阳能转换装置,例如光伏板作为次级源,说明示例性实施例。要理解本发明的实际应用并不局限于该例子,本发明可以用在期望削弱能源的输出中的快速摇摆的任何环境中。
图1是本发明适用于的情形的种类的曲线图。对于一天中的特定时期,例如,给定的某小时来说,公用事业公司预期来自连接到配电网的太阳能板的一定数量的输出功率。考虑到电网吸收变化的能力,可为该时期确定上限10和下限12,以限定来自太阳能板的容许输出功率的范围或带。此范围可以随时间因素,比如时辰、月中日期和/或月份而变化,以考虑到太阳的位置的变化。作为替代地或者附加地,它可以是影响次级能源的输出的地理参数,比如太阳日射、风速等的函数。这些参数可以基于根据历史数据或者实时测量获得的估计量。
线13代表在所述时期内,太阳能板可能输出的实际功率水平。尽管该时期的平均输出可能在期望的带内,不过瞬时值可能变化极大和极快,导致超过上限10的波峰14,和低于下限12的波谷16。另外,即使当实际功率水平在期望的功率带内时,瞬时增长率18或者减少率20也可能超过电网能够吸收的值。由于主发电源不能足够快速地抗衡这些波峰、波谷和较高的上升率或下降率的影响,因此配电网上的功率水平可能偏离期望的功率水平。
为了减轻这种功率摇摆可能对配电网的影响,使能量存储***与太阳能转换装置结合,从而通过削弱太阳能板的输出的变化,降低来自主源的所要求的响应,和从而招致的成本。通过把能量从能量存储***释放到电网上,对太阳能板的输出降低到期望的带之下进行抗衡,并且通过把一些或者全部多余的能量转移到能量存储***,补偿输出超过上限10的向上增加。此外,当太阳能板在期望的带内工作时,存储装置可被充电或放电,以把保存的能量维持在最佳水平,以用于吸收太阳能板的输出中的下次较大变化,同时削弱输出功率的任何较高的增长率或减少率。
图2A-2C的时间曲线图中图解说明了通过组合诸如电池之类的能量存储装置和太阳能板而获得的效果。图2A描述其中在从ti-1到ti的时期内,太阳能板的输出功率的瞬时增大大于最大容许变化率的情形。在这种情况下,电池存储***被启动,以对电池充电,从而使来自太阳能板的一些输出功率被电池吸收。结果,在该时期内,对电网的净输出功率保持在容许的斜升率之内。
图2B图解说明相反的情形,其中源于太阳能板的输出功率以超过最大容许速率的速率降低。在这种情况下,电池放电,从而在该时期内向电网供给额外的功率,使得相对于前一时期的净变化被减小,从而保持在容许的变化率之内。
在图2C的例子中,一天之中的期望功率带由按照时辰而变化的上限10和下限12限定。当在一天之中的部分时刻内,太阳能板的实际输出功率超过上限时,多余的功率被电池吸收,使得向电网供给的净功率被限制为利用粗线段11描述的量。类似地,当在一天之中稍晚的部分时刻内,太阳能板的输出功率降到下限12以下时,电池向电网供给额外的功率,使得输送的净功率保持在利用粗线段13描述的水平。
适当的能量存储***的例子是采用连接到配电网,并且被有选择地充电或放电,以便分别吸收多余的能量和提供补充能量的电池组的能量存储***。图3是图解说明实现本发明的原理的控制存储电池的充电和放电的示例性***的框图。参见图3,一个或多个太阳能板22产生由逆变器24转换成交流(AC)功率的直流输出功率。该AC功率被提供给电功率配电网26。
传感器27把表示太阳能板逆变器的输出功率的信号提供给电池存储***控制器28。该控制器产生影响连接到电网26的电池存储***(BSS)30中的电池的充电或放电的信号。BSS控制器28的第一模块32按照本发明的原理工作,以调节太阳能板22的输出的斜坡(即,变化率),以及把太阳能板22的输出对电网的贡献保持在期望带内。该模块按照太阳能板逆变器的瞬时输出功率,生成信号Dispatch1,以削弱所述输出功率的较大和/或较快的摇摆,以及调节所述输出功率的总水平。在本发明的一个实施例中,太阳能调节模块32的输出信号Dispatch1可被直接应用于BSS30,以按根据太阳能板的输出控制电池的充电和放电。
在另一个实施例中,从太阳能调节模块32输出的信号Dispatch1被提供给频率调节模块34,如图3中所示。频率调节模块34按照电网26上的AC功率的频率,修改Dispatch1信号。本质上,频率调节模块使BSS向电网供给电能,或者从电网吸收电能,以把电网的工作频率维持在预定范围内,所述预定范围以期望的额定工作频率,例如,在美国的60Hz,为基础。在同时待审的共同转让的美国专利申请No.12/248,106中说明了这种频率调节的一个例子,该专利申请的公开内容在此引为参考。如这里所述,BSS和电网之间的能量传递的量或速率可以是电网的工作频率的函数。频率调节模块要求的电池的放电量或充电量与来自太阳能调节模块32的信号Dispatch1结合,从而产生应用于BSS的输出信号Dispatch2。
应用于BSS的控制信号,例如第一实施例中的Dispatch1或第二实施例中的Dispatch2的符号启动BSS中的转换器***(未示出)内的逆变器,从而使电池向电网放电,或者启动BSS中的转换器***内的转换器,从而用来自电网的电能对电池充电。信号的大小决定将被加入电网或者将从电网吸收的电能的量。由于太阳能板逆变器24的输出功率被施加于BSS和电网之间的连接,因此电池的充电和放电实际上分别用于吸收来自太阳能板的多余电能或者补充电能。
图4中图解说明太阳能斜坡调节模块34的更详细描述。该模块包括执行后面说明的控制算法的处理器38,和被配置有保存所述算法采用的参数的寄存器的一种或多种形式的存储器40。这些参数包括具有示出的测量单位的下述一组输入值:
Solar(kWh)-太阳能板逆变器在当前时刻t的输出。
LagSolar(kWh)-在时间t-1,对电网的调节后的功率输出,即,太阳能板22的输出和BSS30的电池的输出的代数组合。
Floor(kWh)-用户规定的关于功率输出的下限,例如极限值12。
Ceiling(kWh)-用户规定的关于功率输出的上限,例如极限值10。
RampMax(kWh)-用户规定的从时间t-1到t的功率输出的向上或者向下的最大变化。
SoC(%,0-100)-电池的充电状态。
BattCap(kWh)-关于瞬间电池功率输出的限制。
kWh(kWh)-总的电池能量容量。
Bias(kWh)-用户定义的电池的最佳电荷状态的值。
保存在存储器40中的参数还包括利用算法计算的以下中间变量:
BasicDisp(kWh)-无约束的电池调度(dispatch)信号。
Conf(kWh)-关于使电池充电的约束条件。
Cone(kWh)-关于使电池放电的约束条件。
UpperLim(kWh)-对电网的功率输出的容许范围的上限。
LowerLim(kWh)-对电网的功率输出的容许范围的下限。
Rbe(%,0-100)-当前电荷状态和满电荷之间的差(=1-SoC)。
如前所述,Floor和Ceiling的值是用户确定的值,它们可以是影响次级源的预期输出的时间和/或地理参数的函数。在另一个实施例中,它们可根据电池的充电状态(SoC)被确定。同样地,RampMax的值由用户输入,且可以是任意一个或多个这些相同因素的函数。最大变化率也可根据次级能源的输出被确定。
根据保存在这些寄存器中的数据,处理器38产生两个输出信号:Dispatch1和Dump。如前所述,在一个实施例中,Dispatch1信号可被直接应用于BSS30,以控制电池的充电和放电。在备选实施例中,Dispatch1信号被提供给频率调节模块,并被按需修改,以产生控制电池的充电和放电的Dispatch2信号。
Dump信号被用于在太阳能板产生的电能过多从而不能被电网和BSS吸收时,有选择地丢弃太阳能板产生的电能。例如,如图3中图形所示,Dump信号可启动开关42,以把太阳能电力从电网转移到处于接地电位的电极44。
图5-8B的流程图中表示了处理器38执行的产生这些信号的算法。图5图解说明周期性地,例如每秒一次地执行的主例程。在所述周期开始时,在步骤50,比较Solar的当前值与下限Floor。如果Solar小于Floor,那么在步骤52执行放电子例程Low。如果Solar的值大于Floor,那么处理器进入步骤54,在步骤54,处理器比较Solar的值和上限Ceiling。如果Solar超过Ceiling,那么在步骤56执行充电子例程High。如果Solar小于Ceiling,那么在步骤57,处理器执行In-Range子例程。
图6的流程图中描述了步骤52的放电子例程。当处理器跳转到该子例程时,在步骤58,处理器把无约束的电池放电信号BasicDisp的值设定成等于Solar减去Floor或(LagSolar-RampMax)中的较大者的值。LagSolar是在时间t-1时的太阳能板和BSS的组合输出。(LagSolar-RampMax)是从变化率看的最小容许输出。如果LagSolar高于但是接近于最低限度值,那么(LagSolar-RampMax)会使新的输出降到最低限度值之下。这种情况下,“max”函数确保新的(无约束的)目标输出至少为最低限度值。这将为负值,因为最低限度值高于逆变器输出,电池将不得不把电能放出到电网中,以弥补差值。
BasicDisp的负值实质上是使电池放电,以便把***输出升高到最低限度水平之上的请求。不过,总的放电量必须不超过电池中的可用能量,或者电池的最大额定功率。于是,在步骤60,参数Cone被设定成等于(SoC*kWh/100)或BattCap中的较小者的负数。总的值为负,因为这是放电约束。
在步骤62,选择无约束的调度值BasicDisp和约束值Cone中的较大者,从而产生Dispatch1控制信号。由于在本子例程中,电池正在被放电,因此不存在要废弃的多余能量。因而,在步骤64,Dump控制信号被设定为0。
图7的流程图说明当太阳能逆变器输出升高到用户规定的最高限度之上时,用于控制BSS的充电子例程56。在步骤66,BasicDisp的值被设定成等于Solar减去Ceiling和(LagSolar+RampMax)中的较小者的值。从斜坡(slope)观点看的最大容许输出由(LagSolar+RampMax)定义。如果LagSolar接近于上限,那么(LagSolar+RampMax)会使新的输出超过最高限度。这种情况下,“min”函数确保新的(无约束的)目标值最多等于最高限度值。这将是正值,因为逆变器输出高于最高限度值,从而电池将不得不充电(吸收能量),以减小输出。
任何充电信号必须不超过电池的未用能量容量,或者电池的最大额定功率。于是,在步骤68,选择(Rbe*kWh/100)和BattCap中的较小者以产生充电约束条件Conf。
在步骤70,选择均为正值的无约束的调度值BasicDisp和约束值Conf中的较小者,从而产生调度量控制信号Dispatch1。如果约束条件有约束力,那么或者由于电池接近于满电荷,或者由于电池的最大额定功率,不存在电池的来自逆变器24的过多输出要处理。在这种情况下,来自逆变器的一些输出必须被废弃,使得对电网的净输出保持在极限之内。因而,在步骤72,Dump控制信号被设定成0或(BasicDisp-Conf)中的较大者。
图8A和8B的流程图表示当逆变器24的输出在介于最高限度值和最低限度值之间的容许范围中时,处理器用于控制***的子例程57。大多数时候情况可能都是这样。在该时间内,电池的电荷状态被保持在最佳水平,以便准备好适应太阳能板的输出中的下一个波峰或波谷。
在步骤74,设定充电约束条件Conf。由于这是充电约束条件,因此它具有正值。任何充电信号必须不超过电池的未用能量容量,或者电池的最大额定功率。于是,选择(Rbe*kWh/100)和BattCap中的较小者以产生Conf。
在步骤76,设定放电约束条件Cone。由于这是放电约束条件,因此它具有负值。任何放电信号必须不超过电池中的可用能量,或者电池的最大额定功率。因而,Cone被设定成等于(SoC*kWh/100)和BattCap中的较小者。
关于***输出的容许上限是受最高限度值限制的前一时期中的***输出加上最大变化率(ramp rate)。在步骤78,上限值UpperLim被设定成等于Ceiling和(LagSolar+RampMax)中的较小者。关于***输出的容许下限值是受最低限度值限制的前一时期中的***输出减去最大变化率。在步骤80,下限值LowerLim被设定成等于Floor和(LagSolar-RampMax)中的较大者。由于Ceiling和Floor的值可以是时间因素的函数,因此UpperLim和LowerLim也可以是这些因素的函数。
由于***输出不可能超过最高限度,因此不需要废弃电能。因而,在步骤82,控制信号Dump被设定成等于0。
现在参见图8B,在步骤84,进行检查,以了解电池的电荷状态是否大于用户规定的上阈值,例如89%。如果是,那么电池接近于满电荷,从而处理器进入步骤86。在步骤86,使控制信号Dispatch1偏向于上限,以便使放电达到最大程度(或者使充电达到最小程度)。基本的无约束的调度为Solar-UpperLim。如果Solar>UpperLim,那么调度为充电信号,并且受充电约束条件Conf约束。如果Solar<UpperLim,那么调度为放电信号,并且受放电约束条件Cone约束。如此约束的值被减小用户供给的Bias的值,并作为Dispatch1输出。
如果电荷状态小于上阈值,那么在步骤88进行检查,以了解电池的电荷状态是否小于用户规定的下阈值,例如,20%。如果是,那么电池接近于放电,从而处理器进入步骤90。在这种情况下,使控制信号Dispatch1偏向于下限,以便使充电达到最大程度(或者使放电达到最小程度)。基本的无约束的调度为Solar-Lowerlim。如果Solar<Lowerlim,那么调度为放电信号,从而受Cone的值约束。如果Solar>Lowerlim,那么调度为充电信号,从而受Conf约束。如此约束的值被加到Bias的值上,从而变成Dispatch1。
在步骤92,确定是否Solar>UpperLim。如果是,那么在步骤94,发送利用Conf限制的充电信号Solar-UpperLim。如果Solar不大于UpperLim,那么在步骤96确定是否Solar<LowerLim。如果是,那么在步骤98,发送利用Cone限制的放电信号Solar-LowerLim。如果步骤84、88、92或96的条件都不被满足,那么不需要任何调节,在步骤100,把控制信号Dispatch1设定为0。
应理解通过模块化地或者一体地利用硬件和/或利用计算机软件,可以控制逻辑的形式,实现如上所述的本发明。根据这里提供的公开和教导,本领域的普通技术人员会理解和意识到利用硬件,以及硬件和软件的组合,实现本发明的其它途径。例如,在图4的例子中,斜坡调节模块被描述成具有它自己的处理器。实际上,实现图5-8B的逻辑的处理器可以是更大的***,例如,操作整个BSS控制器28,并执行除在流程图中描述的那些例程之外的其它例程的***的一部分。
利用任何适当的计算机语言,比如基于Java,C++或Perl的常规技术或者面向对象的技术,可把这里说明的任意软件组件或函数实现成将由处理器执行的软件代码。所述软件代码可作为一系列的指令或者命令被保存在计算机可读介质上,以便存储,所述适当的介质包括随机存取存储器(RAM),只读存储器(ROM),诸如硬盘驱动器或软盘之类的磁介质,或者诸如压缩盘(CD)或DVD(数字通用盘)之类的光介质,闪速存储器等等。计算机可读介质可以是这些存储装置的任何组合。
出于说明和描述的目的,给出了示例性实施例的以上说明。要理解可以用其它方式,实现成为本发明的基础的原理,而不脱离其本质特性。例如,虽然关于使用太阳能板作为次级能源,说明了示例性实施例,不过要理解本发明可用于任何其它种类的能源,尤其是具有可变输出的那些能源,比如风力发电机。同样地,可以采用除电池之外的能量存储介质,比如电容***、飞轮或压缩空气来调节次级源的输出功率。另外,虽然说明了用于调节输出功率的具有上限和下限的优选功率带,不过本发明可以用在只具有功率的容许范围的一个极限,例如最低限度值,而没有上限的***中。最大斜坡也可以不对称,当输出升高时的功率的容许变化不同于当输出降低时的功率的容许变化。
因而,上述示例性实施例并不是穷尽的,也不意图把本发明限制于公开的具体形式,鉴于上面的教导,许多修改和变化都是可能的。说明实施例是为了解释本发明的原理及其实际应用,从而使本领域的技术人员能够在各个实施例中,和利用适合于预期的特定应用的各种修改应用本发明。
Claims (24)
1.一种调节向配电网供给的电源的输出功率的方法,包括:
确定:
(a)电源的输出功率是否在预定范围之外,和
(b)输出功率的变化率是否超过预定最大值,所述预定最大值是影响电源的预期输出的一个或多个参数的函数,其中所述一个或多个参数选择自包括下列各项的列表:
关于使能量存储介质充电的充电约束条件,其中所述充电约束条件限制能量存储介质的充电,其中所述充电约束条件是能量存储介质的未用能量存储容量和能量存储介质的最大额定功率中的较小者,和
关于使能量存储介质放电的放电约束条件,其中所述放电约束条件限制能量存储介质的放电,其中所述放电约束条件是能量存储介质的可用能量存储容量和能量存储介质的最大额定功率中的较小者;以及
响应于确定条件(b)被满足或条件(a)和(b)都被满足,通过在能量存储介质和电网之间转移能量,调节提供给电网的输出功率,
其中所述转移包括使所述能量存储介质放电或充电。
2.按照权利要求1所述的方法,其中所述预定范围由下限值限定,并且其中响应于确定电源的输出功率小于所述下限值,通过使能量存储介质放电将能量从能量存储介质转移到电网。
3.按照权利要求2所述的方法,还包括:按照变化率的预定义的最大值,约束从能量存储介质被转移到电网的能量的量。
4.按照权利要求3所述的方法,其中按照能量存储介质的电荷状态和能量存储介质的最大额定功率中的较小者,进一步约束从能量存储介质被转移到电网的能量的量。
5.按照权利要求2所述的方法,其中所述预定范围还由上限值限定,并且其中响应于确定电源的输出功率大于所述上限值,通过使能量存储介质充电将能量从电网转移到能量存储介质。
6.按照权利要求5所述的方法,还包括:按照变化率的预定义的最大值,约束从电网转移到能量存储介质的能量的量。
7.按照权利要求6所述的方法,其中按照能量存储介质的未用容量和能量存储介质的最大额定功率中的较小者,进一步约束从电网被转移到能量存储介质的能量的量。
8.按照权利要求1所述的方法,其中所述预定范围是时间因素的函数。
9.按照权利要求1所述的方法,其中所述预定范围是影响电源的输出的地理参数的函数。
10.按照权利要求1所述的方法,其中所述预定范围是能量存储介质的电荷状态的函数。
11.按照权利要求1所述的方法,其中所述预定最大值是时间因素的函数。
12.按照权利要求1所述的方法,其中所述预定最大值是影响电源的输出的地理参数的函数。
13.按照权利要求1所述的方法,其中所述预定最大值是电源的输出的函数。
14.按照权利要求1所述的方法,所述预定最大值是能量存储介质的电荷状态的函数。
15.按照权利要求1所述的方法,进一步包括:
响应于确定条件(a)或(b)都不被满足:
确定能量存储介质的电荷状态SoC是否在预定阈值之内;和
响应于确定能量存储介质的SoC在所述预定阈值之外,在所述能量存储设备和电网之间转移能量,以使SoC在所述预定限制之内。
16.按照权利要求15所述的方法,其中在能量存储介质和电网之间转移能量,以使SoC在所述预定阈值之内包括:
定义用于在能量存储介质和电网之间转移能量的上限值和下限值,上限值和下限值每个以供给电网的最近电力量和变化率的最大值为基础;
确定电源的输出功率是否大于所述上限值;以及
响应于确定所述电源的输出功率大于所述上限值,通过使能量存储介质充电将能量从电网转移到能量存储介质。
17.按照权利要求16所述的方法,还包括:
响应于确定所述电源的输出功率不大于所述上限值,确定电源的输出功率是否小于所述下限值;
响应于确定电源的输出功率小于所述下限值,将能量从能量存储介质转移到电网;以及
按照能量存储介质的电荷状态和能量存储介质的最大额定功率中的较小者,约束从能量存储介质转移到电网的能量的量。
18.按照权利要求16所述的方法,还包括:按照能量存储介质的未用容量和能量存储介质的最大额定功率中的较小者,约束从电网转移到能量存储介质的能量的量。
19.按照权利要求15所述的方法,其中所述预定阈值是时间因素的函数。
20.一种调节向配电网供给的电源的输出功率的***,包括:
至少一个能量存储介质;
转换器***,响应于接收到向电网加入能量或者从电网吸收能量的命令,被配置为有选择地将所述至少一个能量存储介质耦接到电网,以便在所述至少一个能量存储介质和电网之间转移能量;和
功率调节***,所述功率调节***被配置为:
确定:
(a)电源的输出功率是否在预定范围之外,和
(b)输出功率的变化率是否超过预定义的最大值,所述预定最大值是影响电源的预期输出的一个或多个参数的函数,其中所述一个或多个参数选择自包括下列各项的列表:
关于使能量存储介质充电的充电约束条件,其中所述充电约束条件限制能量存储介质的充电,其中所述充电约束条件是能量存储介质的未用能量存储容量和能量存储介质的最大额定功率中的较小者,和
关于使能量存储介质放电的放电约束条件,其中所述放电约束条件限制能量存储介质的放电,其中所述放电约束条件是能量存储介质的可用能量存储容量和能量存储介质的最大额定功率中的较小者;以及
响应于确定条件(b)被满足或条件(a)和(b)都被满足,通过在所述至少一个能量存储介质和电网之间转移能量来控制所述转换器***,
其中所述转移包括使所述至少一个能量存储介质放电或充电。
21.按照权利要求20所述的***,其中所述功率调节***还包括频率调节***,所述频率调节***被配置为:
确定电网的工作频率是否在额定工作频率的预定范围内;以及
控制所述转换器***在所述至少一个能量存储介质和电网之间转移能量以使工作频率在所述范围之内。
22.按照权利要求21所述的***,其中所述转移是电网的工作频率的函数。
23.一种调节向配电网供给的电源的输出功率的方法,包括:
确定:
(a)电源的输出功率是否在预定范围之外,和
(b)输出功率的变化率是否超过预定最大值,所述预定最大值是影响电源的预期输出的一个或多个参数的函数,其中所述一个或多个参数选择自包括下列各项的列表:
关于使能量存储介质充电的充电约束条件,其中所述充电约束条件限制能量存储介质的充电,其中所述充电约束条件是能量存储介质的未用能量存储容量和能量存储介质的最大额定功率中的较小者,和
关于使能量存储介质放电的放电约束条件,其中所述放电约束条件限制能量存储介质的放电,其中所述放电约束条件是能量存储介质的可用能量存储容量和能量存储介质的最大额定功率中的较小者;以及
在确定仅条件(a)被满足之后,通过在能量存储介质和电网之间转移能量来调节向电网供给的输出功率,
在确定仅条件(b)被满足之后,通过在能量存储介质和电网之间转移能量来调节向电网供给的输出功率,
在确定条件(a)和(b)都被满足之后,通过在能量存储介质和电网之间转移能量来调节向电网供给的输出功率,
其中所述转移包括使所述能量存储介质放电或充电。
24.一种调节向配电网供给的电源的输出功率的***,包括:
至少一个能量存储介质;
转换器***,响应于接收到向电网加入能量或者从电网吸收能量的命令,被配置为有选择地将所述至少一个能量存储介质耦接到电网,以便在所述至少一个能量存储介质和电网之间转移能量;和
功率调节***,所述功率调节***被配置为:
确定:
(a)电源的输出功率是否在预定范围之外,和
(b)输出功率的变化率是否超过预定最大值,所述预定最大值是影响电源的预期输出的一个或多个参数的函数,其中所述一个或多个参数选择自包括下列各项的列表:
关于使能量存储介质充电的充电约束条件,其中所述充电约束条件限制能量存储介质的充电,其中所述充电约束条件是能量存储介质的未用能量存储容量和能量存储介质的最大额定功率中的较小者,和
关于使能量存储介质放电的放电约束条件,其中所述放电约束条件限制能量存储介质的放电,其中所述放电约束条件是能量存储介质的可用能量存储容量和能量存储介质的最大额定功率中的较小者;以及
在确定仅条件(a)被满足之后,通过在所述至少一个能量存储介质和电网之间转移能量来控制所述转换器***,
在确定仅条件(b)被满足之后,通过在所述至少一个能量存储介质和电网之间转移能量来控制所述转换器***,
在确定条件(a)和(b)都被满足之后,通过在所述至少一个能量存储介质和电网之间转移能量来控制所述转换器***,
其中所述转移包括使所述至少一个能量存储介质放电或充电。
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/722,271 | 2010-03-11 | ||
US12/722,271 US8914158B2 (en) | 2010-03-11 | 2010-03-11 | Regulation of contribution of secondary energy sources to power grid |
PCT/US2011/000446 WO2011112255A2 (en) | 2010-03-11 | 2011-03-10 | Regulation of contribution of secondary energy sources to power grid |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103081290A CN103081290A (zh) | 2013-05-01 |
CN103081290B true CN103081290B (zh) | 2017-03-01 |
Family
ID=44559285
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201180020603.2A Active CN103081290B (zh) | 2010-03-11 | 2011-03-10 | 次级能源对电网的贡献的调节 |
Country Status (13)
Country | Link |
---|---|
US (1) | US8914158B2 (zh) |
EP (1) | EP2545632B1 (zh) |
CN (1) | CN103081290B (zh) |
AR (1) | AR080498A1 (zh) |
BR (1) | BR112012022923B1 (zh) |
CL (1) | CL2012002505A1 (zh) |
DK (1) | DK2545632T3 (zh) |
ES (1) | ES2762402T3 (zh) |
HU (1) | HUE047262T2 (zh) |
PL (1) | PL2545632T3 (zh) |
PT (1) | PT2545632T (zh) |
RU (1) | RU2565235C2 (zh) |
WO (1) | WO2011112255A2 (zh) |
Families Citing this family (56)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102308431A (zh) | 2009-02-09 | 2012-01-04 | 伊克斯动力有限公司 | 对电池进行放电 |
US8471520B2 (en) | 2010-05-04 | 2013-06-25 | Xtreme Power Inc. | Managing renewable power generation |
EP2759033B1 (de) * | 2011-09-20 | 2017-04-05 | SMA Solar Technology AG | Bereitstellung von regelleistung mit einer photovoltaikanlage |
DE102011055232A1 (de) | 2011-11-10 | 2013-05-16 | Evonik Industries Ag | Verfahren zur Bereitstellung von Regelleistung mit einem Energiespeicher mit variabler Totbandbreite bei der Regelleistungserbringung |
WO2013086411A1 (en) * | 2011-12-09 | 2013-06-13 | The Aes Corporation | Frequency responsive charge sustaining control of electricity storage systems for ancillary services on an electrical power grid |
KR101818036B1 (ko) * | 2012-01-30 | 2018-01-15 | 한국전자통신연구원 | 유무선 에너지 전송 기능을 구비한 에너지 저장 시스템 |
JP5738220B2 (ja) * | 2012-02-28 | 2015-06-17 | 三菱重工業株式会社 | 出力平滑化装置、出力平滑化方法及びプログラム |
WO2014000770A1 (de) * | 2012-06-26 | 2014-01-03 | Siemens Aktiengesellschaft | Energieversorgungsanlage |
JP5968719B2 (ja) * | 2012-08-06 | 2016-08-10 | 京セラ株式会社 | 管理システム、管理方法、制御装置及び蓄電池装置 |
US20140350743A1 (en) * | 2012-08-27 | 2014-11-27 | Nec Laboratories America, Inc. | Tiered power management system for microgrids |
US9685887B2 (en) | 2012-10-12 | 2017-06-20 | Younicos Inc. | Controlling power conversion systems |
US9276425B2 (en) | 2012-12-28 | 2016-03-01 | Younicos Inc. | Power management systems with dynamic target state of charge |
US9368968B2 (en) * | 2012-12-28 | 2016-06-14 | Younicos, Inc. | Responding to local grid events and distributed grid events |
JP5709910B2 (ja) * | 2013-01-21 | 2015-04-30 | 三菱重工業株式会社 | 制御装置及び方法並びにプログラム、それを備えた自然エネルギー発電装置 |
US9641021B2 (en) * | 2013-01-31 | 2017-05-02 | General Electric Company | Photovoltaic power generation system including apparatus and method to buffer power fluctuations |
US10418833B2 (en) | 2015-10-08 | 2019-09-17 | Con Edison Battery Storage, Llc | Electrical energy storage system with cascaded frequency response optimization |
DE102013206808A1 (de) * | 2013-04-16 | 2014-10-16 | Younicos Ag | Verfahren und Vorrichtung zur Regelung des Ladezustandes eines Batteriekraftwerks |
US20160079778A1 (en) | 2013-04-29 | 2016-03-17 | Welsengen Limited | Apparatus and method for managing stored energy |
CN103248069B (zh) * | 2013-05-10 | 2015-11-18 | 深圳晶福源科技股份有限公司 | 一种防逆流光伏并网***及其防止逆电流的方法 |
CN105379058A (zh) * | 2013-07-16 | 2016-03-02 | 日本电气株式会社 | 用于蓄电池的快速充电方法、快速充电***和程序 |
US9599976B2 (en) | 2013-09-23 | 2017-03-21 | Infosys Limited | Systems and methods for effective selection of disparate distributed power sources for smart grid |
CN104201699A (zh) * | 2014-09-05 | 2014-12-10 | 广东电网公司佛山供电局 | 基于储能变流器的微网公共连接点功率自动跟踪方法 |
DE102014221555A1 (de) * | 2014-10-23 | 2016-04-28 | Wobben Properties Gmbh | Verfahren zum Betreiben eines Inselnetzes |
WO2016100406A1 (en) * | 2014-12-16 | 2016-06-23 | Sinewatts, Inc. | Dispatchable photovoltaic panel with fully integrated energy storage and grid interactive power conversion |
JP6449645B2 (ja) * | 2014-12-26 | 2019-01-09 | シャープ株式会社 | 電力制御装置、及び電力制御方法 |
JP6480196B2 (ja) * | 2015-01-26 | 2019-03-06 | 株式会社日立製作所 | 蓄電池システム及びそれを有する太陽光発電システム |
JP6480198B2 (ja) * | 2015-01-28 | 2019-03-06 | 株式会社日立製作所 | 蓄電池システム及びそれを有する太陽光発電システム |
FR3035550B1 (fr) * | 2015-04-27 | 2019-05-03 | Commissariat A L'energie Atomique Et Aux Energies Alternatives | Procede de charge electrique d'une batterie par une source d'energie intermittente et dispositif de controle de charge correspondant |
WO2016196968A1 (en) * | 2015-06-04 | 2016-12-08 | Nec Energy Solutions, Inc. | Utilizing a load for optimizing energy storage size and operation in power systems regulation applications |
CN104967139A (zh) * | 2015-07-29 | 2015-10-07 | 阳光电源股份有限公司 | 一种光伏发电装置 |
US10283968B2 (en) * | 2015-10-08 | 2019-05-07 | Con Edison Battery Storage, Llc | Power control system with power setpoint adjustment based on POI power limits |
US10389136B2 (en) | 2015-10-08 | 2019-08-20 | Con Edison Battery Storage, Llc | Photovoltaic energy system with value function optimization |
US11210617B2 (en) | 2015-10-08 | 2021-12-28 | Johnson Controls Technology Company | Building management system with electrical energy storage optimization based on benefits and costs of participating in PDBR and IBDR programs |
US10418832B2 (en) | 2015-10-08 | 2019-09-17 | Con Edison Battery Storage, Llc | Electrical energy storage system with constant state-of charge frequency response optimization |
US10554170B2 (en) | 2015-10-08 | 2020-02-04 | Con Edison Battery Storage, Llc | Photovoltaic energy system with solar intensity prediction |
US10190793B2 (en) | 2015-10-08 | 2019-01-29 | Johnson Controls Technology Company | Building management system with electrical energy storage optimization based on statistical estimates of IBDR event probabilities |
US10250039B2 (en) | 2015-10-08 | 2019-04-02 | Con Edison Battery Storage, Llc | Energy storage controller with battery life model |
US10186889B2 (en) | 2015-10-08 | 2019-01-22 | Taurus Des, Llc | Electrical energy storage system with variable state-of-charge frequency response optimization |
US10564610B2 (en) | 2015-10-08 | 2020-02-18 | Con Edison Battery Storage, Llc | Photovoltaic energy system with preemptive ramp rate control |
US10222427B2 (en) | 2015-10-08 | 2019-03-05 | Con Edison Battery Storage, Llc | Electrical energy storage system with battery power setpoint optimization based on battery degradation costs and expected frequency response revenue |
US10197632B2 (en) | 2015-10-08 | 2019-02-05 | Taurus Des, Llc | Electrical energy storage system with battery power setpoint optimization using predicted values of a frequency regulation signal |
US10742055B2 (en) * | 2015-10-08 | 2020-08-11 | Con Edison Battery Storage, Llc | Renewable energy system with simultaneous ramp rate control and frequency regulation |
US10700541B2 (en) | 2015-10-08 | 2020-06-30 | Con Edison Battery Storage, Llc | Power control system with battery power setpoint optimization using one-step-ahead prediction |
US10439401B2 (en) * | 2015-11-23 | 2019-10-08 | Doosan Gridtech, Inc. | Managing the outflow of a solar inverter |
WO2017154116A1 (ja) * | 2016-03-08 | 2017-09-14 | 日本電気株式会社 | 電力制御装置、電力制御システム、電力制御方法、及び、プログラム |
US10594153B2 (en) | 2016-07-29 | 2020-03-17 | Con Edison Battery Storage, Llc | Frequency response optimization control system |
US10778012B2 (en) | 2016-07-29 | 2020-09-15 | Con Edison Battery Storage, Llc | Battery optimization control system with data fusion systems and methods |
CN109792154B (zh) * | 2016-10-10 | 2023-06-30 | 昕诺飞控股有限公司 | 用于在电池和电网之间优化地分配功率的方法和*** |
FR3060229B1 (fr) * | 2016-12-12 | 2019-01-25 | Electricite De France | Commande en puissance d'onduleurs d'une installation photovoltaique pour la participation au reglage en frequence du reseau de distribution electrique |
JP6640925B2 (ja) * | 2017-05-29 | 2020-02-05 | 京セラ株式会社 | 管理システム、管理方法、制御装置及び蓄電池装置 |
US11159022B2 (en) | 2018-08-28 | 2021-10-26 | Johnson Controls Tyco IP Holdings LLP | Building energy optimization system with a dynamically trained load prediction model |
US11163271B2 (en) | 2018-08-28 | 2021-11-02 | Johnson Controls Technology Company | Cloud based building energy optimization system with a dynamically trained load prediction model |
CN109617093A (zh) * | 2018-12-04 | 2019-04-12 | 北京科诺伟业科技股份有限公司 | 一种维持电网功率稳定的控制方法 |
TWI726590B (zh) * | 2019-01-30 | 2021-05-01 | 財團法人工業技術研究院 | 充放電裝置和充放電方法 |
DE102019123383A1 (de) | 2019-08-30 | 2021-03-04 | Wobben Properties Gmbh | Verfahren zum Betreiben einer elektrischen Speicherstation |
FR3104842B1 (fr) | 2019-12-16 | 2023-06-30 | Commissariat Energie Atomique | Procédé et dispositif de pilotage d’un ensemble de production d’électricité, et ensemble de production associé |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007104167A1 (en) * | 2006-03-16 | 2007-09-20 | Abb Research Ltd | Method for operating a battery energy storage system (bess) and battery energy storage system |
CN102395758A (zh) * | 2009-02-13 | 2012-03-28 | 第一太阳能有限公司 | 光伏电站输出 |
Family Cites Families (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19516838A1 (de) * | 1995-05-08 | 1996-11-14 | Hagen Batterie Ag | Verfahren und Schaltungsanordnung zur Deckung von Energiespitzenbedarf bei elektrischen Wechselstrom- bzw. Drehstromnetzen |
DE69720950T2 (de) | 1997-02-07 | 2004-03-11 | Alstom (Switzerland) Ltd. | Verfahren zur Steuerung einer Kraftwerksanlage |
US5923100A (en) * | 1997-03-31 | 1999-07-13 | Lockheed Martin Corporation | Apparatus for controlling a solar array power system |
BR0308702A (pt) * | 2002-03-28 | 2005-02-09 | Robertshaw Controls Co | Sistema e método de gerenciamento de suprimento de energia, dispositivo de termostato e método de desvio de pedidos de energia |
US7262520B2 (en) | 2003-12-18 | 2007-08-28 | General Electric Company | Robust power distribution systems and methods |
US7117044B2 (en) * | 2003-12-30 | 2006-10-03 | Square D Company | Alternative energy system control method and apparatus |
US20070100506A1 (en) * | 2005-10-31 | 2007-05-03 | Ralph Teichmann | System and method for controlling power flow of electric power generation system |
US20080084178A1 (en) * | 2006-06-18 | 2008-04-10 | Dowd Raymond P | Solar power supply with monitoring and communications |
US7983799B2 (en) | 2006-12-15 | 2011-07-19 | General Electric Company | System and method for controlling microgrid |
US7787272B2 (en) * | 2007-03-01 | 2010-08-31 | Wisconsin Alumni Research Foundation | Inverter based storage in dynamic distribution systems including distributed energy resources |
JP4551921B2 (ja) * | 2007-09-27 | 2010-09-29 | 株式会社日立エンジニアリング・アンド・サービス | 蓄電システム併設型風力発電システム |
JP5391598B2 (ja) * | 2008-07-10 | 2014-01-15 | 株式会社明電舎 | 分散型電源の安定化制御方式 |
US8901411B2 (en) * | 2008-08-27 | 2014-12-02 | General Electric Company | System and method for controlling ramp rate of solar photovoltaic system |
US9257847B2 (en) | 2009-10-12 | 2016-02-09 | Sunpower Corporation | Photovoltaic system with managed output |
US8860236B2 (en) * | 2009-10-19 | 2014-10-14 | Uwm Research Foundation, Inc. | Wind energy power conversion system reducing gearbox stress and improving power stability |
US9466984B2 (en) * | 2009-10-26 | 2016-10-11 | General Electric Company | Power ramp rate control for renewable variable power generation systems |
JP2013529051A (ja) * | 2010-05-07 | 2013-07-11 | アドバンスド エナージィ インダストリーズ,インコーポレイテッド | 太陽光発電予測システム並びに方法 |
US8344550B2 (en) * | 2010-12-21 | 2013-01-01 | General Electric Company | Power conversion control with energy storage |
-
2010
- 2010-03-11 US US12/722,271 patent/US8914158B2/en active Active
-
2011
- 2011-03-10 HU HUE11753720A patent/HUE047262T2/hu unknown
- 2011-03-10 DK DK11753720.9T patent/DK2545632T3/da active
- 2011-03-10 EP EP11753720.9A patent/EP2545632B1/en active Active
- 2011-03-10 PL PL11753720T patent/PL2545632T3/pl unknown
- 2011-03-10 RU RU2012143401/07A patent/RU2565235C2/ru active
- 2011-03-10 WO PCT/US2011/000446 patent/WO2011112255A2/en active Application Filing
- 2011-03-10 CN CN201180020603.2A patent/CN103081290B/zh active Active
- 2011-03-10 PT PT117537209T patent/PT2545632T/pt unknown
- 2011-03-10 BR BR112012022923-0A patent/BR112012022923B1/pt active IP Right Grant
- 2011-03-10 ES ES11753720T patent/ES2762402T3/es active Active
- 2011-03-11 AR ARP110100769 patent/AR080498A1/es active IP Right Grant
-
2012
- 2012-09-11 CL CL2012002505A patent/CL2012002505A1/es unknown
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007104167A1 (en) * | 2006-03-16 | 2007-09-20 | Abb Research Ltd | Method for operating a battery energy storage system (bess) and battery energy storage system |
CN102395758A (zh) * | 2009-02-13 | 2012-03-28 | 第一太阳能有限公司 | 光伏电站输出 |
Also Published As
Publication number | Publication date |
---|---|
PT2545632T (pt) | 2020-01-21 |
DK2545632T3 (da) | 2020-01-20 |
WO2011112255A3 (en) | 2012-01-05 |
BR112012022923B1 (pt) | 2019-11-26 |
EP2545632A2 (en) | 2013-01-16 |
ES2762402T3 (es) | 2020-05-25 |
US8914158B2 (en) | 2014-12-16 |
CL2012002505A1 (es) | 2013-01-18 |
EP2545632B1 (en) | 2019-10-23 |
RU2012143401A (ru) | 2014-04-20 |
BR112012022923A2 (pt) | 2017-10-24 |
EP2545632A4 (en) | 2013-12-18 |
US20110221276A1 (en) | 2011-09-15 |
PL2545632T3 (pl) | 2020-04-30 |
AR080498A1 (es) | 2012-04-11 |
CN103081290A (zh) | 2013-05-01 |
RU2565235C2 (ru) | 2015-10-20 |
WO2011112255A2 (en) | 2011-09-15 |
HUE047262T2 (hu) | 2020-04-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103081290B (zh) | 次级能源对电网的贡献的调节 | |
JP5100132B2 (ja) | 周波数調整システムおよび周波数調整方法 | |
JP5395251B2 (ja) | ハイブリッドエネルギー貯蔵システム、該貯蔵システムを含む再生可能エネルギーシステムおよびその使用方法 | |
CN103986190B (zh) | 基于发电功率曲线的风光储联合发电***平滑控制方法 | |
US8688286B2 (en) | Method for maintaining an optimal amount of energy derived from a power generation system in a storage device | |
JP5113789B2 (ja) | 充放電制御装置および充放電制御方法 | |
WO2007046547A3 (en) | Charged/discharged power control for a capacitor type energy storage device | |
JP2001327080A (ja) | 電力貯蔵装置及びそれを備えた分散電源システムの制御方法 | |
US9608462B2 (en) | Control system, control apparatus, and control method | |
CN108767872B (zh) | 一种应用于风光混合储能微网***的模糊控制方法 | |
CN106159980B (zh) | 发电***和能量管理方法 | |
CN103956758A (zh) | 一种风储***中储能soc优化控制方法 | |
WO2015133136A1 (ja) | 電源システム | |
CN111900745A (zh) | 一种用于平抑风电功率波动的混合储能分频协调控制*** | |
JP6821415B2 (ja) | 給電システム | |
US20130314022A1 (en) | Control system, control apparatus, and control method | |
Samson et al. | Optimal load sharing strategy in a hybrid power system based on pv/fuel cell/battery/supercapacitor | |
JP2018085862A (ja) | 電力供給安定化システムおよび再生エネルギ発電システム | |
WO2013046509A1 (ja) | 給電システム及び給電方法 | |
JP6055968B2 (ja) | 電源システム | |
CN113422378A (zh) | 一种能量枢纽的综合能源*** | |
EP2339685B1 (en) | Method for controlling sodium-sulfur battery | |
KR102597278B1 (ko) | 복합 기능을 수행하는 에너지 저장 시스템 및 그 설계 방법 | |
US11108239B2 (en) | Power system and power control device | |
JP6933575B2 (ja) | 蓄電池システムおよび蓄電池システムの制御方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220209 Address after: American Virginia Patentee after: Florence Energy Co.,Ltd. Address before: American Virginia Patentee before: THE AES Corp. |
|
TR01 | Transfer of patent right |