CN103078758B - Optical transport business method for configuring route and device - Google Patents

Optical transport business method for configuring route and device Download PDF

Info

Publication number
CN103078758B
CN103078758B CN201310001922.XA CN201310001922A CN103078758B CN 103078758 B CN103078758 B CN 103078758B CN 201310001922 A CN201310001922 A CN 201310001922A CN 103078758 B CN103078758 B CN 103078758B
Authority
CN
China
Prior art keywords
operation layer
port
business
output port
address
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310001922.XA
Other languages
Chinese (zh)
Other versions
CN103078758A (en
Inventor
李荆晶
邹红兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN ZHONGXING SOFTWARE CO., LTD.
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201310001922.XA priority Critical patent/CN103078758B/en
Publication of CN103078758A publication Critical patent/CN103078758A/en
Application granted granted Critical
Publication of CN103078758B publication Critical patent/CN103078758B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)
  • Optical Communication System (AREA)

Abstract

The invention discloses a kind of optical transport business method for configuring route and device, its method comprises: when business route instruction arrives, obtain initial input end mouth in the i-th operation layer; Record by initial input end mouth arrive the i-th operation layer output port line passing, arrived by the i-th operation layer output port the i-th+1 operation layer input port optical fibre channel and arrive the line passing of the i-th+1 operation layer output port by the i-th+1 operation layer input port address; When the i-th+1 operation layer output port is port corresponding to destination address, by record arrive all line passings of destination address by initial address and optical fibre channel is combined as business route; According to business route, configuring service path.The present invention generates business route automatically according to business route instruction, carries out service channel automatically configure according to business route, avoids poor efficiency and high error rate that manual configuration brings, effectively improves efficiency and the accuracy of configuration.

Description

Optical transport business method for configuring route and device
Technical field
The present invention relates to communication technical field, be related specifically to optical transport business method for configuring route and device.
Background technology
At present, optical transmission system, when carrying out service delivery, often needs first to carry out the network planning, is then connected with configuration service by manually carrying out Fiber connection according to planning.But for large-scale optical transmission system, this configuration effort often more complicated, iff dependence human configuration mode, be very easy to make mistakes, and efficiency is very low.Along with the development of optical transmission system, current optical transmission system more and more cannot meet development need.
Summary of the invention
Main purpose of the present invention is for providing optical transport business method for configuring route and the device of a kind of effective raising allocative efficiency and accuracy.
The present invention proposes a kind of optical transport business method for configuring route, comprises step:
When business route instruction arrives, in the i-th operation layer, obtain initial input end mouth; Described initial input end mouth is port corresponding to the initial address that comprises in described business route instruction, and described i-th operation layer is the operation layer at port place corresponding to described initial address;
Record by described initial input end mouth arrive the i-th operation layer output port line passing, arrived by described i-th operation layer output port the i-th+1 operation layer input port optical fibre channel and arrive the line passing of the i-th+1 operation layer output port by described i-th+1 operation layer input port address;
When the i-th+1 operation layer output port is port corresponding to destination address that described business route instruction comprises, by record arrive all line passings of destination address by initial address and optical fibre channel is combined as business route;
According to described business route, configuring service path.
Preferably, described record by described initial input end mouth arrive the i-th operation layer output port line passing, by described i-th operation layer output port arrive the i-th+1 operation layer input port optical fibre channel and by described i-th+1 operation layer input port address arrive the i-th+1 operation layer output port line passing step before also comprise:
The i-th operation layer output port with described initial input end mouth adaptation is obtained in the i-th operation layer;
The i-th+1 operation layer input port with described i-th operation layer output port adaptation is obtained in the i-th+1 operation layer;
The i-th+1 operation layer output port with described i-th+1 operation layer input port adaptation is obtained in the i-th+1 operation layer.
Preferably, described record by described initial input end mouth arrive the i-th operation layer output port line passing, by described i-th operation layer output port arrive the i-th+1 operation layer input port optical fibre channel and by described i-th+1 operation layer input port address arrive the i-th+1 operation layer output port line passing step after also comprise:
When the i-th+1 operation layer output port is not port corresponding to destination address that described business route instruction comprises, records and arrive the optical fibre channel of the i-th+2 operation layer input port by described i-th+1 operation layer output port and arrived the line passing of the i-th+2 operation layer output port by described i-th+2 operation layer input port address;
The rest may be inferred, until the port that the destination address finding described business route instruction to comprise is corresponding, by record arrive all line passings of destination address by initial address and optical fibre channel is combined as business route.
Preferably, described according to described business route, also comprise before the step of configuring service path:
When described business route is the different business route of many length, select the business route that length is the shortest;
When described business route is the identical business route of many length, a selected and sorted business route foremost.
Preferably, described when business route instruction arrives, also comprised obtain the step of initial input end mouth in the i-th operation layer before:
When address distribution instruction arrives, it is all of the port allocation address in each operation layer; One_to_one corresponding between described port and address.
The present invention also proposes a kind of optical transport business routing configuration device, comprising:
Business module, for when business route instruction arrives, obtains initial input end mouth in the i-th operation layer; Described initial input end mouth is port corresponding to the initial address that comprises in described business route instruction, and described i-th operation layer is the operation layer at port place corresponding to described initial address;
Monitoring module, for record by described initial input end mouth arrive the i-th operation layer output port line passing, arrived by described i-th operation layer output port the i-th+1 operation layer input port optical fibre channel and arrive the line passing of the i-th+1 operation layer output port by described i-th+1 operation layer input port address;
Described monitoring module also for, when the i-th+1 operation layer output port is port corresponding to destination address that described business route instruction comprises, by record arrive all line passings of destination address by initial address and optical fibre channel is combined as business route;
Configuration module, for according to described business route, configuring service path.
Preferably, described business module also for:
The i-th operation layer output port with described initial input end mouth adaptation is obtained in the i-th operation layer;
The i-th+1 operation layer input port with described i-th operation layer output port adaptation is obtained in the i-th+1 operation layer;
The i-th+1 operation layer output port with described i-th+1 operation layer input port adaptation is obtained in the i-th+1 operation layer.
Preferably, described monitoring module also for:
When the i-th+1 operation layer output port is not port corresponding to destination address that described business route instruction comprises, records and arrive the optical fibre channel of the i-th+2 operation layer input port by described i-th+1 operation layer output port and arrived the line passing of the i-th+2 operation layer output port by described i-th+2 operation layer input port address;
The rest may be inferred, until the port that the destination address finding described business route instruction to comprise is corresponding, by record arrive all line passings of destination address by initial address and optical fibre channel is combined as business route.
Preferably, described monitoring module also for:
When described business route is the different business route of many length, select the business route that length is the shortest;
When described business route is the identical business route of many length, a selected and sorted business route foremost.
Preferably, described optical transport business routing configuration device, also comprises administration module, for when address distribution instruction arrives, is all of the port allocation address in each operation layer; One_to_one corresponding between described port and address.
The business route that the present invention generates automatically according to business route instruction, and carry out service channel automatically configure according to the business route generated, avoids poor efficiency and high error rate that manual configuration brings, effectively improves efficiency and the accuracy of configuration.
Accompanying drawing explanation
Fig. 1 is the flow chart of the first embodiment of optical transport business method for configuring route of the present invention;
Fig. 2 is the flow chart of the second embodiment of optical transport business method for configuring route of the present invention;
Fig. 3 is the flow chart of the 3rd embodiment of optical transport business method for configuring route of the present invention;
Fig. 4 is the flow chart of the 4th embodiment of optical transport business method for configuring route of the present invention;
Fig. 5 is the flow chart of the 5th embodiment of optical transport business method for configuring route of the present invention;
Fig. 6 is the flow chart of the 6th embodiment of optical transport business method for configuring route of the present invention;
Fig. 7 is the structural representation of the first embodiment of optical transport business routing configuration device of the present invention;
Fig. 8 is the structural representation of the second embodiment of optical transport business routing configuration device of the present invention;
Fig. 9 (a) is the schematic diagram of the first embodiment of optical transport business route in the present invention;
Fig. 9 (b) is the schematic diagram of the second embodiment of optical transport business route in the present invention;
Fig. 9 (c) is the schematic diagram of the 3rd embodiment of optical transport business route in the present invention;
Fig. 9 (d) is the schematic diagram of the 4th embodiment of optical transport business route in the present invention.
The realization of the object of the invention, functional characteristics and advantage will in conjunction with the embodiments, are described further with reference to accompanying drawing.
Embodiment
Should be appreciated that specific embodiment described herein only in order to explain the present invention, be not intended to limit the present invention.
As shown in Figure 1, Fig. 1 is the flow chart of the first embodiment of optical transport business method for configuring route of the present invention.The optical transport business method for configuring route that the present embodiment is mentioned, comprising:
Step S10, when business route instruction arrives, obtains initial input end mouth in the i-th operation layer;
In the present embodiment, comprise initial address and destination address in business route instruction, initial input end mouth is port corresponding to the initial address that comprises in business route instruction, and the i-th operation layer is the operation layer at port place corresponding to initial address.For following parameters, composition graphs 9(a) be described: initial address is IN2, destination address is OUT4, and the business route instruction of arrival is " the business route that configuration IN2 to OUT4, Optical Channel Data Unit-k (Optical Channel Data Unit, ODU) granularity are ODU2 ".Then in the i-th operation layer, find port IN2.
Step S21, records the line passing being arrived the i-th operation layer output port by initial input end mouth;
Please with reference to Fig. 9 (a), in the i-th operation layer, obtain the line passing between the output port that can arrive with granularity ODU2, input port IN2, comprise the line passing C21(IN2 → OUT1 of input port IN2 to output port OUT1), the line passing C22(IN2 → OUT2 of input port IN2 to output port OUT2).Meanwhile, the i-th operation layer sends address information to the i-th+1 operation layer, and address information comprises address information and the business route instruction of output port OUT1 and output port OUT2.In order to find route, can transmit address informations by 64 SM-TTI bytes of standard OTN frame, 0 to 15 byte is loaded address and is transmitted identifier " ROUTER ", represents that what transmit in this information is address information; 16 to 31 bytes load this system-wide by source address, i.e. the address information of the i-th operation layer output port OUT1 and output port OUT2; 32 to 47 bytes load this system-wide by destination address, the destination address OUT4 namely in business route instruction, 48 to 63 bytes load the initial address of this route, the initial address IN2 namely in business route instruction.
Step S22, records the optical fibre channel being arrived the i-th+1 operation layer input port by the i-th operation layer output port;
Between the i-th operation layer and the i-th+1 operation layer, obtain the optical fibre channel between input port that output port OUT1 can arrive, comprise the optical fibre channel L13(OUT1 → IN3 of output port OUT1 to input port IN3).
Step S23, records the line passing being arrived the i-th+1 operation layer output port by the i-th+1 operation layer input port address;
In the i-th+1 operation layer, obtain the line passing between the output port that can arrive with granularity ODU2, input port IN3, comprise the line passing C33(IN3 → OUT3 of input port IN3 to output port OUT3), the line passing C34(IN3 → OUT4 of input port IN3 to output port OUT4).
Step S30, when the i-th+1 operation layer output port is port corresponding to destination address that business route instruction comprises, by record arrive all line passings of destination address by initial address and optical fibre channel is combined as business route;
Inquire about in above-mentioned each line passing and optical fibre channel, the port targetedly whether location OUT4 is corresponding, output port OUT4 corresponding to destination address OUT4 is included when finding in the i-th+1 operation layer, then record traffic route R=C21(IN2 → OUT1) L13(OUT1 → IN3) C34(IN3 → OUT4), namely business route R is the business route meeting business route instruction.
Step S40, according to business route, configuring service path.
According to business route R=C21(IN2 → OUT1) L13(OUT1 → IN3) C34(IN3 → OUT4), configuration IN2 arrives the line passing of OUT1, the line passing of IN3 arrival OUT4.Because optical fibre channel is normally unique, only line passing need be configured herein.After finishing service via configuration, can when needs transmission data, the service channel according to configuration connects, and completes transfer of data.
The business route that the present embodiment generates automatically according to business route instruction, and carry out service channel automatically configure according to the business route generated, avoids poor efficiency and high error rate that manual configuration brings, effectively improves efficiency and the accuracy of configuration.
As shown in Figure 2, Fig. 2 is the flow chart of the second embodiment of optical transport business method for configuring route of the present invention.The present embodiment based on embodiment illustrated in fig. 1, wherein:
Also comprised before step S21:
Step S51, obtains the i-th operation layer output port with initial input end mouth adaptation in the i-th operation layer;
Also comprised before step S22:
Step S52, obtains the i-th+1 operation layer input port with the i-th operation layer output port adaptation in the i-th+1 operation layer;
Also comprised before step S23:
Step S53, obtains the i-th+1 operation layer output port with the i-th+1 operation layer input port adaptation in the i-th+1 operation layer.
In the present embodiment, in general, optical fibre channel L is unique, and line passing C may not be unique.Namely, between two operation layers, an output port of previous operation layer is uniquely corresponding with an input port of a rear operation layer; And in same operation layer, an output port can be corresponding with multiple input port.With it adaptive next port can being inquired according to a upper port, when finding adaptive port, the address of port and the line passing of correspondence and optical fibre channel can be obtained.The line passing adopting this mode to obtain and optical fibre channel, and then the business of acquisition route, structure is simple, easily realizes, and fast response time, effectively ensure that the correctness of the line passing of acquisition, optical fibre channel and business route.
As shown in Figure 3, Fig. 3 is the flow chart of the 3rd embodiment of optical transport business method for configuring route of the present invention.The present embodiment based on embodiment illustrated in fig. 1, also comprises after step S23:
Step S61, judges that whether the i-th+1 operation layer output port is port corresponding to destination address that business route instruction comprises; If so, then step S30 is performed; If not, then step S62 is performed;
Step S62, records and arrives the optical fibre channel of the i-th+2 operation layer input port and the line passing by i-th+2 operation layer input port address arrival the i-th+2 operation layer output port by the i-th+1 operation layer output port;
Step S63, makes i=i+1, returns step S61.
The present embodiment is please also refer to Fig. 9 (b), take initial address as IN2, destination address is OUT6, the business route instruction arrived is " configuration IN2 to OUT6, Optical Channel Data Unit-k (OpticalChannel Data Unit, ODU) granularity is the business route of ODU2 " be example, line passing C21(IN2 → OUT1 is obtained in the i-th operation layer) and C22(IN2 → OUT2), optical fibre channel L13(OUT1 → IN3 is obtained) between the i-th operation layer and the i-th+1 operation layer, line passing C33(IN3 → OUT3 is obtained in the i-th+1 operation layer) and C34(IN3 → OUT4).But, the port that destination address OUT6 is corresponding is not all had in above-mentioned each line passing and optical fibre channel, then search in the i-th+2 operation layer, optical fibre channel L35(OUT3 → IN5 is obtained between the i-th+1 operation layer and the i-th+2 operation layer), in the i-th+2 operation layer, obtain line passing C55(IN5 → OUT5) and C56(IN5 → OUT6).Now, output port OUT6 corresponding to destination address OUT6 is included when finding in the i-th+2 operation layer, then record traffic route R=C21(IN2 → OUT1) L13(OUT1 → IN3) C33(IN3 → OUT3) L35(OUT3 → IN5) C56(IN5 → OUT6), and according to the business routing configuration service channel obtained.If now still do not find the output port that destination address OUT6 is corresponding, then continue the lower one deck of inquiry, the rest may be inferred, until the port that the destination address that comprises of the business route instruction of finding is corresponding, by record arrive all line passings of destination address by initial address and optical fibre channel is combined as business route, carry out business configuration.The business route that the present embodiment generates automatically according to business route instruction, progressive, structure is simple, further increases efficiency and the accuracy of configuration.
As shown in Figure 4, Fig. 4 is the flow chart of the 4th embodiment of optical transport business method for configuring route of the present invention.The present embodiment based on embodiment illustrated in fig. 1, also comprised before step S40:
Step S71, when business route is the different business route of many length, selects the business route that length is the shortest;
The present embodiment is please also refer to Fig. 9 (c), take initial address as IN2, destination address is OUT6, the business route instruction arrived is " the business route that configuration IN2 to OUT6, Optical Channel Data Unit-k (OpticalChannel Data Unit; ODU) granularity are ODU2 " is example, obtains line passing C21(IN2 → OUT1 in the i-th operation layer) and C22(IN2 → OUT2); Optical fibre channel L13(OUT1 → IN3 is obtained between the i-th operation layer and the i-th+1 operation layer), in the i-th+1 operation layer, obtain line passing C33(IN3 → OUT3) and C34(IN3 → OUT4); Optical fibre channel L35(OUT3 → IN5 is obtained between the i-th+1 operation layer and the i-th+2 operation layer), in the i-th+2 operation layer, obtain line passing C55(IN5 → OUT5) and C56(IN5 → OUT6); Meanwhile, between the i-th operation layer and the i-th+2 operation layer, obtain optical fibre channel L26(OUT2 → IN6), in the i-th+2 operation layer, obtain line passing C65(IN6 → OUT5) and C66(IN6 → OUT6).Now, the output port OUT6 that destination address OUT6 is corresponding is included in i-th+2 operation layer, the business route meeting business route instruction has two, Article 1, business route R1=C21(IN2 → OUT1) L13(OUT1 → IN3) C33(IN3 → OUT3) L35(OUT3 → IN5) C56(IN5 → OUT6), Article 2 business route R2=C22(IN2 → OUT2) L26(OUT2 → IN6) C66(IN6 → OUT6), now, Article 1, the length of business route R1 is greater than the length of Article 2 business route R2, in order to save resource allocation, improve allocative efficiency, the business route that length is the shortest should be selected, namely business configuration is carried out according to Article 2 business route R2.
As shown in Figure 5, Fig. 5 is the flow chart of the 5th embodiment of optical transport business method for configuring route of the present invention.The present embodiment based on embodiment illustrated in fig. 1, also comprised before step S40:
Step S72, when business route is the identical business route of many length, a selected and sorted business route foremost.
The present embodiment is please also refer to Fig. 9 (d), take initial address as IN2, destination address is OUT4, the business route instruction arrived is " the business route that configuration IN2 to OUT4, Optical Channel Data Unit-k (OpticalChannel Data Unit; ODU) granularity are ODU2 " is example, obtains line passing C21(IN2 → OUT1 in the i-th operation layer) and C22(IN2 → OUT2); Optical fibre channel L13(OUT1 → IN3 is obtained between the i-th operation layer and the i-th+1 operation layer) and L24(OUT2 → IN4); In the i-th+1 operation layer, obtain line passing C33(IN3 → OUT3), C34(IN3 → OUT4), C43(IN4 → OUT3), C44(IN4 → OUT4).Now, the output port OUT4 that destination address OUT4 is corresponding is included in i-th+1 operation layer, the business route meeting business route instruction has two, Article 1, business route R1=C21(IN2 → OUT1) L13(OUT1 → IN3) C34(IN3 → OUT4), Article 2 business route R2=C21(IN2 → OUT1) L24(OUT2 → IN4) C44(IN4 → OUT4), now, Article 1, the length of business route R1 is identical with the length of Article 2 business route R2, can select arbitrarily business route, in order to save system service program, further raising allocative efficiency, can the preceding business route of selected and sorted, namely business configuration is carried out according to Article 1 business route R1.
As shown in Figure 6, Fig. 6 is the flow chart of the 6th embodiment of optical transport business method for configuring route of the present invention.The present embodiment based on embodiment illustrated in fig. 1, also comprised before step S10:
Step S80, when address distribution instruction arrives, is all of the port allocation address in each operation layer; One_to_one corresponding between port and address.
In the present embodiment, the address of each port is the unique identification of port, address and port one_to_one corresponding, was assigned, record and belong to address information corresponding to this operation layer physical port in each operation layer before route starts.Therefore, when finding adaptive port, the address of port can be obtained.The present embodiment is each port assignment unique address in each layer service layer, as long as assign the address of the both port of origination needing to carry out optical transport and end port in business route instruction, i.e. initial address and destination address, after Fiber connection, Automatic inquirying and business configuration can be carried out, avoid poor efficiency and high error rate that manual configuration brings, effectively improve efficiency and the accuracy of configuration.
As shown in Figure 7, Fig. 7 is the structural representation of the first embodiment of optical transport business routing configuration device of the present invention.The optical transport business routing configuration device that the present embodiment is mentioned, comprising:
Business module 10, for when business route instruction arrives, obtains initial input end mouth in the i-th operation layer; Initial input end mouth is port corresponding to the initial address that comprises in business route instruction, and the i-th operation layer is the operation layer at port place corresponding to initial address;
Monitoring module 20, for record by initial input end mouth arrive the i-th operation layer output port line passing, arrived by the i-th operation layer output port the i-th+1 operation layer input port optical fibre channel and arrive the line passing of the i-th+1 operation layer output port by the i-th+1 operation layer input port address;
Monitoring module 20 also for, when the i-th+1 operation layer output port is port corresponding to destination address that business route instruction comprises, by record arrive all line passings of destination address by initial address and optical fibre channel is combined as business route;
Configuration module 30, for according to business route, configuring service path.
In the present embodiment, comprise initial address and destination address in business route instruction, initial input end mouth is port corresponding to the initial address that comprises in business route instruction, and the i-th operation layer is the operation layer at port place corresponding to initial address.For following parameters, composition graphs 9(a) be described: initial address is IN2, destination address is OUT4, and the business route instruction of arrival is " the business route that configuration IN2 to OUT4, Optical Channel Data Unit-k (Optical Channel Data Unit, ODU) granularity are ODU2 ".Then in the i-th operation layer, find port IN2.Please with reference to Fig. 9 (a), in the i-th operation layer, obtain the line passing between the output port that can arrive with granularity ODU2, input port IN2, comprise the line passing C21(IN2 → OUT1 of input port IN2 to output port OUT1), the line passing C22(IN2 → OUT2 of input port IN2 to output port OUT2).Meanwhile, the i-th operation layer sends address information to the i-th+1 operation layer, and address information comprises address information and the business route instruction of output port OUT1 and output port OUT2.In order to find route, can transmit address informations by 64 SM-TTI bytes of standard OTN frame, 0 to 15 byte is loaded address and is transmitted identifier " ROUTER ", represents that what transmit in this information is address information; 16 to 31 bytes load this system-wide by source address, i.e. the address information of the i-th operation layer output port OUT1 and output port OUT2; 32 to 47 bytes load this system-wide by destination address, the destination address OUT4 namely in business route instruction, 48 to 63 bytes load the initial address of this route, the initial address IN2 namely in business route instruction.Between the i-th operation layer and the i-th+1 operation layer, obtain the optical fibre channel between input port that output port OUT1 can arrive, comprise the optical fibre channel L13(OUT1 → IN3 of output port OUT1 to input port IN3).In the i-th+1 operation layer, obtain the line passing between the output port that can arrive with granularity ODU2, input port IN3, comprise the line passing C33(IN3 → OUT3 of input port IN3 to output port OUT3), the line passing C34(IN3 → OUT4 of input port IN3 to output port OUT4).Inquire about in above-mentioned each line passing and optical fibre channel, the port targetedly whether location OUT4 is corresponding, output port OUT4 corresponding to destination address OUT4 is included when finding in the i-th+1 operation layer, then record traffic route R=C21(IN2 → OUT1) L13(OUT1 → IN3) C34(IN3 → OUT4), namely business route R is the business route meeting business route instruction.According to business route R=C21(IN2 → OUT1) L13(OUT1 → IN3) C34(IN3 → OUT4), configuration IN2 arrives the line passing of OUT1, the line passing of IN3 arrival OUT4.Because optical fibre channel is normally unique, only line passing need be configured herein.After finishing service via configuration, can when needs transmission data, the service channel according to configuration connects, and completes transfer of data.The business route that the present embodiment generates automatically according to business route instruction, and carry out service channel automatically configure according to the business route generated, avoids poor efficiency and high error rate that manual configuration brings, effectively improves efficiency and the accuracy of configuration.
Business module 10 also for:
The i-th operation layer output port with initial input end mouth adaptation is obtained in the i-th operation layer;
The i-th+1 operation layer input port with the i-th operation layer output port adaptation is obtained in the i-th+1 operation layer;
The i-th+1 operation layer output port with the i-th+1 operation layer input port adaptation is obtained in the i-th+1 operation layer.
In the present embodiment, in general, optical fibre channel L is unique, and line passing C may not be unique.Namely, between two operation layers, an output port of previous operation layer is uniquely corresponding with an input port of a rear operation layer; And in same operation layer, an output port can be corresponding with multiple input port.With it adaptive next port can being inquired according to a upper port, when finding adaptive port, the address of port and the line passing of correspondence and optical fibre channel can be obtained.The line passing adopting this mode to obtain and optical fibre channel, and then the business of acquisition route, structure is simple, easily realizes, and fast response time, effectively ensure that the correctness of the line passing of acquisition, optical fibre channel and business route.
Monitoring module 20 also for:
When the i-th+1 operation layer output port is not port corresponding to destination address that business route instruction comprises, records and arrive the optical fibre channel of the i-th+2 operation layer input port by the i-th+1 operation layer output port and arrived the line passing of the i-th+2 operation layer output port by the i-th+2 operation layer input port address;
The rest may be inferred, until the port that the destination address that comprises of the business route instruction of finding is corresponding, by record arrive all line passings of destination address by initial address and optical fibre channel is combined as business route.
The present embodiment is please also refer to Fig. 9 (b), take initial address as IN2, destination address is OUT6, the business route instruction arrived is " configuration IN2 to OUT6, Optical Channel Data Unit-k (OpticalChannel Data Unit, ODU) granularity is the business route of ODU2 " be example, line passing C21(IN2 → OUT1 is obtained in the i-th operation layer) and C22(IN2 → OUT2), optical fibre channel L13(OUT1 → IN3 is obtained) between the i-th operation layer and the i-th+1 operation layer, line passing C33(IN3 → OUT3 is obtained in the i-th+1 operation layer) and C34(IN3 → OUT4).But, the port that destination address OUT6 is corresponding is not all had in above-mentioned each line passing and optical fibre channel, then search in the i-th+2 operation layer, optical fibre channel L35(OUT3 → IN5 is obtained between the i-th+1 operation layer and the i-th+2 operation layer), in the i-th+2 operation layer, obtain line passing C55(IN5 → OUT5) and C56(IN5 → OUT6).Now, output port OUT6 corresponding to destination address OUT6 is included when finding in the i-th+2 operation layer, then record traffic route R=C21(IN2 → OUT1) L13(OUT1 → IN3) C33(IN3 → OUT3) L35(OUT3 → IN5) C56(IN5 → OUT6), and according to the business routing configuration service channel obtained.If now still do not find the output port that destination address OUT6 is corresponding, then continue the lower one deck of inquiry, the rest may be inferred, until the port that the destination address that comprises of the business route instruction of finding is corresponding, by record arrive all line passings of destination address by initial address and optical fibre channel is combined as business route, carry out business configuration.The business route that the present embodiment generates automatically according to business route instruction, progressive, structure is simple, further increases efficiency and the accuracy of configuration.
Monitoring module 20 also for:
When business route is the different business route of many length, select the business route that length is the shortest.
The present embodiment is please also refer to Fig. 9 (c), take initial address as IN2, destination address is OUT6, the business route instruction arrived is " the business route that configuration IN2 to OUT6, Optical Channel Data Unit-k (OpticalChannel Data Unit; ODU) granularity are ODU2 " is example, obtains line passing C21(IN2 → OUT1 in the i-th operation layer) and C22(IN2 → OUT2); Optical fibre channel L13(OUT1 → IN3 is obtained between the i-th operation layer and the i-th+1 operation layer), in the i-th+1 operation layer, obtain line passing C33(IN3 → OUT3) and C34(IN3 → OUT4); Optical fibre channel L35(OUT3 → IN5 is obtained between the i-th+1 operation layer and the i-th+2 operation layer), in the i-th+2 operation layer, obtain line passing C55(IN5 → OUT5) and C56(IN5 → OUT6); Meanwhile, between the i-th operation layer and the i-th+2 operation layer, obtain optical fibre channel L26(OUT2 → IN6), in the i-th+2 operation layer, obtain line passing C65(IN6 → OUT5) and C66(IN6 → OUT6).Now, the output port OUT6 that destination address OUT6 is corresponding is included in i-th+2 operation layer, the business route meeting business route instruction has two, Article 1, business route R1=C21(IN2 → OUT1) L13(OUT1 → IN3) C33(IN3 → OUT3) L35(OUT3 → IN5) C56(IN5 → OUT6), Article 2 business route R2=C22(IN2 → OUT2) L26(OUT2 → IN6) C66(IN6 → OUT6), now, Article 1, the length of business route R1 is greater than the length of Article 2 business route R2, in order to save resource allocation, improve allocative efficiency, the business route that length is the shortest should be selected, namely business configuration is carried out according to Article 2 business route R2.
Monitoring module 20 also for:
When business route is the identical business route of many length, a selected and sorted business route foremost.
The present embodiment is please also refer to Fig. 9 (d), take initial address as IN2, destination address is OUT4, the business route instruction arrived is " the business route that configuration IN2 to OUT4, Optical Channel Data Unit-k (OpticalChannel Data Unit; ODU) granularity are ODU2 " is example, obtains line passing C21(IN2 → OUT1 in the i-th operation layer) and C22(IN2 → OUT2); Optical fibre channel L13(OUT1 → IN3 is obtained between the i-th operation layer and the i-th+1 operation layer) and L24(OUT2 → IN4); In the i-th+1 operation layer, obtain line passing C33(IN3 → OUT3), C34(IN3 → OUT4), C43(IN4 → OUT3), C44(IN4 → OUT4).Now, the output port OUT4 that destination address OUT4 is corresponding is included in i-th+1 operation layer, the business route meeting business route instruction has two, Article 1, business route R1=C21(IN2 → OUT1) L13(OUT1 → IN3) C34(IN3 → OUT4), Article 2 business route R2=C21(IN2 → OUT1) L24(OUT2 → IN4) C44(IN4 → OUT4), now, Article 1, the length of business route R1 is identical with the length of Article 2 business route R2, can select arbitrarily business route, in order to save system service program, further raising allocative efficiency, can the preceding business route of selected and sorted, namely business configuration is carried out according to Article 1 business route R1.
As shown in Figure 8, Fig. 8 is the structural representation of the second embodiment of optical transport business routing configuration device of the present invention.The present embodiment, on basis embodiment illustrated in fig. 7, adds administration module 40, for when address distribution instruction arrives, is all of the port allocation address in each operation layer; One_to_one corresponding between port and address.
In the present embodiment, the address of each port is the unique identification of port, address and port one_to_one corresponding, was assigned, record and belong to address information corresponding to this operation layer physical port in each operation layer before route starts.Therefore, when finding adaptive port, the address of port can be obtained.The present embodiment is each port assignment unique address in each layer service layer, as long as assign the address of the both port of origination needing to carry out optical transport and end port in business route instruction, i.e. initial address and destination address, after Fiber connection, Automatic inquirying and business configuration can be carried out, avoid poor efficiency and high error rate that manual configuration brings, effectively improve efficiency and the accuracy of configuration.
The foregoing is only the preferred embodiments of the present invention; not thereby the scope of the claims of the present invention is limited; every utilize specification of the present invention and accompanying drawing content to do equivalent structure or equivalent flow process conversion; or be directly or indirectly used in other relevant technical fields, be all in like manner included in scope of patent protection of the present invention.

Claims (10)

1. an optical transport business method for configuring route, is characterized in that, comprises step:
When business route instruction arrives, in the i-th operation layer, obtain initial input end mouth; Described initial input end mouth is port corresponding to the initial address that comprises in described business route instruction, and described i-th operation layer is the operation layer at port place corresponding to described initial address;
Record by described initial input end mouth arrive the i-th operation layer output port line passing, arrived by described i-th operation layer output port the i-th+1 operation layer input port optical fibre channel and arrive the line passing of the i-th+1 operation layer output port by described i-th+1 operation layer input port address;
When the i-th+1 operation layer output port is port corresponding to destination address that described business route instruction comprises, by record arrive all line passings of destination address by initial address and optical fibre channel is combined as business route;
According to described business route, configuring service path.
2. optical transport business method for configuring route according to claim 1, it is characterized in that, described record by described initial input end mouth arrive the i-th operation layer output port line passing, by described i-th operation layer output port arrive the i-th+1 operation layer input port optical fibre channel and by described i-th+1 operation layer input port address arrive the i-th+1 operation layer output port line passing step before also comprise:
The i-th operation layer output port with described initial input end mouth adaptation is obtained in the i-th operation layer;
The i-th+1 operation layer input port with described i-th operation layer output port adaptation is obtained in the i-th+1 operation layer;
The i-th+1 operation layer output port with described i-th+1 operation layer input port adaptation is obtained in the i-th+1 operation layer.
3. optical transport business method for configuring route according to claim 1, it is characterized in that, described record by described initial input end mouth arrive the i-th operation layer output port line passing, by described i-th operation layer output port arrive the i-th+1 operation layer input port optical fibre channel and by described i-th+1 operation layer input port address arrive the i-th+1 operation layer output port line passing step after also comprise:
When the i-th+1 operation layer output port is not port corresponding to destination address that described business route instruction comprises, records and arrive the optical fibre channel of the i-th+2 operation layer input port by described i-th+1 operation layer output port and arrived the line passing of the i-th+2 operation layer output port by described i-th+2 operation layer input port address;
The rest may be inferred, until the port that the destination address finding described business route instruction to comprise is corresponding, by record arrive all line passings of destination address by initial address and optical fibre channel is combined as business route.
4. the optical transport business method for configuring route according to any one of claims 1 to 3, is characterized in that, described according to described business route, also comprises before the step of configuring service path:
When described business route is the different business route of many length, select the business route that length is the shortest;
When described business route is the identical business route of many length, a selected and sorted business route foremost.
5. the optical transport business method for configuring route according to any one of claims 1 to 3, is characterized in that, described when business route instruction arrives, and also comprises before obtaining the step of initial input end mouth in the i-th operation layer:
When address distribution instruction arrives, it is all of the port allocation address in each operation layer; One_to_one corresponding between described port and address.
6. an optical transport business routing configuration device, is characterized in that, comprising:
Business module, for when business route instruction arrives, obtains initial input end mouth in the i-th operation layer; Described initial input end mouth is port corresponding to the initial address that comprises in described business route instruction, and described i-th operation layer is the operation layer at port place corresponding to described initial address;
Monitoring module, for record by described initial input end mouth arrive the i-th operation layer output port line passing, arrived by described i-th operation layer output port the i-th+1 operation layer input port optical fibre channel and arrive the line passing of the i-th+1 operation layer output port by described i-th+1 operation layer input port address;
Described monitoring module also for, when the i-th+1 operation layer output port is port corresponding to destination address that described business route instruction comprises, by record arrive all line passings of destination address by initial address and optical fibre channel is combined as business route;
Configuration module, for according to described business route, configuring service path.
7. optical transport business routing configuration device according to claim 6, is characterized in that, described business module also for:
The i-th operation layer output port with described initial input end mouth adaptation is obtained in the i-th operation layer;
The i-th+1 operation layer input port with described i-th operation layer output port adaptation is obtained in the i-th+1 operation layer;
The i-th+1 operation layer output port with described i-th+1 operation layer input port adaptation is obtained in the i-th+1 operation layer.
8. optical transport business routing configuration device according to claim 6, is characterized in that, described monitoring module also for:
When the i-th+1 operation layer output port is not port corresponding to destination address that described business route instruction comprises, records and arrive the optical fibre channel of the i-th+2 operation layer input port by described i-th+1 operation layer output port and arrived the line passing of the i-th+2 operation layer output port by described i-th+2 operation layer input port address;
The rest may be inferred, until the port that the destination address finding described business route instruction to comprise is corresponding, by record arrive all line passings of destination address by initial address and optical fibre channel is combined as business route.
9. the optical transport business routing configuration device according to any one of claim 6 to 8, is characterized in that, described monitoring module also for:
When described business route is the different business route of many length, select the business route that length is the shortest;
When described business route is the identical business route of many length, a selected and sorted business route foremost.
10. the optical transport business routing configuration device according to any one of claim 6 to 8, is characterized in that, also comprise administration module, for when address distribution instruction arrives, is all of the port allocation address in each operation layer; One_to_one corresponding between described port and address.
CN201310001922.XA 2013-01-04 2013-01-04 Optical transport business method for configuring route and device Expired - Fee Related CN103078758B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310001922.XA CN103078758B (en) 2013-01-04 2013-01-04 Optical transport business method for configuring route and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310001922.XA CN103078758B (en) 2013-01-04 2013-01-04 Optical transport business method for configuring route and device

Publications (2)

Publication Number Publication Date
CN103078758A CN103078758A (en) 2013-05-01
CN103078758B true CN103078758B (en) 2015-10-21

Family

ID=48155168

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310001922.XA Expired - Fee Related CN103078758B (en) 2013-01-04 2013-01-04 Optical transport business method for configuring route and device

Country Status (1)

Country Link
CN (1) CN103078758B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1427572A (en) * 2001-12-20 2003-07-02 株式会社日立制作所 Optical signal converting apparatus, optical communication network and usage thereof
WO2003079215A1 (en) * 2002-03-14 2003-09-25 Elematics, Inc. Computer network for layer three correlation with layer one topology
CN101110652A (en) * 2006-07-18 2008-01-23 中兴通讯股份有限公司 Apparatus and method for supporting automatic optical fiber connecting configuration of optical transmission equipment
CN101150441A (en) * 2007-10-16 2008-03-26 中兴通讯股份有限公司 A system and method for automatic single board connection configuration in network management
CN101442426A (en) * 2007-11-21 2009-05-27 中兴通讯股份有限公司 Method for configuring optical fiber connection data of WDM business
CN101447848A (en) * 2007-11-28 2009-06-03 华为技术有限公司 Method and device for realizing ring network protection
CN102763355A (en) * 2010-02-02 2012-10-31 瑞典爱立信有限公司 Traffic differentiation in a transport network

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4045419B2 (en) * 2002-06-21 2008-02-13 日本電気株式会社 Transmission path setting method, transmission apparatus and network system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1427572A (en) * 2001-12-20 2003-07-02 株式会社日立制作所 Optical signal converting apparatus, optical communication network and usage thereof
WO2003079215A1 (en) * 2002-03-14 2003-09-25 Elematics, Inc. Computer network for layer three correlation with layer one topology
CN101110652A (en) * 2006-07-18 2008-01-23 中兴通讯股份有限公司 Apparatus and method for supporting automatic optical fiber connecting configuration of optical transmission equipment
CN101150441A (en) * 2007-10-16 2008-03-26 中兴通讯股份有限公司 A system and method for automatic single board connection configuration in network management
CN101442426A (en) * 2007-11-21 2009-05-27 中兴通讯股份有限公司 Method for configuring optical fiber connection data of WDM business
CN101447848A (en) * 2007-11-28 2009-06-03 华为技术有限公司 Method and device for realizing ring network protection
CN102763355A (en) * 2010-02-02 2012-10-31 瑞典爱立信有限公司 Traffic differentiation in a transport network

Also Published As

Publication number Publication date
CN103078758A (en) 2013-05-01

Similar Documents

Publication Publication Date Title
CN101588293B (en) Full IP communication interconnection system of Ad Hoc network and IPv6 network
CN103312611B (en) Message processing method, device label processing method and equipment
CN104283806A (en) Service link processing method and device
CN103023773B (en) Method, device and system for forwarding message in multi-topology network
CA2651020A1 (en) Method and apparatus for managing a set of communications connection related information
CN104349400A (en) Wireless communication method, wired transmission detection method, and correlation device
CN106685832A (en) WIA-PA field network/IPv6 backhaul network combination scheduling method based on SDN
CN102195844A (en) Method and equipment for managing forwarding table entry
JP2017526262A (en) Service data transmission method and apparatus
CN102098596A (en) Route establishing method and device in optical network
US8488471B2 (en) Intelligent network planning and provisioning tool
CN102195818B (en) Data service processing single board and method
CN103379033A (en) Message forwarding method and grouped optical transmission network device
CN103297344A (en) Distributed data communicating system and multicast message transmitting method thereof
CN103078758B (en) Optical transport business method for configuring route and device
CN103748842A (en) Method, device and route device for forwarding data packages
US8855015B2 (en) Techniques for generic pruning in a trill network
CN101945110A (en) Configuration method and device of address resolution protocol entry
CN104869062A (en) Data packet forwarding method and device
CN104253751A (en) Multi-role host-based message transmission method and multi-role host-based message transmission equipment
CN103560937A (en) Data accessing method and entry server
US20150109945A1 (en) On-demand transmission path providing system and method
CN102244615A (en) Forwarding entry sending method, device and system as well as autonomous system border router
CN104852982B (en) A kind of direct-connected method of WIA-PA network handheld device and field device based on Keep-alive frames
CN102647333B (en) Communication means under distributed base station system between baseband processing equipment and device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170421

Address after: 430223 East Lake Wuhan New Technology Development Zone Hua Hua Road, Optics Valley Industrial Park, ZTE building, building No. 3, building

Patentee after: WUHAN ZHONGXING SOFTWARE CO., LTD.

Address before: 518057 Nanshan District Guangdong high tech Industrial Park, South Road, science and technology, ZTE building, Ministry of Justice

Patentee before: ZTE Corporation

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151021

Termination date: 20190104