CN103046767B - Dual-control synchronous jacking construction method of PLC (Programmable Logic Controller) computer slot body - Google Patents

Dual-control synchronous jacking construction method of PLC (Programmable Logic Controller) computer slot body Download PDF

Info

Publication number
CN103046767B
CN103046767B CN201210556712.2A CN201210556712A CN103046767B CN 103046767 B CN103046767 B CN 103046767B CN 201210556712 A CN201210556712 A CN 201210556712A CN 103046767 B CN103046767 B CN 103046767B
Authority
CN
China
Prior art keywords
jack
jacking
bearing
displacement
pretension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210556712.2A
Other languages
Chinese (zh)
Other versions
CN103046767A (en
Inventor
应小林
苏孝敏
许华
雷涛
应江龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Province No1 Water Conservancy & Electric Power Construction Group Holdings Co Ltd
Original Assignee
Zhejiang Province No1 Water Conservancy & Electric Power Construction Group Holdings Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Province No1 Water Conservancy & Electric Power Construction Group Holdings Co Ltd filed Critical Zhejiang Province No1 Water Conservancy & Electric Power Construction Group Holdings Co Ltd
Priority to CN201210556712.2A priority Critical patent/CN103046767B/en
Publication of CN103046767A publication Critical patent/CN103046767A/en
Application granted granted Critical
Publication of CN103046767B publication Critical patent/CN103046767B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention is suitable for slot body jacking, and particularly relates to a dual-control synchronous jacking construction method of a PLC (Programmable Logic Controller) computer slot body. The method comprises the following steps: (1) surveying lofting; (2) support base prepressing; (3) lifting jack on-station; (4), PLC computer synchronous jacking system jacking; (5) lifting jack locking; (6) quick concrete casting; (7) lifting jack equal-strength removal; and the like. According to the method, the lifting speed of the lifting jack can be accurately controlled, the control of four-point synchronous lifting is realized, and the functions of synchronous lifting, synchronous descending, heavy load weighing and the like are satisfied.

Description

PLC calculates trough body double control synchronization of jacking up construction
Technical field
The present invention is applicable to the jacking of groove body, and specifically a kind of PLC calculates trough body double control synchronization of jacking up construction.
Background technology
The jacking of groove body is key and the core of this Scheme of Strengthening.Due to groove body deflection little (the maximum only 1mm of theory calculate), and the stressed difference of each bearing, require when accurately controlling end reaction (i.e. top lift), the displacement of strict control flume body.Current high-precision jack and synchronous control system can only carry out the Synchronization Control of single index, and displacement accuracy is all at ± about 5mm, far can not meet the precision controlling requirement of this groove body.Though by dial gauge observation displacement accuracy meet the demands, data can not with control synchronization, very easily cause the failure of jacking.
Summary of the invention
For the problems referred to above, the present invention discloses a kind of PLC and calculates trough body double control synchronization of jacking up construction, accurately can control the lifting speed of jack, realize the control of 4 synchronization liftings, functions such as meeting synchronization of jacking up, synchronously land, heavy duty is weighed.
The present invention is achieved by the following technical solutions: a kind of PLC calculates trough body double control synchronization of jacking up construction, and step is (1) surveying and locating; (2) bearing precompressed; (3) jack is in place; (4) plc computer synchronous jacking system jacking; (5) lock jack; (6) quick concrete placings; (7) wait and remove by force jack top etc.
As improvement, step (2) in, bearing is pressed in the previous day that (4) step is implemented in advance.
As improvement, step (2) in, bury settlement observation point underground at the groove body top at bearing position, and obtain displacement initial value.
As preferably, step (3) in, installation position displacement sensor and pressure sensor, and carry out oil pipe and be connected with holding wire.
As preferably, step (4) in, the laminating of groove body and displacement zero setting will be carried out before formal jacking.
As preferably, step (6) in, jacking terminates, and imbeds stressometer when building concrete, to measure Bearing Seat Force situation at any time in final-period management.
As preferably, step (6) in, after jacking terminates, again measured by the settlement observation point that survey crew is pre-buried to groove body top, and contrast with initial value, the deformation of analysis vat body.
Present invention employs above-mentioned measure to improve, beneficial effect is remarkable: adopt frequency control closed-loop control system in this engineering method, rely on the frequency regulating power supply, change motor speed, reach and make the continuously adjustable object of the flow of oil pump, then be equipped with advanced electric control gear and high-precision displacement, pressure detecting system, just accurately can control the lifting speed of jack, realize the control of 4 synchronization liftings, functions such as meeting synchronization of jacking up, synchronously land, heavy duty is weighed.
Accompanying drawing explanation
Fig. 1 is process chart of the present invention.
Detailed description of the invention
The present invention is further illustrated in conjunction with the embodiments to contrast accompanying drawing below:
With reference to shown in Fig. 1, in embodiment 1, a kind of PLC calculates trough body double control synchronization of jacking up construction, and step be (1) surveying and locating: the stress point of analysis bearing, determines jack placement location.
(2) bearing precompressed: in jacking the previous day, by the requirement of design drawing relative position, bearing and bearing steel plate are placed on steelframe, jack place step (1) in the position determined, pretension is carried out by jack pair bearing, after pretension to design strength, with 4M22*160 high-strength bolt, bearing steel plate and bearing entirety are fixed, then remove jack, remove the bearing pretension body (this pretension body weight is about 180kg) after fixing, carry out the pretension of next block bearing.During jack pretension bearing, carry out pretension by the pressure sensor being arranged on jack top with Stress control.And bury settlement observation point underground at the groove body top at each bearing position, obtain its displacement initial value.
(3) be first arranged on by displacement transducer on the concrete wall bottom the groove body near bearing, directly can reflect the real misalignment of groove body, pressure passes the top that sensor is arranged on jack, accurately can reflect the situation of change of top lift when jacking.Then be the safety during guaranteeing jacking, before jack installation in position, carry out that example is normal checks the complete situation comprising each equipment and tube connector, line, guarantee that equipment is not operating only haltingly.Namely press oil circuit design scheme by oil pipe exact connect ion oil pump, valve body and jack, the holding wire of displacement and pressure sensor will with computer exact connect ion, to manual testing be carried out after connection, to guarantee that signal transmission is normal, finally that jack is in place.
(4) before formal jacking, first will carry out the laminating of groove body and displacement zero setting, method is: arrange displacement zero setting point by the oil pressure of 5MPa, first push up in advance by the top lift (i.e. laminate pressure) under the oil pressure of 5MPa, when after execution zero setting button, No. 4 jack start jacking, after the real load in picture reaches the setting value of zero setting tonnage, jack stops jacking automatically, and the displacement of servo jack resets by simultaneity factor automatically, is now the benchmark zero point of synchronization of jacking up.Namely zero setting terminates.Pre-top is in order to displacement monitoring, is also to make the interface close contact such as bearing steel plate and bottom land concrete, jack and stake platform concrete, reduces displacement error, avoids the generation of jacking security incident simultaneously.
After zero setting terminates, first set jacking speed 0.1mm/min or 5t/min jacking (concrete jacking speed is depending on groove body operating mode), when the displacement of any jack or top lift reach setting value, synchronous control system will send instruction automatically, automatically the jacking fuel feeding of this jack is closed, this hydraulic jack stop motion.Jacking just completes.
(5) jacking terminates, locking jack.
(6) jacking terminates, and treats that jack locks, and namely carries out quick concrete placings, imbeds stressometer simultaneously, to measure Bearing Seat Force situation at any time in final-period management.In addition, again measured by the settlement observation point that survey crew is pre-buried to groove body top, and contrast with initial value, the deformation of analysis vat body, convenient reason of analyzing carries out later jacking.
(7) wait and remove by force jack top etc.
That more than enumerates is only specific embodiments of the invention, obviously, the invention is not restricted to above embodiment.All distortion that those of ordinary skill in the art can directly derive from content disclosed by the invention or associate, all should belong to protection scope of the present invention.

Claims (1)

1. PLC calculates a trough body double control synchronization of jacking up construction, it is characterized in that step is (1) surveying and locating: the stress point analyzing bearing, determines jack placement location;
(2) bearing precompressed: in jacking the previous day, by the requirement of design drawing relative position, bearing and bearing steel plate are placed on steelframe, jack place step (1) in the position determined, carry out pretension by jack pair bearing, after pretension to design strength, with 4M22*160 high-strength bolt, bearing steel plate and bearing entirety are fixed, remove jack again, remove the bearing pretension body after fixing, this pretension body weight is about 180kg, carries out the pretension of next block bearing; During jack pretension bearing, carry out pretension by the pressure sensor being arranged on jack top with Stress control; And bury settlement observation point underground at the groove body top at each bearing position, obtain its displacement initial value;
(3) be first arranged on by displacement transducer on the concrete wall bottom the groove body near bearing, directly can reflect the real misalignment of groove body, pressure sensor is arranged on the top of jack, accurately can reflect the situation of change of top lift when jacking; Then be the safety during guaranteeing jacking, before jack installation in position, carry out that example is normal checks the complete situation comprising each equipment and tube connector, line, guarantee that equipment is not operating only haltingly; Namely press oil circuit design scheme by oil pipe exact connect ion oil pump, valve body and jack, the holding wire of displacement and pressure sensor will with computer exact connect ion, to manual testing be carried out after connection, to guarantee that signal transmission is normal, finally that jack is in place;
(4) before formal jacking, first carry out the laminating of groove body and displacement zero setting, method is: arrange displacement zero setting point by the oil pressure of 5MPa, first push up in advance by the top lift (i.e. laminate pressure) under the oil pressure of 5MPa, when after execution zero setting button, No. 4 jack start jacking, after the real load in picture reaches the setting value of zero setting tonnage, jack stops jacking automatically, and the displacement of servo jack resets by simultaneity factor automatically, is now the benchmark zero point of synchronization of jacking up; Namely zero setting terminates; Pre-top is in order to displacement monitoring, is also to make bearing steel plate and bottom land concrete, jack and stake platform concrete interface close contact, reduces displacement error, avoids the generation of jacking security incident simultaneously;
After zero setting terminates, first set jacking speed 0.1mm/min or 5t/min jacking, when the displacement of any jack or top lift reach setting value, synchronous control system will send instruction automatically, automatically the jacking fuel feeding of this jack is closed, this hydraulic jack stop motion; Jacking just completes;
(5) jacking terminates, locking jack;
(6) jacking terminates, and treats that jack locks, and namely carries out quick concrete placings, imbeds stressometer simultaneously, to measure Bearing Seat Force situation at any time in final-period management; In addition, again measured by the settlement observation point that survey crew is pre-buried to groove body top, and contrast with initial value, the deformation of analysis vat body, convenient reason of analyzing carries out later jacking;
(7) wait and remove jack by force.
CN201210556712.2A 2012-12-20 2012-12-20 Dual-control synchronous jacking construction method of PLC (Programmable Logic Controller) computer slot body Active CN103046767B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210556712.2A CN103046767B (en) 2012-12-20 2012-12-20 Dual-control synchronous jacking construction method of PLC (Programmable Logic Controller) computer slot body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210556712.2A CN103046767B (en) 2012-12-20 2012-12-20 Dual-control synchronous jacking construction method of PLC (Programmable Logic Controller) computer slot body

Publications (2)

Publication Number Publication Date
CN103046767A CN103046767A (en) 2013-04-17
CN103046767B true CN103046767B (en) 2015-01-21

Family

ID=48059598

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210556712.2A Active CN103046767B (en) 2012-12-20 2012-12-20 Dual-control synchronous jacking construction method of PLC (Programmable Logic Controller) computer slot body

Country Status (1)

Country Link
CN (1) CN103046767B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102777024A (en) * 2012-08-14 2012-11-14 俞彬 Digital and intelligent lifting control device
CN105464398A (en) * 2015-12-23 2016-04-06 江苏鼎达建筑新技术有限公司 PLC intelligent synchronous jacking unloading construction device used for reinforcing concrete independent column
CN106151123B (en) * 2016-08-01 2017-12-29 中国人民解放军海军航空工程学院 A kind of dual-control loop Hydrauservo System component parameters optimization method
CN107724254A (en) * 2017-08-23 2018-02-23 北京公联洁达公路养护工程有限公司 The synchronization of jacking up of construction of bridge T beam changes construction method with making
CN114355832A (en) * 2021-12-27 2022-04-15 大连华锐重工集团股份有限公司 Torpedo tank car jacking control system and method based on car lifting jack hydraulic system
CN115506588B (en) * 2022-10-25 2024-05-28 四川路桥桥梁工程有限责任公司 Intelligent integrated lifting support

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201372578Y (en) * 2008-12-30 2009-12-30 上海天演建筑物移位工程有限公司 Internal force and height controllable sliding displacement device
CN201605829U (en) * 2009-12-30 2010-10-13 上海天演建筑物移位工程有限公司 Building jacking system
CN201915650U (en) * 2010-09-03 2011-08-03 上海天演建筑物移位工程有限公司 Control system for synchronous push
CN102704705A (en) * 2012-06-06 2012-10-03 河北省建筑科学研究院 Building long-stroke redescending-free multi-point synchronous jacking method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090026430A1 (en) * 2007-07-27 2009-01-29 Simplified Lifting Systems, Llc Lifting and cribbing systems

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201372578Y (en) * 2008-12-30 2009-12-30 上海天演建筑物移位工程有限公司 Internal force and height controllable sliding displacement device
CN201605829U (en) * 2009-12-30 2010-10-13 上海天演建筑物移位工程有限公司 Building jacking system
CN201915650U (en) * 2010-09-03 2011-08-03 上海天演建筑物移位工程有限公司 Control system for synchronous push
CN102704705A (en) * 2012-06-06 2012-10-03 河北省建筑科学研究院 Building long-stroke redescending-free multi-point synchronous jacking method

Also Published As

Publication number Publication date
CN103046767A (en) 2013-04-17

Similar Documents

Publication Publication Date Title
CN103046767B (en) Dual-control synchronous jacking construction method of PLC (Programmable Logic Controller) computer slot body
CN103526948B (en) The control method of intelligent tensioning system and intelligent tensioning system
US8863474B2 (en) Main work construction method for reinforced concrete building and building construction machine
CN202562677U (en) Prestress under anchorage intelligent synchronous stretching and drawing detection device
KR100833686B1 (en) Control system for lifting a bridge and lifting method using the system
CN111321767A (en) Power transmission line tower lifting system and method based on intelligent hydraulic technology
CN108677765B (en) Bridge integral synchronous jacking support replacing system and construction method
CN208517944U (en) A kind of Metro station excavation bracing members axle power autocompensation installation
CN102431090B (en) Fiber grating precast beam prestress intelligent tensioning control system and implementation method thereof
CN102304979B (en) The automatic control device of pre-stress stretching device
CN110181650A (en) A kind of prefabricated case beam template synchronous jacking system and its control method
CN102094393B (en) Construction process of steel-concrete joint for steel and concrete mixed continuous steel structure bridge
CN103145046B (en) The automatic safety-control device of bridge machine and method under complex working condition
CN211846975U (en) Steel support axial force servo system with locking mechanism
CN210764118U (en) Synchronous jacking system based on fuzzy control
CN111560862A (en) Pre-pressing self-balancing support replacing method
CN201579474U (en) Vertical plate shearing machine worktable hydraulic proportion control deflection compensating system
CN106320719B (en) Alignment and leveling method for nuclear power station metal core shell
CN109505404A (en) The intelligent recognition and restraint system of roof system deformation
CN202416853U (en) Novel synchronous jacking control system based on CAN (control area network) bus
CN210500703U (en) Synchronous jacking system of prefabricated box girder template
CN203065040U (en) Automatic safety control device of bridge crane under complex conditions
CN201035381Y (en) Oil-well rig headframe, subbase hydraulic lifting synchronous controller
CN209723226U (en) A kind of large span steel structure roof entirety lift structure
CN202519581U (en) Automatic prestress intelligent stretching device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant