CN103032083A - 一种隔水壳再造方法 - Google Patents
一种隔水壳再造方法 Download PDFInfo
- Publication number
- CN103032083A CN103032083A CN2012105621964A CN201210562196A CN103032083A CN 103032083 A CN103032083 A CN 103032083A CN 2012105621964 A CN2012105621964 A CN 2012105621964A CN 201210562196 A CN201210562196 A CN 201210562196A CN 103032083 A CN103032083 A CN 103032083A
- Authority
- CN
- China
- Prior art keywords
- water proof
- proof shell
- water
- aquifer
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Geophysics And Detection Of Objects (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
本发明公开了一种隔水壳再造方法。确定矿体周围含水层分布情况,在这些含水层中进行隔水壳再造,在矿体周围形成一个完整连续的隔水关键层。结合实际工程情况和力学原理计算隔水顶板所需厚度。利用Flac3d模拟在矿体开采条件下,隔水壳应力、塑性区、沉降分布情况,以判断其是否会发生破坏。工程实施中首先在含水层中打探测孔并用地质探测仪器确定溶洞、裂隙位置,在中段周围含水层中施工联络巷道,在巷道靠近含水层裂隙处施工钻注硐室。在巷道、硐室中合理布置注浆孔并进行加密注浆,最后进行孔间CT透视,检查注浆堵水效果。该方法再造了矿床开采环境,使得矿床开采安全高效进行,且有效降低了地质灾害的发生。
Description
技术领域
本发明涉及一种矿山安全领域的隔水壳再造方法。
背景技术
对于大水岩溶矿体开采,采取有效的地下水防治方案显得尤其重要。传统的疏干排水为主的防治水方案,由于在开采过程中,疏干了大量的地下水,使得矿区地下水位下降,形成大范围的降落漏斗,容易造成地表塌陷,形成一系列的地质灾害,不仅增加矿山排水负担,致使矿床无法高效连续开采,而且容易引发工农矛盾。如仍采取预留护顶矿,以10m×10m网度向含水顶板施工水平法向注浆孔的防治水方案,则不仅浪费大量矿产资源(采出的矿量仅占剩余矿量的三分之一左右),而且存在突水淹井的威胁。若只在顶板含水层中进行隔水关键层注浆加固,忽略侧向岩体或者底板岩体的岩溶突水情况,矿山生产安全仍然无法得到保障。因此,如何进行安全、高效开采而又不引发地表塌陷、地下水位下降等地质灾害,是大水岩溶矿体开采需要面临的一个大问题。
发明内容
本发明所要解决的技术问题是提供一种既能安全、高效开采而又不引发地表塌陷、地下水位下降地质灾害的隔水壳再造方法。
为了解决上述技术问题,本发明提供的隔水壳再造方法,依据已有地质资料和实地地质勘测结果,确定各开采中段矿体周围的含水岩层分布情况,在含水层中进行隔水壳再造,在矿体周围形成一个连续的防水的坚固外壳,保证矿体安全开采,结合含水层中岩石力学特性,依据力学原理计算隔水壳所需的厚度,这个厚度包括无效厚度和有效厚度两部分,利用数字模拟软件模拟矿体在矿石开采活动下,隔水壳的应力大小、塑性区分布、沉降大小和孔隙水压力大小,以判断其是否会发生破坏和突水事故;工程施工中在矿体周围含水层中打探测孔,使用精确的探测仪器确定顶板含水层的节理裂隙的分布,在中段勘探线附近的含水层中施工一条联络巷道,在联络巷道靠近裂隙处施工与矿体走向平行的钻注硐室,在联络巷道和钻注硐室中布置注浆孔,进行加密注浆和孔间CT透视,确保施工的质量和堵水效果。
所述的隔水壳为人工再造体,其位置是依据矿体周围的含水层分布而确定,在顶板围岩、底板围岩或者侧帮围岩。
所述的隔水壳再造是使用TRT6000、地质雷达先探测出含水层节理裂隙分布情况,对含水层中的节理裂隙经行注浆堵水,把矿体周围岩石连成一个完整的隔水壳体。
在布置探测孔时,钻孔方向大致平行矿体走向,钻孔均为倾角5度近水平钻孔,相邻两孔大致平行,钻孔开孔口径150mm,钻进4m后,采用注浆办法埋设孔口管,安装好高压阀门放突水应急措施,变径91mm继续钻进,遇涌水点及破碎带均用注浆办法通过,要求达到注浆结束标准,直到终孔。
依据矿体赋存条件和矿床开采设计,利用Fl a c3d进行数值模拟,计算各开采步骤下的应力、塑性区分布和沉降情况,依据结果来判断隔水壳是否会发生破坏和突水事故,进而考虑是否进行隔水壳厚度调整。
所述的注浆孔的浆液扩散半径取值为5米,注浆孔孔底间距不超过10米,孔深为巷道或钻注硐室与含水层裂隙之间的距离。
在注浆孔的布孔方式上有四种可供选择:从状孔、下行纵向孔、上行纵向孔和近水平法向孔。四种布孔方式各具特点,根据实际情况灵活运用,达到经济有效的目的。
具体实施步骤如下:
(1)、收集地质资料和进行工程区域的地质勘测,确定各开采中段周围岩体中含水层分布状况,隔水壳将布置在这些含水层中;
(2)、依据矿体与含水层的相对位置和采矿设计参数建立力学模型,结合边界条件、Mo hr-Ca lomb破坏准则和裂隙岩***移计算公式计算隔水壳的无效厚度;采用弹性力学薄板理论,依据H-Tresca屈服准则计算隔水壳的有效厚度,将无效厚度与有效厚度相加即可获得隔水壳的厚度;
(3)、依据矿体赋存条件和矿床开采设计,利用Flac3d进行数值模拟,计算各开采步骤下的应力、塑性区分布和沉降情况,依据结果来判断隔水壳是否会发生破坏和顶板突水事故,进而考虑是否进行顶板厚度调整;
(4)、在矿体周围含水层中打探测孔,使用TRT6000和地质雷达探测仪器,确定含水层中的溶洞、裂隙分布情况,依据含水层中的溶洞、裂隙分布确定联络巷道和注浆硐室的布置方案;
(5)、在中段勘探线含水层中施工一条联络巷道,在联络巷道靠近溶洞或裂隙的位置施工钻注硐室,硐室方向基本平行矿体走向;
(6)、依据工程实际情况,选择合适布孔方式,在联络巷道和注浆硐室中布置注浆孔并进行加密注浆;
(7)、在相邻探测孔,利用孔底锚头分别安装CT透视的发射极和接收极对两孔间的岩溶裂隙进行探测最终通过八个测试剖面,来监测工程施工质量和注浆堵水效果。
采用上述技术方案的隔水壳再造方法,在矿体周围的含水层中进行隔水壳再造,堵住含水层中的溶洞和裂隙,使矿体周围的岩体形成一个连续的隔水壳体和稳固的采矿围岩环境,可以大大减少地下水渗入开采空间中,从而减少了矿床开采的地下水疏干量,防止地下水水位的降低和降落漏斗的形成,避免了地表塌陷,保护了生态环境。同时由于在含水层形成坚固的隔水壳,避免了预留保护矿体所造成的资源浪费,大大提高了矿石的回收率。使得地下矿床的开采安全、高效。
本发明在隔水壳厚度的确定,不单纯采用力学分析计算获得,还要结合具体的采矿方案,利用FLAC3D模拟软件进行模拟计算,获得在各采矿步骤下隔水壳应力分布、塑性区分布、沉降及孔隙水压力,进而对隔水壳厚度进行进一步调整。在施工过程要求打探测孔,进行孔间CT透视,以便对孔间裂隙和注浆堵水效果进行检测。充分保证了隔水壳质量的安全可靠。
综上所述,本发明是一种既能安全、高效开采而又不引发地表塌陷、地下水位下降地质灾害的隔水壳再造方法。
附图说明
图1是隔水壳在地下空间中分布图。
图2是隔水壳结构示意图。
图3是无效厚度应力计算模型。
图4是隔水壳有效厚度计算力学模型。
图5是本发明隔水壳工程示意图。
图6是图6中沿A-A面剖视图。
图7是图6中沿B-B面剖视图。
具体实施方式
本发明提出的隔水壳再造具体用例,以顶板岩体为含水层的情况为例:
参见图1、图2、图3、图4、图5、图6和图7,图中:1为矿体;2为含水层;3为隔水层岩石或弱渗透性岩石;4为隔水壳;5为含水层中的溶洞或者裂隙;6为联络巷道;7为钻注硐室;8为注浆孔;本发明提供的隔水壳再造方法是:收集地质资料并进行相应的地质勘测,确定矿床周围含水层分布情况和围岩各种应力和水文参数;隔水壳包括无效厚度h2和有效厚度h1,依据采矿设计参数建立力学模型,结合边界条件、Mohr-Calomb破坏准则和裂隙岩***移计算公式计算隔水壳的无效厚度h2。采用弹性力学薄板理论,依据H-Tresca屈服准则计算隔水壳的有效厚度h1。隔水壳的厚度为h=h1+h2。根据矿山开采的具体方案和采空区处理方案,利用Flac3d软件进行建模计算,求的在矿石采掘扰动、围岩应力和孔隙水压力的情况下隔水壳最大主应力分布、沉降分布和塑性区分布图。看是否会发生顶板破坏,甚至是突水事故。在矿体上覆的含水层中打探测孔,使用先进的探测仪器确定含水层中的节理裂隙分布情况,依据节理裂隙分布来设计联络巷道6和注浆硐室7。在中段勘探线上朝顶板施工一条联络巷道6,在联络巷道6靠近溶洞、裂隙的位置施工钻注硐室7,注浆硐室7方向基本平行矿体1走向。依据实际情况选择合理的布孔方式,在联络巷道6和注浆硐室7中打注浆孔8并进行加密注浆,注浆孔8孔底间距为10米,孔深为注浆硐室7或联络巷道6到裂隙之间的距离。利用孔底锚头分别安装CT透视的发射极和接收极对两孔间的岩溶裂隙进行探测最终通过八个测试剖面,确定裂隙注浆堵水效果。
本方法的具体实施步骤如下:
1.收集地质资料和进行工程区域的地质勘测,确定各开采中段周围岩体中含水层2分布状况。隔水壳4将布置在这些含水层2中。
2.依据矿体1与含水层2的相对位置和采矿设计参数建立力学模型,结合边界条件、Mohr-Calomb破坏准则和裂隙岩***移计算公式计算隔水壳4的无效厚度。采用弹性力学薄板理论,依据H-Tresca屈服准则计算隔水壳4的有效厚度。将无效厚度与有效厚度相加即可获得隔水壳4的厚度。
3.依据矿体1赋存条件和矿床开采设计,利用Flac3d进行数值模拟,计算各开采步骤下的应力、塑性区分布和沉降情况,依据结果来判断隔水壳4是否会发生破坏和顶板突水事故,进而考虑是否进行顶板厚度调整。
4.在矿体1周围含水层2中打探测孔,使用TRT6000和地质雷达等探测仪器,确定含水层2中的溶洞、裂隙等分布情况,依据含水层2中的溶洞、裂隙分布确定联络巷道6和注浆硐室7的布置方案。
5.在中段勘探线含水层2中施工一条联络巷道6,在联络巷道6靠近溶洞或裂隙的位置施工钻注硐室7,注浆硐室7方向基本平行矿体1走向。
6.依据工程实际情况,选择合适布孔方式,在联络巷道6和注浆硐室7中布置注浆孔8并进行加密注浆。
7.在相邻探测孔,利用孔底锚头分别安装CT透视的发射极和接收极对两孔间的岩溶裂隙进行探测最终通过八个测试剖面,来监测工程施工质量和注浆堵水效果。
隔水壳4为人工再造体,既是隔水体又是采场周围的岩石的一种加固,其位置是依据矿体周围的含水层分布而确定,有可能在顶板围岩,底板围岩或者侧帮围岩,其厚度包括无效厚度和有效厚度两部分。
隔水壳4再造并非对整个含水层进行帷幕注浆,而是使用TRT6000、地质雷达等先探测出含水层节理裂隙分布情况,对含水层中的节理裂隙经行注浆堵水,把矿体周围岩石连成一个完整的隔水壳体。
在布置探测孔时,钻孔方向要大致平行矿体走向,钻孔均为倾角5度近水平钻孔,相邻两孔大致平行,钻孔开孔口径150mm,钻进4m后,采用注浆办法埋设孔口管,安装好高压阀门等放突水应急措施,变径91mm继续钻进,遇涌水点及破碎带均用注浆办法通过(要求达到注浆结束标准),直到终孔。
依据矿体赋存条件和矿床开采设计,利用Flac3d进行数值模拟,计算各开采步骤下的应力、塑性区分布和沉降情况,依据结果来判断隔水壳是否会发生破坏和突水事故,进而考虑是否进行隔水壳厚度调整。
注浆孔8的浆液扩散半径取值为5米,注浆孔孔底间距不超过10米,孔深为巷道或钻注硐室与含水层裂隙之间的距离。
在注浆孔8的布孔方式上有四种可供选择:从状孔、下行纵向孔、上行纵向孔和近水平法向孔。四种布孔方式各具特点,根据实际情况灵活运用,达到经济有效的目的。
以上面类似的方法处理底板岩体和侧帮岩体为含水层的情况,这样在矿体周围形成一个稳定连续的隔水壳,保证了矿床开采的安全高效进行。
经过与实际工程实施,发现工程堵水效果好,隔水壳稳固,是的矿床开采安全高效进行。但是,在本发明的技术领域内,只要具备基本知识,就可以对本发明的实施方式进行改进。在本发明中对实质性技术方案提出了专利保护,其申请保护范围应包括具有上述技术特征的一切变化方式。
上例所述,仅是本发明的较佳实施例而已,并非对本发明作任何形式上的限制。虽然本发明已以较佳实施例揭露如上,然而并非用以限定本发明,任何熟悉本专业的技术人员,在不脱离本发明技术方案范围内,当可利用上述揭示的方法及技术内容做出些许的更动或修饰为等同变化的等效实施例,但凡是未脱离本发明技术方案的内容,依据本发明的技术实质对以上实施例所作的任何简单修改,等同变化与修饰,均仍属于本发明技术方案的范围内。
Claims (8)
1.一种隔水壳再造方法,其特征是:依据已有地质资料和实地地质勘测结果,确定各开采中段矿体周围的含水岩层分布情况,在含水层中进行隔水壳再造,在矿体周围形成一个连续的防水的坚固外壳,保证矿体安全开采,结合含水层中岩石力学特性,依据力学原理计算隔水壳所需的厚度,这个厚度包括无效厚度和有效厚度两部分,利用数字模拟软件模拟矿体在矿石开采活动下,隔水壳的应力大小、塑性区分布、沉降大小和孔隙水压力大小,以判断其是否会发生破坏和突水事故;工程施工中在矿体周围含水层中打探测孔,使用精确的探测仪器确定顶板含水层的节理裂隙的分布,在中段勘探线附近的含水层中施工一条联络巷道,在联络巷道靠近裂隙处施工与矿体走向平行的钻注硐室,在联络巷道和钻注硐室中布置注浆孔,进行加密注浆和孔间CT透视,确保施工的质量和堵水效果。
2.根据权利要求1所述的隔水壳再造方法,其特征在于:所述的隔水壳为人工再造体,其位置是依据矿体周围的含水层分布而确定,在顶板围岩、底板围岩或者侧帮围岩。
3.根据权利要求1或2所述的隔水壳再造方法,其特征在于:所述的隔水壳再造是使用TRT6000、地质雷达先探测出含水层节理裂隙分布情况,对含水层中的节理裂隙经行注浆堵水,把矿体周围岩石连成一个完整的隔水壳体。
4.根据权利要求1或2所述的隔水壳再造方法,其特征在于:在布置探测孔时,钻孔方向大致平行矿体走向,钻孔均为倾角5度近水平钻孔,相邻两孔大致平行,钻孔开孔口径150mm,钻进4m后,采用注浆办法埋设孔口管,安装好高压阀门放突水应急措施,变径91mm继续钻进,遇涌水点及破碎带均用注浆办法通过,要求达到注浆结束标准,直到终孔。
5.根据权利要求1或2所述的隔水壳再造方法,其特征在于:依据矿体赋存条件和矿床开采设计,利用Flac3d进行数值模拟,计算各开采步骤下的应力、塑性区分布和沉降情况,依据结果来判断隔水壳是否会发生破坏和突水事故,进而考虑是否进行隔水壳厚度调整。
6.根据权利要求1或2所述的隔水壳再造方法,其特征在于:所述的注浆孔的浆液扩散半径取值为5米,注浆孔孔底间距不超过10米,孔深为巷道或钻注硐室与含水层裂隙之间的距离。
7.根据权利要求1或2所述的隔水壳再造方法,其特征在于:注浆孔的布孔方式为:从状孔、下行纵向孔、上行纵向孔或近水平法向孔。
8.根据权利要求1或2所述的隔水壳再造方法,其特征在于:具体实施步骤如下:
(1)、收集地质资料和进行工程区域的地质勘测,确定各开采中段周围岩体中含水层分布状况,隔水壳将布置在这些含水层中;
(2)、依据矿体与含水层的相对位置和采矿设计参数建立力学模型,结合边界条件、Mohr-Calomb破坏准则和裂隙岩***移计算公式计算隔水壳的无效厚度;采用弹性力学薄板理论,依据H-Tresca屈服准则计算隔水壳的有效厚度,将无效厚度与有效厚度相加即可获得隔水壳的厚度;
(3)、依据矿体赋存条件和矿床开采设计,利用Flac3d进行数值模拟,计算各开采步骤下的应力、塑性区分布和沉降情况,依据结果来判断隔水壳是否会发生破坏和顶板突水事故,进而考虑是否进行顶板厚度调整;
(4)、在矿体周围含水层中打探测孔,使用TRT6000和地质雷达探测仪器,确定含水层中的溶洞、裂隙分布情况,依据含水层中的溶洞、裂隙分布确定联络巷道和注浆硐室的布置方案;
(5)、在中段勘探线含水层中施工一条联络巷道,在联络巷道靠近溶洞或裂隙的位置施工钻注硐室,硐室方向基本平行矿体走向;
(6)、依据工程实际情况,选择合适布孔方式,在联络巷道和注浆硐室中布置注浆孔并进行加密注浆;
(7)、在相邻探测孔,利用孔底锚头分别安装CT透视的发射极和接收极对两孔间的岩溶裂隙进行探测最终通过八个测试剖面,来监测工程施工质量和注浆堵水效果。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012105621964A CN103032083A (zh) | 2012-12-21 | 2012-12-21 | 一种隔水壳再造方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012105621964A CN103032083A (zh) | 2012-12-21 | 2012-12-21 | 一种隔水壳再造方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103032083A true CN103032083A (zh) | 2013-04-10 |
Family
ID=48019424
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012105621964A Pending CN103032083A (zh) | 2012-12-21 | 2012-12-21 | 一种隔水壳再造方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103032083A (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103866780A (zh) * | 2014-03-28 | 2014-06-18 | 中国水电顾问集团贵阳勘测设计研究院有限公司 | 一种在岩溶管道渗漏区进行快速防渗帷幕灌浆的施工方法 |
CN108625895A (zh) * | 2018-04-25 | 2018-10-09 | 贵州开磷集团股份有限公司 | 一种探查并排除矿体内暗溶洞积水的方法 |
CN109458180A (zh) * | 2018-09-17 | 2019-03-12 | 东北大学秦皇岛分校 | 一种与地下仓库建设相结合的采矿方法及通风降温*** |
CN112377221A (zh) * | 2020-10-30 | 2021-02-19 | 中煤科工集团西安研究院有限公司 | 采前注浆建造结构关键层抑制导水裂缝带发育的方法 |
CN112761677A (zh) * | 2020-12-09 | 2021-05-07 | 中国矿业大学 | 一种采用机械掘槽施工灌浆隔水层的煤矿井下防治水方法 |
CN113217025A (zh) * | 2021-05-21 | 2021-08-06 | 长沙矿山研究院有限责任公司 | 一种适用于大水矿床快速开采的帷幕注浆方法 |
CN113309565A (zh) * | 2021-06-07 | 2021-08-27 | 中国矿业大学 | 一种大空间大倾角采空区帷幕注浆方法 |
CN113669070A (zh) * | 2021-08-23 | 2021-11-19 | 北京科技大学 | 一种采矿运输巷道施工方法 |
CN114483110A (zh) * | 2022-04-02 | 2022-05-13 | 湖南科技大学 | 一种地下大硐室顶板斜交注浆堵水施工方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4371288A (en) * | 1979-03-27 | 1983-02-01 | Industrie Pirelli S.P.A. | Fluid impermeable liner for a cavity in the earth |
CN101603429A (zh) * | 2009-07-09 | 2009-12-16 | 西安理工大学 | 地裂缝地层隧道复合衬砌变形缝防渗结构及其构筑方法 |
CN101608552A (zh) * | 2008-06-18 | 2009-12-23 | 郭国政 | 煤层底板含水层加固并在加固过程中保护隔水层的方法 |
CN101864960A (zh) * | 2010-05-17 | 2010-10-20 | 中铁二十局集团有限公司 | 岩溶地区双连拱公路隧道施工方法 |
CN101922303A (zh) * | 2010-08-30 | 2010-12-22 | 中铁第四勘察设计院集团有限公司 | 隧道下穿暗河岩溶大厅处理方法 |
CN201705369U (zh) * | 2010-06-28 | 2011-01-12 | 中铁二十局集团有限公司 | 高原冻土隧道防水结构 |
CN102155241A (zh) * | 2011-05-10 | 2011-08-17 | 广州市城市规划勘测设计研究院 | 一种岩溶注浆加固止水施工方法 |
-
2012
- 2012-12-21 CN CN2012105621964A patent/CN103032083A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4371288A (en) * | 1979-03-27 | 1983-02-01 | Industrie Pirelli S.P.A. | Fluid impermeable liner for a cavity in the earth |
CN101608552A (zh) * | 2008-06-18 | 2009-12-23 | 郭国政 | 煤层底板含水层加固并在加固过程中保护隔水层的方法 |
CN101603429A (zh) * | 2009-07-09 | 2009-12-16 | 西安理工大学 | 地裂缝地层隧道复合衬砌变形缝防渗结构及其构筑方法 |
CN101864960A (zh) * | 2010-05-17 | 2010-10-20 | 中铁二十局集团有限公司 | 岩溶地区双连拱公路隧道施工方法 |
CN201705369U (zh) * | 2010-06-28 | 2011-01-12 | 中铁二十局集团有限公司 | 高原冻土隧道防水结构 |
CN101922303A (zh) * | 2010-08-30 | 2010-12-22 | 中铁第四勘察设计院集团有限公司 | 隧道下穿暗河岩溶大厅处理方法 |
CN102155241A (zh) * | 2011-05-10 | 2011-08-17 | 广州市城市规划勘测设计研究院 | 一种岩溶注浆加固止水施工方法 |
Non-Patent Citations (1)
Title |
---|
邓红卫: "典型矿山地下水防治与资源化调控及工程应用研究", 《中国博士学位论文全文数据库(博士),工程科技Ⅰ辑》 * |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103866780B (zh) * | 2014-03-28 | 2016-01-06 | 中国水电顾问集团贵阳勘测设计研究院有限公司 | 一种在岩溶管道渗漏区进行快速防渗帷幕灌浆的施工方法 |
CN103866780A (zh) * | 2014-03-28 | 2014-06-18 | 中国水电顾问集团贵阳勘测设计研究院有限公司 | 一种在岩溶管道渗漏区进行快速防渗帷幕灌浆的施工方法 |
CN108625895A (zh) * | 2018-04-25 | 2018-10-09 | 贵州开磷集团股份有限公司 | 一种探查并排除矿体内暗溶洞积水的方法 |
CN109458180A (zh) * | 2018-09-17 | 2019-03-12 | 东北大学秦皇岛分校 | 一种与地下仓库建设相结合的采矿方法及通风降温*** |
CN109458180B (zh) * | 2018-09-17 | 2020-07-14 | 东北大学秦皇岛分校 | 一种与地下仓库建设相结合的采矿方法及通风降温*** |
CN112377221B (zh) * | 2020-10-30 | 2022-09-23 | 中煤科工集团西安研究院有限公司 | 采前注浆建造结构关键层抑制导水裂缝带发育的方法 |
CN112377221A (zh) * | 2020-10-30 | 2021-02-19 | 中煤科工集团西安研究院有限公司 | 采前注浆建造结构关键层抑制导水裂缝带发育的方法 |
CN112761677A (zh) * | 2020-12-09 | 2021-05-07 | 中国矿业大学 | 一种采用机械掘槽施工灌浆隔水层的煤矿井下防治水方法 |
CN113217025A (zh) * | 2021-05-21 | 2021-08-06 | 长沙矿山研究院有限责任公司 | 一种适用于大水矿床快速开采的帷幕注浆方法 |
CN113309565A (zh) * | 2021-06-07 | 2021-08-27 | 中国矿业大学 | 一种大空间大倾角采空区帷幕注浆方法 |
CN113309565B (zh) * | 2021-06-07 | 2022-06-24 | 中国矿业大学 | 一种大空间大倾角采空区帷幕注浆方法 |
CN113669070A (zh) * | 2021-08-23 | 2021-11-19 | 北京科技大学 | 一种采矿运输巷道施工方法 |
CN113669070B (zh) * | 2021-08-23 | 2022-05-06 | 北京科技大学 | 一种采矿运输巷道施工方法 |
CN114483110A (zh) * | 2022-04-02 | 2022-05-13 | 湖南科技大学 | 一种地下大硐室顶板斜交注浆堵水施工方法 |
CN114483110B (zh) * | 2022-04-02 | 2024-06-21 | 湖南科技大学 | 一种地下大硐室顶板斜交注浆堵水施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103032083A (zh) | 一种隔水壳再造方法 | |
Fan et al. | Hazards and treatment of karst tunneling in Qinling-Daba mountainous area: overview and lessons learnt from Yichang–Wanzhou railway system | |
CN100467829C (zh) | 利用结构关键层作为隔水层的保水采煤方法 | |
Bukowski | Water hazard assessment in active shafts in upper silesian coal basin mines | |
Cui et al. | Mitigation of geohazards during deep excavations in karst regions with caverns: a case study | |
CN103924975B (zh) | 一种用于采煤过程中的保水方法 | |
CN102134967A (zh) | 一种煤层底板注浆加固水平定向钻孔的施工方法 | |
CN113175325B (zh) | 基于关键层保护的煤与共生砂岩型铀矿协调开采方法 | |
Li et al. | On prevention and mechanism of bed separation water inrush for thick coal seams: a case study in China | |
CN110344850A (zh) | 一种煤层开采底板灰岩水防治方法 | |
CN101021154A (zh) | 一种薄基岩浅埋煤层长壁工作面保水开采方法 | |
Liu et al. | Numerical modelling of mining-induced inrushes from subjacent water conducting karst collapse columns in northern China | |
Li et al. | A novel treatment method and construction technology of the pipeline gushing water geohazards in karst region | |
CN105652311A (zh) | 一种监测底板突水的微震监测方法 | |
Yang et al. | Overburden failure and the prevention of water and sand inrush during coal mining under thin bedrock | |
CN105332738A (zh) | 一种采煤沉陷灾变发生的预警方法 | |
Yao et al. | Numerical analysis of the influence of isolation piles in metro tunnel construction of adjacent buildings | |
CN104088637B (zh) | 一种煤层群条件下上组浅埋残煤复采方法 | |
Zhang et al. | A simple and efficient way to detect the mining induced water-conducting fractured zone in overlying strata | |
Li et al. | Study on major construction disasters and controlling technology at the Qingdao Kiaochow Bay subsea tunnel | |
Kang et al. | Compound karst cave treatment and waterproofing strategy for EPB shield tunnelling in karst areas: a case study | |
Viggiani et al. | Geotechnical aspects of underground railway construction in the urban environment: the examples of Rome and Naples | |
CN114444266A (zh) | 一种近松散层下煤层提高回采上限安全开采的可行性评价方法 | |
Stacey et al. | The influence of subsidence on planning and development in Johannesburg, South Africa | |
Merlini et al. | Numerical models for the design and construction of new underground structures at CERN (HL-LHC), Point 5 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130410 |