CN103016028A - Hydraulic self-propelled steel form carrier for tunnel secondary lining operation - Google Patents

Hydraulic self-propelled steel form carrier for tunnel secondary lining operation Download PDF

Info

Publication number
CN103016028A
CN103016028A CN 201210518134 CN201210518134A CN103016028A CN 103016028 A CN103016028 A CN 103016028A CN 201210518134 CN201210518134 CN 201210518134 CN 201210518134 A CN201210518134 A CN 201210518134A CN 103016028 A CN103016028 A CN 103016028A
Authority
CN
China
Prior art keywords
door frame
backform
tunnel
hydraulic self
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201210518134
Other languages
Chinese (zh)
Inventor
张进军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Machinery Co Ltd Is Marched In Changsha
Original Assignee
Machinery Co Ltd Is Marched In Changsha
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Machinery Co Ltd Is Marched In Changsha filed Critical Machinery Co Ltd Is Marched In Changsha
Priority to CN 201210518134 priority Critical patent/CN103016028A/en
Publication of CN103016028A publication Critical patent/CN103016028A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a hydraulic self-propelled steel form carrier for tunnel secondary lining operation. A travelling system is driven by a hydraulic system to move on steel rails, a backform frame body assembly is erected on a platform beam through a backform column and is driven by a jacking oil cylinder, the platform beam is arranged on a gantry beam through a jack frame in the middle, the gantry beam is erected on a middle beam through a middle column, gantry columns are respectively arranged on the two end parts of the middle beam, the gantry columns and a side form assembly are provided with a plurality of side form lead screws and reinforcement lead screws, the two ends of the side form lead screws are respectively hinged with the gantry columns and the side form assembly, and a bottom longitudinal beam is arranged below the gantry columns. The gantry frame of the hydraulic self-propelled steel form carrier for tunnel secondary lining operation is a non-stress part during the construction and is only stressed during erecting form removing and travelling processes; and when the hydraulic self-propelled steel form carrier constructs or travels in a ramp tunnel, the jacking oil cylinder on the lower part of the gentry frame is used for regulating the height, so that the whole carrier body is positioned in a horizontal state and does not have forward inclining force and side inclining force, and the whole stability of the carrier is ensured.

Description

A kind of Tunnel Second Lining operation hydraulic self-traveling steel form carrier
Technical field
The present invention relates to a kind of tunnel construction machinery, particularly a kind of Tunnel Second Lining operation hydraulic self-traveling steel form carrier.
Background technology
Tradition lining trolley chassis door frame in construction is stressed member, the lateral pressure that it is subjected to is larger, and produce with the rigidity of door frame size and do not wait distortion, and should not on-line operation in the tunnel that larger horizontal wall inscription and longitudinal gradient are arranged, working environment is had relatively high expectations, otherwise will cause chassis bulk deformation and damage.
Summary of the invention
For the problem that prior art exists, the present invention aims to provide that a kind of location is simple, adjustment lining cutting geometric position speed is fast, the Tunnel Second Lining operation hydraulic self-traveling steel form carrier of high efficiency.
The invention provides a kind of Tunnel Second Lining operation hydraulic self-traveling steel form carrier, comprise backform support body assembly, hydraulic system, running gear and electrical system.
Described running gear drives at rail mobile by hydraulic system.
Described electrical system comprises that motor reaches by motor-operated oil pump.
Described backform support body assembly is located at Tai Liangshang by the backform column support, and is driven by jacking cylinder.
Described beam is located on the described door frame crossbeam by the middle part qianjin rack.
Described door frame crossbeam top is provided with translation oil cylinder.
Described door frame crossbeam is set up on the middle cross beam by central post, and the both ends of described middle cross beam are provided with the door frame column and are used for the described door frame crossbeam of supplemental support.
The periphery of described door frame column is provided with scaffold and side form oil cylinder, and described side form oil cylinder is connected with the limit mould assembly by the Bian Motong beam.
Described door frame column and described limit mould assembly are provided with a plurality of side form screw mandrels and strengthen screw mandrel, and the two ends of described side form screw mandrel are hinged with described door frame column and described limit mould assembly respectively, and described reinforcement screw mandrel and described side form screw mandrel are the angle setting.
Described door frame column below is provided with bottom girder, and the below of described bottom girder is provided with described rail, and described rail below is provided with sleeper.
Preferably, the curved setting of described backform support body assembly, and be welded to each other with backform column and Tai Liang.
Further, be provided with longeron between described backform column and the described backform and be used for supporting described backform.
Preferably, described central post and the corresponding setting in described backform column interval.
Further, be provided with middle longeron between the very heavy and described beam in described middle part.
Further, longitudinally be provided with detachable oblique leading screw between described bottom girder and the described limit mould assembly.
Further, described running gear comprises that running gear and rack winch form, described running gear is comprised of four walking wheels, and each described walking wheels comprises two road wheels, and described walking wheels adopt the plug-in type connection to install under described door frame column.
Preferably, described backform support body assembly and described limit mould assembly are hinged.
Described its door frame of Tunnel Second Lining operation hydraulic self-traveling steel form carrier provided by the invention is the part that do not stress in construction, the support member of its template is the side form screw mandrel of limit mould assembly, door frame is only just stressed in taking off formwork erection, walking process, and suffered power vertically downward, do not have lateral pressure, only need just can not be out of shape by the enough rigidity of chassis deadweight design door frame; When in the tunnel in ramp is arranged, constructing or walking, no matter be horizontal wall inscription or longitudinal gradient, can carry out by the jacking cylinder of door frame bottom height and regulate, make chassis integral body be in level, go all out and roll force before the chassis global non-existence, guaranteed the whole stationarity of chassis; It is very heavy that chassis has fully phased out the screw mandrel that supports usefulness, and the chassis location is simple, can adjust to very fast the lining cutting geometric position, has saved a large amount of manpower and materials, has improved work efficiency, has shortened dust cycle, has correspondingly saved engineering cost.
Description of drawings
Fig. 1 is the structural representation of a kind of Tunnel Second Lining operation hydraulic self-traveling steel form carrier of proposing of the present invention.
The drawing reference numeral explanation
1-backform support body assembly, 2-backform column, the upper longeron of 3-, longeron among the 4-, 5-platform beam, the 6-middle part is very heavy, 7-jacking cylinder, 8-translation oil cylinder, 9-door frame crossbeam, 10-central post, 11-door frame column, 12-middle cross beam, the 13-scaffold, 14-side form oil cylinder, 15-Bian Motong beam, 16-strengthens screw mandrel, 17-limit mould assembly, 18-side form screw mandrel, 19-bottom girder, the 20-rail, 21-sleeper, the oblique leading screw of 22-.
The specific embodiment
Further specify technical scheme of the present invention below in conjunction with accompanying drawing and by the specific embodiment:
Please refer to Fig. 1, the invention provides a kind of Tunnel Second Lining operation hydraulic self-traveling steel form carrier, comprise backform support body assembly 1, hydraulic system, running gear and electrical system.
Please refer to Fig. 1, described running gear drives at rail 20 mobile by hydraulic system.
Described electrical system comprises that motor reaches by motor-operated oil pump.
Please refer to Fig. 1, described backform support body assembly 1 is set up on the platform beam 5 by backform column 2, and is driven by jacking cylinder 7.
Please refer to Fig. 1, described beam 5 is set up on the described door frame crossbeam 9 by middle part very heavy 6.
Please refer to Fig. 1, described door frame crossbeam 9 tops are provided with translation oil cylinder 8.
Please refer to Fig. 1, described door frame crossbeam 9 is set up on the middle cross beam 12 by central post 10, and the both ends of described middle cross beam 12 are provided with door frame column 11 and are used for the described door frame crossbeam 9 of supplemental support.
Please refer to Fig. 1, the periphery of described door frame column 11 is provided with scaffold 13 and side form oil cylinder 14, and described side form oil cylinder 14 is connected with limit mould assembly 17 by Bian Motong beam 15.
Please refer to Fig. 1, described door frame column 11 is provided with a plurality of side form screw mandrels 18 and strengthens screw mandrel 16 with described limit mould assembly 17, the two ends of described side form screw mandrel 18 are hinged with described door frame column 11 and described limit mould assembly 17 respectively, and described reinforcement screw mandrel 16 is the angle setting with described side form screw mandrel 18.
Please refer to Fig. 1, described door frame column 11 belows are provided with bottom girder 19, and the below of described bottom girder 19 is provided with described rail 20, and described rail 20 belows are provided with sleeper 21.
Please refer to Fig. 1, described backform support body assembly 1 curved setting, and be welded to each other with backform column 2 and platform beam 5.
Please refer to Fig. 1, be provided with longeron 3 between described backform column 2 and the described backform 1 and be used for supporting described backform 1.
Please refer to Fig. 1, described central post 10 and the corresponding setting in described backform column 2 intervals.
Please refer to Fig. 1, be provided with middle longeron 4 between described middle part very heavy 6 and described beam 5.
Please refer to Fig. 1, longitudinally be provided with detachable oblique leading screw 22 between described bottom girder 19 and the described limit mould assembly 17.
Please refer to Fig. 1, described running gear comprises the not shown and not shown composition of rack winch of running gear, described running gear is comprised of four walking wheels, and each described walking wheels comprises two road wheels, and described walking wheels adopt plug-in type to connect to install in described door frame column 11 times.
Please refer to Fig. 1, described backform support body assembly 1 is hinged with described limit mould assembly 17.
Described Tunnel Second Lining operation hydraulic self-traveling steel form carrier is installed in the tunnel behind the excavation, drives at rail 20 mobile by running gear; It adopts external 380V power supply as the running gear main power source, also is the main power source of motor drives oil pump drive hydraulic system principle work; Chassis adopts the hydraulic system transmission, makes the bogie frame designs simplification, weight saving, and the while has also been improved flexibility and the diversity of structure; Chassis is designed to Overall Steel Formwork, hydraulic jack takes off formwork erection, lean on the very heavy support of screw mandrel in the construction, motor is automatically walked or the oil cylinder step-by-step movement is walked automatically, all adopt the perfusion of concrete transfer pump car, is furnished with hydraulic lock on the jacking cylinder 7, hoist steadily guaranteeing, to prevent jacking cylinder 7 automatic retracteds, to prevent oil pipe break or have an accident when seriously leaking; Be handled easily, the main button of chassis is located on the working platform, and is furnished with waterproof measure and safety measures for power consumption; And the door frame of chassis is the part that do not stress in construction, the support member of its template is the side form screw mandrel 18 of limit mould assembly, and door frame is only just stressed in taking off formwork erection, walking process, and suffered power vertically downward, do not have lateral pressure, only need just can not be out of shape by the enough rigidity of chassis deadweight design door frame; When in the tunnel in ramp is arranged, constructing or walking, no matter be horizontal wall inscription or longitudinal gradient, can carry out by the jacking cylinder of door frame bottom height and regulate, make chassis integral body be in level, go all out and roll force before the chassis global non-existence, guaranteed the whole stationarity of chassis; It is very heavy that chassis has fully phased out the screw mandrel that supports usefulness, and the chassis location is simple, can adjust to very fast the lining cutting geometric position, has saved a large amount of manpower and materials, has improved work efficiency, has shortened dust cycle, has correspondingly saved engineering cost.
The above has carried out exemplary description to the present invention by reference to the accompanying drawings; obvious realization of the present invention is not subjected to the restriction of aforesaid way; as long as the various improvement of having adopted technical solution of the present invention to carry out; or without improving design of the present invention and technical scheme are directly applied to other occasion, all in protection scope of the present invention.

Claims (8)

1. a Tunnel Second Lining operation hydraulic self-traveling steel form carrier is characterized in that, comprises backform support body assembly (1), hydraulic system, running gear and electrical system, wherein,
Described running gear drives at rail (20) mobile by hydraulic system;
Described electrical system comprises that motor reaches by motor-operated oil pump;
Described backform support body assembly (1) is set up on the platform beam (5) by backform column (2), and is driven by jacking cylinder (7);
Described beam (5) is set up on the described door frame crossbeam (9) by middle part very heavy (6);
Described door frame crossbeam (9) top is provided with translation oil cylinder (8);
Described door frame crossbeam (9) is set up on the middle cross beam (12) by central post (10), and the both ends of described middle cross beam (12) are provided with door frame column (11) and are used for the described door frame crossbeam of supplemental support (9);
The periphery of described door frame column (11) is provided with scaffold (13) and side form oil cylinder (14), and described side form oil cylinder (14) is connected with limit mould assembly (17) by Bian Motong beam (15);
Described door frame column (11) is provided with a plurality of side form screw mandrels (18) and strengthens screw mandrel (16) with described limit mould assembly (17), the two ends of described side form screw mandrel (18) are hinged with described door frame column (11) and described limit mould assembly (17) respectively, and described reinforcement screw mandrel (16) is the angle setting with described side form screw mandrel (18);
Described door frame column (11) below is provided with bottom girder (19), and the below of described bottom girder (19) is provided with described rail (20), and described rail (20) below is provided with sleeper (21).
2. Tunnel Second Lining operation hydraulic self-traveling steel form carrier according to claim 1 is characterized in that, the curved setting of described backform support body assembly (1), and be welded to each other with backform column (2) and platform beam (5).
3. Tunnel Second Lining operation hydraulic self-traveling steel form carrier according to claim 2 is characterized in that, is provided with longeron (3) between described backform column (2) and the described backform (1) and is used for supporting described backform (1).
4. Tunnel Second Lining operation hydraulic self-traveling steel form carrier according to claim 3 is characterized in that, described central post (10) and the corresponding setting in described backform column (2) interval.
5. Tunnel Second Lining operation hydraulic self-traveling steel form carrier according to claim 4 is characterized in that, is provided with middle longeron (4) between described middle part very heavy (6) and described the beam (5).
6. Tunnel Second Lining operation hydraulic self-traveling steel form carrier according to claim 5 is characterized in that, longitudinally is provided with detachable oblique leading screw (22) between described bottom girder (19) and the described limit mould assembly (17).
7. Tunnel Second Lining operation hydraulic self-traveling steel form carrier according to claim 6, it is characterized in that, described running gear comprises that running gear and rack winch form, described running gear is comprised of four walking wheels, each described walking wheels comprises two road wheels, and described walking wheels adopt the plug-in type connection to install under described door frame column (11).
8. Tunnel Second Lining operation hydraulic self-traveling steel form carrier according to claim 7 is characterized in that, described backform support body assembly (1) is hinged with described limit mould assembly (17).
CN 201210518134 2012-12-06 2012-12-06 Hydraulic self-propelled steel form carrier for tunnel secondary lining operation Pending CN103016028A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201210518134 CN103016028A (en) 2012-12-06 2012-12-06 Hydraulic self-propelled steel form carrier for tunnel secondary lining operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201210518134 CN103016028A (en) 2012-12-06 2012-12-06 Hydraulic self-propelled steel form carrier for tunnel secondary lining operation

Publications (1)

Publication Number Publication Date
CN103016028A true CN103016028A (en) 2013-04-03

Family

ID=47965071

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201210518134 Pending CN103016028A (en) 2012-12-06 2012-12-06 Hydraulic self-propelled steel form carrier for tunnel secondary lining operation

Country Status (1)

Country Link
CN (1) CN103016028A (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437782A (en) * 2013-08-21 2013-12-11 中国长江三峡集团公司 Hydraulic self-moving steel mould trolley and construction method thereof
CN103615261A (en) * 2013-11-25 2014-03-05 国电大渡河沙坪水电建设有限公司 Height-adjustable steel form jumbo and implementation method thereof
CN103867215A (en) * 2014-03-04 2014-06-18 张进军 Expressway tunnel groove integral lining trolley
CN104234723A (en) * 2014-07-23 2014-12-24 中建三局集团有限公司 Self-propelled mobile template support trolley for open trench tunnel with rectangular cross section
CN104564104A (en) * 2014-12-17 2015-04-29 张进军 Trolley system used for tunnel lining
CN104763447A (en) * 2015-03-25 2015-07-08 三峡大学 Beret piece combined steel mold trolley
CN105065035A (en) * 2015-09-09 2015-11-18 中国铁建大桥工程局集团有限公司 Light pushing-sliding tunnel lining trolley
CN105350984A (en) * 2015-11-15 2016-02-24 贵阳鼎辉科技有限公司 Side mold assembly mechanism for tunnel lining trolley
CN107448218A (en) * 2017-09-26 2017-12-08 中铁十七局集团第工程有限公司 A kind of single-track tunnel lining trolley constructing device
CN108005684A (en) * 2017-11-06 2018-05-08 新疆兵团水利水电工程集团有限公司 Separated steel mould trolley and its construction method
CN108301847A (en) * 2018-03-28 2018-07-20 中铁八局集团第三工程有限公司 A kind of Tunnel Second Lining trolley hydraulic end head mould and its construction method
CN108756934A (en) * 2018-06-01 2018-11-06 招商局重庆交通科研设计院有限公司 Run disease tunnel assembled treatment structures construction operation trolley
CN108952770A (en) * 2018-09-30 2018-12-07 中铁六局集团广州工程有限公司 A kind of outer mould trolley of slope open trench tunnel rectangular configuration lining cutting
CN109356620A (en) * 2018-12-03 2019-02-19 湖南五新隧道智能装备股份有限公司 A kind of portal-framed structure
CN109578025A (en) * 2019-02-01 2019-04-05 洛阳兴坤隧道工程机械有限公司 A kind of large space trolley structure for Tunnel Second Lining automatic pouring system
CN112855212A (en) * 2021-01-15 2021-05-28 北京市市政四建设工程有限责任公司 Two lining quick construction die carriers of arch in separation island formula undercut station
CN114575892A (en) * 2022-05-07 2022-06-03 北京市第三建筑工程有限公司 Off-wall vault lining trolley and construction method thereof

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437782B (en) * 2013-08-21 2015-08-19 中国长江三峡集团公司 Hydraulic pressure automatic moving type steel form carrier and construction method thereof
CN103437782A (en) * 2013-08-21 2013-12-11 中国长江三峡集团公司 Hydraulic self-moving steel mould trolley and construction method thereof
CN103615261A (en) * 2013-11-25 2014-03-05 国电大渡河沙坪水电建设有限公司 Height-adjustable steel form jumbo and implementation method thereof
CN103615261B (en) * 2013-11-25 2016-06-22 国电大渡河沙坪水电建设有限公司 A kind of Height-adjustable steel form jumbo and its implementation
CN103867215A (en) * 2014-03-04 2014-06-18 张进军 Expressway tunnel groove integral lining trolley
CN103867215B (en) * 2014-03-04 2016-03-16 张进军 The overall lining trolley of a kind of freeway tunnel groove
CN104234723B (en) * 2014-07-23 2016-12-07 中建三局集团有限公司 A kind of open trench tunnel square-section self-propelled mobile falsework chassis
CN104234723A (en) * 2014-07-23 2014-12-24 中建三局集团有限公司 Self-propelled mobile template support trolley for open trench tunnel with rectangular cross section
CN104564104B (en) * 2014-12-17 2016-06-15 张进军 A kind of table system for tunnel-liner
CN104564104A (en) * 2014-12-17 2015-04-29 张进军 Trolley system used for tunnel lining
CN104763447A (en) * 2015-03-25 2015-07-08 三峡大学 Beret piece combined steel mold trolley
CN105065035A (en) * 2015-09-09 2015-11-18 中国铁建大桥工程局集团有限公司 Light pushing-sliding tunnel lining trolley
CN105350984A (en) * 2015-11-15 2016-02-24 贵阳鼎辉科技有限公司 Side mold assembly mechanism for tunnel lining trolley
CN107448218A (en) * 2017-09-26 2017-12-08 中铁十七局集团第工程有限公司 A kind of single-track tunnel lining trolley constructing device
CN108005684A (en) * 2017-11-06 2018-05-08 新疆兵团水利水电工程集团有限公司 Separated steel mould trolley and its construction method
CN108005684B (en) * 2017-11-06 2023-11-28 新疆兵团水利水电工程集团有限公司 Separated steel mould trolley and construction method thereof
CN108301847A (en) * 2018-03-28 2018-07-20 中铁八局集团第三工程有限公司 A kind of Tunnel Second Lining trolley hydraulic end head mould and its construction method
CN108301847B (en) * 2018-03-28 2024-02-02 中铁八局集团第三工程有限公司 Hydraulic end mould of tunnel secondary lining trolley and construction method thereof
CN108756934A (en) * 2018-06-01 2018-11-06 招商局重庆交通科研设计院有限公司 Run disease tunnel assembled treatment structures construction operation trolley
CN108756934B (en) * 2018-06-01 2023-10-20 招商局重庆交通科研设计院有限公司 Operation disease tunnel assembly type treatment structure construction operation trolley
CN108952770A (en) * 2018-09-30 2018-12-07 中铁六局集团广州工程有限公司 A kind of outer mould trolley of slope open trench tunnel rectangular configuration lining cutting
CN109356620A (en) * 2018-12-03 2019-02-19 湖南五新隧道智能装备股份有限公司 A kind of portal-framed structure
CN109578025A (en) * 2019-02-01 2019-04-05 洛阳兴坤隧道工程机械有限公司 A kind of large space trolley structure for Tunnel Second Lining automatic pouring system
CN112855212B (en) * 2021-01-15 2023-02-28 北京市市政四建设工程有限责任公司 Two lining quick construction die carriers of arch in separation island formula undercut station
CN112855212A (en) * 2021-01-15 2021-05-28 北京市市政四建设工程有限责任公司 Two lining quick construction die carriers of arch in separation island formula undercut station
CN114575892A (en) * 2022-05-07 2022-06-03 北京市第三建筑工程有限公司 Off-wall vault lining trolley and construction method thereof
CN114575892B (en) * 2022-05-07 2022-08-16 北京市第三建筑工程有限公司 Off-wall vault lining trolley and construction method thereof

Similar Documents

Publication Publication Date Title
CN103016028A (en) Hydraulic self-propelled steel form carrier for tunnel secondary lining operation
CN201077721Y (en) Gantry crane with falling girder
CN204640450U (en) A kind of assembling-type precast box girder integral moving die plate
CN103452052B (en) Movable mold hanging equipment for closing swivel bridges and closure section construction method
CN201474704U (en) Needle beam type hydraulic steel mould carrier
CN203308471U (en) Open type TBM cast-in-place concrete inverted arch synchronous lining trolley
CN103133012A (en) Open type tunnel boring machine (TBM) on-site concrete inverted arch synchronous lining trolley
CN102337905B (en) Open type TBM (Tunnel Boring Machine) fullface synchronous lining trolley for hydraulictunnel
CN102434171A (en) Tunnel bottom concrete side-slipping lining construction method and side-slipping needle beam bottom board trolley
CN201581899U (en) Hydraulic drive walking type motorized cart of tunnel construction trestle
CN206205894U (en) Monoblock type automatic telescopic Mobile reinforcement stand
CN103194977B (en) Integration of transporting and building formula Bridge Erector sets up first hole case beam front launching nose machine installation method
CN102230381A (en) Hollow needle beam lining trolley
CN101943004B (en) Hydraulic self-running inclined-hole ordinary-state concrete casting trolley
CN101967798B (en) Highway double-guide-beam bridge erecting machine and turning method
CN202325546U (en) Side slip type needle beam bottom die trolley
CN103527218A (en) Multifunctional combined type concrete lining trolley
CN210366808U (en) Lifting and dismantling device for rail walking
CN207919265U (en) Suitable for covering rail plate-type ballastless track plate paver on steel truss girder bridge
CN109487646A (en) Shield section and platform section running track traveling process become automatically across method
CN103114808A (en) Arch centering pipe shed drilling machine
CN102229401A (en) Maintenance of underground overhead crane support
CN202731933U (en) Full-hydraulic self-propelled trestle trolley
CN101775990B (en) Three-dimensional space curved surface steel mould trolley
CN212867563U (en) Tunnel super-large section two-lining trolley capable of being widened for multiple times

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130403