CN103001152A - 输电线路架空地线提升器 - Google Patents

输电线路架空地线提升器 Download PDF

Info

Publication number
CN103001152A
CN103001152A CN2012105356687A CN201210535668A CN103001152A CN 103001152 A CN103001152 A CN 103001152A CN 2012105356687 A CN2012105356687 A CN 2012105356687A CN 201210535668 A CN201210535668 A CN 201210535668A CN 103001152 A CN103001152 A CN 103001152A
Authority
CN
China
Prior art keywords
transmission line
ground wire
overhead ground
adjusting
wire lifter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012105356687A
Other languages
English (en)
Inventor
熊作忠
胡志军
向军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Power Bureau
State Grid Corp of China SGCC
Original Assignee
Chengdu Power Bureau
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Power Bureau, State Grid Corp of China SGCC filed Critical Chengdu Power Bureau
Priority to CN2012105356687A priority Critical patent/CN103001152A/zh
Publication of CN103001152A publication Critical patent/CN103001152A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本发明公开了一种输电线路安装工具,具体涉及一种输电线路架空地线提升器,包括底座(1)、两个调整板(2)、两个双头丝杆(3)和两个挂钩(4),所述两个调整板(2)上均匀设置有调整螺孔(5),所述底座(1)的两侧分别通过与调整螺孔(5)相适配的调整螺栓(6)与调整板(2)相连接,所述双头丝杆(3)的顶部与调整板(2)的底部相互铰接,双头丝杆(3)的底部与挂钩(4)相连接。本发明的作用是:通用性好,操作方便,有效降低施工风险。

Description

输电线路架空地线提升器
技术领域
本发明涉及一种输电线路安装工具,具体涉及一种输电线路架空地线提升器。
背景技术
目前部分电力检修单位在进行输电线路架空地线更换施工时,普遍采用人力方式或相应型号铁塔专用提升器将架空地线翻入放线滑车内。由于输电线路档距长,架空地线重量大(220kV输电线路档距通常为300-400米,如为500KV输电线路档距更大,架空地线在杆塔受力处重量约为600公斤左右)。如采用人力更换架空地线的工作需2-3人协同作业才能将架空地线放入放线滑车内。但由于铁塔顶部空间有限,较为恰当的作业点通常只能容纳1名工作人员,其他协作人员不能进入理想的作业点,导致更换架空地线的工作效率低,安全风险高。例如220KV输电线路架空地线更换工作,1基铁塔上需要2-3人协作,大约需要1-2小时才能将架空地线翻进放线滑车。如采用相应型号的专用提升器,虽然一人也能快速的将架空地线放入放线滑车内,但是电力检修单位需要根据铁塔型号大量购置专用的提升器,无形中增加了企业的生产运营成本,随着电网规模的发展,大量的高压和特高压线路投入***运行,架空地线的线径越来越大,目前市场上的提升器还存在通用性不强,适用范围小,仅能适用于线径相对较小的架空地线的提升,提升的载荷不能满足电网建设的需要,不利于企业的安全生产。
发明内容
本发明的目的在于提供一种输电线路架空地线提升器,解决了架空地线翻入放线滑车的工具使用范围单一,需要根据不同的型号使用不同的工具,造成成本提高资源浪费的问题。
为解决上述的技术问题,本发明采用以下技术方案:一种输电线路架空地线提升器,包括底座、两个调整板、两个双头丝杆和两个挂钩,所述两个调整板上均匀设置有调整螺孔,所述底座的两侧分别通过与调整螺孔相适配的调整螺栓与调整板相连接,所述双头丝杆的顶部与调整板的底部相互铰接,双头丝杆的底部与挂钩相连接。
更进一步的技术方案是上述双头丝杆上套接有扳手。
与现有技术相比,本发明的有益效果是:通用性好:本成品适用220KV及以上输电线路所有的直路塔;操作方便:本成品可以由1人在铁塔上轻松操作;施工效率高:工作人员在把架空地线快速的提升和移动,相对原有的施工方法节约时间约3/4;有效降低施工风险:由于减少了施工人员数量和体力消耗,极大地提高了施工过程的安全性和可靠性。
附图说明
图1为本发明输电线路架空地线提升器一个实施例的结构示意图。
具体实施方式
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。
图1示出了本发明输电线路架空地线提升器的一个实施例:一种输电线路架空地线提升器,包括底座1、两个调整板2、两个双头丝杆3和两个挂钩4,所述两个调整板2上均匀设置有调整螺孔5,所述底座1的两侧分别通过与调整螺孔5相适配的调整螺栓6与调整板2相连接,所述双头丝杆3的顶部与调整板2的底部相互铰接,双头丝杆3的底部与挂钩4相连接。
根据本发明输电线路架空地线提升器的另一个实施例,双头丝杆3上套接有扳手7。
本输电线路架空地线提升器在使用时,可以根据实际使用场地、高度以及铁塔型号,利用调整版2上的调整螺孔5和调整螺栓6之间的配合做出调整,先将底座1通过螺栓固定在铁塔架空地线悬挂点的上方,然后用挂钩4将架空地线勾住,通过双头丝杆3的转动,可实现架空地线的快速提升和下降。
尽管这里参照本发明的多个解释性实施例对本发明进行了描述,但是,应该理解,本领域技术人员可以设计出很多其他的修改和实施方式,这些修改和实施方式将落在本申请公开的原则范围和精神之内。更具体地说,在本申请公开、附图和权利要求的范围内,可以对主题组合布局的组成部件和/或布局进行多种变型和改进。除了对组成部件和/或布局进行的变型和改进外,对于本领域技术人员来说,其他的用途也将是明显的。

Claims (2)

1.一种输电线路架空地线提升器,其特征在于:包括底座(1)、两个调整板(2)、两个双头丝杆(3)和两个挂钩(4),所述两个调整板(2)上均匀设置有调整螺孔(5),所述底座(1)的两侧分别通过与调整螺孔(5)相适配的调整螺栓(6)与调整板(2)相连接,所述双头丝杆(3)的顶部与调整板(2)的底部相互铰接,双头丝杆(3)的底部与挂钩(4)相连接。
2.根据权利要求1所述的一种输电线路架空地线提升器,其特征在于:所述双头丝杆(3)上套接有扳手(7)。
CN2012105356687A 2012-12-13 2012-12-13 输电线路架空地线提升器 Pending CN103001152A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012105356687A CN103001152A (zh) 2012-12-13 2012-12-13 输电线路架空地线提升器

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012105356687A CN103001152A (zh) 2012-12-13 2012-12-13 输电线路架空地线提升器

Publications (1)

Publication Number Publication Date
CN103001152A true CN103001152A (zh) 2013-03-27

Family

ID=47929429

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012105356687A Pending CN103001152A (zh) 2012-12-13 2012-12-13 输电线路架空地线提升器

Country Status (1)

Country Link
CN (1) CN103001152A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104828677A (zh) * 2015-04-29 2015-08-12 汪涛 运行稳固的电力铁塔维护用设备及其使用方法
CN104828675A (zh) * 2015-04-29 2015-08-12 毛玲波 具有限位功能的电力铁塔维护用设备及其使用方法
CN105655919A (zh) * 2016-03-21 2016-06-08 中国南方电网有限责任公司超高压输电公司百色局 架空opgw复合光缆地线提升器
CN105703278A (zh) * 2016-04-26 2016-06-22 邹平县供电公司 一种用于架空地线的装置及使用方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008154438A (ja) * 2006-12-15 2008-07-03 Michio Takaoka 架空送電線の着氷雪の除去
CN201813108U (zh) * 2010-10-12 2011-04-27 金华电业局 500kV送电线路架空地线提升装置
CN102468620A (zh) * 2010-11-14 2012-05-23 河南省电力公司濮阳供电公司 输电线路220千伏地线提升器
CN203071498U (zh) * 2012-12-13 2013-07-17 成都电业局 输电线路架空地线提升器

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008154438A (ja) * 2006-12-15 2008-07-03 Michio Takaoka 架空送電線の着氷雪の除去
CN201813108U (zh) * 2010-10-12 2011-04-27 金华电业局 500kV送电线路架空地线提升装置
CN102468620A (zh) * 2010-11-14 2012-05-23 河南省电力公司濮阳供电公司 输电线路220千伏地线提升器
CN203071498U (zh) * 2012-12-13 2013-07-17 成都电业局 输电线路架空地线提升器

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104828677A (zh) * 2015-04-29 2015-08-12 汪涛 运行稳固的电力铁塔维护用设备及其使用方法
CN104828675A (zh) * 2015-04-29 2015-08-12 毛玲波 具有限位功能的电力铁塔维护用设备及其使用方法
CN105655919A (zh) * 2016-03-21 2016-06-08 中国南方电网有限责任公司超高压输电公司百色局 架空opgw复合光缆地线提升器
CN105703278A (zh) * 2016-04-26 2016-06-22 邹平县供电公司 一种用于架空地线的装置及使用方法

Similar Documents

Publication Publication Date Title
CN103001152A (zh) 输电线路架空地线提升器
CN102689849A (zh) 更换变压器起吊装置
CN203674624U (zh) 一种带电紧固引流线夹套筒式组合工具
CN203352052U (zh) 一种输电线路耐张线夹螺栓的带电紧固工具
CN104201615A (zh) 高压输电线路直线型铁塔带电作业架空地线提升装置
CN201859587U (zh) 一种用于培训的组立电杆模型
CN201533140U (zh) 高压输电线路架空地线防震锤复位器
CN203071498U (zh) 输电线路架空地线提升器
CN206379675U (zh) 带电更换直线塔v串绝缘子导线的联板卡
CN204597356U (zh) 一种电网抢险装置
CN201778531U (zh) 辅助抱杆固定底座
CN204947466U (zh) 便携式带电作业提线器
CN204732751U (zh) 变压器有载调压开关检修工具
CN202978098U (zh) 架空地线提升器
CN201868786U (zh) 输电线路220千伏避雷线检修专用提升器
CN203967265U (zh) 便携式铁塔专用接地线
CN204680988U (zh) 输电线路耐张绝缘子塔首末片更换工具
CN206076838U (zh) 一种500kV输电导线悬垂金具更换装置
CN205212327U (zh) 一种110kV-220kV绝缘子更换器
CN205159913U (zh) 一种长度可调式提线钩
CN203430132U (zh) 绝缘横担
CN203674623U (zh) 一种带电紧固引流线夹棘轮式组合工具
CN202572321U (zh) 一种安装压缩机气阀用工具
CN204897264U (zh) 用于输电线路铺设的提升机
CN103318773A (zh) 一种变压器吊装装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130327