CN102927582A - Bin storage type hot air powder-feeding tertiary-air-free combustion system - Google Patents

Bin storage type hot air powder-feeding tertiary-air-free combustion system Download PDF

Info

Publication number
CN102927582A
CN102927582A CN2012104332219A CN201210433221A CN102927582A CN 102927582 A CN102927582 A CN 102927582A CN 2012104332219 A CN2012104332219 A CN 2012104332219A CN 201210433221 A CN201210433221 A CN 201210433221A CN 102927582 A CN102927582 A CN 102927582A
Authority
CN
China
Prior art keywords
air
powder
tertiary
tertiary air
combustion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012104332219A
Other languages
Chinese (zh)
Inventor
孙家鼎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2012104332219A priority Critical patent/CN102927582A/en
Publication of CN102927582A publication Critical patent/CN102927582A/en
Pending legal-status Critical Current

Links

Images

Abstract

Provided is a bin storage type hot air powder-feeding tertiary-air-free combustion system. The powder return amount and circulating magnification are monitored through a pulverizing system coarse powder separator (3), the ventilation quantity of a coal mill (2) is adjusted, tertiary air (7) is optimized, and tertiary air originally introduced from the upper portion of a hearth is abandoned, the introducing position is replaced a small cloth bag type dust collector (8), separated fine coal powder is utilized fully and participates in primary-air combustion, discharged clean gas is directly discharged into the atmosphere after the small cloth bag type dust collector performs filtering, and the tertiary air is prevented from being discharging into a boiler and influencing the safety and economical efficiency of the combustion. Therefore, by means of the technical measure, the bin storage type hot air powder-feeding tertiary-air-free combustion system has the advantages of (1) being stable in combustion; (2) remarkably reducing flying ash combustibles; (3) reducing the temperature of discharged smoke and enabling the boiler efficiency to be improved remarkably while reducing or eradicating an extinguishment phenomenon.

Description

Warehouse formula pulverized coal carried by hot air is without the tertiary air combustion system
Technical field
The present invention relates to a kind of warehouse formula pulverized coal carried by hot air without the tertiary air combustion system, improve the technical field of boiler combustion efficiency.
Background technology
The most pulverized-coal fired boilers in the thermal power plant of China extensively adopt warehouse formula pulverized coal carried by hot air system, go out pulverized-coal collector top and extract the weary gas that carries the small part very fine coal and be called tertiary air, and go out mill exhauster and directly send into the tertiary air nozzles of upper furnace and participate in burning.Tertiary air is usually placed in the superiors of burner, is furnished with primary and secondary air under it.The air quantity of tertiary air is about 15~20% of total blast volume, wherein contains 10~15% particulate coal dust.The characteristics of tertiary air are that temperature is low, and moisture is large, and coal dust is thin.Take the power plant of a certain 300MW burning meager coal as example, the relation of one, two, three wind such as following table:
Project Wind rate (%) Wind speed (m/s) Wind-warm syndrome (℃) Resistance (Pa)
A wind 19 24 229.9 1000
Secondary Air 48.6 45 336 1300
Tertiary air 20.8 50 96 2400
Operating experience shows, the employing of tertiary air has obvious adverse effect to the stability of boiler combustion and the economy of boiler combustion: 1, make the furnace flame temperature reduce combustion instability; When 2, tertiary air quantity was larger, wind speed also increased, and easily upset the normal air flow field of boiler, caused that flame pastes the wall slagging scorification; 3, tertiary air is injected at a high speed, and the flame residual rotation is increased, and fly ash combustible material increases simultaneously; 4, flame is spun out, and furnace outlet gas temperature raises, and exhaust gas temperature raises, and makes the superheater and reheater overtemperature, and the steam temperature amplitude of accommodation increases.
The purpose of invention
In order to solve the ubiquitous combustion instability of existing warehouse formula pulverized coal carried by hot air system, need to throw the problems such as oil companion burning, exhaust gas temperature rising, unburned carbon in flue dust increase, a kind of warehouse formula pulverized coal carried by hot air has been proposed without the tertiary air combustion system.
The content of invention
For solving above technical problem, take the 1025t/h coal-burning boiler as example: the burner hearth (14) with 5 layers of wind master nozzles (13), establishing 4 main nozzles diagonal angles for every layer arranges, arrange at the diagonal angle, top of last layer master nozzles and to introduce tertiary air, take following technology reforming scheme: cancel the tertiary air that introduce on former cause burner hearth (14) top, change into and introduce the small-sized cloth bag (8) that is arranged on the Pulverized Coal Bin (10), entrained fine particle in the tertiary air (7) separated enter Pulverized Coal Bin, directly send into hearth combustion by rotation air-locked type machine supplying powder (11) and monitoring powder-feeding amount device (12), cleaning tertiary air after filtering can directly discharged to atmosphere, have been avoided the adverse effect to boiler combustion.
Its useful effect is: by pulverized coal preparation system mill separator (3) Hui Fenliang monitoring circulating ratio, adjust the ventilation of coal pulverizer (2), reduce tertiary air (7) amount, and cancel the tertiary air that former cause upper furnace is introduced, change and introduce the position to small-sized cloth bag (8), fine breeze under separating enters Pulverized Coal Bin and takes full advantage of, participate in a wind burning, the cleaning tertiary air of discharging after small-sized cloth bag filters is directly discharged to atmosphere, avoid tertiary air to enter burner hearth (14) and affect the safety and economy of boiler combustion, such technical measures institute produce an effect is very obvious: 1) smooth combustion; 2) fly ash combustible material significantly reduces; 3) exhaust gas temperature reduces; When reducing or stopping to put out a fire, make boiler efficiency occur improving greatly.
Description of drawings
Below in conjunction with drawings and embodiments, warehouse formula pulverized coal carried by hot air is described further without the tertiary air combustion system.
Accompanying drawing is: the schematic diagram of 1025t/h coal-burning boiler warehouse formula pulverized coal carried by hot air without the tertiary air combustion system of giving an example:
1. hot air duct 2. low speed coal mills 3. mill separators 4. are monitored back 13. wind masters of powder amount device 5. pulverized-coal collector 6. Powder discharging fans, 7. tertiary air 8. small-sized cloth bags, 9. monitoring powder falling amount device 10. Pulverized Coal Bin, 11. rotation air-locked type machine supplying powder 12. monitoring powder-feeding amount devices nozzles, 14. burner hearths
Concrete embodiment
The tertiary air that realization of the present invention only needs former cause burner hearth (14) top is introduced is cancelled, change into and enter the small-sized cloth bag (8) that is arranged on the Pulverized Coal Bin (10), the fine breeze that carries in the tertiary air (7) separated send in the Pulverized Coal Bin, again by rotation air-locked type machine supplying powder (11) with monitor powder falling amount device (12) and directly enter hearth combustion.The retrofit work amount is little, and small investment only need install small-sized cloth bag additional, removes section of tubing and air door.Therefore, the present invention has stronger realistic meaning, will produce considerable social benefit and economic benefit once using.

Claims (2)

1. a warehouse formula pulverized coal carried by hot air is without the tertiary air combustion system, it is characterized in that: in Pulverized Coal Bin (10) small-sized sack cleaner (8) is set, the tertiary air (7) of Powder discharging fan outlet is introduced small-sized sack cleaner, fine powder separated fall into Pulverized Coal Bin, directly introduce burner hearth (14) burning by wind master nozzles (13), cleaning tertiary air after filtering can be directly discharged to atmosphere.
2. arrange in the powder retrieving pipe road of mill separator (3) and monitor back powder amount device (4), can monitor Hui Fenliang and the circulating ratio thereof of mill separator (3), optimize ventilation and the tertiary air quantity (7) thereof of coal pulverizer (2) and Powder discharging fan (6).
CN2012104332219A 2012-11-05 2012-11-05 Bin storage type hot air powder-feeding tertiary-air-free combustion system Pending CN102927582A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012104332219A CN102927582A (en) 2012-11-05 2012-11-05 Bin storage type hot air powder-feeding tertiary-air-free combustion system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012104332219A CN102927582A (en) 2012-11-05 2012-11-05 Bin storage type hot air powder-feeding tertiary-air-free combustion system

Publications (1)

Publication Number Publication Date
CN102927582A true CN102927582A (en) 2013-02-13

Family

ID=47642450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012104332219A Pending CN102927582A (en) 2012-11-05 2012-11-05 Bin storage type hot air powder-feeding tertiary-air-free combustion system

Country Status (1)

Country Link
CN (1) CN102927582A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104676628A (en) * 2013-12-03 2015-06-03 吉林省电力科学研究院有限公司 Intelligent distribution system for medium-speed coal mill
CN105032890A (en) * 2015-07-07 2015-11-11 义马环保电力有限公司 Barium slag processing system and method
CN105039726A (en) * 2015-07-07 2015-11-11 义马环保电力有限公司 Chromium slag processing method
CN108980822A (en) * 2018-07-27 2018-12-11 常州市新港热电有限公司 A kind of low nitrogen burning coal-powder boiler and low nitrogen burning method
CN109772569A (en) * 2019-01-28 2019-05-21 常州市长江热能有限公司 A kind of pulverized coal preparation system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1738992A (en) * 2002-12-11 2006-02-22 阿尔斯托姆(瑞士)有限公司 Indirect heating system with upgrading of ultra-fine fuel particles
CN201339948Y (en) * 2009-01-09 2009-11-04 宋军保 Pulverized coal preparation system
CN201764529U (en) * 2009-11-06 2011-03-16 孙家鼎 Online real-time powder flow monitoring system
CN202132968U (en) * 2011-07-20 2012-02-01 上海机易电站设备有限公司 Smoke drying steel ball brown-coal milling system
CN202195493U (en) * 2011-06-20 2012-04-18 上海机易电站设备有限公司 Medium-speed milling pulverization system for flue gas-dried lignite

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1738992A (en) * 2002-12-11 2006-02-22 阿尔斯托姆(瑞士)有限公司 Indirect heating system with upgrading of ultra-fine fuel particles
CN201339948Y (en) * 2009-01-09 2009-11-04 宋军保 Pulverized coal preparation system
CN201764529U (en) * 2009-11-06 2011-03-16 孙家鼎 Online real-time powder flow monitoring system
CN202195493U (en) * 2011-06-20 2012-04-18 上海机易电站设备有限公司 Medium-speed milling pulverization system for flue gas-dried lignite
CN202132968U (en) * 2011-07-20 2012-02-01 上海机易电站设备有限公司 Smoke drying steel ball brown-coal milling system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104676628A (en) * 2013-12-03 2015-06-03 吉林省电力科学研究院有限公司 Intelligent distribution system for medium-speed coal mill
CN105032890A (en) * 2015-07-07 2015-11-11 义马环保电力有限公司 Barium slag processing system and method
CN105039726A (en) * 2015-07-07 2015-11-11 义马环保电力有限公司 Chromium slag processing method
CN105032890B (en) * 2015-07-07 2017-06-06 义马环保电力有限公司 Barium slag disposal system and processing method
CN108980822A (en) * 2018-07-27 2018-12-11 常州市新港热电有限公司 A kind of low nitrogen burning coal-powder boiler and low nitrogen burning method
CN109772569A (en) * 2019-01-28 2019-05-21 常州市长江热能有限公司 A kind of pulverized coal preparation system

Similar Documents

Publication Publication Date Title
CN105509085B (en) A kind of tertiary air air-coal separating reduces the system and method for emission of NOx of boiler
CN103216840B (en) Formula of storing up in coal-burning boiler coal pulverizer reduces nitric oxide system
CN203571721U (en) Combustion heating system taking biomass as fuel
CN102927582A (en) Bin storage type hot air powder-feeding tertiary-air-free combustion system
CN105864748A (en) Combined combustion system of chain boiler
CN208475369U (en) Coal-burning boiler pulverized coal preparation system
CN202973142U (en) Intermediate silo-type hot-air powder feeding burning tertiary-air-free system
CN103884013B (en) Manifold type environment-friendly type fluidized-bed combustion boiler combustion method and device
CN202884901U (en) Boiler capable of realizing reignition of exhaust gas coal powder by using high-temperature flue gas and reducing NOx
CN105987379A (en) Boiler unit
CN203771439U (en) High-moisture lignite medium speed mill coal pulverizing system using pulverized coal combustion heating primary air
CN103697465A (en) Boiler capable of achieving reignition of exhaust gas coal powder and reducing NOx by using high-temperature flue gas
CN103206716B (en) The low NO of many coals ecad xcombustion system
CN104990097B (en) It is a kind of to improve the method that high sodium coal stains coking that uses
CN103574594B (en) Combustion heat supplying system taking living beings as fuel
CN101354129A (en) Biomass and fire coal composite fuel boiler
CN102226519B (en) Control method of combustion device of multifunction tangential firing pulverized coal boiler
CN105170296B (en) A kind of pulverized coal preparation system fine explosion protection system of complete period inerting
CN205372606U (en) System for deep or light separation of tertiary air reduces boiler NOx and discharges
CN102818247B (en) Efficient steam boiler for gasification and combined combustion of pulverized coal
CN104990072A (en) Efficient and low NOx emission fluidized bed boiler
CN205859997U (en) A kind of vent pulverized coal handling system
CN204756912U (en) Fluidized bed boiler that high -efficient low NOx discharged
CN101430098B (en) Method and apparatus for improving primary air breeze gas flow temperature of W-shaped flame boiler
CN202056867U (en) Combustion device of multifunctional tangentially fired pulverized coal boiler

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C05 Deemed withdrawal (patent law before 1993)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130213