CN102888865B - The bearing calibration of steel beam column verticality and device in stand column pile construction - Google Patents

The bearing calibration of steel beam column verticality and device in stand column pile construction Download PDF

Info

Publication number
CN102888865B
CN102888865B CN201210169584.6A CN201210169584A CN102888865B CN 102888865 B CN102888865 B CN 102888865B CN 201210169584 A CN201210169584 A CN 201210169584A CN 102888865 B CN102888865 B CN 102888865B
Authority
CN
China
Prior art keywords
steel beam
beam column
verticality
pipe
calibrated mount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210169584.6A
Other languages
Chinese (zh)
Other versions
CN102888865A (en
Inventor
龙敏健
陈静
彭振峰
黄韬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201210169584.6A priority Critical patent/CN102888865B/en
Publication of CN102888865A publication Critical patent/CN102888865A/en
Application granted granted Critical
Publication of CN102888865B publication Critical patent/CN102888865B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses bearing calibration and the device of steel beam column verticality in the construction of a kind of stand column pile.The method be steel beam column top is fixed on be positioned at stake holes aperture calibrated mount in the middle of, and regulated by the deflection angle of jack pair calibrated mount, calibrated mount drives steel beam column and calibrated mount synchronously to deflect the correction realizing steel beam column verticality; Timing, X-direction and Y-direction correct respectively, after correcting what a direction, are fixed by the deflection angle in this direction of calibrated mount; And then correct other direction; The quantity of jack is arranged according to verticality precision prescribed, and precision is directly proportional to using the quantity of jack.Adjusting range of the present invention is large, less demanding to the verticality of stake holes, can reduce construction cost.Not high to the rigidity requirement of steel beam column, both can be used for, to steel pipe column construction, also can constructing by the lattice column less to rigidity, the scope of application is comparatively wide, and floor space is little, and precision is high.Be applicable to small-bore pile hole construction, avoid occurring that accumulated error improves vertical adjustment efficiency.

Description

The bearing calibration of steel beam column verticality and device in stand column pile construction
Technical field
the present invention relates to bearing calibration and the device of steel beam column verticality in the construction of a kind of stand column pile, belong to construction foundation working technical field.
Background technology
in the fast development process of urban construction; the Application and Development of the underground spaces such as building basement, underground store and subway station gets more and more; for the consideration of the factors such as environmental protection, construction period, roading; many employings stand column pile is constructed; stand column pile takes full advantage of outer wall of basement as to go along with sb. to guard him and structural beam slab doubles as support; there is the advantages such as rigidity is large, Bit andits control ability is strong, field course layout is convenient; but at present in stand column pile work progress, how accurately, the verticality problem that controls stand column pile is efficiently the technical barrier needing to solve.
the verticality of current control stand column pile mainly contains three kinds of solutions, first air bag vertical adjustment method, and to be that four limits are each bottom steel beam column fix an air bag to specific practice, and air bag transfers to below ground with steel beam column, and is fixed in stressed good soil layer.By realizing the control of verticality to different bladder inflation/deflation.The subject matter that the method exists is that air bag has certain stroke, and adjusting range is less, requires higher to the verticality of stake holes.In addition, owing to adopting canvas air bag, in actual use, length is broken by hook and cannot construct, and air bag is also often embedded in concrete and is difficult to reclaim.
it two is mechanical vertical adjustment methods: the method is that the screw rod having a difference in height by four direction more than ground regulates, and screw rod heads on steel beam column and produces turning moment and realize degree control.The subject matter that the method exists is the vertical adjustment that can only be used for the larger steel beam column of rigidity (steel pipe bearing post etc.), if steel beam column rigidity less (as lattice column etc.), the flexural deformation applying lattice column during moment of torsion on top is excessive, is unfavorable for the vertical adjustment of lattice column.The party's ratio juris is the long limit utilizing the minor face basseted to control pile body, and error is comparatively large, and floor space is large.
it three is pilot sleeve vertical adjustment methods, and the method is converted into pilot sleeve correcting a steel beam column.The vertical adjustment of pilot sleeve can adopt air-bag method and mechanical vertical adjustment method.Subject-oriented sleeve vertical adjustment terminates and after fixing, inserts steel beam column, arrange the insertion that pulley is beneficial to support column, then build stand column pile concrete, until concrete extracts pilot sleeve after fixing steel beam column in pilot sleeve in the middle of pilot sleeve.The subject matter that the method exists is: because pilot sleeve is outside steel beam column, and aperture certainly will be made to become large.And sleeve self is without vertical adjustment function, need carry out vertical adjustment by air-bag method or mechanical vertical adjustment method, vertical error can be accumulated.
in sum, all there is a kind of problem in several vertical adjustment methods conventional at present, all undesirable to the degree control precision of steel beam column.
Summary of the invention
the object of the invention is to, bearing calibration and the device of steel beam column verticality in the construction of a kind of stand column pile is provided.To improve the correction accuracy of steel beam column verticality, reduce construction cost.To overcome the deficiencies in the prior art.
technical scheme of the present invention:
the bearing calibration of steel beam column verticality in a kind of plug-in type stand column pile construction, the method be steel beam column top is fixed on be positioned at stake holes aperture calibrated mount in the middle of, and regulated by the deflection angle of jack pair calibrated mount, calibrated mount drives steel beam column and calibrated mount synchronously to deflect the correction realizing steel beam column verticality; Timing, X-direction and Y-direction correct respectively, after correcting what a direction, are fixed by the deflection angle in this direction of calibrated mount; And then correct other direction; The quantity of jack is arranged according to verticality precision prescribed, and precision is directly proportional to using the quantity of jack.
in preceding method, install in described steel beam column and correct pipe, correct the axis being parallel of tubular axis line and steel beam column, timing is being carried out to steel beam column verticality, correct the verticality of pipe and remain consistent with the verticality of steel beam column, by detecting the verticality of the verticality determination steel beam column correcting pipe.
in preceding method, described correction pipe is provided with adjusting bolt and represents the temporald eixis lamp of different azimuth; The worst error value of steel beam column verticality is controlled according to the distance of axial displacement of adjusting bolt; The incline direction of steel beam column is judged according to the illuminating state of different azimuth indicator lamp.
in preceding method, described adjusting bolt is positioned at and correction pipe top, and manages coaxial with correction; Be connected with vertical line bottom adjusting bolt, the vertical line other end is connected with heavily falling, and the vertical line heavily falling top is provided with bridged electrode, and the surrounding of bridged electrode is provided with the azimuthal electrodes that a group represents different azimuth, azimuthal electrodes with correct inside pipe wall and insulate and be connected; When correcting pipe angle of inclination and exceeding setting value, bridged electrode contacts with in a prescription potential electrode or two azimuthal electrodes, lights corresponding temporald eixis lamp, and display corrects the well azimuth of pipe.
in preceding method, described bridged electrode is provided with 45 ° of conical surfaces, regulates the distance between the conical surface of bridged electrode and azimuthal electrodes, with control survey precision and sensitivity by the axial displacement of adjusting bolt.
in preceding method, be provided with heavy oil bottom described correction pipe, heavily pendant is immersed in heavy oil, and heavy oil plays damping action, to reduce the amplitude of fluctuation heavily fallen.
according to the perpendicularity correction equipment that preceding method is formed, comprise the calibrated mount being located at stake holes aperture and the correction pipe be located in steel beam column; Correct pipe to be arranged in parallel with steel beam column, steel beam column top is connected with calibrated mount is vertical, is provided with one group of jack between the calibrated mount of steel beam column surrounding and ground.
in aforementioned means, described calibrated mount comprises framework, and the surrounding of framework is provided with one group of jack; Framework end face is provided with two crossbeams, and crossbeam two ends and framework end face are slidably connected; Two crossbeam end faces are arranged with coupling assembling, and coupling assembling and crossbeam end face are slidably connected; Coupling assembling is provided with the fixing hole be connected with steel beam column.
in aforementioned means, described correction pipe comprises shell, and shell top is provided with top cover, and tube shell bottom is provided with bottom; The central authorities of top cover are provided with adjusting bolt, and adjusting bolt is provided with through wires hole, and through wires hole is connected with vertical line; The top cover of adjusting bolt surrounding is evenly equipped with temporald eixis lamp; The junction of described shell and bottom is provided with insulating slab; The bottom surface of insulating slab is provided with a prescription potential electrode, and azimuthal electrodes and temporald eixis lamp are electrically connected; The described vertical line other end is connected with heavily falling, and is provided with bridged electrode with the vertical line of azimuthal electrodes correspondence position.
in aforementioned means, be provided with heavy oil in described bottom, heavily pendant is positioned at heavy oil; Described bridged electrode is electrically connected through battery and temporald eixis lamp and azimuthal electrodes.
compared with prior art, the present invention compares with air bag vertical adjustment method, and the stroke of jack is comparatively large, and adjusting range is also corresponding comparatively large, less demanding to the verticality of stake holes.There is not the problem that air bag breakage cannot be constructed, can construction cost be reduced.The present invention compares with mechanical vertical adjustment method, not high to the rigidity requirement of steel beam column, both can be used for constructing to steel pipe column, and also can construct by the lattice column less to rigidity, the scope of application is wider.The present invention is the minor face utilizing the long limit being positioned at underground to control steel beam column, and error is little, and floor space is also less.The present invention compares with pilot sleeve vertical adjustment method, is applicable to small-bore stake holes, avoids accumulated error, and the present invention is by the adjustable correction accuracy of adjusting bolt, and the occasion not high to required precision can improve vertical adjustment efficiency, is also applicable to high-precision requirement by regulating.The present invention, by the indicator lamp display incline direction of different azimuth, more intuitively, meets the sensation custom of people, can avoid reverse operating, affect vertical adjustment efficiency.The present invention, by heavy oil damping, can prevent from occurring in vertical adjustment process the problem that temporald eixis lamp frequently glimmers.
Accompanying drawing explanation
fig. 1 is structural representation one (steel latticework part) of the present utility model;
fig. 2 is structural representation two (steel tube component) of the present utility model;
fig. 3 is the calibrated mount structural representation for steel latticework part;
fig. 4 is the calibrated mount structural representation for steel tube component;
fig. 5 is the structural representation correcting pipe;
fig. 6 is the schematic diagram correcting pipe;
fig. 7 is the circuit diagram of temporald eixis.
being labeled as in accompanying drawing: 1-stake holes, 2-calibrated mount, 3-steel beam column, 4-correct pipe, 5-ground, 6-jack, 7-framework, 8-crossbeam, 9-coupling assembling, 10-fixing hole, 11-shell, 12-top cover, 13-bottom, 14-adjusting bolt, 15-through wires hole, 16-vertical line, 17-temporald eixis lamp, 18-insulating slab, 19-azimuthal electrodes, 20-heavily fall, 21-bridged electrode, 22-heavy oil, 23-battery.
Detailed description of the invention
below in conjunction with accompanying drawing, the present invention is described in further detail, but not as any limitation of the invention.
a bearing calibration for steel beam column verticality in the construction of plug-in type stand column pile, as depicted in figs. 1 and 2.Steel beam column in Fig. 1 is steel latticework part, steel beam column in Fig. 2 is steel tube component, during Specific construction, steel beam column 3 top is fixed on the calibrated mount 2 being positioned at stake holes 5 aperture middle, and regulated by the deflection angle of jack 6 pairs of calibrated mounts, calibrated mount 2 drives that steel beam column 3 is synchronous with calibrated mount 2 deflects the correction realizing steel beam column 3 verticality; Timing, X-direction and Y-direction correct respectively, after correcting what a direction, are fixed by the deflection angle in this direction of calibrated mount 2; And then correct other direction; The quantity of jack 6 is arranged according to verticality precision prescribed, and precision is directly proportional to using the quantity of jack 6.Install in described steel beam column 3 and correct pipe 4, correct the axis being parallel of pipe 4 axis and steel beam column 3, carrying out timing to steel beam column 3 verticality, the verticality correcting pipe 4 remains consistent with the verticality of steel beam column 3, by detecting the verticality of the verticality determination steel beam column 3 correcting pipe 4.Described correction pipe 4 as shown in Figure 3 and Figure 4, corrects the temporald eixis lamp 17 that pipe 4 is provided with adjusting bolt 14 and represents different azimuth; The worst error value of steel beam column 3 verticality is controlled according to the distance of axial displacement of adjusting bolt 14; The incline direction of steel beam column 3 is judged according to the illuminating state of different azimuth indicator lamp 17.Described adjusting bolt 14 is positioned at and correction pipe 4 top, and coaxial with correction pipe 4; Be connected with vertical line 16 bottom adjusting bolt 14, vertical line 16 other end with heavily fall 20 and be connected, heavily the vertical line 16 fallen above in the of 20 is provided with bridged electrode 21, and the surrounding of bridged electrode 21 is provided with the azimuthal electrodes 19 that a group represents different azimuth, and azimuthal electrodes 19 is connected with correction pipe 4 inner wall insulation; When correcting pipe 4 angle of inclination and exceeding setting value, bridged electrode 21 contacts with in a prescription potential electrode or two azimuthal electrodes 19, lights corresponding temporald eixis lamp 17, and display corrects the well azimuth of pipe 4.Described bridged electrode 21 is provided with 45 ° of conical surfaces, regulates the distance between the conical surface of bridged electrode 21 and azimuthal electrodes 19, with control survey precision and sensitivity by the axial displacement of adjusting bolt 14.Be provided with heavy oil 22 bottom described correction pipe 4, heavily fall 20 and be immersed in heavy oil 22, heavy oil 22 damping actions, to reduce the amplitude of fluctuation heavily falling 20.
according to the perpendicularity correction equipment that preceding method is formed, as shown in Figure 1.Comprise the calibrated mount 2 being located at stake holes 1 aperture and the correction pipe 4 be located in steel beam column 3; Correct pipe 4 to be arranged in parallel with steel beam column 3, steel beam column 3 top is connected with calibrated mount 2 is vertical, is provided with one group of jack 6 between the calibrated mount 2 of steel beam column 3 surrounding and ground 5.Described calibrated mount as shown in Figure 2, comprises framework 7, and the surrounding of framework 7 is provided with one group of jack 6; Framework 7 end face is provided with two crossbeams 8, and crossbeam 8 two ends and framework 7 end face are slidably connected; Two crossbeam 8 end faces are arranged with coupling assembling 9, and coupling assembling 9 and crossbeam 8 end face are slidably connected; Coupling assembling 9 is provided with the fixing hole 10 be connected with steel beam column 3.Described correction pipe 4 as shown in Figure 3 and Figure 4, comprises shell 11, and shell 11 top is provided with top cover 12, is provided with bottom 13 bottom shell 11; The central authorities of top cover 12 are provided with adjusting bolt 14, and adjusting bolt 14 is provided with through wires hole 15, and through wires hole 15 is connected with vertical line 16; The top cover 12 of adjusting bolt 14 surrounding is evenly equipped with temporald eixis lamp 17; Described shell 11 is provided with insulating slab 18 with the junction of bottom 13.The bottom surface of insulating slab 18 is provided with a prescription potential electrode 19, and azimuthal electrodes 19 and temporald eixis lamp 17 are electrically connected; Described vertical line 16 other end with heavily fall 20 and be connected, be provided with bridged electrode 21 with the vertical line 16 of azimuthal electrodes 19 correspondence position.Be provided with heavy oil 22 in described bottom 13, heavily fall 20 and be positioned at heavy oil 22; Described bridged electrode 21 is electrically connected (see figure 5) through battery 23 and temporald eixis lamp 17 with azimuthal electrodes 19.
below in conjunction with embodiment, the present invention is described in further detail, but not as any limitation of the invention.
embodiment.The present invention is one group of jack by being located between calibrated mount and ground, regulates the amount of deflection of calibrated mount, drives steel beam column (can be steel pipe column or steel lattice column) to rotate correct object to reach by calibrated mount.Incline direction is observed at any time by the parallel correction pipe be fixed in steel beam column inner chamber in trimming process.Calibrated mount in this example as shown in Figure 2, be the rectangular frame be welded into i iron, during welding rectangular frame, the four edges of rectangular frame leave the groove installing jack, every bar limit is left the groove of three installation jack, adopt 8 jack to adjust altogether.Rectangular frame is provided with two crossbeams, and crossbeam adopts square steel, and two ends are welded with fastening devices, fastening devices is provided with fixing hole, is connected with elongated slot on rectangular frame by bolt, and unclamping bolt crossbeam can slide along elongated slot direction, for regulating center, tight a bolt permanent position.Two crossbeams are provided with coupling assembling, and coupling assembling is slidably connected by the elongated slot on bolt and crossbeam, and unclamping bolt connection assembly can slide along crossbeam direction, and for regulating center, tight a bolt permanent position.Coupling assembling is provided with the fixing hole be connected with steel beam column, is rigidly connected by bolt and steel beam column.Coupling assembling can adjust according to the shape of steel beam column, if be connected with steel pipe column, the bonding surface of coupling assembling and steel pipe column can be designed to arcwall face.
the correction pipe of this example adopts steel pipe to make, two ends are connected with top cover and bottom through flange, the center of top cover is provided with adjusting bolt, the center of adjusting bolt is drilled with through wires hole, hang the vertical line heavily fallen to pass from through wires hole, then be connected with heavily falling, vertical line and the dead in line correcting pipe during to ensure plumbness.Insulating slab is provided with in the junction of bottom, insulating slab is annular, centre has hole, vertical line passes from hole, east, the southeast, south, southwest, west, northwest, north and 8, northeast azimuthal electrodes is inlaid with bottom insulating slab, corresponding with on top cover respectively 8 the temporald eixis lamps of 8 direction electrodes connect, the vertical line corresponding with azimuthal electrodes is provided with bridged electrode, bridged electrode is provided with the conical surface, the gap between bridged electrode and azimuthal electrodes can be regulated by the adjusting bolt on top cover, the less precision in gap and sensitivity higher.During concrete use, also can improve precision by regulating the length of the length and vertical line that correct pipe shell.Be in course of adjustment, if occur, steel beam column is tilted beyond setting value, and bridged electrode contacts with east potential electrode, lights the temporald eixis lamp in east side, then illustrate that steel beam column tilts eastwards.In order to reduce the situation that adjustment process perpendicular bisector swings back and forth, in bottom, heavy oil being housed, making heavily to fall and be immersed in heavy oil, by the damping action of heavy oil, slow down the amplitude of fluctuation and frequency that heavily fall.

Claims (7)

1. the bearing calibration of steel beam column verticality in stand column pile construction, it is characterized in that: the method be steel beam column top is fixed on be positioned at stake holes aperture calibrated mount in the middle of, and regulated by the deflection angle of jack pair calibrated mount, calibrated mount drives steel beam column and calibrated mount synchronously to deflect the correction realizing steel beam column verticality; Timing, X-direction and Y-direction correct respectively, after correcting what a direction, are fixed by the deflection angle in this direction of calibrated mount; And then correct other direction; The quantity of jack is arranged according to verticality precision prescribed, and precision is directly proportional to using the quantity of jack; Install in described steel beam column and correct pipe, correct the axis being parallel of tubular axis line and steel beam column, timing is being carried out to steel beam column verticality, is correcting the verticality of pipe and remain consistent with the verticality of steel beam column, by detecting the verticality of the verticality determination steel beam column correcting pipe; Correct the temporald eixis lamp that pipe is provided with adjusting bolt and represents different azimuth; The worst error value of steel beam column verticality is controlled according to the distance of axial displacement of adjusting bolt; The incline direction of steel beam column is judged according to the illuminating state of different azimuth indicator lamp; Adjusting bolt is positioned at and correction pipe top, and manages coaxial with correction; Be connected with vertical line bottom adjusting bolt, the vertical line other end is connected with heavily falling, and the vertical line heavily falling top is provided with bridged electrode, and the surrounding of bridged electrode is provided with the azimuthal electrodes that a group represents different azimuth, azimuthal electrodes with correct inside pipe wall and insulate and be connected; When correcting pipe angle of inclination and exceeding setting value, bridged electrode contacts with in a prescription potential electrode or two azimuthal electrodes, lights corresponding temporald eixis lamp, and display corrects the well azimuth of pipe.
2. method according to claim 1, is characterized in that: described bridged electrode is provided with 45 ° of conical surfaces, regulates the distance between the conical surface of bridged electrode and azimuthal electrodes, with control survey precision and sensitivity by the axial displacement of adjusting bolt.
3. method according to claim 1, is characterized in that: be provided with heavy oil bottom described correction pipe, and heavily pendant is immersed in heavy oil, and heavy oil plays damping action, to reduce the amplitude of fluctuation heavily fallen.
4. the means for correcting of steel beam column verticality that method is formed according to the arbitrary claim of claims 1 to 3, is characterized in that: comprise the calibrated mount (2) being located at stake holes (1) aperture and the correction pipe (4) be located in steel beam column (3); Correct pipe (4) to be arranged in parallel with steel beam column (3), steel beam column (3) top is connected with calibrated mount (2) is vertical, is provided with one group of jack (6) between the calibrated mount (2) of steel beam column (3) surrounding and ground (5).
5. device according to claim 4, it is characterized in that: described calibrated mount (2) comprises framework (7), the surrounding of framework (7) is provided with one group of jack (6); Framework (7) end face is provided with two crossbeams (8), and crossbeam (8) two ends and framework (7) end face are slidably connected; Two crossbeam (8) end faces are arranged with coupling assembling (9), and coupling assembling (9) and crossbeam (8) end face are slidably connected; Coupling assembling (9) is provided with the fixing hole (10) be connected with steel beam column (3).
6. device according to claim 4, is characterized in that: described correction pipe (4) comprises shell (11), and shell (11) top is provided with top cover (12), and shell (11) bottom is provided with bottom (13); The central authorities of top cover (12) are provided with adjusting bolt (14), and adjusting bolt (14) is provided with through wires hole (15), and through wires hole (15) is connected with vertical line (16); The top cover (12) of adjusting bolt (14) surrounding is evenly equipped with temporald eixis lamp (17); Described shell (11) is provided with insulating slab (18) with the junction of bottom (13); The bottom surface of insulating slab (18) is provided with a prescription potential electrode (19), and azimuthal electrodes (19) and temporald eixis lamp (17) are electrically connected; Described vertical line (16) other end with heavily fall (20) and be connected, be provided with bridged electrode (21) with the vertical line (16) of azimuthal electrodes (19) correspondence position.
7. device according to claim 6, is characterized in that: be provided with heavy oil (22) in described bottom (13), heavily falls (20) and is positioned at heavy oil (22); Described bridged electrode (21) is electrically connected with azimuthal electrodes (19) through battery (23) and temporald eixis lamp (17).
CN201210169584.6A 2012-05-29 2012-05-29 The bearing calibration of steel beam column verticality and device in stand column pile construction Expired - Fee Related CN102888865B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210169584.6A CN102888865B (en) 2012-05-29 2012-05-29 The bearing calibration of steel beam column verticality and device in stand column pile construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210169584.6A CN102888865B (en) 2012-05-29 2012-05-29 The bearing calibration of steel beam column verticality and device in stand column pile construction

Publications (2)

Publication Number Publication Date
CN102888865A CN102888865A (en) 2013-01-23
CN102888865B true CN102888865B (en) 2015-08-12

Family

ID=47532532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210169584.6A Expired - Fee Related CN102888865B (en) 2012-05-29 2012-05-29 The bearing calibration of steel beam column verticality and device in stand column pile construction

Country Status (1)

Country Link
CN (1) CN102888865B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147466B (en) * 2013-03-08 2013-11-20 中国地质大学(武汉) Automatic inclination measurement device for precast pile with rectangular or hollow rectangular cross section
CN103195106B (en) * 2013-03-08 2013-11-27 中国地质大学(武汉) Automatic synchronous inclination measuring device for precast pile with circular or circular ring shaped cross section
CN104344818B (en) * 2013-07-29 2018-03-16 上海航天设备制造总厂 A kind of vertical detection device and method
CN103696568B (en) * 2013-12-14 2015-12-30 上海建工二建集团有限公司 A kind of construction method being convenient to dismounting lattice column
CN106759558B (en) * 2017-01-22 2019-04-12 上海森信建设集团有限公司 A kind of control is buried in the earth the construction method of stand column pile direction and verticality
CN107254890B (en) * 2017-07-03 2019-07-23 浙江省建筑设计研究院 A kind of limiting device for precast square pile truncation rectification
CN108049407B (en) * 2017-11-10 2024-05-17 中铁五局集团有限公司 Accurate positioning device for lowering reinforcement cage and lattice column
TWI663378B (en) * 2018-07-27 2019-06-21 鄭振廷 Reverse steel column vertical alignment device
CN111472353A (en) * 2020-04-09 2020-07-31 南京理工大学 Reverse construction method steel pipe upright pile construction casing device and construction method thereof
CN112304284A (en) * 2020-10-27 2021-02-02 中国人民解放***箭军工程大学 Power distribution network safety monitoring device and method
CN112813978A (en) * 2020-12-30 2021-05-18 中国建筑第八工程局有限公司 Positioning and guiding device for lattice column and construction method thereof
CN114369996A (en) * 2021-11-26 2022-04-19 中铁二局集团有限公司 Method for mounting steel pipe column of pier in bridge water

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000046914A (en) * 1998-12-31 2000-07-25 김윤규, 정주영, 심옥진, 정몽헌 Verticality regulator of underground steel beam
CN1424469A (en) * 2002-08-23 2003-06-18 上海市第一建筑有限公司 Method and apparatus for controlling verticality of steel pile
CN101024965A (en) * 2006-02-21 2007-08-29 上海建工(集团)总公司 Underground preburied column high-precision smart verticality-regulating system and mounting construction method
CN101546673A (en) * 2008-03-28 2009-09-30 吴建昌 Electronic component module
CN201874018U (en) * 2010-10-28 2011-06-22 重庆工程职业技术学院 Light inclinometer for sunk well in submerged water
CN202577380U (en) * 2012-05-29 2012-12-05 中国建筑第四工程局有限公司 Steel member perpendicularity correcting device for construction of upright column piles

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000046914A (en) * 1998-12-31 2000-07-25 김윤규, 정주영, 심옥진, 정몽헌 Verticality regulator of underground steel beam
CN1424469A (en) * 2002-08-23 2003-06-18 上海市第一建筑有限公司 Method and apparatus for controlling verticality of steel pile
CN101024965A (en) * 2006-02-21 2007-08-29 上海建工(集团)总公司 Underground preburied column high-precision smart verticality-regulating system and mounting construction method
CN101546673A (en) * 2008-03-28 2009-09-30 吴建昌 Electronic component module
CN201874018U (en) * 2010-10-28 2011-06-22 重庆工程职业技术学院 Light inclinometer for sunk well in submerged water
CN202577380U (en) * 2012-05-29 2012-12-05 中国建筑第四工程局有限公司 Steel member perpendicularity correcting device for construction of upright column piles

Also Published As

Publication number Publication date
CN102888865A (en) 2013-01-23

Similar Documents

Publication Publication Date Title
CN102888865B (en) The bearing calibration of steel beam column verticality and device in stand column pile construction
CN202577380U (en) Steel member perpendicularity correcting device for construction of upright column piles
CN110219326B (en) Reverse construction method one-column one-pile underwater verticality adjusting construction process
CN104110035A (en) Perpendicularity correcting device for concrete-filled steel tube columns constructed by top-down process and construction method implemented by perpendicularity correcting device
CN108827230B (en) Ultra-wide water area precise river crossing leveling device and method
CN107268446B (en) Cable-stayed bridge tower beam synchronous construction measuring device and measuring method thereof
CN210238595U (en) One-column one-pile underwater verticality adjusting construction device by reverse construction method
CN107090775A (en) A kind of full framing space beam-ends cable guide pipe construction localization method
CN101864840B (en) Construction method for spatial special multi-curved surface netlike shell formed by connecting gusset plates
CN209820449U (en) A earth's surface real-time monitoring system for shield constructs construction tunnel
CN203323740U (en) Building settlement nondestructive measurement leveling rod bracket
CN214948055U (en) Fixed mounting formula total powerstation support
CN204139619U (en) For the support that huge post lifting is installed
CN201133827Y (en) Measuring instrument support
CN203256744U (en) Device for correcting perpendicularity of concrete-filled steel tubular column through reverse construction method
CN206815191U (en) A kind of full framing space beam-ends cable guide pipe positioner
CN220084047U (en) Auxiliary tool for axis center line calibration
CN107448540A (en) One kind, which rises, dials formula crane span structure adjusting method
CN221297997U (en) Monitoring and early warning device for support deflection of subway foundation pit
CN214656984U (en) Pile foundation construction steel protects positioner of a section of thick bamboo
CN214219763U (en) Foundation settlement observation system with variable datum
CN219759954U (en) Geodesic GNSS antenna and vision double-camera connecting device
CN115961622B (en) Pile foundation steel upright post positioning and verticality adjusting device and construction method thereof
CN202787088U (en) Embedded template structure for cable sleeve of main beam of stayed-cable bridge
CN203734598U (en) Photovoltaic bracket mounting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150812