CN102888843A - Rail sliding type piling machine and construction method thereof - Google Patents

Rail sliding type piling machine and construction method thereof Download PDF

Info

Publication number
CN102888843A
CN102888843A CN2012103553996A CN201210355399A CN102888843A CN 102888843 A CN102888843 A CN 102888843A CN 2012103553996 A CN2012103553996 A CN 2012103553996A CN 201210355399 A CN201210355399 A CN 201210355399A CN 102888843 A CN102888843 A CN 102888843A
Authority
CN
China
Prior art keywords
track
machine
sliding
stake
brake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103553996A
Other languages
Chinese (zh)
Other versions
CN102888843B (en
Inventor
王新泉
马跃光
陈春来
沈浩
吕舜远
江建坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dezhou Road Engineering Corp
Zhejiang Xinzhongyuan Construction Co ltd
Original Assignee
Zhejiang Xin Zhongyuan Construction Co Ltd
Zhejiang University City College ZUCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Xin Zhongyuan Construction Co Ltd, Zhejiang University City College ZUCC filed Critical Zhejiang Xin Zhongyuan Construction Co Ltd
Priority to CN201210355399.6A priority Critical patent/CN102888843B/en
Publication of CN102888843A publication Critical patent/CN102888843A/en
Application granted granted Critical
Publication of CN102888843B publication Critical patent/CN102888843B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a rail sliding type piling machine, and a construction method of the rail sliding type piling machine; the rail sliding type piling machine is characterized in that a transverse sliding rail is arranged on a vertical sliding rail through a transverse sliding rail fixing plate; in the construction, the piling machine moves on the transverse sliding rail, and the transverse sliding rail and the piling machine are driven by the transverse sliding rail fixing plate to move on the vertical sliding rail; hole leading or stirring equipment and pile pressing and sinking equipment are symmetrically arranged at two sides of a horizontal upper underframe of the piling machine; the piling machine is rotated by 360 degrees by rotating a gear disk, to finish alternated constructions of hole leading and piling and two types of piles; during the construction process, a high-definition camera is used for monitoring the construction process; under assistance of a vertical machine moving jack, the vertical motion of the rail sliding type piling machine is completed; and a power control system and a high-definition camera monitoring system are integrated in a main control room. The rail sliding type piling machine has the advantages of rapid construction speed, low influence on constructed piles, rapid completion of alternated constructions of two types of piles and others, and the like, and has a better technical and economic benefit compared with the existing piling machine.

Description

A kind of track sliding stake machine and job practices
Technical field
The present invention relates to the sliding stake of a kind of track machine and job practices, belong to ground and process king-pile machine engineering field, be particularly useful for drawing the hole and stake sets or the two class stakes foundation treatment engineering of construction etc. alternately.
Background technology
The stake machines such as present tube-sinking cast-in-situ pile, preformed pile, cement mixing pile, need on construction ground the steel pipe by its frame bottom, and the underlay sleeper is realized telephone-moving, because the not yet initial sets such as concrete, cement during telephone-moving, this telephone-moving mode easily makes the pile bodies such as the tube-sinking cast-in-situ pile that set, cement mixing pile broken pile occur, have a strong impact on its load-carrying properties, and because of the repeatedly telephone-moving of each position, so telephone-moving speed is slow, efficient is low.Adopt crawler-type mobile to improve a lot in telephone-moving speed, still have considerable influence setting pile center and stake Zhou Yidong to setting stake but crawler belt is also many, and each position also needs repeatedly telephone-moving more.
In the engineerings such as ground processing, pattern foundation pit supporting structure, be combined with more and more two classes or the above technique of two classes or stake type and obtained preferably economic benefit, such as the SMW engineering method, insert preformed pile, steel pipe pile, tube-sinking cast-in-situ pile in the cement mixing pile, the length stake that rigid pile and flexible pile are alternately arranged etc.; But each type need adopt corresponding equipment to construct respectively, needs mutual linking between the different construction equipments, and the telephone-moving of rear construction stake type construction equipment and set and can have a negative impact to construction stake, and speed of application is slow, work efficiency is low, construction cost is high.For example, cover at ground and to be mingled with the soil layer that thickness is large, bearing capacity is good in thicker crust layer or the ground, preformed pile is difficult to construction, often need draw first the hole, and then carry out the constructions such as preformed pile static pressure or hammering, need to draw hole equipment and press the sinking apparatus combination construction.
In sum, at present the stake facility such as tube-sinking cast-in-situ pile, preformed pile, cement mixing pile have translational speed slow, on setting the shortcomings such as the stake impact is large, human cost is high, and there is the blind area, visual angle in a machine operation personnel, and security incident easily occurs; The simultaneously alternately construction of kinds of processes and stake type have speed of application slow, need the shortcoming such as more personnel's cooperation.Need at present that a kind of telephone-moving speed of invention is fast, the stake impact is little, technique and stake type replace stake machine and the job practices that construction efficiency is high, human cost is low, working security is high more than 2 kinds on setting badly.
Summary of the invention
The objective of the invention is to invent a kind of speed of application fast, more than 2 kinds technique and stake type replace that construction efficiency is high, human cost, orbit sliding type stake machine and job practices that working security is high, to utilize the stake machine to realize quick telephone-moving at the quick sliding of horizontal sliding track and straight skidding track, and with 2 kinds of techniques and the stake type construction equipment be symmetricly set in the frame both sides, by the rotation of frame, realize the fast alternately construction of 2 kinds of techniques and stake type; By the setting of high-definition camera, realize the Multi-azimuth monitoring to work progress simultaneously, improved the safety of construction.
In order to realize above-mentioned technical purpose, the present invention has adopted following technical scheme:
The sliding stake of a kind of track machine is characterized in that the horizontal sliding track is placed on the straight skidding track by horizontal sliding track fixed head; The cross track slide device is set on the horizontal sliding track, the lateral traction motor places on the horizontal sliding track fixed head, the lateral traction motor connects the lateral traction wire rope, the lateral traction wire rope is walked around the pulley that is fixed on the cross track slide device, and traction cross track slide device moves; The longitudinal traction motor is set on the straight skidding track, the longitudinal traction motor connects the longitudinal traction wire rope, the longitudinal traction wire rope is walked around the pulley that is fixed in horizontal sliding track fixed head, traction horizontal sliding track fixed head moves, and on horizontal stroke, straight skidding track a machine brake gear and fixed head brake gear is set respectively;
The toothed disc turning cylinder runs through underframe center under the machine level, be connected with device of rotation driving, underframe bottom centre on the machine level is fixed at turning gear wheel disc top, realize 360 ° of rotations of stake machine by the turning gear wheel disc, the underframe both sides are symmetrical arranged perpendicular to its centerline and draw hole or mixing plant and pressure sinking apparatus on stake machine level, and be connected with vertical frame by its vertical fixed guide frame respectively, between the vertical frame vertical frame diagonal brace is set; The position of the suitable conduct monitoring at all levels in four corners of underframe, horizontal sliding track fixed head two inboard corners and 1 or above high-definition camera highly are set on stake machine level; Under the horizontal sliding track fixed head of both sides, be symmetrical arranged respectively 4 vertical telephone-moving jack during vertical telephone-moving; Power control system and high-definition camera monitoring system are integrated in master-control room.
The sliding stake of aforesaid a kind of track machine is characterized in that horizontal sliding track and straight skidding track can adopt steel pipe or H shaped steel.
The sliding stake of aforesaid a kind of track machine, it is characterized in that the cross track slide device is identical with long rails slide device structure, type setting according to the horizontal sliding track of selecting and straight skidding track, the cross track slide device is fixed in the bottom of underframe under the machine level, the long rails slide device is fixed in the bottom of horizontal sliding track fixed head, when sliding rail is steel pipe, slide device is set to laterally zygomorphic two track sliding plates, every track sliding plate arranges semicircle slippage slot along its center, inboard sideline, by monosymmetric four and the connection of above sliding plate connecting bolt, two track sliding plate match lines overlap with the sliding rail horizontal center line up and down; When sliding rail is H shaped steel, slide device by symmetry about two track sliding plates be welded at sliding plate match line place, parcel sliding rail upper flange and 1/2 above web height, sliding plate match line and sliding rail web central lines after the welding of two track sliding plates.
The sliding stake of aforesaid a kind of track machine, it is characterized in that a machine brake gear is identical with fixed head brake gear structure, type setting according to the horizontal sliding track of selecting and straight skidding track, stake machine brake gear is fixed in the bottom of underframe under the machine level, the fixed head brake gear is fixed in the bottom of horizontal sliding track fixed head, when sliding rail is steel pipe, sliding rail outer wall welding circular ring type brake magnet, brake gear is connected to form by four and above brake magnet plate slippage bar by the up and down two brake magnet plates that are symmetrical in the sliding rail horizontal center line, every brake magnet plate arranges semicircle brake groove along its center, inboard sideline, brake magnet plate slippage bar and the welding of upper brake magnet plate, upper brake magnet plate and the welding of circular ring type brake magnet, lower brake magnet plate can be free to slide along brake magnet plate slippage bar; When sliding rail is H shaped steel, braking in sliding rail top flange upside welding, magnet plate, bottom flange are symmetrical in two brakes of web both sides welding magnet, the web both sides arrange brake magnet plate slippage slot, brake magnet downside is symmetrical in the sliding rail web magnet plate that brakes under two separate types is set, the magnet plate that brakes up and down passes through four and the connection of above brake magnet plate slippage bar at two ends, brake magnet plate slippage masthead section and upper brake magnet plate firm welding, lower brake magnet plate can be free to slide along magnet plate slippage bar and brake magnet plate slippage slot.
The job practices of the sliding stake of a kind of track machine is characterized in that may further comprise the steps:
Step 1, at first ground under the straight skidding track is adopted to change fill out or the cement-soil consolidation process;
Step 2, after a machine assembles at the scene with sliding rail and stake, be placed in the construction plant, the fixed head brake gear places braking state;
After step 3, stake machine move to the stake position along the horizontal sliding track, stake machine brake gear places braking state, by after drawing hole or mixing plant and drawing hole or cement mixing pile driving construction, stake machine Rotate 180 draws hole or mixing plant and pressure sinking apparatus and alternately constructs ° by pressing sinking apparatus to carry out preformed pile or filling pile construction;
After step 4, a unlatching stake machine brake gear, stake machine were finished next position 2 campsheds construction successively along the slip of horizontal sliding track, a machine moved to horizontal sliding orbit centre position;
Step 5, stake machine brake gear place braking state, open the fixed head brake gear, are along the longitudinal movement by horizontal sliding track fixed head, drive the horizontal sliding track and are along the longitudinal movement with a stake machine, finish successively the place pile construction.
After pile driving construction is finished in step 6, the straight skidding track slippage scope place, the stake machine is moved to horizontal sliding orbit centre place, stake machine brake gear places braking state, the fixed head brake gear places opening, under vertically the telephone-moving jack is assisted, and ensure a level of machine underframe, finish vertically moving of straight skidding track, after the straight skidding rail moving is finished, carry out the construction of next section of place.
The sliding stake of the track that the present invention relates to machine and job practices has the following advantages and beneficial effect:
(1) by horizontal sliding track and straight skidding track, realized the stake machine fast in length and breadth to movement, the horizontal sliding rail does not contact with ground, the straight skidding track places outside the construction plant or Reinforcement Measures has at first been taked in the bottom, stake machine telephone-moving process is on the construction stake impact is less, and telephone-moving speed is fast;
(2) be symmetricly set in the frame both sides by the construction equipment with 2 kinds of techniques and stake type, the rotation by frame has realized the quick alternately construction of 2 kinds of techniques and stake type;
(3) by the setting of four corners of underframe, horizontal sliding track fixed head two inboard corner high-definition cameras on the stake machine level, be convenient to the situation of master-control room operating personnel Multi-azimuth monitoring construction plant, improved the safety of construction.
Description of drawings
Fig. 1 is the portable stake of slide bar machine layout schematic diagram;
Fig. 2 is the slide device structure section schematic diagram of sliding rail when being round steel pipe;
Fig. 3 is the slide device structure section schematic diagram of sliding rail when being H shaped steel;
Fig. 4 is the brake device structure sectional schematic diagram of sliding rail when being round steel pipe;
Fig. 5 is the brake device structure sectional schematic diagram of sliding rail when being H shaped steel.
Among the figure: underframe under the 1-stake machine level, underframe on the 2-stake machine level, 3-turning gear wheel disc, 4-toothed disc turning cylinder, 5-horizontal sliding track, 6-cross track slide device, 7-stake machine brake gear, 8-straight skidding track, 9-horizontal sliding track fixed head, 10-fixed head brake gear, 11-lateral traction wire rope, 12-pulley, 13-lateral traction motor, 14-longitudinal traction wire rope, the vertical frame of 15-, the vertical frame diagonal brace of 16-, 17-draws hole or mixing plant, 18-presses sinking apparatus, the vertical fixed guide frame of 19-, 20-high-definition camera, the vertical telephone-moving jack of 21-, 22-long rails slide device, the 23-master-control room, 24-track sliding plate, 25-sliding plate connecting bolt, 26-sliding plate match line, the upper brake of 27-magnet plate, the magnet plate that brakes under the 28-, the 29-magnet that brakes, 30-brake magnet plate slippage bar, 31-brake magnet plate slippage slot.
The specific embodiment
Stake mechanism makes requirement, gantry configuration requirement, power control system, vertically telephone-moving jack type selecting, lateral traction motor selection, device of rotation driving, high-definition camera technical data, the requirement of transmitting gear disk material etc., need to determine in conjunction with designs such as Specific construction technological requirement, stake type type and design parameterss, and mostly be the art those skilled in the art's routine techniques means; Being connected underframe under cross track slide device, long rails slide device, stake machine brake gear, fixed head brake gear etc. and the stake machine level simultaneously, the layout of toothed disc turning cylinder drive unit underframe bottom under stake machine level etc. also all adopts the routine techniques means, is apparent in the art those skilled in the art; All be not repeated in the present embodiment, emphasis is set forth arrangement, the difference that the present invention relates to the sliding stake of track machine and is had technical data and the job practices that stake mechanism makes now.
Fig. 1 is the portable stake of slide bar machine layout schematic diagram, with reference to shown in Figure 1, and the sliding stake of a kind of track machine, horizontal sliding track 5 places on the straight skidding track 8 by horizontal sliding track fixed head 9; Cross track slide device 6 is set on the horizontal sliding track 5, lateral traction motor 13 places on the horizontal sliding track fixed head 9, lateral traction motor 13 connects lateral traction wire rope 11, lateral traction wire rope 11 is walked around the pulley 12 that is fixed on the cross track slide device 6, drives the stake machine by lateral traction motor 13 by pulley 12 and lateral traction wire rope 11 traction cross track slide devices 6 during construction mobile at horizontal sliding track 5; The longitudinal traction motor is set on the straight skidding track 5, the longitudinal traction motor connects longitudinal traction wire rope 14, longitudinal traction wire rope 14 is walked around the pulley 12 that is fixed in horizontal sliding track fixed head 9, draw horizontal sliding track fixed heads 9 by the longitudinal traction motor by pulley 12 and longitudinal traction wire rope 14 during construction, thereby it is mobile at straight skidding track 8 to drive horizontal sliding track 5 and a machine, and at horizontal, straight skidding track a machine brake gear 7 and fixed head brake gear 10 is set respectively;
Toothed disc turning cylinder 4 runs through underframe 1 center under the machine level, be connected with device of rotation driving, 2 centers, underframe bottom on the machine level are fixed at turning gear wheel disc 3 tops, realize 360 ° of rotations of stake machine by turning gear wheel disc 3, underframe 2 both sides are symmetrical arranged perpendicular to its centerline and draw hole or mixing plant 17 and press sinking apparatus 18 on stake machine level, and be connected with vertical frame 15 by its vertical fixed guide frame 19 respectively, between the vertical frame 15 vertical frame diagonal brace 16 is set; The position of the suitable conduct monitoring at all levels in 2 four corners of underframe, 9 liang of inboard corners of horizontal sliding track fixed head and 1 or above high-definition camera 20 highly are set on stake machine level; Be symmetrical arranged respectively 4 vertical telephone-moving jack 21 for 9 times at both sides horizontal sliding track fixed head during vertical telephone-moving; Power control system and high-definition camera 20 monitoring systems are integrated in master-control room 23.
Underframe 2 on underframe 1 and the stake machine level under the stake machine level, according to requirements such as stake machine weight and stability, can adopt monolithic rectangle or square shape steel plate, or adopt shaped steel and steel plate Combination Welding to form, be as good as with a present existing stake machine underframe processing technology, no longer launch in the present embodiment to set forth, can suit as required to be connected and fixed between the underframe 2 on underframe 1 and the stake machine level under the stake machine level simultaneously.
Horizontal sliding track 5 and straight skidding track 8 can adopt steel pipe or H shaped steel; Horizontal sliding track 5 is evenly arranged 4, and can adopt external diameter is that 299mm, wall thickness are the hot rolled seamless steel tube of 20mm; Also can adopt 4 hot rolling wide width wing edge H shaped steel, be that 300mm, wing plate thickness are that 15mm, web thickness are 10, radius of corner is 20mm for 300mm, width highly; It is that 600mm, wall thickness are the hot rolled seamless steel tube of 20mm that straight skidding track 8 can adopt 2 external diameters; Also can adopt 4 to adopt the narrow edge of a wing of hot rolling H shaped steel, highly be that 800mm, width are that 300mm, wing plate thickness are that 26mm, web thickness are 14, radius of corner is 28mm.
Fig. 2 is the slide device structure section schematic diagram of sliding rail when being round steel pipe, Fig. 3 is the slide device structure section schematic diagram of sliding rail when being H shaped steel, with reference to Fig. 2, shown in 3, cross track slide device 6 is identical with long rails slide device 22 structures, type setting according to the horizontal sliding track 5 of selecting and straight skidding track 8, cross track slide device 6 is fixed in the bottom of underframe 1 under the machine level, long rails slide device 22 is fixed in the bottom of horizontal sliding track fixed head 9, be that external diameter is 299mm such as sliding rail, when wall thickness is the hot rolled seamless steel tube of 20mm (Fig. 2), slide device is arranged to laterally zygomorphic two track sliding plates 24, track sliding plate 24 width are 600mm, highly be 300mm, every track sliding plate 24 arranges diameter along its center, inboard sideline be the semicircle slippage slot of 302mm, by monosymmetric four and 25 connections of above sliding plate connecting bolt, the screw diameter 30mm of sliding plate connecting bolt 25, nut diameter 60mm, nut height 30mm, two track sliding plate match lines 26 overlap with the steel pipe horizontal center line up and down; Such as sliding rail for being that highly 300mm, width are that 300mm, wing plate thickness are when being the hot rolling wide width wing edge H shaped steel that 15mm, web thickness are 10, radius of corner is 20mm (Fig. 2), slide device is welded at sliding plate match line 26 places by two L-type track sliding plates 24 of symmetry, the web of whole parcel H shaped steel upper flange and 1/2 above height after 24 welding of two track sliding plates, track sliding plate 24 is that Plate Welding or the monoblock cast of 20mm forms by thickness, sliding plate match line 26 and H shape steel web central lines.
Fig. 4 is the brake device structure sectional schematic diagram of sliding rail when being round steel pipe, Fig. 5 is the brake device structure sectional schematic diagram of sliding rail when being H shaped steel, with reference to Fig. 4, shown in 5, stake machine brake gear 7 is identical with fixed head brake gear 10 structures, type setting according to the horizontal sliding track 5 of selecting and straight skidding track 8, stake machine brake gear 7 is fixed in the bottom of underframe 1 under the machine level, fixed head brake gear 10 is fixed in the bottom of horizontal sliding track fixed head 9, be that external diameter is 299mm such as sliding rail, when wall thickness is the hot rolled seamless steel tube of 20mm, the outer wall of steel pipe welding external diameter of sliding rail is 319mm, thickness is 10mm circular ring type brake magnet 29, brake gear is 600mm by the width that is symmetrical in the steel pipe horizontal center line, it highly is the upper brake magnet plate 27 of 290mm, lower brake magnet plate 28 connects to form by four and above brake magnet plate slippage bar 30, magnet plate slippage bar 30 diameter 30mm, length is 625mm (not containing two ends bellend height), two ends bellend height is 30mm, diameter is 60mm, every brake magnet plate arranges the semicircle brake groove that diameter is 322mm along its center, inboard sideline, brake magnet plate slippage bar 30 and upper brake magnet plate 27 welding, upper brake magnet plate 27 and 29 welding of circular ring type brake magnet, lower brake magnet plate 28 can be free to slide along brake magnet plate slippage bar 30; Be highly for 300mm such as sliding rail, width is 300mm, wing plate thickness is 15mm, web thickness is 10, when radius of corner is the hot rolling wide width wing edge H shaped steel of 20mm (Fig. 5), be 380mm in the top flange of sliding rail upside weld width, thickness is the upper brake of 20mm magnet plate 27, be symmetrical in two brakes of web both sides welding magnet 29 in the bottom flange of sliding rail, every brake magnet 29 width are 144.5mm, thickness is 15mm, brake magnet plate slippage slot 31 is set in the web both sides of sliding rail, brake magnet 29 downsides are symmetrical in the H shape steel web, and two separate type width are set is 184.5mm, thickness is brake magnet plate 28 under the 20mm, magnet plate 27 brakes up and down, 28 two ends are by four and 30 connections of above brake magnet plate slippage bar, brake magnet plate slippage bar 30 diameter 15mm, length is 90mm (not containing two ends bellend height), two ends bellend height is 15mm, diameter is 30mm, its top bellend and upper brake magnet plate 27 firm welding, lower brake magnet plate 28 can be free to slide along magnet plate slippage bar 30 and brake magnet plate slippage slot 31.
The job practices of the sliding stake of a kind of track machine may further comprise the steps:
Step 1, at first 8 times grounds of straight skidding track are adopted to change fill out or the cement-soil consolidation process;
Step 2, after a machine assembles at the scene with sliding rail and stake, be placed in the construction plant, fixed head brake gear 10 places braking state;
After step 3, stake machine move to the stake position along horizontal sliding track 5, stake machine brake gear 7 places braking state, by after drawing hole or mixing plant 17 and drawing hole or cement mixing pile driving construction, stake machine Rotate 180 draws hole or mixing plant 17 and presses alternately construction of sinking apparatus 18 ° by pressing sinking apparatus 18 to carry out preformed pile or filling pile construction;
After step 4, a unlatching stake machine brake gear 7, stake machine were finished next position 2 campsheds construction successively along 5 slips of horizontal sliding track, a machine moved to horizontal sliding track 5 centers;
Step 5, stake machine brake gear 7 place braking state, open fixed head brake gear 10, are along the longitudinal movement by horizontal sliding track fixed head 9, drive horizontal sliding track 5 and are along the longitudinal movement with a stake machine, finish successively the place pile construction.
After pile driving construction is finished in step 6, the straight skidding track 8 slippage scope places, the stake machine is moved to horizontal sliding track 5 centers, stake machine brake gear 7 places braking state, fixed head brake gear 10 places opening, under vertically very heavy 21 tops of telephone-moving are assisted, and the level of guarantee stake machine underframe, vertically moving of straight skidding track 8 finished, after straight skidding track 8 moves and finishes, carry out the construction of next section of place.

Claims (5)

1. the sliding stake of a track machine is characterized in that horizontal sliding track (5) is placed on the straight skidding track (8) by horizontal sliding track fixed head (9); Cross track slide device (6) is set on the horizontal sliding track (5), lateral traction motor (13) places on the horizontal sliding track fixed head (9), lateral traction motor (13) connects lateral traction wire rope (11), lateral traction wire rope (11) is walked around the pulley (12) that is fixed on the cross track slide device (6), and traction cross track slide device (6) is mobile; The straight skidding track arranges the longitudinal traction motor on (5), the longitudinal traction motor connects longitudinal traction wire rope (14), longitudinal traction wire rope (14) is walked around the pulley (12) that is fixed in horizontal sliding track fixed head (9), traction horizontal sliding track fixed head (9) is mobile, on horizontal stroke, straight skidding track a machine brake gear (7) and fixed head brake gear (10) is set respectively;
Toothed disc turning cylinder (4) runs through underframe (1) center under the machine level, be connected with device of rotation driving, (2) center, underframe bottom on the machine level is fixed at turning gear wheel disc (3) top, realize 360 ° of rotations of stake machine by turning gear wheel disc (3), underframe (2) both sides are symmetrical arranged perpendicular to its centerline and draw hole or mixing plant (17) and press sinking apparatus (18) on stake machine level, and be connected with vertical frame (15) by its vertical fixed guide frame (19) respectively, between the vertical frame (15) vertical frame diagonal brace (16) is set; The position of the suitable conduct monitoring at all levels in (2) four corners of underframe, horizontal sliding track fixed head (9) two inboard corners and 1 or above high-definition camera (20) highly are set on stake machine level; Under both sides horizontal sliding track fixed heads (9), be symmetrical arranged respectively 4 vertical telephone-moving jack (21) during vertical telephone-moving; Power control system and high-definition camera (20) monitoring system is integrated in master-control room (23).
2. the sliding stake of a kind of track according to claim 1 machine is characterized in that horizontal sliding track (5) and straight skidding track (8) can adopt steel pipe or H shaped steel.
3. the sliding stake of a kind of track according to claim 1 machine, it is characterized in that cross track slide device (6) is identical with long rails slide device (22) structure, type setting according to the horizontal sliding track (5) of selecting and straight skidding track (8), cross track slide device (6) is fixed in the bottom of underframe (1) under the machine level, long rails slide device (22) is fixed in the bottom of horizontal sliding track fixed head (9), when sliding rail is steel pipe, slide device is set to laterally zygomorphic two track sliding plates (24), every track sliding plate (24) arranges semicircle slippage slot along its center, inboard sideline, by monosymmetric four and above sliding plate connecting bolt (25) connection, two track sliding plate match lines (26) overlap with the sliding rail horizontal center line up and down; When sliding rail is H shaped steel, slide device by symmetry about two track sliding plates (24) locate to be welded at sliding plate match line (26), parcel sliding rail upper flange and 1/2 above web height after the welding of two track sliding plates (24), sliding plate match line (26) and sliding rail web central lines.
4. the sliding stake of a kind of track according to claim 1 machine, it is characterized in that a machine brake gear (7) is identical with fixed head brake gear (10) structure, type setting according to the horizontal sliding track (5) of selecting and straight skidding track (8), stake machine brake gear (7) is fixed in the bottom of underframe (1) under the machine level, fixed head brake gear (10) is fixed in the bottom of horizontal sliding track fixed head (9), when sliding rail is steel pipe, sliding rail outer wall welding circular ring type brake magnet (29), brake gear is connected to form by four and above brake magnet plate slippage bar (30) by the up and down two brake magnet plates that are symmetrical in the sliding rail horizontal center line, every brake magnet plate arranges semicircle brake groove along its center, inboard sideline, brake magnet plate slippage bar (30) and upper brake magnet plate (27) welding, upper brake magnet plate (27) can be free to slide along brake magnet plate slippage bar (30) with circular ring type brake magnet (29) welding, lower brake magnet plate (28); When sliding rail is H shaped steel, weld the magnet plate (27) that brakes at sliding rail top flange upside, the bottom flange is symmetrical in two brakes of web both sides welding magnet (29), the web both sides arrange brake magnet plate slippage slot (31), brake magnet (29) downside is symmetrical in the sliding rail web magnet plate (28) that brakes under two separate types is set, the magnet plate that brakes up and down passes through four and above brake magnet plate slippage bar (30) connection at two ends, brake magnet plate slippage bar (30) top and upper brake magnet plate (27) firm welding, lower brake magnet plate (28) can be free to slide along magnet plate slippage bar (30) and brake magnet plate slippage slot (31).
5. the job practices of the sliding stake of track machine is characterized in that may further comprise the steps:
Step 1, at first the lower ground of straight skidding track (8) is adopted to change fill out or the cement-soil consolidation process;
Step 2, after a machine assembles at the scene with sliding rail and stake, be placed in the construction plant, fixed head brake gear (10) places braking state;
After step 3, stake machine move to the stake position along horizontal sliding track (5), stake machine brake gear (7) places braking state, by after drawing hole or mixing plant (17) and drawing hole or cement mixing pile driving construction, stake machine Rotate 180 draws hole or mixing plant (17) and presses alternately construction of sinking apparatus (18) ° by pressing sinking apparatus (18) to carry out preformed pile or filling pile construction;
After step 4, a unlatching stake machine brake gear (7), stake machine were finished next position 2 campsheds construction successively along horizontal sliding track (5) slip, a machine moved to horizontal sliding track (5) center;
Step 5, stake machine brake gear (7) place braking state, open fixed head brake gear (10), be along the longitudinal movement by horizontal sliding track fixed head (9), drive horizontal sliding track (5) and a stake machine are along the longitudinal movement, and finish successively the place pile construction;
After pile driving construction is finished in step 6, straight skidding track (8) the slippage scope place, the stake machine is moved to horizontal sliding track (5) center, stake machine brake gear (7) places braking state, fixed head brake gear (10) places opening, under vertically telephone-moving jack (21) is assisted, and ensure a level of machine underframe, finish vertically moving of straight skidding track (8), straight skidding track (8) carries out the construction of next section of place after moving and finishing.
CN201210355399.6A 2012-09-21 2012-09-21 Rail sliding type piling machine and construction method thereof Expired - Fee Related CN102888843B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210355399.6A CN102888843B (en) 2012-09-21 2012-09-21 Rail sliding type piling machine and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210355399.6A CN102888843B (en) 2012-09-21 2012-09-21 Rail sliding type piling machine and construction method thereof

Publications (2)

Publication Number Publication Date
CN102888843A true CN102888843A (en) 2013-01-23
CN102888843B CN102888843B (en) 2014-09-03

Family

ID=47532510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210355399.6A Expired - Fee Related CN102888843B (en) 2012-09-21 2012-09-21 Rail sliding type piling machine and construction method thereof

Country Status (1)

Country Link
CN (1) CN102888843B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104675322A (en) * 2015-03-10 2015-06-03 重庆亨尔通冶金新技术股份有限公司 Numerical control automatic pile hole machine
CN105317042A (en) * 2015-10-28 2016-02-10 岩土科技股份有限公司 Base of telescopic advancing type pile planting machine
CN106437533A (en) * 2016-11-18 2017-02-22 大连船舶重工集团有限公司 Device applicable to module gliding
CN108104108A (en) * 2017-12-21 2018-06-01 东莞市棣业建设有限公司 The construction equipment and method of waste silt shallow-layer in-situ solidifying
CN108571894A (en) * 2017-03-07 2018-09-25 中国二十冶集团有限公司 It is sintered the installation method of owner's exhaust duct
CN109403966A (en) * 2018-09-11 2019-03-01 临沂矿业集团有限责任公司 One kind is mining chisel dress all-in-one machine and its application method
CN110500042A (en) * 2019-08-14 2019-11-26 中船重工(青岛)海洋装备研究院有限责任公司 A kind of pin-connected panel guide rail for ocean drilling and repairing machine
CN111535319A (en) * 2020-05-17 2020-08-14 崔伟杰 Pile pressing equipment for constructional engineering
CN112095605A (en) * 2020-07-30 2020-12-18 浙江二十冶建设有限公司 Method and system for shifting pile machine
CN112204196A (en) * 2018-04-11 2021-01-08 包尔特殊基础工程有限公司 Civil engineering device and system for monitoring construction site
CN114293554A (en) * 2021-12-27 2022-04-08 中国港湾工程有限责任公司 Device for steel sheet pile construction

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001248154A (en) * 2000-03-07 2001-09-14 Tokyu Constr Co Ltd Method of processing pile head, head structure of cast-in- place concrete pile, and form for processing pile head, for use in method of constructing cast-in-place concrete pile
JP2007308924A (en) * 2006-05-17 2007-11-29 Takenaka Komuten Co Ltd Method of constructing soil improving composite pile structure, and apparatus for constructing the same
CN201753449U (en) * 2010-07-07 2011-03-02 吕双朋 Walking support for pile driver
CN102425168A (en) * 2011-12-23 2012-04-25 湖南新天和工程设备有限公司 Asymmetric walking type walking chassis for SMW (soil mixing wall) method pile driver
CN202440819U (en) * 2012-01-19 2012-09-19 邓长峰 Column-type telescopic pile driver
CN202899136U (en) * 2012-09-21 2013-04-24 浙江大学城市学院 Rail sliding type piling machine

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001248154A (en) * 2000-03-07 2001-09-14 Tokyu Constr Co Ltd Method of processing pile head, head structure of cast-in- place concrete pile, and form for processing pile head, for use in method of constructing cast-in-place concrete pile
JP2007308924A (en) * 2006-05-17 2007-11-29 Takenaka Komuten Co Ltd Method of constructing soil improving composite pile structure, and apparatus for constructing the same
CN201753449U (en) * 2010-07-07 2011-03-02 吕双朋 Walking support for pile driver
CN102425168A (en) * 2011-12-23 2012-04-25 湖南新天和工程设备有限公司 Asymmetric walking type walking chassis for SMW (soil mixing wall) method pile driver
CN202440819U (en) * 2012-01-19 2012-09-19 邓长峰 Column-type telescopic pile driver
CN202899136U (en) * 2012-09-21 2013-04-24 浙江大学城市学院 Rail sliding type piling machine

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104675322A (en) * 2015-03-10 2015-06-03 重庆亨尔通冶金新技术股份有限公司 Numerical control automatic pile hole machine
CN105317042B (en) * 2015-10-28 2017-03-29 岩土科技股份有限公司 Line pile-grafting machine base before flexible
CN105317042A (en) * 2015-10-28 2016-02-10 岩土科技股份有限公司 Base of telescopic advancing type pile planting machine
CN106437533B (en) * 2016-11-18 2018-12-28 大连船舶重工集团有限公司 A kind of device suitable for module sliding
CN106437533A (en) * 2016-11-18 2017-02-22 大连船舶重工集团有限公司 Device applicable to module gliding
CN108571894A (en) * 2017-03-07 2018-09-25 中国二十冶集团有限公司 It is sintered the installation method of owner's exhaust duct
CN108104108A (en) * 2017-12-21 2018-06-01 东莞市棣业建设有限公司 The construction equipment and method of waste silt shallow-layer in-situ solidifying
CN108104108B (en) * 2017-12-21 2023-12-26 东莞市棣业建设有限公司 Construction equipment and method for shallow in-situ solidification of waste sludge
CN112204196A (en) * 2018-04-11 2021-01-08 包尔特殊基础工程有限公司 Civil engineering device and system for monitoring construction site
CN109403966A (en) * 2018-09-11 2019-03-01 临沂矿业集团有限责任公司 One kind is mining chisel dress all-in-one machine and its application method
CN110500042A (en) * 2019-08-14 2019-11-26 中船重工(青岛)海洋装备研究院有限责任公司 A kind of pin-connected panel guide rail for ocean drilling and repairing machine
CN111535319A (en) * 2020-05-17 2020-08-14 崔伟杰 Pile pressing equipment for constructional engineering
CN111535319B (en) * 2020-05-17 2021-11-02 上海建元工程股份有限公司 Pile pressing equipment for constructional engineering
CN112095605A (en) * 2020-07-30 2020-12-18 浙江二十冶建设有限公司 Method and system for shifting pile machine
CN114293554A (en) * 2021-12-27 2022-04-08 中国港湾工程有限责任公司 Device for steel sheet pile construction

Also Published As

Publication number Publication date
CN102888843B (en) 2014-09-03

Similar Documents

Publication Publication Date Title
CN202899136U (en) Rail sliding type piling machine
CN102888843B (en) Rail sliding type piling machine and construction method thereof
CN105736016B (en) Tunnel double-lining framework of steel reinforcement construction equipment and its application
CN105370298B (en) Loess tunnel once lining hydraulic template trolley
CN108867647B (en) Multifunctional steel pipe column verticality adjusting machine for pile and column integrated construction
CN103016028A (en) Hydraulic self-propelled steel form carrier for tunnel secondary lining operation
CN104533460B (en) Support replacement formula formwork jumbo and the construction method of underpass concreting
CN202596743U (en) Formwork trolley for underground tunnel pull-rod-free side wall construction
CN203834914U (en) Automatic lifting stacking platform
CN205618174U (en) Box culvert platform truck
CN106593469A (en) Trolley for construction of inverted arch
CN109944120B (en) Rapid disassembly and transportation device and disassembly and transportation method for transportation steel rail in shield tunnel construction
CN103552800A (en) Translation method of large-scale canned equipment
CN109355983B (en) Trackless construction method for urban rail
CN106192621B (en) High-speed railway track plate lays precision high-speed adjustment device and method
CN206220536U (en) 3D builds print job platform
CN209760820U (en) Blanking and mixed vibrating device for self-moving type regeneration block
CN203843433U (en) Equipment for rolling over main chord tubes of trussed pile legs of self-elevating drilling platform
CN107140564A (en) Special lifting device on the type non-fragment orbit printed lines of high ferro CRTS III
CN106837376A (en) Bind module turning device for subway tunnel section of jurisdiction
CN111188289A (en) Culvert trolley and construction method thereof
CN110700418A (en) Construction process for mounting laminated slab by matching laminated slab mounting trolley with tower crane
CN110745151A (en) Mining hydraulic trackless self-moving equipment train
CN115853518A (en) Shield construction method using subway crossover arrangement
CN212316711U (en) Culvert trolley

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: ZHEJIANG XINZHONGYUAN CONSTRUCTION CO., LTD. DEZHO

Free format text: FORMER OWNER: ZHEJIANG XINZHONGYUAN CONSTRUCTION CO., LTD.

Effective date: 20140724

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Wang Xinquan

Inventor after: Ma Yueguang

Inventor after: Chen Chunlai

Inventor after: Shen Hao

Inventor after: Lv Shunyuan

Inventor after: Jiang Jiankun

Inventor after: Ren Shengjun

Inventor after: Qi Xinlong

Inventor before: Wang Xinquan

Inventor before: Ma Yueguang

Inventor before: Chen Chunlai

Inventor before: Shen Hao

Inventor before: Lv Shunyuan

Inventor before: Jiang Jiankun

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WANG XINQUAN MA YUEGUANG CHEN CHUNLAI SHEN HAO LV SHUNYUAN JIANG JIANKUN TO: WANG XINQUAN MA YUEGUANG CHEN CHUNLAI SHEN HAO LV SHUNYUAN JIANG JIANKUN REN SHENGJUN QI XINLONG

TA01 Transfer of patent application right

Effective date of registration: 20140724

Address after: Zhejiang University City College No. 50 Huzhou street Hangzhou city Zhejiang province 310015 2-315

Applicant after: Zhejiang University City College

Applicant after: ZHEJIANG XINZHONGYUAN CONSTRUCTION Co.,Ltd.

Applicant after: DEZHOU ROAD ENGINEERING Corp.

Address before: Zhejiang University City College No. 50 Huzhou street Hangzhou city Zhejiang province 310015 2-315

Applicant before: Zhejiang University City College

Applicant before: ZHEJIANG XINZHONGYUAN CONSTRUCTION Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140903

Termination date: 20210921