CN102873762B - Movable concrete mixing plant - Google Patents

Movable concrete mixing plant Download PDF

Info

Publication number
CN102873762B
CN102873762B CN201210306469.9A CN201210306469A CN102873762B CN 102873762 B CN102873762 B CN 102873762B CN 201210306469 A CN201210306469 A CN 201210306469A CN 102873762 B CN102873762 B CN 102873762B
Authority
CN
China
Prior art keywords
main building
slide rail
concrete mixing
mixing plant
base rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210306469.9A
Other languages
Chinese (zh)
Other versions
CN102873762A (en
Inventor
莫劲风
苏赣斌
杨立山
徐坚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zoomlion Heavy Industry Science and Technology Co Ltd
Original Assignee
Zoomlion Heavy Industry Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zoomlion Heavy Industry Science and Technology Co Ltd filed Critical Zoomlion Heavy Industry Science and Technology Co Ltd
Priority to CN201210306469.9A priority Critical patent/CN102873762B/en
Publication of CN102873762A publication Critical patent/CN102873762A/en
Application granted granted Critical
Publication of CN102873762B publication Critical patent/CN102873762B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)

Abstract

The invention provides a movable concrete mixing plant. This portable concrete mixing plant includes the feed proportioning system, defeated material system, weighing system, mixing system and powder storehouse system, the feed proportioning system includes proportioning machine and proportioning machine foundation support, mixing system includes main building and main building foundation support, the powder storehouse system is including powder storehouse and powder storehouse foundation support, the first end fixed connection of main building is on main building foundation support, between proportioning machine and the proportioning machine foundation support, between main building and the main building foundation support, be connected with dismantling between powder storehouse and the powder storehouse foundation support, the unsettled setting of second end of main building. According to the mobile concrete mixing station, the assembly and disassembly efficiency of all parts of the concrete mixing station can be improved, and the construction period and the construction cost are reduced.

Description

Mobile concrete mixing plant
Technical field
The present invention relates to concrete mixer apparatus field, in particular to a kind of mobile concrete mixing plant.
Background technology
Along with the develop rapidly of concrete construction industry, concrete has obtained original application more widely at construction fields such as highway, bridge, tunnels.And along with the continuous increase of concrete construction region, concrete construction is also applied in some scarcely populated building sites, or some have the region of specific geographic environment.In order to meet local construction needs, it is little that concrete mixing plant requires to have floor space, is convenient to the feature of dismounting transportation, to meet the needs of the working environment of frequent resettlement.
Existing small-sized mixing station is comprised of proportioning machine, aggregate lifting system, powder scale, water scale, additive scale, Double-horizontal-shaft stirring host, stirring main building, spiral, powder storehouse, electric-control system etc.Before installation, need first basis to be accomplished fluently, then proportioning machine, stirring main building, powder storehouse, control room are fixed on basis separately, again by remaining part being fixedly mounted on corresponding position with bolt one by one, again water, electricity, gas are connected on request, could work, the time of whole process need about one week; Dismounting too, must elder generation all be broken into scattered parts during transition, repeats said process after transporting to new building site again.Therefore, adopt current general small-sized mixing station, the assembling and dissembling speed between each parts is slow, and the mixing plant mounting or dismounting work period is longer, has increased construction cost.
Summary of the invention
The present invention aims to provide a kind of mobile concrete mixing plant, can accelerate the mounting or dismounting efficiency between each parts of concrete mixing plant, reduces construction period and construction cost.
To achieve these goals, according to an aspect of the present invention, a kind of mobile concrete mixing plant is provided, comprise feed proportioning system, conveying system, Weighing system, stirring system and powder storehouse system, feed proportioning system comprises proportioning machine and is fixedly installed on the proportioning machine base rack of proportioning machine bottom, stirring system comprises main building and is fixedly installed on the main building base rack of main building bottom, powder storehouse system comprises powder storehouse and is fixedly installed on the powder storehouse base rack of bottom, powder storehouse, the first end of main building is fixedly connected on main building base rack, between proportioning machine and proportioning machine base rack, between main building and main building base rack, between the base rack of Yu Fen storehouse, powder storehouse, be and removably connect, the unsettled setting of the second end of main building.
Further, between proportioning machine base rack and main building base rack for removably connecting.
Further, main building comprises main building supporting leg and stirs main building, main building supporting leg is removably fixedly installed on the first end of main building base rack, the first end that stirs main building is removably fixedly connected on the top of main building supporting leg, stir the unsettled setting of the second end of main building, the second end below of stirring main building is provided with hopper.
Further, conveying system comprises the aggregate lifting device between the charging aperture that is arranged on the discharging opening of proportioning machine and stirs main building, and aggregate lifting device comprises being obliquely installed and being fixedly connected on and stirs the slide rail on main building and be slidably disposed on the elevator bucket on slide rail.
Further, slide rail comprises slide rail, middle slide rail and glidepath, and middle slide rail is removably fixedly connected on and stirs on main building, and the upper end of glidepath is removably connected with middle slide rail, upper slide rail is removably connected with middle slide rail, and the chute surface of upper slide rail, middle slide rail and glidepath flushes.
Further, the upper end of middle slide rail is provided with the first connecting plate, and the lower end of upper slide rail is provided with the second connecting plate, and middle slide rail is fixedly connected with the second connecting plate by the first connecting plate with upper slide rail.
On the first connecting plate and the second connecting plate, be also provided with bearing pin connecting hole, upper slide rail has the first syndeton being fixedly connected with middle slide rail and the second syndeton being connected rotationally with middle slide rail.
Further, the bottom of middle slide rail is provided with the elevator bucket detent mechanism that limits the position of elevator bucket on middle slide rail.
Further, mobile concrete mixing plant also comprises control room, and main building supporting leg comprises a plurality of vertical supporting posts, and control room is fixedly installed between a plurality of vertical supporting posts in formed spatial accommodation.
Further, on the sidewall of control room near hopper one side, offer observation window.
Further, the connection of the pipeline between feed proportioning system, conveying system, Weighing system, stirring system and powder storehouse system is articulation connection.
Further, main building also comprises the stirring host being fixedly installed on stirring main building, and stirring host is vertical shaft planet stirring main frame or Double-horizontal-shaft stirring host.
Apply technical scheme of the present invention, mobile concrete mixing plant comprises feed proportioning system, conveying system, Weighing system, stirring system and powder storehouse system, feed proportioning system comprises proportioning machine and is fixedly installed on the proportioning machine base rack of proportioning machine bottom, stirring system comprises main building and is fixedly installed on the main building base rack of main building bottom, powder storehouse system comprises powder storehouse and is fixedly installed on the powder storehouse base rack of bottom, powder storehouse, the first end of main building is fixedly connected on main building base rack, between proportioning machine and proportioning machine base rack, between main building and main building base rack, between the base rack of Yu Fen storehouse, powder storehouse, be and removably connect, the unsettled setting of the second end of main building.By the various piece of mixing plant is carried out to modularized design, the various piece that makes mixing plant when installing without basis is set, the base rack that can directly have by itself arranges, therefore when transportation, each several part can be carried out to modularization transportation, and need not disassemble completely, when carrying out Construction Arrangement, only each system need to be fixedly installed by base rack, and assemble, therefore greatly improve the mounting or dismounting efficiency of mobile concrete mixing plant, reduced construction period and construction cost.
Accompanying drawing explanation
The accompanying drawing that forms a part of the present invention is used to provide a further understanding of the present invention, and schematic description and description of the present invention is used for explaining the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 shows the stirring system of mobile concrete mixing plant and the syndeton schematic diagram of feed proportioning system according to an embodiment of the invention;
Fig. 2 shows the stirring system of mobile concrete mixing plant and the syndeton schematic diagram of powder storehouse system according to an embodiment of the invention;
Fig. 3 shows the working state structure schematic diagram of the main building of mobile concrete mixing plant according to an embodiment of the invention;
Fig. 4 shows the travel position structural representation of the main building of mobile concrete mixing plant according to an embodiment of the invention; And
Fig. 5 shows according to the structure for amplifying schematic diagram at the L place of Fig. 4.
The specific embodiment
Hereinafter with reference to accompanying drawing, also describe the present invention in detail in conjunction with the embodiments.It should be noted that, in the situation that not conflicting, embodiment and the feature in embodiment in the application can combine mutually.
As depicted in figs. 1 and 2, according to embodiments of the invention, mobile concrete mixing plant comprises feed proportioning system 10, conveying system, Weighing system 60, stirring system 20 and powder storehouse system 30, feed proportioning system 10 comprises proportioning machine 11 and is fixedly installed on the proportioning machine base rack 12 of proportioning machine 11 bottoms, stirring system 20 comprises main building 21 and is fixedly installed on the main building base rack 22 of main building 21 bottoms, powder storehouse system 30 comprises powder storehouse 31 and is fixedly installed on the powder storehouse base rack 32 of 31 bottoms, powder storehouse, the first end of main building 21 is fixedly connected on main building base rack 22, the unsettled setting of the second end of main building 21.
Before installation, only need to arrange the place sclerosis of mobile concrete mixing plant, then mobile concrete mixing plant is transported to construction site.After mobile concrete mixing plant is shown up, respectively by main building base rack 22, proportioning machine base rack 12, powder storehouse base rack 32 is put into the position of appointment, then respectively powder storehouse 31 hung on powder storehouse base rack 32 and fix, proportioning machine 11 is hung on proportioning machine base rack 12 and fixed, main building 21 is hung on main building base rack 22 and fixed, afterwards by conveying worm, stair etc. are in place, respectively track and main building 21 platforms are launched, by water, electricity, the pipelines such as gas are connected to corresponding joint, just can make whole mobile concrete mixing plant in commissioning test state, whole installation process just can complete within the short period, due to without each system is split, modular each system directly can be installed to connection, and come into operation, therefore, greatly improved the speed of transportation and assembling, improved transition efficiency, shortened construction period, reduced construction cost.Equally, when needs are dismantled mobile concrete mixing plant, only need to carry out reverse operating according to above-mentioned steps, just can complete soon dismounting and entrucking transportation.Therefore, the mobile concrete mixing plant of the present embodiment has greatly improved installation and removal speed, has improved operating efficiency.
In conjunction with referring to shown in Fig. 3 and Fig. 4, preferably, between proportioning machine 11 and proportioning machine base rack 12, between main building 21 and main building base rack 22, between 31Yu Fen storehouse, powder storehouse base rack 32, be and removably connect, between proportioning machine base rack 12 and main building base rack 22 for removably connecting.Between each base rack and each parts, be set to dismountable syndeton, make the module refinement more of each system, structure is less, takes up room less, is convenient to shipment, is also more convenient to carry out assembly and disassembly.And proportioning machine base rack 12 and main building base rack 22 are directly removably linked together, make the structure of main building 21 systems more stable when work, and when travel position, again can be easily by proportioning machine base rack 12 and the 22 separately entruckings of main building base rack, therefore operation is more flexible.
Main building 21 comprises main building supporting leg 211 and stirs main building 212, main building supporting leg 211 is removably fixedly installed on the first end of main building base rack 22, the first end that stirs main building 212 is removably fixedly connected on the top of main building supporting leg 211, stir the unsettled setting of the second end of main building 212, the second end below of stirring main building 212 is provided with hopper 213.The second end that stirs main building 212 is unsettled setting, main by realizing fixed support with being connected of main building supporting leg 211.The below of stirring main building 212 is stocking space, material has been after body produced, can be divided into bulk cargo transportation or directly by agitator truck transportation etc., owing to stirring main building 212, only have a side support, therefore can, for the shipment of material body provides larger activity space, load and transport convenient.
Main building 21 also comprises the control room 23 in the formed spatial accommodation of vertical supporting post 214 that is arranged on main building supporting leg 211.Control room 23 can be fixedly installed on main building base rack 22, also can be fixedly connected on the vertical supporting post 214 of main building supporting leg 211, utilizes main building supporting leg 211 to be used as control room 23 supporting legs, support and control chamber 23.In the present embodiment, control room 23 is to be fixedly installed on the vertical supporting post 214 of main building supporting leg 211, and this is fixedly connected with mode for example for welding or be spirally connected.
Control room 23 is arranged in the formed spatial accommodation of main building supporting leg 211, makes control room 23 can utilize main building supporting leg 211 as supporting construction, and without independent control room 23 supporting legs are set, saved section bar, reduced cost.Meanwhile, control room 23 is arranged in the formed spatial accommodation of main building supporting leg 211, does not need to take independent space, and the floor space of whole stirring main building 212 structures is reduced, and more saves space, transports convenient.
Preferably, main building supporting leg 211 is removably connected respectively with between main building base rack 22 and stirring main building 212.When stirring main building 212 structures are transported, only need to and stir dismounting between main building 212 and separate main building base rack 22, main building supporting leg 211, make control room 23 and the 211 one transportations of main building supporting leg, just main building base rack 22, main building supporting leg 211 and stirring main building 212 can be respectively charged in container and transport, compact conformation, be convenient to dismounting, improved transition efficiency.Because the structure after main building base rack 22, main building supporting leg 211 and 212 fractionations of stirring main building is all comparatively regular, therefore, while packing into the container, take up room less, can effectively reduce cost of transportation.
In order to maintain the stability that space is set in whole control room 23, strengthen the resistance to compression bending resistance of main building supporting leg 211, preferably, main building supporting leg 211 is by vertical supporting post 214 be arranged on the transverse link between a plurality of vertical supporting posts 214, oblique strut and form truss structure.Because main building base rack 22 is arranged on the bottom, need to support the weight of main building supporting leg 211, control room 23 and stirring main building 212 simultaneously, therefore, main building base rack 22 also can be set to truss structure, to improve the support strength of main building base rack 22.
Control room 23 offers door and window, wherein observation window 231 is arranged on control room 23 near a side that stirs the hopper 213 of main building 212, the height of observation window 231 roughly flushes with the bottom level of hopper 213, so that observe stirring the blanking situation of main building 212, assurance can be obtained the work at present status information that stirs main building 212 real-time and accurately, and convenient staff operates.
Preferably, main building supporting leg 211 away from stirring the first end end face of main building 212 and the first end end face of main building base rack 22, the second end end face relative with first end of main building supporting leg 211 and the second end end face that stirs main building 212, the spacing of two opposite flanks of main building supporting leg 211 is identical with the spacing of two opposite flanks of main building base rack 22.This kind of set-up mode, can reduce to stir the floor space of main building 212 structures further, and it is more reasonable to make to stir the layout of main building 212 structures, can further improve and stir main building 212 structures in the applicability of narrow space.
Stir the guardrail that main building 212 also includes aisle and is around in aisle periphery, the side in aisle is connected with cat ladder, so that staff can climb to stirring main building 212 tops, carries out associative operation.The bottom of cat ladder is fixedly installed on the ground, also can be fixedly connected on proportioning machine base rack 12, to guarantee stability and the security of cat ladder.
Main building 21 also comprises the stirring host 215 being fixedly installed on stirring main building 212, and wherein stirring host 215 is vertical shaft planet stirring main frame 215 or Double-horizontal-shaft stirring host 215.
Conveying system comprises the aggregate lifting device 40 between the charging aperture that is arranged on the discharging opening of proportioning machine 11 and stirs main building 212, and aggregate lifting device 40 comprises being obliquely installed and being fixedly connected on and stirs the slide rail on main building 212 and be slidably disposed on the elevator bucket 41 on slide rail.The material body hoisting way that adopts elevator bucket 41 and slide rail to coordinate, and drive elevator bucket 41 to slide up and down along slide rail by hoist engine, material body transportation work in the time of can meeting wide-angle, reduce further the floor space of main building 21 systems, main building 21 systems can be applied to more in rugged environment, and adaptability is stronger.This aggregate lifting device 40 also can substitute with oblique belt transmission agency.Conveying system also comprises the conveying worm between the charging aperture that is arranged on the discharging opening in powder storehouse 31 and stirs main building 212, and conveying worm is delivered to stirring system 20 by the material body in powder storehouse 31, is uniformly mixed, thereby obtains finished product concrete with aggregate.
Slide rail comprises slide rail 42, middle slide rail 43 and glidepath 44, and wherein middle slide rail 43 is removably fixedly connected on and stirs on main building 212, and the upper end of glidepath 44 is removably connected with middle slide rail 43, and the lower end of glidepath 44 is fixedly installed.The lower end of glidepath 44 can be fixedly installed on basis, ground, also can be fixedly installed on main building base rack 22.Preferably, glidepath 44 is to be removably connected on main building base rack 22.When mobile concrete mixing plant is in running order, the upper end of glidepath 44 is connected with middle slide rail 43, forms complete slide rail, and the lower end of glidepath 44 is fixedly connected with main building base rack 22, make slide rail there is stable guide frame, guarantee chain bucket normal hoisting material body on slide rail.When mobile concrete mixing plant is during in travel position, the upper end of glidepath 44 therefrom can be pulled down on slide rail 43, between the lower end of glidepath 44 and main building base rack 22, disassemble, then by the independent entrucking transportation of glidepath 44.
Between upper slide rail 42 and middle slide rail 43, also for being removably connected, and upper slide rail 42, middle slide rail 43 and glidepath 44 flush at the chute surface when being fixedly connected with state, to guarantee that elevator bucket 41 normally slides on chute surface.The cross sectional shape of slide rail can be Y shape groove or T-slot etc.
In conjunction with shown in Figure 5, the upper end of middle slide rail 43 is provided with the first connecting plate 431, and the lower end of upper slide rail 42 is provided with the second connecting plate 421, and middle slide rail 43 is fixedly connected with the second connecting plate 421 by the first connecting plate 431 with upper slide rail 42.The first connecting plate 431 is fixedly installed on the outer wall of both sides of middle slide rail 43, and the second connecting plate 421 is fixedly installed on the outer wall of both sides of slide rail 42.On the first connecting plate 431 and the second connecting plate 421, be also provided with bearing pin connecting hole, slide rail 42 is had the first syndeton being fixedly connected with middle slide rail 43 and the second syndeton being connected rotationally with middle slide rail 43.In the middle of while being the first syndeton being fixedly connected with between slide rail 43 and upper slide rail 42, two the second connecting plates 421 are arranged in the first connecting plate 431, and fixed by bolt, make slide rail 42, middle slide rail 43 and glidepath 44 form complete slide rail, now mobile concrete mixing plant is in running order.While being rotating the second syndeton between central slide rail 43 and upper slide rail 42, connecting bolt between the first connecting plate 431 and the second connecting plate 421 is dismantled, then will between upper slide rail 42 and middle slide rail 43, by bearing pin, connect, slide rail 42 can be rotated with respect to middle slide rail 43, and now mobile concrete mixing plant is in travel position.
In the middle of other embodiment, connection between upper slide rail 42 and middle slide rail 43 can also be a kind of like this form, go up between slide rail 42 and middle slide rail 43 by being arranged on the hinge pivot joint of a side, the upper slide rail 42 of the opposite side relative with this side and the link position of middle slide rail 43 are provided with connecting plate, when mobile concrete mixing plant is in running order, the connecting plate of the opposite side of slide rail 42 and middle slide rail 43 is bolted, makes to form complete slide rail between slide rail 42, middle slide rail 43 and glidepath 44.When mobile concrete mixing plant is during in travel position, make between the connecting plate of opposite side of slide rail 42 and middle slide rail 43 separately, and make slide rail 42 wrap page to turn to opposite side, and set up on middle slide rail 43, thereby reduce the whole height of whole main building 21, so that main building 21 entrucking transportations.
Preferably, the bottom of middle slide rail 43 is provided with elevator bucket 41 detent mechanisms that limit the position of elevator bucket 41 on middle slide rail 43.During work, get on the right track and be connected by bolt and bearing pin with the orbital plane of middle orbit, elevator bucket 41 under hoist engine drives along orbital plane scroll-up/down, improving material; During dismounting, first pull down aisle guardrail, aisle is folded and is fixed up to central rotation 90 degree by both sides, elevator bucket 41 is slided to middle orbit lower end simultaneously, and fixing in orbit by elevator bucket 41 detent mechanisms, turn on again get on the right track and middle orbit between connecting bolt, will get on the right track along connecting turn clockwise certain angle fixing of bearing pin, finally whole main building 21 modules are carried out to modularization vanning transportation.Elevator bucket 41 detent mechanisms can be connecting bolt, also can, for shop bolt etc., correspondingly, be provided with the bolt hole coordinating with connecting bolt or the pin hole coordinating with shop bolt on elevator bucket 41.
Preferably, the connection of the pipeline between feed proportioning system 10, conveying system, Weighing system 60, stirring system 20 and powder storehouse system 30 is articulation connection.Employing articulation connects, and is a kind of push-in jointing, can improve the efficiency of the installation and removal between pipeline and corresponding joint, has fully demonstrated the feature of quick mobile concrete mixing plant.
Weighing system 60 is separately positioned on proportioning machine 11, powder storehouse 31 and stirs in main building 212, for when carrying out concrete-agitating, material body being weighed, to material weight is controlled.
From above description, can find out, the above embodiments of the present invention have realized following technique effect: mobile concrete mixing plant comprises feed proportioning system, conveying system, Weighing system, stirring system and powder storehouse system, feed proportioning system comprises proportioning machine and is fixedly installed on the proportioning machine base rack of proportioning machine bottom, stirring system comprises main building and is fixedly installed on the main building base rack of main building bottom, powder storehouse system comprises powder storehouse and is fixedly installed on the powder storehouse base rack of bottom, powder storehouse, the first end of main building is fixedly connected on main building base rack, the unsettled setting of the second end of main building.By the various piece of mixing plant is carried out to modularized design, the various piece that makes mixing plant when installing without basis is set, the base rack that can directly have by itself arranges, therefore when transportation, each several part can be carried out to modularization transportation, and need not disassemble completely, when carrying out Construction Arrangement, only each system need to be fixedly installed by base rack, and assemble, therefore greatly improve the mounting or dismounting efficiency of mobile concrete mixing plant, reduced construction period and construction cost.
These are only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any modification of doing, be equal to replacement, improvement etc., within all should being included in protection scope of the present invention.

Claims (10)

1. a mobile concrete mixing plant, comprise feed proportioning system (10), conveying system, Weighing system (60), stirring system (20) and powder storehouse system (30), it is characterized in that, described feed proportioning system (10) comprises proportioning machine (11) and is fixedly installed on the proportioning machine base rack (12) of described proportioning machine (11) bottom, described stirring system (20) comprises main building (21) and is fixedly installed on the main building base rack (22) of described main building (21) bottom, described powder storehouse system (30) comprises powder storehouse (31) and is fixedly installed on the powder storehouse base rack (32) of bottom, described powder storehouse (31), the first end of described main building (21) is fixedly connected on described main building base rack (22), between described proportioning machine (11) and described proportioning machine base rack (12), between described main building (21) and described main building base rack (22), between described powder storehouse (31) and described powder storehouse base rack (32), be and removably connect, the unsettled setting of the second end of described main building (21),
Between described proportioning machine base rack (12) and described main building base rack (22) for removably connecting;
Described main building (21) comprises main building supporting leg (211) and stirs main building (212), described main building supporting leg (211) is removably fixedly installed on the first end of described main building base rack (22), the first end of described stirring main building (212) is removably fixedly connected on the top of described main building supporting leg (211), the unsettled setting of the second end of described stirring main building (212), the second end below of described stirring main building (212) is provided with hopper (213).
2. mobile concrete mixing plant according to claim 1, it is characterized in that, described conveying system comprises the aggregate lifting device (40) being arranged between the discharging opening of described proportioning machine (11) and the charging aperture of described stirring main building (212), and described aggregate lifting device (40) comprises the slide rail that is obliquely installed and is fixedly connected on described stirring main building (212) and is slidably disposed on the elevator bucket (41) on described slide rail.
3. mobile concrete mixing plant according to claim 2, it is characterized in that, described slide rail comprises slide rail (42), middle slide rail (43) and glidepath (44), described middle slide rail (43) is removably fixedly connected on described stirring main building (212), the upper end of described glidepath (44) is removably connected with described middle slide rail (43), described upper slide rail (42) is removably connected with described middle slide rail (43), and the chute surface of described upper slide rail (42), described middle slide rail (43) and described glidepath (44) flushes.
4. mobile concrete mixing plant according to claim 3, it is characterized in that, the upper end of described middle slide rail (43) is provided with the first connecting plate (431), the lower end of described upper slide rail (42) is provided with the second connecting plate (421), and described middle slide rail (43) is fixedly connected with described the second connecting plate (421) by described the first connecting plate (431) with described upper slide rail (42).
5. mobile concrete mixing plant according to claim 4, it is characterized in that, on described the first connecting plate (431) and described the second connecting plate (421), be also provided with bearing pin connecting hole, described upper slide rail (42) has the first syndeton being fixedly connected with described middle slide rail (43) and the second syndeton being connected rotationally with described middle slide rail (43).
6. mobile concrete mixing plant according to claim 3, is characterized in that, the bottom of described middle slide rail (43) is provided with the elevator bucket detent mechanism that limits the position of described elevator bucket (41) on described middle slide rail (43).
7. according to the mobile concrete mixing plant described in any one in claim 1 to 6, it is characterized in that, described mobile concrete mixing plant also comprises control room (23), described main building supporting leg (211) comprises a plurality of vertical supporting posts (214), and described control room (23) are fixedly installed between described a plurality of vertical supporting posts (214) in formed spatial accommodation.
8. mobile concrete mixing plant according to claim 7, is characterized in that, described control room (23) offer observation window (231) near on the sidewall of described hopper (213) one sides.
9. mobile concrete mixing plant according to claim 1, it is characterized in that, the pipeline connection between described feed proportioning system (10), conveying system, Weighing system (60), stirring system (20) and powder storehouse system (30) is articulation and connects.
10. according to the mobile concrete mixing plant described in any one in claim 1 to 6, it is characterized in that, described main building (21) also comprises the stirring host (215) being fixedly installed on described stirring main building (212), and described stirring host (215) is vertical shaft planet stirring main frame or Double-horizontal-shaft stirring host.
CN201210306469.9A 2012-08-24 2012-08-24 Movable concrete mixing plant Active CN102873762B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210306469.9A CN102873762B (en) 2012-08-24 2012-08-24 Movable concrete mixing plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210306469.9A CN102873762B (en) 2012-08-24 2012-08-24 Movable concrete mixing plant

Publications (2)

Publication Number Publication Date
CN102873762A CN102873762A (en) 2013-01-16
CN102873762B true CN102873762B (en) 2014-12-03

Family

ID=47475390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210306469.9A Active CN102873762B (en) 2012-08-24 2012-08-24 Movable concrete mixing plant

Country Status (1)

Country Link
CN (1) CN102873762B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103231454A (en) * 2013-04-25 2013-08-07 山东建设机械股份有限公司 Foundation-free concrete mixing station
CN103660040B (en) * 2013-12-10 2015-10-28 石家庄铁道大学 Quick mobile concrete mixing plant
CN103895106B (en) * 2014-04-28 2016-02-17 常州艾布纳机械有限公司 Packaged type mortar production device
CN105236142B (en) * 2014-06-24 2017-12-22 中联重科股份有限公司 Mixing plant and powder storehouse device thereof
CN104118061B (en) * 2014-07-24 2016-04-20 浙江瑞泰耐火材料科技有限公司 A kind of castable proportioner
US9969103B2 (en) * 2014-12-25 2018-05-15 Shenzhen Weihai Building Material Co., Ltd. Environmental-friendly mortar mixing robot
CN107150414B (en) * 2016-03-03 2022-11-29 珠海力准电子科技有限公司 Traction type commercial concrete mixing station
CN106217650B (en) * 2016-09-21 2018-04-10 泰安岳首筑路机械有限公司 Guide rail scale removes formula concrete mixing plant soon
CN109989320A (en) * 2019-04-30 2019-07-09 福建南方路面机械有限公司 A kind of fast assembling asphalt mixing plant
CN112590012B (en) * 2020-12-11 2022-04-05 北京榆构有限公司 Easy dismouting formula concrete mixing plant
CN114055633B (en) * 2021-11-18 2022-05-31 中建三局四川建筑装备有限公司 Modular mobile equipment for producing fluidized self-compacting solidified soil
CN115157454B (en) * 2022-06-22 2023-09-01 宁都县兴业机械制造有限公司 Foundation-free movable concrete mixing plant equipment

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2202628Y (en) * 1994-09-26 1995-07-05 湖南省建材机械厂 Concrete mixer
CN2308673Y (en) * 1997-08-13 1999-02-24 中国建筑二局洛阳建筑工程机械厂 Combined concrete agitation station
DE20203461U1 (en) * 2002-03-04 2003-07-10 Walter-Heilit Verkehrswegebau GmbH, 81677 München Transportable concrete mixer has bonding agent store and intermediate store, with top parts connecting, overflow and storage chambers
CN101011844A (en) * 2007-01-24 2007-08-08 三一重工股份有限公司 High-performance concrete mixing station
CN101659088A (en) * 2009-09-14 2010-03-03 三一重工股份有限公司 Steel structure mixing station base and implementation method thereof
CN201736350U (en) * 2010-06-02 2011-02-09 青岛科尼乐机械设备有限公司 Module quick-mounting mixing plant
CN201848927U (en) * 2009-12-10 2011-06-01 山东建设机械股份有限公司 Foundation-free concrete mixing station

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004268407A (en) * 2003-03-07 2004-09-30 Hitachi Constr Mach Co Ltd Ready-mixed concrete manufacturing apparatus

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2202628Y (en) * 1994-09-26 1995-07-05 湖南省建材机械厂 Concrete mixer
CN2308673Y (en) * 1997-08-13 1999-02-24 中国建筑二局洛阳建筑工程机械厂 Combined concrete agitation station
DE20203461U1 (en) * 2002-03-04 2003-07-10 Walter-Heilit Verkehrswegebau GmbH, 81677 München Transportable concrete mixer has bonding agent store and intermediate store, with top parts connecting, overflow and storage chambers
CN101011844A (en) * 2007-01-24 2007-08-08 三一重工股份有限公司 High-performance concrete mixing station
CN101659088A (en) * 2009-09-14 2010-03-03 三一重工股份有限公司 Steel structure mixing station base and implementation method thereof
CN201848927U (en) * 2009-12-10 2011-06-01 山东建设机械股份有限公司 Foundation-free concrete mixing station
CN201736350U (en) * 2010-06-02 2011-02-09 青岛科尼乐机械设备有限公司 Module quick-mounting mixing plant

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP特开2004-268407A 2004.09.30 *

Also Published As

Publication number Publication date
CN102873762A (en) 2013-01-16

Similar Documents

Publication Publication Date Title
CN102873762B (en) Movable concrete mixing plant
RU2668854C2 (en) System and method of delivering oilfield materials
CN202053383U (en) Concrete mixing plant
CN2515229Y (en) Standard container type bituminous mixture stirring apparatus
KR101208629B1 (en) Portable batcher plant
CN101391459A (en) Detachable mobile mixing station capable of loading in container
CN102189601A (en) Movable concrete mixing plant
CN106217650A (en) Formula concrete mixing plant removed soon by guide rail scale
CN201086354Y (en) Fast-assembling portable stirring station
CN107150414B (en) Traction type commercial concrete mixing station
CN201604215U (en) Movable mixing plant capable of being detached and loaded in container
CN205416035U (en) Remove grit feed proportioning system at stirring station
CN205416036U (en) Towed commodity concrete mixing plant
CN102528935B (en) Fast mounting mixing station main building and mixing station with same
CN107618102B (en) Movable modular cement production line
CN204800859U (en) Small -size concrete mixing plant
CN201279838Y (en) Main-building structure of mobile asphalt mixture blending plant
CN210758426U (en) Movable concrete mixing system
CN210453256U (en) Integrated form concrete mixing plant owner building
CN1079316C (en) Mobile batching plant
CN206374036U (en) Mobile filling formula trucd mixer
CN206085356U (en) Formula concrete mixing plant is removed soon to guide rail balance
CN211221421U (en) Hoister module and quick-assembly mixing station
CN210758480U (en) Vehicle-mounted concrete mixing plant
CN201769285U (en) Concrete mixing plant

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 415907, Hunan, Hanshou hi tech Industrial Park, Changde Huang Fu neighborhood committee, No. 1, Union Road

Patentee after: ZOOMLION HEAVY INDUSTRY SCIENCE&TECHNOLOGY Co.,Ltd.

Address before: 410013 Yuelu District, Hunan, silver basin Road, No. 361, No.

Patentee before: ZOOMLION HEAVY INDUSTRY SCIENCE&TECHNOLOGY Co.,Ltd.