CN102872582A - Ball game method imitating modern warfare game form, and facility system thereof - Google Patents

Ball game method imitating modern warfare game form, and facility system thereof Download PDF

Info

Publication number
CN102872582A
CN102872582A CN 201110195004 CN201110195004A CN102872582A CN 102872582 A CN102872582 A CN 102872582A CN 201110195004 CN201110195004 CN 201110195004 CN 201110195004 A CN201110195004 A CN 201110195004A CN 102872582 A CN102872582 A CN 102872582A
Authority
CN
China
Prior art keywords
goal
altitude
court
ball
attack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110195004
Other languages
Chinese (zh)
Inventor
孟杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201110195004 priority Critical patent/CN102872582A/en
Publication of CN102872582A publication Critical patent/CN102872582A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Toys (AREA)

Abstract

The invention relates to a ball game method imitating the modern warfare game form, and a facility system thereof. In the invention, the arrangement of a corresponding high-altitude goal system makes an attacker attack the high-altitude goal (in a single direction) in a direct confrontation case and goal to score and also makes players and a match ball freely move to and from a space under the high-altitude goal system to realize continuous field transition in order to form effective attacks (re-attacks) and defenses, so the sport game form imitating the space war of the modern warfare is constructed; and the arrangements of low-altitude goal systems at two ends of a playfield and in other suitable positions make the attacker attack the low-altitude goal systems of the opposite side directly or after the realization of high-altitude goal scoring, so the whole ball game process obviously imitates the complete modern warfare of space, air, ground and sea integration. The method substantially improves the sport and game wonderfulness and enhances people's understanding and awareness of the modern warfare, so the method is a new physical culture form highly combining the intelligence with the body.

Description

A kind of ball game method and facility system thereof of imitative modern-war form
Affiliated technical field
Belong to ball game and sports equipment field.
Background technology
The main ball game that contemporary world is carried out: such as football, basketball, vollyball, rugby, handballs etc. all produce and are ripe in 18, modern western society before and after the 19th-century, its all with the Modern West industrialization at the beginning of social economy, social life and culture adapt with consistent, the mode of its sports all is mainly the game on the utmost point low spatial of ground and ground proximity, what mainly take in the motion is soil and space on the horizontal direction, particularly the required site area of the motion such as football and rugby is very large, but society's land used of this and contemporary many countries and regions and nervous situation thereof form great contradiction, are restricting carrying out of relevant motion; Both made simultaneously and resembled the modern soccer motion that is called as the first in the world motion, obvious not enough situation that it can show also in the many important top races in the world that competition scenes are excellent not, heat is uninteresting etc. is changed and is transformed into people's thinking and the important topic of exploring accordingly; They are three years old, contemporary society is in economy, science and technology, the material view, the life culture form, at the beginning of all many-sides such as the consciousness structure of knowledge etc. and the modern industry so certain era thereafter formed great difference and different, if with 18,19 centuries such as grade were called ocean century, the ocean epoch, that 21st century then can be called the empty day epoch, empty day century, empty day epoch, space was explored by society, people go frequently in Gao Tian, look at the sky frequently, look up blue sky, look up high buildings and large mansions, the human lives in empty day epoch has larger height and abundanter content request with culture in space existence and spatial perception, the most crucial game technology that empty day game technology and game culture become the epoch and one of culture, as most important physical culture game culture and one of form, ball game contemporary and following century should break through the limitation of traditional ground game, embody new times flavour and requirements of the times, and then create include more excellent, more modern high-flying attack, the high-altitude competition, the new ball game mode of the content of high-altitude game and form, the game content that also makes simultaneously the modern main ball game that comes from the west and form reveal new higher in succession and in innovating, brighter brightness.
The ball game such as football are called the war of peace sometimes by people, this illustrates that its competitive way has the characteristics of stronger approximate wargame, and in modern times and future war, space warfare (air battle, day war) more and more becomes first-selected with first war form, the decision meaning that more and more has left and right sides victory or defeat, if do not make empty day ability, in whole war, situation passive and vulnerable to attack will be unable to escape, and the game form of the empty day Great War of modern war and the key character that game method should be called the present age and following many ball game can be embodied preferably.
The main ball game itself that comprises football of now carrying out all differs far, is difficult to contact directly apart from the game form of empty day Great War formula of modern war; In the Cuju motion of the high-altitude simple gate form that ancient Chinese was once carried out, can obtain the enlightenment of " high-altitude " ball game, but its game both sides' indirect antagonism, sportsman's place restriction etc. are had a greatly reduced quality the excellence of its game and value, we can get, and it is desirable, abandon its deficiency, realize innovation and breakthrough.
Modern war also can not break away from land and waters forever, does not have continental rise and sea base basis, and an empty day system will lose support; Do not have the triumph of land battle and sea warfare, the triumph of whole war also can be that incomplete, complete modern war is the supersolid war that contains complete land, ocean, sky, huge three-dimensional system.The game form of imitating the ball game of this supersolid war should include game method and the process of ground ball type games simultaneously, the elite of succession, reference and the modern various ground type ball game of extensively carrying out of absorption is with excellent, not only can make the ball game of the innovation of future tense have real powerful basis, also more meet inherent law and the requirement of ball game progress simultaneously.
The purpose of innovation and creation
The objective of the invention is to provide a kind of method that includes the ball game of " high-altitude formula " the game form that can be bordering on the empty day Great War of imitative modern war, certainly it also can comprise, merges and innovate form and the content of the ball game of the modern all kinds of ground type games of extensively carrying out simultaneously, thus create more excellent, more scientific, also more real, have more education and inspiration new physical culture game and the form of culture that adapts with new era development meaning.It not only can promote the common people's physique and life taste with teaching through lively activities, make the common people participate in and view and admire obtain the game forms such as modern war in the more excellent athletic competition perception with cognitive, it is very not enough also can to adapt to well simultaneously the physical site of facing with solution modern city and social development, and the large place such as football sports events is popularized circumstances and problem difficult, excellent difficulty.
Technical scheme and beneficial effect
The object of the present invention is achieved like this: at first, comprise in the facility system of ball game method of the present invention and be provided with the signified satellite with high height that can be in central space zone, court, guided missile spatial movement track-missile trajectory, attack at least one goal, high-altitude and high-altitude goal system with the rum point of interception guided missile-anti-ballistic node etc., have high height and the lower end of the high-altitude goal system of the complete unsettled setting of trying one's best should be able to guarantee normal sportsman during the games apart from the distance of court surface (water surface), official ball and even sportsman take advantage of carries that instrument---first-class can making things convenient for freely passes through the vessel car.
But the sportsman not only can pass through the goal, high-altitude and score by making the motion of ball on from the one's own side court to the opponents' court direction in the situation of facedown in the match, can also make sportsman and official ball etc. freely travel to and fro between the below of high-altitude goal system and realize cutting to quickly and easily, with continuous formation new effective attack and defence, thereby constructed the game form of ball game of the excellence of the sky sky Great War that can be bordering on imitative modern war.
When a high-altitude goal system that is on the midfield only was set, the sportsman both can squeeze into opponents' court and score with ball by the goal, high-altitude of midfield by corresponding attack in one's own side's court; Again can be in the other side's court prevent that by corresponding defence behavior the other side from squeezing into the one's own side court with ball by the goal, high-altitude and do not lose points; When needing that ball is reached the one's own side court after the opponents' court ball-handling, the sportsman could attack again the goal, high-altitude, and then make the motion of ball on from the one's own side court to the opponents' court direction by the goal, high-altitude and score, a kind of special situation is: near the other side's one side that the sportsman can be the juncture area of both sides court by the modes such as banana kick also can make ball aloft with the motion on from the one's own side court to the opponents' court direction by the goal, high-altitude, so also can remember minute;
Arranging in the situation of two and a plurality of high-altitudes goal system, thus grand occasion and advantage that both sides all can start continuously the attack manufacturing to goal, more high-altitudes forward to score continuously, run; Simultaneously can also stipulate that as required the sportsman still can in time return ball under some high-altitude goal system, and then forward new attack is started at these goals, high-altitude again, thereby realize the continual attack of passback formula and the situation of running;
Above-mentioned multiple tactics of attacking forward again after signifying satellite, missile trajectory and other sky temmoku target high-altitude goal system and can implementing continuously forward attack and passback makes ball game method of the present invention have the unique advantage of the empty day Great War of good simulation modern war.
They are two years old, for reflecting all sidedly and imitate the overall picture of modern war, corresponding with the high-altitude goal system that central region top in court arranges, near the positions such as the outside in the court the two ends in court can add existing goal football, the handball door, rugby golf, the low latitude goal system of the existing forms such as basketball ball frame and the low latitude goal system of other new innovation form, thereby make the sportsman both can in one's own side's court, make ball squeeze into opponents' court and score by the goal, high-altitude by corresponding high-flying attack behavior, can continue to get ball after the score, ball-handling, attack again the other side's goal, low latitude, thereby create the meeting of more multimachine and the effect of in an attack, running; Also can select by ball directly being shot the other side low latitude goal system or ball being phoresied to opponents' court by the below of high-altitude goal system ball is shot the other side low latitude goal system and score more first.
In the court of sportsman one's own side, by corresponding attack ball is squeezed into opponents' court by the goal, high-altitude and after the score, if offense sportsman continues to get ball at opponents' court, then can be further in opponents' court directtissima the other side's low latitude goal system, or select to pass ball back own half and again attack the high-altitude goal system, thereby chance and the effect that all can create continuous attack, run; When making great efforts attack, the sportsman should take precautions against the opposing team and get ball and directtissima one's own side's low latitude goal system in the one's own side court, takes precautions against again opposing team directtissima high-altitude goal system or one's own side court attack one's own side's the goal, low latitude of driving straight in after opponents' court gets ball; Both sides' attack with the defence all be three-dimensional, multizone, multi-level, also all be can plan more, more options, diverse; In whole match, realize that more ball-handling chance just can grasp the initiative of game more, thereby select a good opportunity and create more chance attack score, reduce simultaneously the other side's threat and open goal; In whole match, realize that more ball-handling chance just can grasp the initiative of game more, thereby select a good opportunity and create more chance attack score, reduce simultaneously the other side's threat and open goal.
In ball war and game, be good at land battle person, can walk ground more, attack goal, the other side low latitude more; Be good at air battle person, can walk sky more, attack goal, the other side high-altitude more; Land battle, air battle be kind person all, can select a good opportunity and move, wound machine and going, strive for the combat success of maximum;
Three, as required, T-ground section zone also can add the low latitude goal system of suitable form, also can establish the high-altitude goal system of suitable form at the two ends, court, thereby can make middle part, court, the attack at two ends, court and form and the content of game become more rich and varied.
Different goal, high-altitude forms and different goal, low latitude forms can be set as required, simultaneously according to the complexity of scoring not square one set different high-altitudes score value and the different low latitudes score value of scoring to get of scoring to get, the high person of various goal total mark score values is the winner in the whole match.
Combined type goal and other the new suitable goal form that contains simultaneously big or small goal also can be adopted in set goal, low latitude, court.
Basic skills and the facility system thereof of the grand formula ball game of war of the above-mentioned space warfare feature that can embody preferably and reflect modern war, can merge mutually, adapt with now ongoing various ball motion, thereby design and create the grand formula football of war, the grand formula handball of war, the grand Touch Rugby of fighting, the grand formula basketball of war, the grand formula water polo of war and other all multi-form brand-new ball game method and the facility system thereof that can be bordering on imitative modern-war form.
Above-mentioned new ball war system, ball war game method and game process can become that important military sports is combined, one of the construction form of the advanced person's of manufacturing products for both peacetime and wartime us modern cultural and construction content.
Description of drawings
Situation as shown in Figure of description 1-11 page or leaf:
Fig. 1 a in the accompanying drawing 1, Fig. 1 b, Fig. 1 c are respectively a kind of court of a high-altitude goal system and front view, top view, side views of facility system thereof of containing.
Fig. 2 a in the accompanying drawing 2, Fig. 2 b, Fig. 2 c are respectively a kind of court of two high-altitude goal system and front view, top view, side views of facility system thereof of containing.
Accompanying drawing 3 is a kind of court of the high-altitude goal system that contains horizontal arched framework and the stereogram of facility system thereof.
Accompanying drawing 4 is a kind of court of three high-altitude goal system and stereograms of facility system thereof of containing.
Accompanying drawing 5 is a kind of court of basket type high-altitude goal system and front views of facility system thereof of containing.
Accompanying drawing 6 is that a kind of T-ground section zone is provided with the court of high-altitude goal system and low latitude goal system and the stereogram of facility system thereof simultaneously.
Fig. 7 a in the accompanying drawing 7, Fig. 7 b, Fig. 7 c a kind ofly arrange the court of a plurality of high-altitudes goal system and front view, top view, the side view of facility system thereof at longitudinal arched skeleton.
Fig. 8 a in the accompanying drawing 8, Fig. 8 b, Fig. 8 c view situation when to be respectively some multi-form high-altitude goal system of reflection be located among the court with multi-form low latitude goal system is same.
Fig. 9 a in the accompanying drawing 9, Fig. 9 b, Fig. 9 c are respectively a kind of view situations that contains the goal of the soft block structure of weight-curtain falling type and contain the goal of the soft block structure of spring-curtain falling type.
Figure 10 a in the accompanying drawing 10, Figure 10 b, Figure 10 c, Figure 10 d, Figure 10 e, Figure 10 f be respectively a kind of round target formula goal employing level, vertically, front view and the top view of the three kinds of different set-up modes that tilt.
Accompanying drawing 11a, accompanying drawing 11b are respectively front view and the side views of a kind of ballistic high-altitude goal system.
Accompanying drawing 12a, accompanying drawing 12b are respectively a kind of front view and side views of room cage type court facility system of high tower form of guided missile moulding.
Figure 13 a in the accompanying drawing 13, Figure 13 b, Figure 13 c are respectively front view, top view, the side views of the room cage type court facility system of a kind of ridge room form.
Figure 14 a in the accompanying drawing 14, Figure 14 b, Figure 14 c are respectively front view, top view, the side views of the room cage type court facility system of a kind of " cage in the cage " form.
Figure 15 a in the accompanying drawing 15, Figure 15 b, Figure 15 c are respectively a kind of front view, top view, side views of being located at the room cage type court facility system on the vessel.
Figure 16 a in the accompanying drawing 16, Figure 16 b, Figure 16 c are respectively front view, top view, the side views that vessel is used in a kind of ball war that is provided with goal system.
The specific embodiment
Below from a plurality of broad aspect the specific embodiment of ball game method of the present invention and facility system thereof and example thereof etc. are set forth respectively.
The first, more more specifically method and the process of the facilities of the basic comprising of high-altitude goal system and T-ground and corresponding ball game are:
At first, the high-altitude goal system can be by at least one goal, high-altitude 1, goal, high-altitude skeleton 2, can select goal, the high-altitude Intranet 3 that adopts with goal, high-altitude outer net 4, the outer network framework 5 in goal, high-altitude, play support, suspend the compositions such as connecting framework 6 that whole high-altitude goal system etc. acts in midair; Connecting framework 6 grades can be rigid structure and also can be inflatable structure; Goal, high-altitude etc. can be set as the adjustable version of height, thereby can become as required the goal, low latitude, the version of also can be set as the energy easy disassembly, packing up etc.(situation as shown in accompanying drawing 1,2,3,4 etc.).
When whole court arranges a high-altitude goal system, this high-altitude goal system can be located at the whole court of five equilibrium court center line 7 directly over, the court center line and on the high-altitude goal system whole court and space thereof are divided into two, in the match, both sides can only attack from one's own side's one side direction the other side direction the high-altitude goal system of zone line, shoot goal postscript score, certainly in the situation that is provided with the low latitude goal system, both sides all can catch and create openings realizes minute other effective attack to goal, high-altitude and goal, the other side low latitude.(situation as shown in accompanying drawing 1,3 etc.).
When two high-altitude goal system are set, they can be located on court center line 7 the both sides corresponding position and space symmetrically, thereby can form midfield and space, midfield between two high-altitude goal system, midfield and both sides, space, midfield then can be regarded as respectively one's own side court, space, one's own side court and opponents' court, opponents' court space.(situation as shown in Figure 2).
In the match, both can stipulate: both sides all can select simultaneously and attack above-mentioned two high-altitude goal system from comprising the one's own side's one side direction the other side direction that is in midfield and one's own side court, shoot goal, corresponding high-altitude and can all remember minute; Also can stipulate as required: both sides only have and just remember when comprising that the one's own side's one side direction the other side direction that is in midfield and one's own side court is shot the goal, high-altitude in opponents' court forward position minute, have a mind to this moment or when being not intended to make ball from the one's own side court to the high-altitude goal of the other side's direction by forward position, one's own side court, can both not include score, also not very error, and only be considered as the pass behavior.
When two above high-altitude goal system are set, except symmetrically balanced laying, both can take orientation to shoot the equal score in goal, used high-altitude in the match, the game method that also can adopt the goal, part high-altitude of only shooting near the other side's one side just to remember minute, other goal can only be considered as the behavior of passing normally.(situation as shown in accompanying drawing 4,7).
As required, can in the larger space, court of standard football pitch and other area, three high-altitude goal system be set simultaneously, its adoptable set-up mode is: establish high-altitude, midfield goal system directly over the T-ground line 7, simultaneously establish respectively symmetrical each other front court high-altitude goal system and a back court high-altitude goal system on the suitable distance of goal system both sides, high-altitude, midfield and suitable locational space again.(situation as shown in Figure 7).
Arranging in the situation of two and plural high-altitude goal system, when thereby the high-altitude goal of ball by disregarding score directly shot again the goal of remembering minute aloft and formed the high-altitude and drop in goal, can be considered effectively and efficient the goal, can remember minute even can remember higher score; When ball continues to pass through two and a plurality ofly remember that point goal forms a high-altitude and drops in when scoring aloft, can remember the accumulated value that respectively is broken goal, even can be on the basis of above-mentioned accumulated value above-mentioned high-altitude be dropped in to score to increase and reward score.
Be provided with in one, two, two the various situations with the high-altitude goal system of first-class varying number above-mentioned, when shooting goal, a high-altitude and even directly shoot again goal, the other side low latitude after the high-altitude continues to pass through goal, more high-altitude, ball forms height empty string croquet, also can not only remember the accumulated value of each goal this moment, also can further increase corresponding award score.
As required, can all establish web frame 4 outside the goal, corresponding high-altitude on each high-altitude goal system in the above-mentioned situation; Web frame 4 can cut down the attack ball that very big part trains off outside the goal, thereby make the offense not only can't score also can create the chance that obtains ball and counterattack fast for the other side, thereby make the dual character that the attack of high-altitude goal system is had score and risk coexistence, the accurate ability of its attack for the offense and attack effect propose higher requirement.(situation as shown in accompanying drawing 1,2,3,4,7 etc.).
Web frame 4 can be likened the empty day systems of defense such as missile shield in the modern war approx to outside above-mentioned each goal, high-altitude, although it can not remove to tackle the ball of the attack of squeezing into the goal, high-altitude on one's own initiative, but its interception for the ball of the attack that trains off can become more general situation, and for very proper to and the high-altitude ball of dropping in accurately, the special goals such as height empty string croquet, the continuous inefficacy of the empty day system of defense of goal, high-altitude outer net type can be very special situation, certainly as required, by enlarging the goal, high-altitude, reduce goal, high-altitude height, be conducive to the continuously design of the attack track of goal, the above-mentioned chance of scoring of dropping in is increased significantly, can ask and attainable strike sharp weapon thereby the goal of dropping in that high score and high-quality are attacked becomes.
As required, also can not establish web frame outside the goal on the high-altitude goal system in the above-mentioned situation, the ball that trains off only can be cut down or keep off back by goal, high-altitude skeleton 2 grades in situation seldom, the ball of the attack that in most cases trains off can be outside the goal, high-altitude the forwards court that falls, the invalid space of passing goal system region, high-altitude, even this moment to the risk of attacks of high-altitude goal system is less can not be directly by high-altitude goal score, also can be for the attack of the other side low latitude goal system being created the chance near aspects such as distances.(situations as shown in accompanying drawing 6 grades).
Above-mentioned selection of establishing a high-altitude goal system more is suitable for the situation of court horizontal space size less; At many levels, the setting of multiple tracks high-altitude goal system is then applicable to the larger situation of court horizontal space depth.
Because the existence of the high-altitude goal system between the low latitude goal system that is in the two ends, court is arranged, the offense in the one's own side court and midfield zone wait when controlling ball, both can select nearby the high-altitude goal system to be attacked, thereby can transfer the other side has to the sportsman of necessary amount is used for the front court, the defence of midfield, contention and preparation counteroffensive, it is less to be chosen in again the opponents' court number of player, in the situation a little less than the defence, drive straight in suddenly, enforcement reaches magical game process and plot to the rapidly and efficiently strike of the other side low latitude goal system thereby create excellent attack scene.
Certainly, besieging the other side low latitude goal system, thereby when making the other side that the sportsman more is used for the defence at its goal, low latitude, attacking and defending also can return ball suddenly, thereby cause the other side is defendd the relatively favourable attack situation of the high-altitude goal system of weakening, after successfully rushing out above-mentioned back thrust and realizing high-altitude goal and score, the offense also can continue to select to attack goal, the other side low latitude or again threaten the other side high-altitude goal system with forms such as back thrust, or the continuation high-altitude scores the goal, or again transfer the other side etc., the grand formula ball game of whole war is full of changes and entertaining, also value such as more creative and inspiration.
As required, if the offense goes smoothly with directtissima and the above-mentioned modes such as back thrust in real racetrack, after breaking through goal, high-altitude and score, can limit it and again carry out score in the mode of above-mentioned back thrust, and the offense can only be relied on forward attack goal, the other side low latitude and increase score, this kind situation, the high-altitude target that can be similar to enemy in the actual war was attacked hit and was destroyed by last time, again hit without actual capabilities or value; On the other hand, repeatedly attack the goal, high-altitude in the mode of back thrust and continuous score if continue the allowance offense, then can be similar to the enemy and have more high-altitude target and can be attacked and destroy, also be fine, just may be unfavorable for like this refining and optimizing of whole ball game game process; Certainly can in real racetrack, constantly obtain continuously ball, ball-handling, rush out back thrust until to create at last the situation of scoring in continuous high-altitude also be difficult continuously, so also can not carry out the restriction of any systematicness to it, all at one's discretion the field player freely strive for and create.
In the grand formula ball game of war, can realize that a side of efficient ball-handling will obtain great battlefield supremacy, thereby be in game status extremely initiatively, it can have purpose, rhythm is arranged, have and freely select and transfer the other side---and soldier the other side that cutting edge of a knife or a sword is instigated has to be guarded against that the sudden change of soldier's cutting edge of a knife or a sword makes the other side hard to guard against; All the time the strategy that is in defends a side of status to be transferred by the other side more with the battlefield, is in status passive and vulnerable to attack, loses more the goal bitterly and striking out at last.
Offense's efficient possession of the ball is exactly battlefield supremacy, can transfer exactly the other side's power, can create exactly the right of good attack and scoring opportunity, the power of getting the upper hand of exactly!
The good countercharge ball ability of defence is exactly the strategic containing ability in battlefield, strategic counterforce capability, thus change from passive to active exactly countercharge the other side, the anti-ability that wins the other side.
" ball-handling, variation and transfer the other side, creation attack good opportunity---countercharge ball, anti-transfer, the anti-goalscoring opportunity of creating " will become substance and the process of court game, and grasp good opportunity, one arrow hits, an arrow punching, become get the upper hand of into combat success then becomes link with the most critical of final hit of good opportunity, this link is not good, and all that has been achieved is spoiled!
When containing the version at compound goal 8 at large and small goal of " with the handsome account formula of door " when the low latitude goal system is configured to simultaneously, the danger that the handsome account formula of the high score of the one sword life heart is scored also will cause defence and the difficulty of selecting for the defender, also become simultaneously attacking and defending and transfer one of important dependence of defence, the defence of adding the high-altitude goal system with can attack, that the grand formula ball game of whole war will become will be the combination of intelligence height, that technology and tactics equal altitudes are unified, comprehensively color, integration capability represent extremely strongly Great Game.(situation as shown in accompanying drawing 1,2 etc.).
Fight in the grand formula football according to condition and needs in part, some goals, low latitude, particularly can adopt the not contest method take the pin goal as goal for the larger goal in the combined type goal, to avoid competition area too small, big foot shooting easily damages and shoots the situations such as larger goal is too easy, because the existence at goal, high-altitude is arranged, more high-altitude falling sphere will appear on the field, people can be by potential energy and the speed of lower falling sphere, other position with health heads into ball more, gear enters, push larger goal and score, certainly the little goal of size that arranges for the low latitude, such as the little goal in the compound goal, can adopt take the pin attack and score simultaneously calculation as the contest method of effective score.
In the grand formula football of war, can adopt various attacks mode and the footworks such as flip shot, backward flight, side fly to the attack at goal, high-altitude.
In some fight grand formula ball game, even can adopt people's ladder type, the formula of leaping high, throw that phoresy in the high-altitude such as people's formula, the offensive pattern of high-flying attack, be summarized as follows:
1, people's ladder type high-flying attack method: near the goal system of high-altitude or other sportsman of suitable space place climb up after being consisted of helper by one's own side sportsman or occuping on the helper to get ball after getting ball, thereby the chance that hit in people's ladder type high-altitude that formation makes the other side be difficult to defend, so that the possibility of scoring in the high-altitude improves greatly.
2, the formula high-flying attack method of leaping high: the sportsman can be take one's own side team member as fulcrum, the height, the boosting strength of while by the teammate that promote own upper punch starting point by " trampling " one's own side team member realize jumping up and aerial stop of maximum possible height, and implement in this course that the other side is difficult to defend and apart from the distance at goal, high-altitude also can be nearer efficient attack, it also can be called bed hedgehopping formula tactics, step on people's formula tactics etc. of jumping up.
3, throw people's formula tactics: the sportsman is mainly thrown in the air by teammate's strength, thereby obtains to have accordingly the attack altitude and attack position of advantage, thereby it also can be described as the people and plays method, people's arrow formula tactics etc.
Above-mentioned high-altitude tactics can make the attacker obtain chance and the advantage of favourable high-flying attack, then can be relative passive if the defender wants to organize corresponding Deep Air Defence and halting to take action, easily lag behind on time, effectively the locus of block also is difficult to hold, thereby the attacker is hit the high-altitude at goal, high-altitude easily to go smoothly, certainly the attacker also can pay for this reason larger personnel too concentrate with physical consumption can be larger etc. the cost of aspect, its ground gets ball again if attack is accidentally dropped, the chance of ball-handling can reduce, thereby obtain the preferably chance of counterattack for the other side easily, so above-mentioned high-altitude tactics is both favourable fraud arranged also, to be the utilization that will realize high level be down to minimum with risk that will failure etc. key.
The high-altitude tactics of above-mentioned form, can be applicable to fight among the grand formula ball game of war such as grand formula handball, war grand formula basketball, the grand Touch Rugby of fighting, the grand formula football of war, it will make the game scene of the grand formula ball game of war have more three-dimensional color, more be imbued with spatial impression, will further promote the excellence, technical and ornamental of whole motion.
The second, be described as follows about the concrete structure of whole high-altitude goal system and on impact of concrete methods of ball game etc. etc.:
At first, the setting principle of high-altitude goal system concrete structure should be: on the one hand the setting of goal, high-altitude and system thereof should be able to reflect the needs that can facilitate the various inherences that the ball game of high-altitude target formula carries out better best, make its rule that inherence that fully meets motion itself is set and requirement, emphasize the independence of the inherence that the high-altitude goal system arranges and to the material impact of low latitude goal system and whole motion each side; The form of high-altitude goal system etc. also should adapt with the ball game such as existing football, rugby, basketball, handball and the goal system that adopts thereof on the other hand, so that new ball game and game process can be connected mutually, coordinate mutually with existing ball game mode better and unified.
Two, the high-altitude goal system structure with arrange some more specifically situation be respectively described below:
(1), the lower end etc. of the connecting framework 6 of high-altitude goal system is located at outside the whole court as far as possible, to form accessible court, low latitude.
(2), connecting framework 6 can adopt the version of arch, and the structures such as skeleton of bottom, domes two ends are in outside the court, to form accessible court, low latitude, the other parts of high-altitude goal system can be located at below, top and other suitable place of arch connecting framework, and can adopt and optionally can adjust the version that height and position are set.
As required, can adopt the horizontal arch connecting framework 601 that parallels with the court center line.(situation as shown in accompanying drawing 1,3 etc.).
As required, also can adopt the longitudinal arched connecting framework 602 perpendicular with the court center line, establish at least one high-altitude goal system in the suitable location of longitudinal arched connecting framework 602; The skeleton structure of bottom, longitudinal arched connecting framework 602 two ends can with skeleton structure integrated design and the setting of the low latitude goal system at two ends, court; Longitudinal arched connecting framework 602 can adopt the various structures forms such as single arch formula skeleton of closely paralleling, double-arc skeleton, multiple arch formula skeleton.(situation as shown in Figure 7).
When longitudinal arched skeleton structures such as double-arc that employing parallels, can consider to make two distances between the longitudinal framework that parallels close even identical with the width of the skeleton at goal, low latitude, bottom, two ends 9, can make the setting of total system more reasonable thus, more efficient.(situation as shown in Figure 7).
(3), at some in particular cases, excessive as working as dimension of the court, directly arrange and stride than accessible court, the low latitude of large space structurally during difficult, high cost, can consider the connecting framework of the high-altitude goal system of the forms such as brace type that on court magnitude setting is the least possible, such as open side type connecting framework 603 of only containing a corbeling etc., if establish two supporting constructions, then can consider to make it can consist of the function of the skeleton structure with needed certain goal, low latitude simultaneously.(situations as shown in accompanying drawing 6 grades).
Other parts of connecting framework structure 604, goal, high-altitude and the high-altitude goal system that (4), can adopt supporting construction to add crossbeam to add the versions such as suspension cable can be hung on the supporting construction 604a of both sides; On crossbeam above also can being hung on, the suspended-cable structure 604b etc.; The supporting construction 604a of both sides and above crossbeam, suspended-cable structure 604b etc. on optionally setting tool sunshade is arranged, the barrier structure 604C of the effect such as take shelter from rain.(situation as shown in accompanying drawing 2,4 etc.).
(5), can consider to establish the aerial chinampa of main dependence aerostatic buoyancy and gravity that other aerial floating structure is born the high-altitude goal system etc., its concrete mode can be:
A, the goal, high-altitude is hung at independently on the aerial chinampa by certain syndeton.
B, with aerial goal skeleton and air ball outdoors network framework etc. be set as the version with certain aerial buoyancy, and they are had can further take on balanced ball outdoors net, the location isostructural part of stay cord and even whole abilities of gravity.
C, location structure of tow line are located in the air to the other parts of aerial chinampa and high-altitude goal system, and make them have the ability that to bear certain wind-force interference, the location structure of tow line can lightweight material consists of by intensity is high, locate as required structure of tow line and also can be designed to have the version of certain buoyancy, as adopt by low density material consist of in fill low density gas tubular style version etc.
(6), the high-altitude goal system can adopt the version that contains goal, high-altitude outer net 4, such as goal, middle high-altitude that contains goal outer net form of ancient Chinese etc., goal, high-altitude outer net 4 is near the certain space of goal, high-altitude skeleton 2 peripheries, and can hang on outside goal, high-altitude skeleton 2 and the goal, high-altitude between the network framework 5, network framework 5 and goal, whole high-altitude outer net 4 can be set as the various shape forms such as rhombus, (length) be square, semicircle, oval, circular outside the goal, high-altitude.(certain situation as shown in accompanying drawing 1,2,3 etc.).
Goal, high-altitude outer net 4 can be blocked and be got to official ball near the periphery of goal, high-altitude the certain space, thereby making the offense have may keep off back when the ball of attack trains off to the attack at goal, high-altitude is conducive to the other side and obtains ball and create the quick abnormal risk such as chance of counterattacking, size that the size of certain this risk also arranges area with size, height and the goal outer net at goal, high-altitude etc. is relevant, thus its also be can select, programmable.
In the match, official ball can be squeezed into the goal and score, also can be returned by bounce-back because hitting the goal outer net, thereby make attack to the high-altitude goal system have favourable goal score and disadvantageously the opposite result such as be blocked, locate to make the attacker will have higher attack level and implement careful attack.
(7), the high-altitude goal system also can adopt the version that does not contain the goal outer net, as be similar to English, the set-up mode of the forms such as American football door, in such cases, even fail to squeeze into the goal and score when attacking the goal, ball also can pass the high-altitude goal system and forward outside the skeleton of goal, to the direction motion away from one's own side's goal, low latitude etc., thereby the probability of the situation appearance that is unfavorable for accordingly one's own side is reduced greatly, the situation that causes ball to be rebounded to return as long as avoid hitting goal, high-altitude skeleton 2 grades as far as possible, both sides all can implement more attack to the high-altitude goal system with lower risk.
(8), imitative basketball goal formula: its can be divided into again have the backboard formula with without the backboard formula.(as shown in Figure 5).
Have that backboard Shi-it can be similar to the version of the basketball device system of backboard, just it can arrange relatively symmetrically in backboard 10 both sides at least two basket structures 11 and backboard and basket structure and is on the space, court with high height position as the important component part of high-altitude goal system.
Without backboard formula-at least one basket structure directly is located on the connecting framework 12 of high-altitude goal system.
No matter the backboard formula is arranged or without the backboard formula, its bottom of playing the skeleton structure system of the connection functions such as support all can be located at outside the court, to be formed with accessible court, the low latitude that is beneficial to motion system.
As required, high-altitude basketry skeleton both can be horizontally disposed with, also can with the setting that has a certain degree of horizontal plane shape, the form that arranges such as the basketry skeleton 13 that can form the high outside and low outside formula that to score more easily, the syndeton of the outer upper end of the basketry skeleton 13 of two high outside and low outside formulas that be symmetrically set this moment can be handed in a distance, top, can closely be the shape form of placed arrow type thereby can form the side-looking projection.
As required, it is the basketry skeleton structure of a level that the basketry skeleton structure of two levels that are symmetrically set can " unite two into one ", and the corresponding syndeton of high-altitude goal system can connect in the mode of symmetry this horizontal basketry skeleton structure; It is a vertical basketry skeleton structure 14 that above-mentioned two symmetrical basketry skeleton structures that are obliquely installed can " unite two into one ", and the backstop structure 15 with abilities such as certain deceleration and demonstrations of the effect forms such as curtain falling type identical with traditional basketry linked network can be set in the vertical basketry skeleton 14.
The basketry skeleton both can be positive circular formula, also can be ellipse and other suitable shape and form.
The set-up mode that is similar to above-mentioned basketball basketry also can be adopted in the goal, high-altitude of the ball game of other types, can optionally be set as level, inclination, the various ways such as vertical.
(9), the connecting framework structure 6 of high-altitude goal system can be set as the version that can connect dissimilar goals, high-altitude, thereby on space, same court, can select easily to arrange dissimilar goals, high-altitude, to carry out the ball game of different modes and form.
As required, in same ball game, can adopt simultaneously suitable dissimilar goal, high-altitude.
In the situation that is provided with many covers high-altitude goal system, on the different goal system identical goal type and form can be set simultaneously, also not identical goal type and form can be set simultaneously, to strengthen diversity, variability and the excellent degree of heat and content.
(10), on the goal system of high-altitude, can establish at least goal, a center, in the time of need to a plurality of goal being set, can about the goal, center so that on the following peripheral size of establishing some peripheral goals, peripheral goal and form can identical with the goal, center, also can be different.(situation shown in accompanying drawing 8a).
As required, on the contrary the large I at goal, center and other each goal adopt near the nearlyer goal, position at goal, center can be larger can be less etc. the difference method to set up.
As required, on the goal, high-altitude of the forms such as rectangle, rhombus, ellipse outer net 4, can become the mode of the layout such as cross that some goals are set.(situation shown in accompanying drawing 8b).
(11), electric hoist high-altitude goal system can be set as required, it can be by being made of the larger a plurality of goal that distributes to less excessive similar calabash shaped respectively successively from the bottom to top, when shooting highly lower and larger goal, bottom, can remember less score, when shooting highly higher and less goal, top, can remember larger score, it is less to form thus the goal of more easily shooting, the difficult larger game form that more meets the game principle and the game situation of goal of shooting.
Both sides at some goals of the above-mentioned electric hoist layout of positions such as being located in the middle of the goal outer net 4 can arrange goal, some left and right sides symmetrically, and the point system of the size at goal, the left and right sides and goal score can be with reference to the situation at the middle goal of close height.(situation as shown in accompanying drawing 1, accompanying drawing 8c).
(12), as required, can be on the goal system of whole high-altitude the umbrella crown structure being set, it both can be the net formula form that is made of block formula net and corresponding skeleton thereof, also can be the board-like form that is consisted of by glass, plastics and other structural slab, structural member, with when ball is implemented effective block, the effect such as also can bring into play sunshade, take shelter from rain is to reduce direct sunlight, rainwater etc. to the adverse effect in sportsman and place.
Three, the concrete structure at goal, high-altitude and on the impact of concrete methods of ball game etc.
(1), Buddhism formula: the space is fully empty naked in the goal, does not establish the goal form of any section gear structure, and it can make the official ball of shooting the goal, high-altitude pass through the goal without any obstacle ground, (situations as shown in the accompanying drawing 1,2,3,4 etc.).
(2), the net formula of hanging down: vertical and have the vertical shop front at the goal that certain vertical angle of inclination arranges and space and set the vertical web frame in goal that end and the left and right sides can automatically change and open under can the impact force action at ball, thereby can make the ball with certain attack dynamics enter opponents' court and score by the goal, can suitably reduce simultaneously the pace of ball so that the goal, high-altitude score be unlikely to fly excessively far away, be unlikely to directly to fly out the place; The vertical net system in goal can automatically be in state and the position of direct soft block goal correlation space with returning vertical laying under the effect of self gravitation and other suitable power.
(3), curtain falling type: the vertical structure line that parallels of the stretching some even layings that naturally drop by relying on gravity, stay cord 17 grades consist of the goal form of the soft block structure in space in the goal, can all hang in the lower end of each soft block structure stay cord 17 and to establish little weight 18, so that stay cord can be by naturally stretching under the action of gravitation of little weight 18 after by the ball impact bending, but each little weight 18 can all be arranged among the structural frames that includes the relative closure space 19 of balling-up lower door frame effect, each soft block structure stay cord 17 need pass to be located at the corresponding minor structure hole on the structural frames 19 and to be connected with little weight 18, with the needs that satisfy safety and do not disturb mutually etc.(situation shown in accompanying drawing 9a).
(4), drag rope of elasticity formula: by the structure line that parallels that relies on the stretching some even layings of elastic force, stay cord 17 grades consist of the goal form of the soft block structure in space in the goal, can all hang in the lower end of each soft block structure stay cord 17 and to establish spring 20, so that stay cord can be by naturally stretching under the effect of the pulling force of spring 20 after by the ball impact bending, spring 20 also can all be arranged among the structural frames that includes the relative closure space 19 that can play the woodwork effect, and each soft block structure stay cord 17 need pass is located at the corresponding minor structure hole on the structural frames 19 and spring 20 is connected.(situation shown in accompanying drawing 9b).
As required, among structural frames 19, also can establish at least one with soft block structure stay cord 17 nearly perpendicular drag rope of elasticity 21, each soft block structure stay cord 17 can all be connected with drag rope of elasticity 21, thereby can realize relying on the stretcher strain of drag rope of elasticity 21 and the effect that makes each soft block structure stay cord 17 distortion and ball is passed through.(situation shown in accompanying drawing 9c).
As required, each soft block structure stay cord 17 itself can be the spring rope with good bullet sex change energy, can effectively pass through the goal to guarantee the official ball that hits accordingly the goal.
(5), umbrella hat type: contain the goal form that forms the angle that suits between the suitable space place that is located at goal, high-altitude top and the goal, high-altitude, can form the umbrella hat type block structure of suitable block effect to the ball of high-flying attack, umbrella hat type block structure can be the net formula form that is made of block net and corresponding skeleton, thus the umbrella hat type block net system of putting on also forming; As required, umbrella hat type block structure also can be made as membrane type, the version such as board-like.
(6) goal, high-altitude both can be various single formulas goal, also can be the combined type goal of containing simultaneously big or small goal and the combined type goal of alternate manner.
(7) round target formula goal system: contain simultaneously goal, center 22 take minimum in large goal as target center, form outside some goals arranged evenly successively circlewise, each ring-type goal skeleton 23 can by simple and direct as far as possible, meet the as far as possible little syndeton of sphere area 24 and be connected, each ring-type goal skeleton 23 both can be in as required same plane, also can non-ly be in same plane; Hang the different net of length on each ring-type goal skeleton, the net that wherein is in the inner end can be longer than the adjacent net that is in the outer end, and the net 25 at goal, center 22 can be the longest, with this goal at different goals can be distinguished more significantly; Can form the required suitable angle that arranges between plane, skeleton place, ring-type goal and the horizontal plane, both can be the zero degree that parallels, also can be 90 perpendicular degree and other suitable angles of inclination.(situation shown in Figure 10 a, Figure 10 b, Figure 10 c, Figure 10 d, Figure 10 e, Figure 10 f in the accompanying drawing 10).
The setting on the whole of round target formula goal can be similar to the setting of aforesaid hoop formula goal system, and it both can be located on the goal system of high-altitude, also can be located on the goal system of low latitude; When the round target formula goal of angle of inclination form is located on the high-altitude goal system at court middle part, be the attack requirement that adapts to opposition both sides different directions, need to arrange in pairs symmetrically.
The buffering web frame of the suitable forms such as curtain falling type can be set, with the Negotiation speed that suitably weakens ball and be beneficial to identification goal position etc. in the vertically disposed round target formula goal.
Squeeze into the goal at minimum goal, center 22 in the match and can remember maximum score, what scored and remember in other each ring-type goal must can reduce by score value from inside to outside successively, and minimum score is remembered in the goal at the ring-type goal of the maximum of outermost end,
(8) relevant each goal, high-altitude can be set as variable versions such as can selecting increase and decrease, switch, convergent-divergent as required, to adapt to the different requirements of different balls war forms and process.
Four, mode and the method for ballistic goal and the ball game that can form thereof:
Ballistic goal: in the middle of the goal, be provided with the wikipedia type trajectory passage 26 that can signify the missile flight trajectory, inner small and outside big horn mouth formula structure 27 can be established in the two ends of wikipedia type trajectory passage 26, and both ends open is large, the version at the ballistic goal of intermediate elongated thereby form.(situation as shown in accompanying drawing 11a, Figure 11 b).
The needs of the visual match of length of wikipedia type trajectory passage 26 etc. are determined; The sectional dimension of wikipedia type trajectory passage 26 can the little ball that accuses each other to making two relative motions can't be simultaneously by, the degree that can only mutually collide.
Among wikipedia type trajectory passage 26, can establish as required soft section gear structure 28, to play the effects such as movement velocity that delay the ball that passes through; Also can among the horn mouth formula structure 27 at wikipedia type trajectory passage 26 two ends, establish as required soft section gear structure 28.(situation as shown in accompanying drawing 11a, Figure 11 b).
As required, can establish goal ectosphere web frame 4, the ball of playing the attack on goal ectosphere web frame 4 will be blocked, thereby make attack to the ballistic goal also have income and risk simultaneously and chance and the effect of depositing.
As required, can establish simultaneously in the goal system of high-altitude various ways from the size different ballistic goals.
During match, being in both sides sportsman in the antagonism can be simultaneously or attack respectively together same ballistic goal from the both sides, goal differing in extremely short time, after both sides almost shoot respectively the horn mouth of both sides, goal simultaneously, both sides' attack in most cases can be met, bump against in long goal wikipedia type trajectory passage 26 with ball, and following three kinds of basic conditions appear in the possibility of result of bump:
A, both sides attack with ball because all attack accurately and the attack dynamics suitable, all fast bounce-backs and all fall after rise to we and attack the place after meeting, bumping against, this moment, both sides can be evenly matchedly, optionally can all forget minute, also can optionally all record score.
B, the attack degree of accuracy and the dynamics of one side's ball obviously are better than the opposing party, as: a side attacks and directly enters goal wikipedia type trajectory passage 26 with ball, not at bell-mouth structure of air 27 places in the outside because of collision, break-ins etc. consume kinetic energy or consume very little, and the opposing party may be owing to attack not accurate enough, ball at the horn mouth place because of the collision, it is larger that break-ins etc. consume kinetic energy, although also may standard but the situation such as ball speed and dynamics be inadequate, after causing two balls to bump against, fly in pairs and enter and fall to weak tendency one side's court, thereby make advantage one side obtain the situation of double play and double and even many times of scores.
Under certain above-mentioned condition, weak tendency one side also may occur and be hit back own half with ball, and rest on situation among the trajectory of goal after the hitting with ball of advantage one side, this moment, advantage can be remembered corresponding score, both sides can continue to attack the ballistic goal of this ball that retains attack last time, the situation of opponents' court may occur being squeezed into by the ballistic goal simultaneously with ball more than two in the corresponding new attack, thereby be that advantage one side creates larger scores.
Utilize the ballistic goal, can carry out the match that each side all can only be in the indirect confrontation type of own half all the time; Also can carry out the match that both sides all can enter the facedown formula that opponents' court attacks, defends and control ball.
As required, the match of a complete facedown formula can be divided into some joints, initial in the match of every joint, both sides sportsman's large section and even all can all be in first own half, and part so all the sportsman all but everyone holds at least a ball bullet and starts the ball bullet to attack to the ballistic goal, after commence firing, by the ballistic goal shoot the space, away ground for the score live ball, not by the ballistic goal but the score live ball not of being that enters the opponents' court space, the ball bullet in own half space of falling back after being stopped by the goal outer net and being hit by the attack of the other side's ball is dead ball, dead ball will be stood down, but and score live ball and not all sustainable participation matches of score live ball.
As required, both sides all can come and go and fight in one's own side and opponents' court: hold ball, control ball, cut to, attack and defend, in each was attacked, hit a ball outdoors net and kick-backed behind the one's own side court by other marble of marble all became dead ball and stands down; The mid game stage ace-shot of squeezing into goal, low latitude, the other side two ends and other special balls door also can be calculated dead ball and stand down; The mid game stage is got also at last dead ball and standing down of marble out-of-bounds, if but squeeze into first directly to fall outside the court again behind the goal, high-altitude and then will count corresponding score.
One can select apart from the edge, court goal, high-altitude near but that can arrange littlely to attack, and squeezes into less goal, high-altitude and it is directly fallen into outside the court, can remember larger score and the other side is lost the chance that obtains ball and counterattack.
Club through the competition on the canto time back court is fewer and feweri, when remaining last official ball and the end of match time also not then, to remain and carry out the form of single ball Great War on the field, until fixture finishes, the mode of the single ball Great War in other grand formula ball game of fighting that the mode in single ball Great War stage and method can be introduced with methods and this case of existing ball game is close with method same.
In fact, if condition is permitted in the match, in the match such as the indirect type antagonism that all is in all the time own half in each side, and for example all can enter the Competition Phase of the non-direct contact antagonism in the direct-type antagonism match of opponents' court in each side, (initially waiting the stage as competing), both sides all can start the successively fast intensive attack of the continuous saturation type of running fire of many balls to a certain or some ballistic goal simultaneously, to strive attacking the attack of suppressing efficiently and hit the other side and the other side with group's bullet that dynamics is accurately arranged; In high-caliber match, the many ball bullets of both sides may meet simultaneously, meet, bump against among the narrow ballistic space at corresponding goal, the multiple result of attacking against each other will occur at last, whole process will be unusually brilliant, create mirable competition scenes and payoff.
If both sides are offensive attack simultaneously, then in the shortest time, will attack with group's bullet that the other side is lived in the advantage compacting of maximum with a side of the precision of maximum and the maximum ball bullets of dynamics tapping, at last more ball bullet is squeezed into, bangs into, sent into the other side's position, court, thereby create maximum score and triumph.
In the match mode of indirectly antagonism, after the ball bullet of both sides' specified quantity and form has been beaten, then can be considered independently end of the trifle ball match of complete attack echelons thatch of symbol, squeeze into the other side's ball bullet total quantity and total taste accounts for the superior's victory; But in the form of play of facedown, one square tube is crossed the ace-shot that the other side is shot at the ballistic goal, can continue as one's own side sportsman grabs, controls, and can be from the passback of the inferior space of door can form the new attack to the ballistic goal, certainly also can directly control ball forward to the other side's the offensive attacks such as goal, low latitude.
Process and the scene of the missile attack but above-mentioned ballistic goal and the many balls of many bullets are attacked against each other etc. simultaneously in the modern war of game mode simulate and anti-ballistic volley etc., when guided missile is attacked against each other and the large postwar of anti-missile interception, both sides sportsman can fight for and strive for the ball and make great efforts to hit the goal, low latitude of getting the other side to opponents' court, continuation extremely, thereby exploit success or retrieve the rough sledding of guided missile in attacking against each other, but the general flow process of its simulate and deduction modern war and shell type method.
Five, the methods of room cage type court apparatus system and ball game thereof:
As required, can adopt the space, vacant lot that can utilize efficiently city etc., have from the court apparatus system every the room cage of functions such as protecting, can modify tone, it both can be the pure cage construction form that only is made of corresponding skeleton and various net 29 etc., also can be roof and periphery have can be rainproof, the room formula version of the functions such as sunshade and even holding chamber internal gas pressure; At least be provided with a high-altitude goal system in the room cage type court apparatus system, can be provided with simultaneously the low latitude goal system of requirement; The places, locus such as room cage type court apparatus system can be built on the ground, waterborne and building roof.
Room cage type court apparatus system can adopt following more concrete different forms and form according to space, place, ball game type philosophy:
(1), high tower: this kind room cage type court apparatus system is similar to high wide larger point building at appearance profile, so can be described as: " high tower ", it is suitable for take empty day Great War---and the attack to the high-altitude goal system is main game exercise, because its relative floor space is less, the city high for site coverage also can adapt to preferably, the less that its goal, low latitude can be established is to adapt to the little characteristics of plane, court depth.
According to needs such as space, place, plastic arts, the high tower court facility system of guided missile moulding can be set, its floor projection can be the difformity forms such as circle, ellipse.(situation as shown in accompanying drawing 12a, accompanying drawing 12b).
In the room of high tower and some other forms cage type court apparatus system, because horizontal space size and place circumferential size are all relatively too small, can adopt accordingly height greater than width even the obvious larger goal, vertical low latitude of high wide ratio, to be convenient for people to falling spheres such as high-altitudes with head, shoot the goal with chest, abdomen, leg etc., simultaneously can stipulate and deliberately directly to attack above-mentioned vertical goal with pin that pin is attacked ball, and score and possession of the ball are not given to the other side yet; As required, in inside, vertical goal less goal can be set, even class is brought up the form such as chamber in ancient Chinese less goal can be set, less and even less goal can score the goal with pin for people.
(2), mongolia yurt type: it can be considered a kind of special shape of ridge room formula, its top can be the shape forms such as hemispheric, centrum formula, in the space of top bump configurable suitable form the high-altitude goal system, court, bottom etc. can be the forms such as circle, ellipse.
(3), the orange field device system of the forms such as above-mentioned guided missile formula, mongolia yurt type can be set as required can be under the effect of the power such as manpower can integrally rotated version, thereby make corresponding room cage type court apparatus system not only can make people carry out corresponding various ball game in the section space within it, also can allow people outside and inner by promoting or the mode such as pulling makes it carry out whole rotatablely moving to make people obtain to take exercise at it.
As required, can form that the motion such as ball of part population in inner place and the space responds to and cooperate with each other across a great distance with the collective motion that space externally (also can comprise inside) promoted and spurred the integrally rotated part population of whole apparatus system, the motion scene of phase mutual excitation etc.
As required, the power that everybody drives the whole apparatus system of lower rotation can be converted into electric power by suitable mode, thereby make this exercise process can create certain energy and economic worth simultaneously, the electric power that produces can be directly or is supplied with the needs such as illumination of whole telecontrol equipment system by modes such as electric power storages.
As required, whole apparatus system can be by the main part of the apparatus system on the circuit orbit system of bottom, top, be located at some wheel constructions below the main part of apparatus system on top etc. and form; The main body of whole apparatus system can be in shuttling movement on the circuit orbit system of bottom by some wheel constructions that its underpart arranges, the rotatablely moving of the low angular speed of the main body of whole apparatus system under the manpower effect can be changed the rotatablely moving of higher angular speed of some wheel constructions that its underpart arranges into, and some wheel constructions can directly or by necessary accelerator drive motor generate electricity; The process of generating also is the process that the resistance of motion is provided for whole telecontrol equipment and people's exercise motion; The adjustable resistance structural system that also can add independently as required or work simultaneously with TRT, thus the needs that people carry out motion and exercise preferably by driving the said apparatus system can be adapted to better.
As required, also can establish in the orange field device system of the forms such as the guided missile formula that is fixedly installed, mongolia yurt type can be under the effect of the power such as manpower can be around the structural system of orange field device rotation, thereby can in the complete actionless situation of whole room cage type court apparatus system main body, still can realize aforesaid in outside the venue simultaneously scene and the function of motion, still can make whole apparatus system performance multiple action; Can in the circuit orbit cocycle campaign of being located on the orange field device system periphery, can certainly allow to do shuttling movement by circular ring-shaped track provided thereon in the structures such as some steamboats of being located on the orange field device system periphery around the structural system that the orange field device rotates by the structure such as some steamboats provided thereon around the structural system of orange field device rotation; Thereby in the above-mentioned motion structure such as some steamboats can obtain higher rotating speed can be directly or by corresponding accelerator drive motor generating; The adjustable resistance structural system that also can add again independently as required or work simultaneously with TRT.
(4), ridge room formula: namely can be the room cage type court apparatus system that is similar to the construction style that contains the raised ridge structure in middle part and space, the space place raised at the middle part establishes the high-altitude goal system, the dimension of the court of this kind form is changeable, the setting at goal, low latitude is flexible choice according to circumstances also, can as one of principal mode of room cage type court apparatus system, can be applicable on the suitable space and place of vast Urban Areas generally.(situation shown in Figure 13 a in the accompanying drawing 13, Figure 13 b, Figure 13 c).
(5), trapezoidal roof type: the vertical section of top ridge structure and space profiles is the room cage type court apparatus system of tapered in form, and it is more suitable for being provided with simultaneously in the ball game of two and a plurality of high-altitudes goal system.
(6), overhead type and hanging type: whole room cage type court apparatus system is located on a certain space by some strut supports of bottom or is relied on that corresponding syndeton is unsettled is affiliated on some larger structure and building system, because built on stilts or unsettled setting, so whole apparatus system can directly not take or only take minimum ground space, thereby can make ground under it and space as uses such as road, land use for greening, other athletic grounds.
As required, on the outside at overhead type and apparatus system top, hanging type court, can add outside upper high-altitude goal system, overhead type can consist of the grand formula of outdoor war court system with the place in apparatus system (outward) lower end, hanging type court and the peripheral certain limit thereof and space with outside upper high-altitude goal system etc., overhead type and hanging type room cage type court apparatus system are in the central area of the grand formula of above-mentioned outdoor war court space system, form the spatial relationship form of parcel room, outdoor court cage covered court.
As required, the outside in overhead type and apparatus system bottom, hanging type court also can hang outside lower high-altitude goal system simultaneously, and outside lower high-altitude goal system can be independently or consisted of the grand formula of outdoor war court system with outside upper high-altitude goal system with ground space etc. is common.
(7), greenhouse and " solar tower " formula---utilizing the materials such as plastics with impact resistance, glass to construct can be every the greenhouse type that protects, has an X-rayed, views and admires and can gather sunlight, the insulation degree court of moving, when whole greenhouse type motion court becomes the high tower shape form that is easier to poly-harvest season season sunlight, namely can be described as " solar tower " formula.
The setting of the means such as the daylighting by necessity, insulation, ventilation, sunshade, greenhouse and " solar tower " formula court system can create better natural cool in summer and warm in winter and air pressure adapt circumstance, thereby are particularly suitable for the use in the areas such as cold, severe cold and high height above sea level.
(8), that semi-underground type---court system bottom is in is underground, top is in the room cage type court system that contains underground sinking space form on the ground, it can take full advantage of the underground space, reduce whole court system ground level, have feature cool in summer and warm in winter, simultaneously the wall of under ground portion can naturally be built into easily again cheap and durable every protecting and the enclosed construction system, thereby reduce the cost of the life cycle management of system; And aerial part can be set as full cage net formula, contain the forms such as rain and sun roof type and aforesaid greenhouse and the sun be tower.
(9), cage in the cage: also can be described as room formula in the room (double deck formula), on the suitable location such as the center within the larger large room cage type court apparatus system in vertically height and space and space, can build less being similar to aforesaid bottom breaks away from ground fully and unsettled cabin cage type court apparatus system, the space that corresponding size should be continued to employ in cabin cage type court apparatus system top outer and the periphery outside is for the large high-altitude goal system that large room cage type court apparatus system is set and as the passage that large high-altitude goal system is attacked etc.
Space and the facility system of the grand formula ball game of war of the completes such as spatial channel that the space of unsettled cabin cage type court apparatus system bottom is attacked with above-mentioned large high-altitude goal system and to large high-altitude goal system.(situation shown in Figure 14 a in the accompanying drawing 14, Figure 14 b, Figure 14 c).
Above-mentioned method to set up can be utilized space and apparatus system more efficiently, it can not increase whole apparatus system and shared space size thereof, when the ball in the large room of the simultaneously not excessive impact cage type court apparatus system is fought the motion game, increase and corresponding cabin cage type court apparatus system, and to the larger cabin cage type court device of width further transverse region be separated out several less room cage type court apparatus systems.
Owing to be in the existence of the cabin cage type court apparatus system of zone position in the space, the high-altitude ball in the large room cage type court apparatus system is fought, and some is similar to mountain on the other way round and the artillery action of carrying out every sky and the war of guided missile.
When large room cage type court apparatus system adopts the partly-exposed basement form, the bottom of its inner cabin cage type court apparatus system that arranges can with ground with high, the also certain altitude that can be above the ground level, thereby form all cage---large systems of double deck formula in the cage good and that efficiently utilized the underground space of total use function and art of architectural modelling.
As required, in the cage cage type court apparatus system can be around the center according to big-and-middle contain contain in little, little less mode be designed to contain more multi-layered time the version of multiple sheathed formula.
(10), skeleton inflatable---court components of system as directed and even whole skeleton all adopt the version of the inflatable with functions such as can conveniently packing up, thereby consist of together the inflatable back bone network, on the inflatable back bone network, can establish the light-duty safeguard structure of the forms such as net formula, membrane type.
(11), inflatable in whole: the structures such as whole facility system periphery employing membrane type are sealed, and the space is filled with have certain air pressure that is higher than atmospheric environment air pressure, utilize the inside and outside draught head of system to prop up the membrane structure etc. of whole system periphery, simultaneously, ad hoc load-carrying members face above the goal system of high-altitude, establish the load-bearing skeleton net on the load-carrying members face and can rely on the come-up such as the closing membrane structure of the poor come-up of system's inner and outer air pressure, the load-bearing skeleton net can be made of main framing and branch's skeleton etc., branch's skeleton is distributed in equably on the whole load-carrying members face and with the come-up structure at each place, zonule and directly links to each other, combine, even with the buoyancy that makes progress that whole come-up structure is subject to, pass to fully branch's skeleton, main framing and whole load-bearing skeleton net, thereby can make each main framing and the whole load-bearing skeleton netting gear that are connected with all multiple-limb skeletons that suitable weight capacity is arranged, and then can on some main framings, directly hang and establish the high-altitude goal system.
As required, can set up simultaneously in the some zones that do not join some independently load-carrying members faces separately, thereby on the more large-area come-up structural plane with buoyancy that makes that corresponding gravity load can drop on whole interior inflatable facility system top more equably, can hang simultaneously on some load-carrying members faces and establish a high-altitude goal system, also can hang simultaneously and establish a plurality of high-altitudes goal system.
As required, the skeleton structure of the empty goal system of above-mentioned load-bearing skeleton net height etc. can further be set as the version of the lighter weight of the forms such as interior inflatable, can reduce like this gravity load of whole system, be beneficial to again the high-altitude goal system setting, pack up and safety, can make above-mentioned interior inflatable skeleton structure etc. with whole in the pneumatic system of inflatable court system unified mutually.
As required, also can ad hoc at least being exclusively used in of form such as arch hang the large span inflatable skeleton structure of establishing the high-altitude goal system in the apparatus system of inflatable court in whole, large span inflatable skeleton structure can connect as one with the come-up structures such as closing membrane that rely on the poor come-up of system's inner and outer air pressure; Because large span inflatable skeleton structure itself can be carried certain gravity load, acting in conjunction at the available larger buoyancy of come-up structure that adds the dependence inside and outside differential pressure that continuous area can be larger, can further make total can carry the weight loading of larger high-altitude goal system etc., certainly, pressure reduction inside and outside the space system of whole court is suitably reduced, keep the poor required relevant power consumption of whole court space system inner and outer air pressure more to adapt to the needs of people motion etc., can correspondingly reduce simultaneously.
The above-mentioned whole interior inflatable spatial structure system that contains large span inflatable skeleton structure, even do not establish the structures such as goal, high-altitude, not as the court apparatus system, its set-up mode is also favourable in many-side, can be applicable in other many interior inflatable spatial structure system.
Inflatable court facility system in the above-mentioned integral body is particularly suitable for place and the situation of the narrow spaces such as city, is particularly suitable for the ground of the unfavorable motion of high height above sea level rarefaction of air, is particularly suitable for relying on cold and the severe cold area of environment temperature in the lifter motion such as solar energy; It can be the morphology form such as tower, arched, ridge room formula on the whole; It should both fully satisfy the needs of space, can consider efficiently to utilize again the needs of solar energy, geothermal energy, thereby can adopt the membrane structure with abilities such as high-efficiency lighting insulations to reach the frame mode that optionally can adopt half ground formula.
(12), water boat formula---can utilize Water space to build fixing and the court system of water boat-shaped formula movably, this court system can all be built on the water surface deck, also can adopt the mode of similar aforesaid " semi-underground cell-type ", the bottom of court system is among the cabin that is lower than the water surface, even can make whole court system be built in the top of other appropriate architecture body on the ship, thereby the boat that makes whole ball war can have better space utilization ability, and the boat of ball war also can become the new-type travel tool with functions such as pleasure-boats, and the boat of large-scale ball war also can become the large-scale new-type pleasure-boat with brand-new characteristic; Certain above-mentioned ball war facility system also can be located among the boats and ships of other purposes, for uses such as crewman and passengers.(situation shown in Figure 15 a in the accompanying drawing 15, Figure 15 b, Figure 15 c).
Six, utilize game mode and the method for the ball game that the tool systems such as special vessel, car first and even " power " aircraft carry out:
At first, can on the suitable water surface, establish high-altitude and low latitude goal system, the Great Game that opposing teams can carry out corresponding ball game waterborne by Waterborne movable modes such as vessel, swimming.
Can imitate aforesaid ground set-up mode waterborne fixed high-altitude and the low latitude goal system of suitable form are set, to realize being similar to the game process waterborne of ground game process, can on all or part of competition vessel, establish simultaneously movable goal system, both sides sportsman not only can resemble in court, aforesaid ground match like that by attacking high-altitude and low latitude fixedly goal and score in the match, can also pass through movable goal on attack the other side ship and score.
High-altitude waterborne goal system and low latitude goal system can be located at relatively fixedly on vessel, the chinampa etc., the match that drives with at least one people can come and go, gallop on the whole match water surface with vessel, player on the vessel can utilize that hand, foot, other suitable position of health and club etc. are held ball, the batting instrument, realizing obtaining ball, ball-handling, and catch and create openings makes great efforts ball is shot the other side's goal, low latitude and goal, corresponding high-altitude.
Also can establish the portable goal system of moving with vessel in all or part of match of both sides on vessel, both sides match can be attacked goal on the opponent vessel with ball with the player on the vessel, hit and score, both sides' man-of-war will all be in the continuous motion in the match, can prevent preferably position and the state attacked to create favourable attack position and state and to form; Both sides drive between power hand that vessel advances and the player who is responsible for attacking etc. and want the close coordination of height of formation and cooperate, and reach fixedly effective attack at goal to create at the volley and to catch favourable attack opportunity to finish rapidly the other side is moved the goal.(situation shown in Figure 16 a in the accompanying drawing 16, Figure 16 b, Figure 16 c).
After the movable goal on a certain match vessel is hit, the offense not only can remember minute, also can be in some cases, as hit the other side a certain lifeblood formula goal and non-lifeblood formula goal and repeatedly hit etc. in the situation, all players that can declare on this vessel and the ship stand down together, thereby make score side obtain the upper advantage in larger field, it is also consistent with the war rule such as real sea warfare simultaneously.
Can be equipped with some suitable model on each vessel of both sides, the attack ball of suitable number, the attack of the different model weight of ball, shape and size etc. can be not identical, be beneficial to in distance, just, size, sound, choice for use in the attack at the goal that the aspects such as speed are different, certainly, if the various attack of suitable number all is finished with ball, then corresponding vessel system will lose attacking ability, in the time of need not stood down but if it does not inflict heavy losses on, it on the one hand also can be as the fixing shield of goal system in the important vessel of other one's own side and low latitude, can also disturb and destroy in the mode of other allowance adversary's attack action on the other hand, such as passage, hinder that the other side passes through etc.
Power hand in the above-mentioned vessel system and control hand etc. and can be among the space system of the safety that is surrounded by net protection structure 30 and cabin etc., so that its not under fire threat of ball, net protection structure 30 can consist of portable goal system on the vessel jointly with other web frame etc. simultaneously, when the ball of attack hits above-mentioned net protection structure 30 and other web frame, its impulsive force can by the absorptions such as door net with dissolve, the ball of attack can be at the ABC of ends off the net in effect whereabouts such as gravity, and can enter among the ad hoc ball gathering system through ad hoc collection channel, the situations such as the number of times of being hit by a bullet with this provable this ship, the used marble of both sides can have obviously not identical color as required, pattern is to make things convenient for differentiation etc.(situation shown in Figure 16 a in the accompanying drawing 16, Figure 16 b, Figure 16 c).
Attacking driving hand in the vessel system can nakedly be on the suitable location of vessel, also can freely move and obtain best attack position to implement efficient attack; The attacking driving hand can determine whether to undertake the protection of this ship goal system according to circumstances, and the removable goal system on each vessel also can determine whether to establish goal defence personnel according to circumstances.
If two, with court, displacement land, court waterborne, simultaneously above-mentioned vessel waterborne is become land car first, then can form game form and the game playing system of the land car first Great War of similar aforementioned vessel Great War waterborne.
Three, motion and the court of game can be located at waterborne and land area simultaneously, corresponding battle on water vessel and land battle Che Jiake participate in game simultaneously, form " land sea Great War ", its can be that is virtually reality like reality the certain situation of land sea Great War, and the game battlefield is among artificial space and the real place.
Four, can adopt with waterborne, on the ground have that motor-driven vessel, Che Jiawei than strong power supports and the nature's mystery system of traction participates in game, whole nature's mystery system can and be in the connection drive system at middle part and the connected system of flight system etc. by the flight system at the drive system of bottom, top and form; The aircraft system at top can be in higher space all the time; On the nature's mystery system, can establish some attacking driving hands, driver etc., establish at least one goal, high-altitude in the suitable location of nature's mystery system simultaneously, to consist of the high-altitude target target control system of the activity that can Gong accuse each other.
Aircraft system on the flight system at top can directly be on the connected system of middle part regularly, can be aircraft and provide on the motor platform system of Multidirectional motion space and Multidirectional motion ability on the connected system top, middle part also can flexibly be provided, thereby aircraft not only can be moved with the drive system part on the water surface, ground, also can in certain height and spatial dimension, have faster motor-driven abilities such as independently can carrying out top to bottom, left and right, front and rear, thereby further promote the comprehensive ability of fighting such as air mobile, attack and defence of aircraft system.
Because the power of nature's mystery system is large, its movement velocity can be apparently higher than the movement velocity that relies on manpower, weak motor-driven power-actuated vessel, car first system, can be in all the time higher locus and have preferably airmobility owing to it simultaneously, so no matter it is the attack to the activity that is in waterborne and ground and fixing goal, low latitude target, or all can form obvious advantage to the attack that is in than goal, the fixed high-altitude target in high-altitude.
High-altitude goal system in the nature's mystery system etc., also nature can become the active attack target of the ball bullet of launching on Ground Vehicle first, the water surface vessel etc., and both sides' nature's mystery system also can be among the game of target of attack each other certainly.
As required, whole nature's mystery system also can become the attack system by the solid of the common formation of the institute of the attacking system (player, batting instrument etc.) on the platform of the multi-level differing heights such as bottom drive system, middle connected system, top flight system, it not only can have height and the speed advantage of air attack like this, also has simultaneously the three-dimensional powerful attacking ability that can be similar to aircraft carrier fleet; Certainly on the other hand, correspondingly also can establish multi-level a plurality of goal system of the differing heights that can be used as the target attack on the nature's mystery system.
Five, different from aforesaid bottom motor driven nature's mystery system, also can establish as required rail mounted nature's mystery system:
By establishing the flight track system that can move for quick high-altitudes of aircraft such as aircrafts on the whole with on the direction of the perpendicular direction of high-altitude goal system and other matters, realize that the aircraft such as aircraft is in aspect advantages such as height and speed.
As required, the flight track system can be built on the domes system of large span of whole court system, certainly simultaneously can establish the systems such as high-altitude and goal, low latitude on the domes system of large span.
Rail mounted nature's mystery advantage of system is: set-up mode and structural system are relatively simple, and shortcoming is: the flight path of aircraft is limited on the specific track, makes it lose larger outmaneuver, becomes easily locked target with attacking.
Rail mounted nature's mystery system is more suitable for building land in, contain the land of the water surface, island, land and have on the water surface on island of more comparatively dense.
Six, by setting and the utilization of above-mentioned water, land and air sky system, can form the methods of the ball game of more complete simulation modern war:
In the ball game of above-mentioned situation and alternate manner of the present invention, can adopt directly as required, indirectly rely on the delivery device of manpower and other strength emission ball bullet and the ball pitching tool of other form to participate in match.
In the match, both sides can select first to hit the other side's reserve force or seize the critical positions that threatens the safety such as opponents' goal, thereby weaken and transfer the enemy, obtain battlefield supremacy.
The core bead door etc. of goal system that is in the positions such as low latitude at both sides' great depth rear can be considered one of game both sides' strategic interests of wanting most and lifeblood, the ground that both sides must go all out to fight the floods, so will become the most important attack of both sides and defended target, become simultaneously important the inducing and relying on that can transfer the other side's strength; As the fixed high-altitude goal system that can signify the important war system such as the empty day target such as satellite, the trajectory of missile attack, the node of anti-missile interception and key element aspect, it also is most important attack and defense target; Vessel, car first and nature's mystery etc. have the common both sides' of formation such as the technical equipment of the higher performance such as motor-driven and the power hand on it, driver, player, commanding effective strength, are the main bodys of game, are the keys and basis that determines victory or defeat.
What seven, the high-altitude goal system can become the court simultaneously is motor-driven every systems such as protecting wire nets and to the lifting of space, whole court usefulness:
It not only can become a kind of optionally low latitude goal system that has after being reduced to the height of adjustable high-altitude goal system to a certain degree, can also optionally make the high-altitude goal system become the motor-driven every systems such as protecting wire nets of court, be beneficial to the efficient utilization in space, whole court.
As required, all goals, high-altitude are closed with structures such as nets, sealing, then corresponding whole goal system both can become can to official ball carry out the gross area block every the protecting wire net system, fall to suitable height ground on every systems such as protecting wire nets along corresponding structural system if will be in overhead goal one, the zone such as middle part, court, then former larger area court can be separated easily and be a plurality of court system, vice versa is returned to original larger area situation easily, thereby makes whole court equipment and space system thereof have good changeability and applicability.
In the middle of can establishing simultaneously in the larger court of standard football pitch and other area and front court, back court be totally three high-altitude goal system, if as required, the bottom, goal of middle high-altitude goal system is fallen to ground, simultaneously each goal sealed with net, then the primary standard football pitch can be divided into two identical new courts; By setting up motor-driven low latitude goal system, and the goal, high-altitude of front court, back court is adjusted to suitable height, then can forms two the grand formula of new war court systems.
As required, if the bottom, goal of the high-altitude goal system of front and back field is fallen to ground, simultaneously each goal sealed with net, then the primary standard football pitch can be divided into three new courts in court in the middle of comprising, court, two outsides; By setting up corresponding motor-driven low latitude goal system, and goal, middle high-altitude is adjusted to suitable height, the court becomes the grand formula of war court system in the middle of then can making; Court, two outsides then can be used for the traditional football motion.
Because the standard football pitch has 68 meters large width, each high-altitude goal system also can be horizontal two covers and many covers goals, high-altitude are set, so the above-mentioned formed less grand formula of war court system further laterally can be separated out two and the grand formula of a plurality of less wars court system with lower net etc.; As when middle high-altitude goal system is fallen and be made as filter after formed two the new grand formula of less war court systems separate further again, thereby can form four, six and even the grand formula of more less wars court system in the place in whole standard football pitch and space, thereby can make the more people grand formula football that participates in fighting.
In fact, when in a large space, court (such as space, standard football pitch) top two and even a plurality of high-altitudes goal system being set, and make this large court space system as a complete large court, for the sportsman of two teams, two forces have at many levels, when the attack of multiple tracks high-altitude goal system and large space depth and game, it is also larger that the grand formula ball game of war such as the grand formula football of whole war will have stronger space warfare color, its entertaining and inspiration meaning.
Because the existence of a plurality of high-altitudes goal system and can being attacked, it makes the very big part position in whole court can become the direct attack point that gets, the transfer velocity of ball between many direct attack points also can be accelerated greatly simultaneously, so the defence personnel's that will make the difficulty of defence and need to drop into quantity increases significantly, thereby can make both sides drop into more forces and participate in whole motion, in some time the part sportsman may be generally relative be active in some FX, with the attacking chances of tackling unexpected acquisition and the defence task of facing suddenly, other sportsmen then undertake the task of large zone and even whole fast reserve, certainly the large zone of high flow rate and even the task of whole court fast reserve can be undertaken by sportsman's alternate turns of different piece, thereby make entire squad have all the time efficient fighting capacity.
If do not carry out the grand formula ball game of war of the large space of whole formula of above-mentioned unification, then can utilize above-mentioned many high-altitude goal system and on goal, many high-altitudes carry out air battle rehearsal between many troops, thereby can make more personnel utilize simultaneously space, above-mentioned court, to improve the utilization ratio of space, whole court and facility largelyr.
Eight, the setting of relevant court facility system can organically combine with the building system in space, place etc.:
At first owing to the setting of high-altitude goal system and to vertically reaching the efficient utilization in whole space, people many health strength that can strength of one's legs, hand-power etc. are relevant in the motions such as attack of high-altitude goal system and the time discharges fully, shows so the property made widely known bring into play, thereby also can obtain stronger place, survival ability even make in its space that is in the less urban cells of horizontal depth.
Two, in areas such as the high latitude of cold and severe cold, high height above sea level, can consider with the construction of the solar building system of building distance unified mutually, make many need to than 11 people of greater room and even ball game facility systems such as the grand formula football of war that can more numbers, can being located at better among following sun city.
Three, the high-altitude goal system directly can be located at the top of the tier building of bottom overhead type.
Four, the goal system of some differing heights can be located at multilayer and some intermediate spaces zone of skyscraper and even the top of building of built on stilts form, particularly, can in the middle of the building body, build the built on stilts part of some suitable forms, hanging garden can be done in the bottom of built on stilts part, can establish large high-altitude goal system on each hanging garden space.
In the structures such as protecting wire net, protective plate of can setting up defences between high-altitude goal system and the hanging garden greatly, it can make on the one hand on the court downstairs the ball to the attack of large high-altitude goal system attack can not fall among the hanging garden, the structure such as protection network, protective plate can make again hanging garden become cage space, a room on the other hand, forms room cage hanging garden.
Can among room cage hanging garden, establish corresponding little high-altitude goal system as required, thereby make this hanging garden become aerial room cage type court, if certainly do not establish large high-altitude goal system on the garden aloft, the residing whole overhead space of hanging garden can be set as larger aerial room cage type court.
Five, being provided with the building of high-altitude goal system and window and the body of wall of relevant building of periphery thereof can adopt the flexible network structure with low noise and necessary intensity and durability to protect, the metope of the body of wall of building also can be done the protective processing that the anti-pellet impact of satisfying of other form and low noise etc. require, thereby the impact that the crowd in the building is subject to is very little, building is not caused damage yet, also can effectively utilize simultaneously the periphery building to the court form nature preferably every protecting.
Six, can utilize be in the middle of the court and peripheral overhead type individual layer, multilayer structure more easily arrange the high-altitude goal system, simultaneously hang corresponding court protecting film, every protecting wire net etc., thereby form the room cage type court system that relies on relevant building, this method can be applicable among the building system of villa, garden, hotel and even residential quarter, thereby forms corresponding cage villa court system, cage garden court system, cage hotel court system, cage residential quarter court system etc.
Seven, at cold and severe cold area, when cage type court intrasystem building in above-mentioned room adopts east-west construction style, but can establish the light transmissive materials such as the glass of more efficient and film in directions such as its southern sides, then can add the better materials of performance such as insulation contain building system jointly to enclose inside solar building room cage type court system in directions such as its north sides in good time.
In solar building room cage type court internal system, the overhead space of the bottom of middle building system, the high-altitude net system space on top, and can jointly consist of the unobstructed annular space that surrounds middle building system around reaching between the space of building system south and north flanks, in the winter time and surrounding time, building surface and air in this zone, annular space south will be heated by sunlight, temperature rises, thereby the south and north flanks in building forms the temperature difference and draught head, and then in unobstructed annular space passage, will form the circulated air that the temperature difference and draught head promote, circulated air will be passed to the north side to the solar heat that the system southern side obtains naturally, pass to each position of annular space, so just be equivalent to middle building system formed one have be higher than environment temperature every protecting space and heat-insulation system, should can bring into play the lifting temperature to whole centre building system every protecting space and heat-insulation system, buffering and warming soft effect every protecting.
Annular space passage (namely every protecting space and heat-insulation system) as the ball game game play space, one side and will naturally obtain the heat that greenhouse effects produce, the middle building system institute dispersed heat that also will obtain to surround on the other hand, so its temperature can be higher than the temperature of ambient air more significantly, and its with higher temperature to middle building system every protect also can make in the middle of building system heat loss still less.
Eight, for more abundant space and the solar energy resources that utilizes efficiently the relevant range, can adopt the room cage covered court system that relies on the solar energy natural heating winter that makes---the distribution form that court, greenhouse system and outdoor open-air court system are arranged in order by the interval, north and south that suits.
For utilizing better whole resource, room cage covered court system can be set as semi-underground form, it can be single formula, also can be combined type, such as primary-secondary type etc., like this its both can to have utilized ground temperature to realize cool in summer and warm in winter etc., can unlikelyly take because whole height is too high again too much space and sunshine resource.
Some rows' court, greenhouse system can be set by six hour winter solstice minimums distance for sunlight such as sunshine, naturally heat with the solar energy of realizing the winter greenhouse court, certainly because the temperature of the spaces such as court can be starkly lower than the requirement of other human residential space, so can reduce according to circumstances actual relevant minimum distance for sunlight for utilizing space resources more efficiently.
Between the system of court, greenhouse, can establish the open-air court of some rows, the periphery of court, greenhouse system is gone along with sb. to guard him etc. every protection structure, not only can shield the official ball of covered court and protect, also can effectively shield the ball of the match that is in the outdoor court between the system of court, greenhouse and protect, thereby can make whole space and each court system of having realizes best positioning efficiency and service efficiency.
Nine, as required, thus can establish green vegetation etc. on the used cage net of above-mentioned court system etc. forms the green ecology movement space system of protecting of shielding.
Ten, as required, the high-altitude goal system can fix or flexibly be located on the square outside of the city and even important, between tall building, building and even the tall and big trees, can be hung under arch building and even the arch bridge pier, and can and corresponding place, ecological space, culture and space thereof etc. between form rational, efficient, artistic organically blending.

Claims (10)

1. ball game method and the facility system thereof of an imitative modern-war form, (can referred to as: formula ball game method and facility system thereof are played chess in war), it is by the court, goal system, the sportsman, laws of the game, judges etc. form and implement, it is characterized in that: comprise and be provided with at least one the high-altitude goal system with high height that can be in court middle part and other area of space, at least contain goal, a high-altitude in the goal system of high-altitude, the lower end of the high-altitude goal system of section and whole unsettled settings should be able to guarantee normal sportsman during the games apart from the distance of court surface (water surface) greatly, official ball and even take advantage of the vessel that carries the sportsman, the car first can make things convenient for and freely pass through;
But the sportsman not only can pass through the goal, high-altitude and score by making the motion of ball on the one side court direction from one's own side one side court to the other side in the situation of facedown in the match, can also make sportsman, official ball and other match freely travel to and fro between the below of high-altitude goal system with instrument and realize cutting to quickly and easily, with continuous formation new effective attack and defence, thereby constructed the game form of ball game of the excellence of the sky sky Great War that can be bordering on imitative modern war;
When a high-altitude goal system that is on the midfield only was set, the sportsman both can squeeze into opponents' court and score with ball by the goal, high-altitude of midfield by corresponding attack in one's own side's court; Again can be in the other side's court prevent that by corresponding defence behavior the other side from squeezing into the one's own side court with ball by the goal, high-altitude and do not lose points; When needing that ball is reached the one's own side court after the opponents' court ball-handling, the sportsman could attack again the goal, high-altitude, and then make the motion of ball on from the one's own side court to the opponents' court direction by the goal, high-altitude and score, a kind of special situation is: near the other side's one side that the sportsman can be the juncture area of both sides court by the modes such as banana kick also can make ball aloft with the motion on from the one's own side court to the opponents' court direction by the goal, high-altitude, so also can remember minute;
Arranging in the situation of two and a plurality of high-altitudes goal system, thus grand occasion and advantage that both sides all can start continuously the attack manufacturing to goal, more high-altitudes forward to score continuously, run; Simultaneously can also stipulate that as required the sportsman still can in time return ball under some high-altitude goal system, and then forward new attack is started at these goals, high-altitude again, thereby realize the continual attack of passback formula and the situation of running;
Above-mentioned multiple tactics of attacking forward again after signifying satellite, missile trajectory and other sky temmoku target high-altitude goal system and can implementing continuously forward attack and passback makes ball game method of the present invention have the unique advantage of the empty day Great War of good simulation modern war.
2. ball game method according to claim 1 and facility system thereof, it is characterized in that: on the end line of the both sides, court that parallel with the high-altitude goal system and near, at least respectively establish respectively relatively symmetrically a low latitude goal system, at least contain goal, a low latitude in each low latitude goal system, the sportsman not only can pass through the goal, high-altitude and score by making the motion of ball on the direction from the one's own side court to opponents' court in the match, simultaneously can also realize score by ball being shot goal, the other side low latitude, goal, high-altitude goal score and the addition of goal, low latitude goal score, the high person of total mark is the winner;
In real racetrack, the offense both can select directtissima low latitude goal, also can formerly attack the high-altitude goal after, continue to get ball, ball-handling, attack again the other side's goal, low latitude, thereby create the meeting of more multimachine and the effect in an attack, run;
When the sportsman in the court of one's own side's one side by corresponding attack with ball by the goal, high-altitude squeeze into the other side's one side the court and after the score, if offense sportsman continues to get ball in the other side one side court, then can be further in the other side one side court directtissima the other side's low latitude goal system, also can select to pass ball back an our side court and again attack the high-altitude goal system, thus chance and the effect that all can create continuous attack, run; When making great efforts attack, the sportsman should take precautions against the opposing team and get ball and directtissima one's own side's low latitude goal system in one's own side one side court, takes precautions against again opposing team directtissima high-altitude goal system or one's own side one side court attack one's own side's the goal, low latitude of driving straight in after the other side one side court gets ball; Both sides' attack with the defence all be three-dimensional, multizone, multi-level, also all be can plan more, more options, diverse;
In whole match, realize that more ball-handling chance just can grasp the initiative of game more, thereby select a good opportunity and create more chance attack score, reduce simultaneously the other side's threat and open goal;
In ball war and game, be good at land battle person, can walk ground more, attack goal, the other side low latitude more; Be good at air battle person, can walk sky more, attack goal, the other side high-altitude more; Land battle, air battle be kind person all, can select a good opportunity and move, wound machine and going, strive for the combat success of maximum;
Different goal, high-altitude forms and different goal, low latitude forms can be set as required, simultaneously according to the complexity of scoring not square one set different high-altitudes score value and the different low latitudes score value of scoring to get of scoring to get, the high person of various goal total mark score values is the winner in the whole match;
The version at the goal of having adopted in now ongoing football, rugby, basketball and other the suitable ball game can be adopted in set goal, low latitude, court, also can adopt the combined type goal and other the new suitable goal form that contain simultaneously big or small goal;
Basic skills and the facility system thereof of the grand formula ball game of war of the above-mentioned space warfare feature that can embody preferably and reflect modern war, can merge mutually, adapt with now ongoing various ball motion, thereby design and create the grand formula football of war, the grand formula handball of war, the grand Touch Rugby of fighting, the grand formula basketball of war, the grand formula water polo of war and other all multi-form brand-new ball game method and the facility system thereof that can be bordering on imitative modern-war form.
3. according to claim 1,2 described ball game method and facility systems thereof, it is characterized in that: as required, T-ground section zone also can add the low latitude goal system of suitable form, also can establish the high-altitude goal system of suitable form at the two ends, court, thereby can make middle part, court, the attack at two ends, court and form and the content of game become more rich and varied.
4. according to claim 1,2,3 described ball game method and facility systems thereof, it is characterized in that: more more specifically method and the process of the basic comprising of high-altitude goal system and the facilities of T-ground and relevant ball game are:
At first, the high-altitude goal system can be by at least one goal, high-altitude 1, goal, high-altitude skeleton 2, can select goal, the high-altitude Intranet 3 that adopts with goal, high-altitude outer net 4, the outer network framework 5 in goal, high-altitude, play support, suspend the compositions such as connecting framework 6 that whole high-altitude goal system etc. acts in midair; Connecting framework 6 grades can be rigid structure and also can be inflatable structure; Goal, high-altitude etc. can be set as the adjustable version of height, thereby can become as required the goal, low latitude, the version of also can be set as the energy easy disassembly, packing up etc.;
When whole court arranges a high-altitude goal system, this high-altitude goal system can be located at the whole court of five equilibrium court center line 7 directly over, the court center line and on the high-altitude goal system whole court and space thereof are divided into two, in the match, both sides can only attack from one's own side's one side direction the other side direction the high-altitude goal system of zone line, shoot goal postscript score, certainly in the situation that is provided with the low latitude goal system, both sides all can catch and create openings realizes minute other effective attack to goal, high-altitude and goal, the other side low latitude;
When two high-altitude goal system are set, they can be located on court center line 7 the both sides corresponding position and space symmetrically, thereby can form midfield and space, midfield between two high-altitude goal system, midfield and both sides, space, midfield then can be regarded as respectively one's own side court, space, one's own side court and opponents' court, opponents' court space;
In the match, both can stipulate: both sides all can select simultaneously and attack above-mentioned two high-altitude goal system from comprising the one's own side's one side direction the other side direction that is in midfield and one's own side court, shoot goal, corresponding high-altitude and can all remember minute; Also can stipulate as required: both sides only have and just remember when comprising that the one's own side's one side direction the other side direction that is in midfield and one's own side court is shot the goal, high-altitude in opponents' court forward position minute, have a mind to this moment or when being not intended to make ball from the one's own side court to the high-altitude goal of the other side's direction by forward position, one's own side court, can both not include score, also not very error, and only be considered as the pass behavior;
When two above high-altitude goal system are set, except symmetrically balanced laying, both can take orientation to shoot the equal score in goal, used high-altitude in the match, the game method that also can adopt the goal, part high-altitude of only shooting near the other side's one side just to remember minute, other goal can only be considered as the behavior of passing normally;
As required, can in the larger space, court of standard football pitch and other area, three high-altitude goal system be set simultaneously, its adoptable set-up mode is: establish high-altitude, midfield goal system directly over the T-ground line 7, simultaneously establish respectively symmetrical each other front court high-altitude goal system and a back court high-altitude goal system on the suitable distance of goal system both sides, high-altitude, midfield and suitable locational space again;
Arranging in the situation of two and plural high-altitude goal system, when thereby the high-altitude goal of ball by disregarding score directly shot again the goal of remembering minute aloft and formed the high-altitude and drop in goal, can be considered effectively and efficient the goal, can remember minute even can remember higher score; When ball continues to pass through two and a plurality ofly remember that point goal forms a high-altitude and drops in when scoring aloft, can remember the accumulated value that respectively is broken goal, even can be on the basis of above-mentioned accumulated value above-mentioned high-altitude be dropped in to score to increase and reward score;
Be provided with in one, two, two the various situations with the high-altitude goal system of first-class varying number above-mentioned, when shooting goal, a high-altitude and even directly shoot again goal, the other side low latitude after the high-altitude continues to pass through goal, more high-altitude, ball forms height empty string croquet, also can not only remember the accumulated value of each goal this moment, also can further increase corresponding award score;
As required, can all establish web frame 4 outside the goal, corresponding high-altitude on each high-altitude goal system in the above-mentioned situation; Web frame 4 can cut down the attack ball that very big part trains off outside the goal, thereby make the offense not only can't score also can create the chance that obtains ball and counterattack fast for the other side, thereby make the dual character that the attack of high-altitude goal system is had score and risk coexistence, the accurate ability of its attack for the offense and attack effect propose higher requirement;
Web frame 4 can be likened the empty day systems of defense such as missile shield in the modern war approx to outside above-mentioned each goal, high-altitude, although it can not remove to tackle the ball of the attack of squeezing into the goal, high-altitude on one's own initiative, but its interception for the ball of the attack that trains off can become more general situation, and for very proper to and the high-altitude ball of dropping in accurately, the special goals such as height empty string croquet, the continuous inefficacy of the empty day system of defense of goal, high-altitude outer net type can be very special situation, certainly as required, by enlarging the goal, high-altitude, reduce goal, high-altitude height, be conducive to the continuously design of the attack track of goal, the above-mentioned chance of scoring of dropping in is increased significantly, can ask and attainable strike sharp weapon thereby the goal of dropping in that high score and high-quality are attacked becomes;
As required, also can not establish web frame outside the goal on the high-altitude goal system in the above-mentioned situation, the ball that trains off only can be cut down or keep off back by goal, high-altitude skeleton 2 grades in situation seldom, the ball of the attack that in most cases trains off can be outside the goal, high-altitude the forwards court that falls, the invalid space of passing goal system region, high-altitude, even this moment to the risk of attacks of high-altitude goal system is less can not be directly by high-altitude goal score, also can be for the attack of the other side low latitude goal system being created the chance near aspects such as distances;
Above-mentioned selection of establishing a high-altitude goal system more is suitable for the situation of court horizontal space size less; At many levels, the setting of multiple tracks high-altitude goal system is then applicable to the larger situation of court horizontal space depth;
Because the existence of the high-altitude goal system between the low latitude goal system that is in the two ends, court is arranged, the offense in the one's own side court and midfield zone wait when controlling ball, both can select nearby the high-altitude goal system to be attacked, thereby can transfer the other side has to the sportsman of necessary amount is used for the front court, the defence of midfield, contention and preparation counteroffensive, it is less to be chosen in again the opponents' court number of player, in the situation a little less than the defence, drive straight in suddenly, enforcement reaches magical game process and plot to the rapidly and efficiently strike of the other side low latitude goal system thereby create excellent attack scene;
Certainly, besieging the other side low latitude goal system, thereby when making the other side that the sportsman more is used for the defence at its goal, low latitude, attacking and defending also can return ball suddenly, thereby cause the other side is defendd the relatively favourable attack situation of the high-altitude goal system of weakening, after successfully rushing out above-mentioned back thrust and realizing high-altitude goal and score, the offense also can continue to select to attack goal, the other side low latitude or again threaten the other side high-altitude goal system with forms such as back thrust, or the continuation high-altitude scores the goal, or again transfer the other side etc., the grand formula ball game of whole war is full of changes and entertaining, also value such as more creative and inspiration;
As required, if the offense goes smoothly with directtissima and the above-mentioned modes such as back thrust in real racetrack, after breaking through goal, high-altitude and score, can limit it and again carry out score in the mode of above-mentioned back thrust, and the offense can only be relied on forward attack goal, the other side low latitude and increase score, this kind situation, the high-altitude target that can be similar to enemy in the actual war was attacked hit and was destroyed by last time, again hit without actual capabilities or value; On the other hand, repeatedly attack the goal, high-altitude in the mode of back thrust and continuous score if continue the allowance offense, then can be similar to the enemy and have more high-altitude target and can be attacked and destroy, also be fine, just may be unfavorable for like this refining and optimizing of whole ball game game process; Certainly can in real racetrack, constantly obtain continuously ball, ball-handling, rush out back thrust until to create at last the situation of scoring in continuous high-altitude also be difficult continuously, so also can not carry out the restriction of any systematicness to it, all at one's discretion the field player freely strive for and create;
In the grand formula ball game of war, can realize that a side of efficient ball-handling will obtain great battlefield supremacy, thereby be in game status extremely initiatively, it can have purpose, rhythm is arranged, have and freely select and transfer the other side---and soldier the other side that cutting edge of a knife or a sword is instigated has to be guarded against that the sudden change of soldier's cutting edge of a knife or a sword makes the other side hard to guard against; All the time the strategy that is in defends a side of status to be transferred by the other side more with the battlefield, is in status passive and vulnerable to attack, loses more the goal bitterly and striking out at last;
Offense's efficient possession of the ball is exactly battlefield supremacy, can transfer exactly the other side's power, can create exactly the right of good attack and scoring opportunity, the power of getting the upper hand of exactly;
The good countercharge ball ability of defence is exactly the strategic containing ability in battlefield, strategic counterforce capability, thus change from passive to active exactly countercharge the other side, the anti-ability that wins the other side;
" ball-handling, variation and transfer the other side, creation attack good opportunity---countercharge ball, anti-transfer, the anti-goalscoring opportunity of creating " will become substance and the process of court game, and grasp good opportunity, one arrow hits, an arrow punching, become get the upper hand of into combat success then becomes link with the most critical of final hit of good opportunity, this link is not good, and all that has been achieved is spoiled;
When containing the version at compound goal 8 at large and small goal of " with the handsome account formula of door " when the low latitude goal system is configured to simultaneously, the danger that the handsome account formula of the high score of the one sword life heart is scored also will cause defence and the difficulty of selecting for the defender, also become simultaneously attacking and defending and transfer one of important dependence of defence, the defence of adding the high-altitude goal system with can attack, that the grand formula ball game of whole war will become will be the combination of intelligence height, that technology and tactics equal altitudes are unified, comprehensively color, integration capability represent extremely strongly Great Game;
In the prominent formula football of part war according to condition and needs, some goals, low latitude, particularly can adopt the not contest method take the pin goal as goal for the larger goal in the combined type goal, to avoid competition area too small, big foot shooting easily damages and shoots the situations such as larger goal is too easy, because the existence at goal, high-altitude is arranged, more high-altitude falling sphere will appear on the field, people can be by potential energy and the speed of lower falling sphere, other position with health heads into ball more, gear enters, push larger goal and score, certainly the little goal of size that arranges for the low latitude, such as the little goal in the compound goal, can adopt take the pin attack and score simultaneously calculation as the contest method of effective score;
In the grand formula football of war, can adopt various attacks mode and the footworks such as flip shot, backward flight, side fly to the attack at goal, high-altitude;
In some fight grand formula ball game, even can adopt people's ladder type, the formula of leaping high, throw that phoresy in the high-altitude such as people's formula, the offensive pattern of high-flying attack, be summarized as follows:
Figure FSA00000536757700041
People's ladder type high-flying attack method: near the goal system of high-altitude or other sportsman of suitable space place climb up after being consisted of helper by one's own side sportsman or occuping on the helper to get ball after getting ball, thereby the chance that hit in people's ladder type high-altitude that formation makes the other side be difficult to defend, so that the possibility of scoring in the high-altitude improves greatly;
Figure FSA00000536757700042
The formula of leaping high high-flying attack method: the sportsman can be take one's own side team member as fulcrum, the height, the boosting strength of while by the teammate that promote own upper punch starting point by " trampling " one's own side team member realize jumping up and aerial stop of maximum possible height, and implement in this course that the other side is difficult to defend and apart from the distance at goal, high-altitude also can be nearer efficient attack, it also can be called bed hedgehopping formula tactics, step on people's formula tactics etc. of jumping up;
Throw people's formula tactics: the sportsman is mainly thrown in the air by teammate's strength, thereby obtains to have accordingly the attack altitude and attack position of advantage, thereby it also can be described as the people and plays method, people's arrow formula tactics etc.;
Above-mentioned high-altitude tactics can make the attacker obtain chance and the advantage of favourable high-flying attack, then can be relative passive if the defender wants to organize corresponding Deep Air Defence and halting to take action, easily lag behind on time, effectively the locus of block also is difficult to hold, thereby the attacker is hit the high-altitude at goal, high-altitude easily to go smoothly, certainly the attacker also can pay for this reason larger personnel too concentrate with physical consumption can be larger etc. the cost of aspect, its ground gets ball again if attack is accidentally dropped, the chance of ball-handling can reduce, thereby obtain the preferably chance of counterattack for the other side easily, so above-mentioned high-altitude tactics is both favourable fraud arranged also, to be the utilization that will realize high level be down to minimum with risk that will failure etc. key;
The high-altitude tactics of above-mentioned form, can be applicable to fight among the grand formula ball game of war such as grand formula handball, war grand formula basketball, the grand Touch Rugby of fighting, the grand formula football of war, it will make the game scene of the grand formula ball game of war have more three-dimensional color, more be imbued with spatial impression, will further promote the excellence, technical and ornamental of whole motion.
5. according to claim 1,2,3 described ball game method and facility systems thereof, it is characterized in that: the concrete structure of whole high-altitude goal system and be on the impact of concrete methods of ball game etc.:
At first, the setting principle of high-altitude goal system concrete structure should be: on the one hand the setting of goal, high-altitude and system thereof should be able to reflect the needs that can facilitate the various inherences that the ball game of high-altitude target formula carries out better best, make its rule that inherence that fully meets motion itself is set and requirement, emphasize the independence of the inherence that the high-altitude goal system arranges and to the material impact of low latitude goal system and whole motion each side; The form of high-altitude goal system etc. also should adapt with the ball game such as existing football, rugby, basketball, handball and the goal system that adopts thereof on the other hand, so that new ball game and game process can be connected mutually, coordinate mutually with existing ball game mode better and unified;
Two, the high-altitude goal system structure with arrange some more specifically situation be respectively described below:
(1), the lower end etc. of the connecting framework 6 of high-altitude goal system is located at outside the whole court as far as possible, to form accessible court, low latitude;
(2), connecting framework 6 can adopt the version of arch, and the structures such as skeleton of bottom, domes two ends are in outside the court, to form accessible court, low latitude, the other parts of high-altitude goal system can be located at below, top and other suitable place of arch connecting framework, and can adopt and optionally can adjust the version that height and position are set;
As required, can adopt the horizontal arch connecting framework 601 that parallels with the court center line;
As required, also can adopt the longitudinal arched connecting framework 602 perpendicular with the court center line, establish at least one high-altitude goal system in the suitable location of longitudinal arched connecting framework 602; The skeleton structure of bottom, longitudinal arched connecting framework 602 two ends can with skeleton structure integrated design and the setting of the low latitude goal system at two ends, court; Longitudinal arched connecting framework 602 can adopt the various structures forms such as single arch formula skeleton of closely paralleling, double-arc skeleton, multiple arch formula skeleton;
When longitudinal arched skeleton structures such as double-arc that employing parallels, can consider to make two distances between the longitudinal framework that parallels close even identical with the width of the skeleton at goal, low latitude, bottom, two ends 9, can make the setting of total system more reasonable thus, more efficient;
(3), at some in particular cases, excessive as working as dimension of the court, directly arrange and stride than accessible court, the low latitude of large space structurally during difficult, high cost, can consider the connecting framework of the high-altitude goal system of the forms such as brace type that on court magnitude setting is the least possible, such as open side type connecting framework 603 of only containing a corbeling etc., if establish two supporting constructions, then can consider to make it can consist of the function of the skeleton structure with needed certain goal, low latitude simultaneously;
Other parts of connecting framework structure 604, goal, high-altitude and the high-altitude goal system that (4), can adopt supporting construction to add crossbeam to add the versions such as suspension cable can be hung on the supporting construction 604a of both sides; On crossbeam above also can being hung on, the suspended-cable structure 604b etc.; The supporting construction 604a of both sides and above crossbeam, suspended-cable structure 604b etc. on optionally setting tool sunshade is arranged, the barrier structure 604C of the effect such as take shelter from rain;
(5), can consider to establish the aerial chinampa of main dependence aerostatic buoyancy and gravity that other aerial floating structure is born the high-altitude goal system etc., its concrete mode can be:
A, the goal, high-altitude is hung at independently on the aerial chinampa by certain syndeton;
B, with aerial goal skeleton and air ball outdoors network framework etc. be set as the version with certain aerial buoyancy, and they are had can further take on balanced ball outdoors net, the location isostructural part of stay cord and even whole abilities of gravity;
C, location structure of tow line are located in the air to the other parts of aerial chinampa and high-altitude goal system, and make them have the ability that to bear certain wind-force interference, the location structure of tow line can lightweight material consists of by intensity is high, locate as required structure of tow line and also can be designed to have the version of certain buoyancy, as adopt by low density material consist of in fill low density gas tubular style version etc.;
(6), the high-altitude goal system can adopt the version that contains goal, high-altitude outer net 4, such as goal, middle high-altitude that contains goal outer net form of ancient Chinese etc., goal, high-altitude outer net 4 is near the certain space of goal, high-altitude skeleton 2 peripheries, and can hang on outside goal, high-altitude skeleton 2 and the goal, high-altitude between the network framework 5, network framework 5 and goal, whole high-altitude outer net 4 can be set as the various shape forms such as rhombus, (length) be square, semicircle, oval, circular outside the goal, high-altitude;
Goal, high-altitude outer net 4 can be blocked and be got to official ball near the periphery of goal, high-altitude the certain space, thereby making the offense have may keep off back when the ball of attack trains off to the attack at goal, high-altitude is conducive to the other side and obtains ball and create the quick abnormal risk such as chance of counterattacking, size that the size of certain this risk also arranges area with size, height and the goal outer net at goal, high-altitude etc. is relevant, thus its also be can select, programmable;
In the match, official ball can be squeezed into the goal and score, also can be returned by bounce-back because hitting the goal outer net, thereby make attack to the high-altitude goal system have favourable goal score and disadvantageously the opposite result such as be blocked, locate to make the attacker will have higher attack level and implement careful attack;
(7), the high-altitude goal system also can adopt the version that does not contain the goal outer net, as be similar to English, the set-up mode of the forms such as American football door, in such cases, even fail to squeeze into the goal and score when attacking the goal, ball also can pass the high-altitude goal system and forward outside the skeleton of goal, to the direction motion away from one's own side's goal, low latitude etc., thereby the probability of the situation appearance that is unfavorable for accordingly one's own side is reduced greatly, the situation that causes ball to be rebounded to return as long as avoid hitting goal, high-altitude skeleton 2 grades as far as possible, both sides all can implement more attack to the high-altitude goal system with lower risk;
(8), imitative basketball goal formula: its can be divided into again have the backboard formula with without the backboard formula;
Have that backboard Shi-it can be similar to the version of the basketball device system of backboard, just it can arrange relatively symmetrically in backboard 10 both sides at least two basket structures 11 and backboard and basket structure and is on the space, court with high height position as the important component part of high-altitude goal system;
Without backboard formula-at least one basket structure directly is located on the connecting framework 12 of high-altitude goal system.
No matter the backboard formula is arranged or without the backboard formula, its bottom of playing the skeleton structure system of the connection functions such as support all can be located at outside the court, to be formed with accessible court, the low latitude that is beneficial to motion system;
As required, high-altitude basketry skeleton both can be horizontally disposed with, also can with the setting that has a certain degree of horizontal plane shape, the form that arranges such as the basketry skeleton 13 that can form the high outside and low outside formula that to score more easily, the syndeton of the outer upper end of the basketry skeleton 13 of two high outside and low outside formulas that be symmetrically set this moment can be handed in a distance, top, can closely be the shape form of placed arrow type thereby can form the side-looking projection;
As required, it is the basketry skeleton structure of a level that the basketry skeleton structure of two levels that are symmetrically set can " unite two into one ", and the corresponding syndeton of high-altitude goal system can connect in the mode of symmetry this horizontal basketry skeleton structure; It is a vertical basketry skeleton structure 14 that above-mentioned two symmetrical basketry skeleton structures that are obliquely installed can " unite two into one ", and the backstop structure 15 with abilities such as certain deceleration and demonstrations of the effect forms such as curtain falling type identical with traditional basketry linked network can be set in the vertical basketry skeleton 14;
The basketry skeleton both can be positive circular formula, also can be ellipse and other suitable shape and form;
The set-up mode that is similar to above-mentioned basketball basketry also can be adopted in the goal, high-altitude of the ball game of other types, can optionally be set as level, inclination, the various ways such as vertical;
(9), the connecting framework structure 6 of high-altitude goal system can be set as the version that can connect dissimilar goals, high-altitude, thereby on space, same court, can select easily to arrange dissimilar goals, high-altitude, to carry out the ball game of different modes and form;
As required, in same ball game, can adopt simultaneously suitable dissimilar goal, high-altitude;
In the situation that is provided with many covers high-altitude goal system, on the different goal system identical goal type and form can be set simultaneously, also not identical goal type and form can be set simultaneously, to strengthen diversity, variability and the excellent degree of heat and content;
(10), on the goal system of high-altitude, can establish at least goal, a center, in the time of need to a plurality of goal being set, can about the goal, center so that on the following peripheral size of establishing some peripheral goals, peripheral goal and form can identical with the goal, center, also can be different;
As required, on the contrary the large I at goal, center and other each goal adopt near the nearlyer goal, position at goal, center can be larger can be less etc. the difference method to set up;
As required, on the goal, high-altitude of the forms such as rectangle, rhombus, ellipse outer net 4, can become the mode of the layout such as cross that some goals are set;
(11), electric hoist high-altitude goal system can be set as required, it can be by being made of the larger a plurality of goal that distributes to less excessive similar calabash shaped respectively successively from the bottom to top, when shooting highly lower and larger goal, bottom, can remember less score, when shooting highly higher and less goal, top, can remember larger score, it is less to form thus the goal of more easily shooting, the difficult larger game form that more meets the game principle and the game situation of goal of shooting;
Both sides at some goals of the above-mentioned electric hoist layout of positions such as being located in the middle of the goal outer net 4 can arrange goal, some left and right sides symmetrically, and the point system of the size at goal, the left and right sides and goal score can be with reference to the situation at the middle goal of close height;
(12), as required, can be on the goal system of whole high-altitude the umbrella crown structure being set, it both can be the net formula form that is made of block formula net and corresponding skeleton thereof, also can be the board-like form that is consisted of by glass, plastics and other structural slab, structural member, with when ball is implemented effective block, the effect such as also can bring into play sunshade, take shelter from rain is to reduce direct sunlight, rainwater etc. to the adverse effect in sportsman and place;
(13) thereby, the high-altitude goal system can become the motor-driven usefulness of utilizing that promotes whole court facility and space every systems such as protecting wire nets in court simultaneously:
It not only can become a kind of optionally low latitude goal system that has after being reduced to the height of adjustable high-altitude goal system to a certain degree, can also optionally make the high-altitude goal system become the motor-driven every systems such as protecting wire nets of court, be beneficial to the efficient utilization in space, whole court;
As required, (sealing) closed with structures such as nets in all goals, high-altitude, then corresponding whole goal system both can become can to official ball carry out the gross area block every the protecting wire net system, if will be in overhead goal, the zone such as middle part, court---fall to suitable height on the ground every systems such as protecting wire nets along corresponding structural system, then former larger area court can be separated easily and be a plurality of court system, vice versa more easily is returned to original larger area situation, thereby makes whole court equipment and space system thereof have good changeability and applicability;
In the middle of can establishing simultaneously in the larger court of standard football pitch and other area and front court, back court be totally three high-altitude goal system, if as required, the bottom, goal of middle high-altitude goal system is fallen to ground, simultaneously each goal sealed with net, then the primary standard football pitch can be divided into two identical new courts; By setting up motor-driven low latitude goal system, and the goal, high-altitude of front court, back court is adjusted to suitable height, then can forms two the grand formula of new war court systems;
As required, if the bottom, goal of the high-altitude goal system of front court, back court is fallen to ground, simultaneously each goal sealed with net, then the primary standard football pitch can be divided into three new courts in court in the middle of comprising, court, two outsides; By setting up corresponding motor-driven low latitude goal system, and goal, middle high-altitude is adjusted to suitable height, the court becomes the grand formula of war court system in the middle of then can making; Court, two outsides then can be used for the traditional football motion;
Because the standard football pitch has 68 meters large width, each high-altitude goal system also can be horizontal two covers and many covers goals, high-altitude are set, so the above-mentioned formed less grand formula of war court system further laterally can be separated out two and the grand formula of a plurality of less wars court system with lower net etc.; As when middle high-altitude goal system is fallen and be made as filter after formed two the new grand formula of less war court systems separate further again, thereby can form four, six and even the grand formula of more less wars court system in the place in whole standard football pitch and space, thereby can make the more people grand formula football that participates in fighting;
In fact, when in a large space, court (such as space, standard football pitch) top two and even a plurality of high-altitudes goal system being set, and make this large court space system as a complete large court, for the sportsman of two teams, two forces have at many levels, when the attack of multiple tracks high-altitude goal system and large space depth and game, it is also larger that the grand formula ball game of the wars such as the grand formula football of whole war will have the meanings such as stronger space warfare color, its entertaining and inspiration;
Because the existence of a plurality of high-altitudes goal system and can being attacked, it makes the very big part position in whole court can become the direct attack point that gets, the transfer velocity of ball between many direct attack points also can be accelerated greatly simultaneously, so the defence personnel's that will make the difficulty of defence and need to drop into quantity increases significantly, thereby can make both sides drop into more forces and participate in whole motion, in some time the part sportsman may be generally relative be active in some FX, with the attacking chances of tackling unexpected acquisition and the defence task of facing suddenly, other sportsmen then undertake the task of large zone and even whole fast reserve, certainly the large zone of high flow rate and even the task of whole court fast reserve can be undertaken by sportsman's alternate turns of different piece, thereby make entire squad have all the time efficient fighting capacity;
If do not carry out the grand formula ball game of war of the large space of whole formula of above-mentioned unification, then can utilize above-mentioned many high-altitude goal system and on goal, many high-altitudes carry out air battle rehearsal between many troops, thereby can make more personnel utilize simultaneously space, above-mentioned court, to improve the utilization ratio of whole ball park, space and facility largelyr.
6. according to claim 1,2,3 described ball game method and facility systems thereof, it is characterized in that: the concrete structure at goal, high-altitude and be on the impact of the concrete methods of ball game:
(1), Buddhism formula: the space is fully empty naked in the goal, does not establish the goal form of any section gear structure, and it can make the official ball of shooting the goal, high-altitude pass through the goal without any obstacle ground;
(2), the net formula of hanging down: vertical and have the vertical shop front at the goal that certain vertical angle of inclination arranges and space and set the vertical web frame in goal that end and the left and right sides can automatically change and open under can the impact force action at ball, thereby can make the ball with certain attack dynamics enter opponents' court and score by the goal, can suitably reduce simultaneously the pace of ball so that the goal, high-altitude score be unlikely to fly excessively far away, be unlikely to directly to fly out the place; The vertical net system in goal can automatically be in state and the position of direct soft block goal correlation space with returning vertical laying under the effect of self gravitation and other suitable power;
(3), curtain falling type: the vertical structure line that parallels of the stretching some even layings that naturally drop by relying on gravity, stay cord 17 grades consist of the goal form of the soft block structure in space in the goal, can all hang in the lower end of each soft block structure stay cord 17 and to establish little weight 18, so that stay cord can be by naturally stretching under the action of gravitation of little weight 18 after by the ball impact bending, but each little weight 18 can all be arranged among the structural frames that includes the relative closure space 19 of balling-up lower door frame effect, each soft block structure stay cord 17 need pass to be located at the corresponding minor structure hole on the structural frames 19 and to be connected with little weight 18, with the needs that satisfy safety and do not disturb mutually etc.;
(4), drag rope of elasticity formula: by the structure line that parallels that relies on the stretching some even layings of elastic force, stay cord 17 grades consist of the goal form of the soft block structure in space in the goal, can all hang in the lower end of each soft block structure stay cord 17 and to establish spring 20, so that stay cord can be by naturally stretching under the effect of the pulling force of spring 20 after by the ball impact bending, spring 20 also can all be arranged among the structural frames that includes the relative closure space 19 that can play the woodwork effect, and each soft block structure stay cord 17 need pass is located at the corresponding minor structure hole on the structural frames 19 and spring 20 is connected;
As required, among structural frames 19, also can establish at least one with soft block structure stay cord 17 nearly perpendicular drag rope of elasticity 21, each soft block structure stay cord 17 can all be connected with drag rope of elasticity 21, thereby can realize relying on the stretcher strain of drag rope of elasticity 21 and the effect that makes each soft block structure stay cord 17 distortion and ball is passed through;
As required, each soft block structure stay cord 17 itself can be the spring rope with good bullet sex change energy, can effectively pass through the goal to guarantee the official ball that hits accordingly the goal;
(5), umbrella hat type: contain the goal form that forms the angle that suits between the suitable space place that is located at goal, high-altitude top and the goal, high-altitude, can form the umbrella hat type block structure of suitable block effect to the ball of high-flying attack, umbrella hat type block structure can be the net formula form that is made of block net and corresponding skeleton, thus the umbrella hat type block net system of putting on also forming; As required, umbrella hat type block structure also can be made as membrane type, the version such as board-like;
(6) goal, high-altitude both can be various single formulas goal, also can be the combined type goal of containing simultaneously big or small goal and the combined type goal of alternate manner;
(7) round target formula goal system: contain simultaneously goal, center 22 take minimum in large goal as target center, form outside some goals arranged evenly successively circlewise, each ring-type goal skeleton 23 can by simple and direct as far as possible, meet the as far as possible little syndeton of sphere area 24 and be connected, each ring-type goal skeleton 23 both can be in as required same plane, also can non-ly be in same plane; Hang the different net of length on each ring-type goal skeleton, the net that wherein is in the inner end can be longer than the adjacent net that is in the outer end, and the net 25 at goal, center 22 can be the longest, with this goal at different goals can be distinguished more significantly; Can form the required suitable angle that arranges between plane, skeleton place, ring-type goal and the horizontal plane, both can be the zero degree that parallels, also can be 90 perpendicular degree and other suitable angles of inclination;
The setting on the whole of round target formula goal can be similar to the setting of aforesaid hoop formula goal system, and it both can be located on the goal system of high-altitude, also can be located on the goal system of low latitude; When the round target formula goal of angle of inclination form is located on the high-altitude goal system at court middle part, be the attack requirement that adapts to opposition both sides different directions, need to arrange in pairs symmetrically;
The buffering web frame of the suitable forms such as curtain falling type can be set, with the Negotiation speed that suitably weakens ball and be beneficial to identification goal position etc. in the vertically disposed round target formula goal;
Squeeze into the goal at minimum goal, center 22 in the match and can remember maximum score, what scored and remember in other each ring-type goal must can reduce by score value from inside to outside successively, and minimum score is remembered in the goal at the ring-type goal of the maximum of outermost end;
(8) relevant each goal, high-altitude can be set as variable versions such as can selecting increase and decrease, switch, convergent-divergent as required, to adapt to the different requirements of different balls war forms and process.
7. according to claim 1,2,3 described ball game method and facility systems thereof, it is characterized in that: can adopt the ballistic goal, and then can be bordering on the ball game campaign of simulation modern war missile attack war and anti-missile interception war:
Ballistic goal: in the middle of the goal, be provided with the wikipedia type trajectory passage 26 that can signify the missile flight trajectory, inner small and outside big horn mouth formula structure 27 can be established in the two ends of wikipedia type trajectory passage 26, and both ends open is large, the version at the ballistic goal of intermediate elongated thereby form;
The needs of the visual match of length of wikipedia type trajectory passage 26 etc. are determined; The sectional dimension of wikipedia type trajectory passage 26 can the little ball that accuses each other to making two relative motions can't be simultaneously by, the degree that can only mutually collide;
Among wikipedia type trajectory passage 26, can establish as required soft section gear structure 28, to play the effects such as movement velocity that delay the ball that passes through; Also can among the horn mouth formula structure 27 at wikipedia type trajectory passage 26 two ends, establish as required soft section gear structure 28;
As required, can establish goal ectosphere web frame 4, the ball of playing the attack on goal ectosphere web frame 4 will be blocked, thereby make attack to the ballistic goal also have income and risk simultaneously and chance and the effect of depositing;
As required, can establish simultaneously in the goal system of high-altitude various ways from the size different ballistic goals;
During match, being in both sides sportsman in the antagonism can be simultaneously or attack respectively together same ballistic goal from the both sides, goal differing in extremely short time, after both sides almost shoot respectively the horn mouth of both sides, goal simultaneously, both sides' attack in most cases can be met, bump against in long goal wikipedia type trajectory passage 26 with ball, and following three kinds of basic conditions appear in the possibility of result of bump:
A, both sides attack with ball because all attack accurately and the attack dynamics suitable, all fast bounce-backs and all fall after rise to we and attack the place after meeting, bumping against, this moment, both sides can be evenly matchedly, optionally can all forget minute, also can optionally all record score;
B, the attack degree of accuracy and the dynamics of one side's ball obviously are better than the opposing party, as: a side attacks and directly enters goal wikipedia type trajectory passage 26 with ball, not at bell-mouth structure of air 27 places in the outside because of collision, break-ins etc. consume kinetic energy or consume very little, and the opposing party may be owing to attack not accurate enough, ball at the horn mouth place because of the collision, it is larger that break-ins etc. consume kinetic energy, although also may standard but the situation such as ball speed and dynamics be inadequate, after causing two balls to bump against, fly in pairs and enter and fall to weak tendency one side's court, thereby make advantage one side obtain the situation of double play and double and even many times of scores;
Under certain above-mentioned condition, weak tendency one side also may occur and be hit back own half with ball, and rest on situation among the trajectory of goal after the hitting with ball of advantage one side, this moment, advantage can be remembered corresponding score, both sides can continue to attack the ballistic goal of this ball that retains attack last time, the situation of opponents' court may occur being squeezed into by the ballistic goal simultaneously with ball more than two in the corresponding new attack, thereby be that advantage one side creates larger scores;
Utilize the ballistic goal, can carry out the match that each side all can only be in the indirect confrontation type of own half all the time; Also can carry out the match that both sides all can enter the facedown formula that opponents' court attacks, defends and control ball;
As required, the match of a complete facedown formula can be divided into some joints, initial in the match of every joint, both sides sportsman's large section and even all can all be in first own half, and part so all the sportsman all but everyone holds at least a ball bullet and starts the ball bullet to attack to the ballistic goal, after commence firing, by the ballistic goal shoot the space, away ground for the score live ball, not by the ballistic goal but the score live ball not of being that enters the opponents' court space, the ball bullet in own half space of falling back after being stopped by the goal outer net and being hit by the attack of the other side's ball is dead ball, dead ball will be stood down, but and score live ball and all sustainable participation matches of score live ball not;
As required, both sides all can come and go and fight in one's own side and opponents' court: hold ball, control ball, cut to, attack and defend, in each was attacked, hit a ball outdoors net and kick-backed behind the one's own side court by other marble of marble all became dead ball and stands down; The mid game stage ace-shot ratio of squeezing into goal, low latitude, the other side two ends and other special balls door can be calculated dead ball and stand down; The mid game stage is got also at last dead ball and standing down of marble out-of-bounds, if but squeeze into first directly to fall again behind the goal, high-altitude and then will count corresponding score outside the court;
One can select apart from the edge, court goal, high-altitude near but that can arrange littlely to attack, and squeezes into less goal, high-altitude and it is directly fallen into outside the court, can remember larger score and the other side is lost the chance that obtains ball and counterattack;
Club through the competition on the canto time back court is fewer and feweri, when remaining last official ball and the end of match time also not then, to remain and carry out the form of single ball Great War on the field, until fixture finishes, the mode of the single ball Great War in other grand formula ball game of fighting that the mode in single ball Great War stage and method can be introduced with methods and this case of existing ball game is close with method same;
In fact, if condition is permitted in the match, in the match such as the indirect type antagonism that all is in all the time own half in each side, and for example all can enter the Competition Phase of the non-direct contact antagonism in the direct-type antagonism match of opponents' court in each side, (initially waiting the stage as competing), both sides all can start the successively fast intensive attack of the continuous saturation type of running fire of many balls to a certain or some ballistic goal simultaneously, to strive attacking the attack of suppressing efficiently and hit the other side and the other side with group's bullet that dynamics is accurately arranged; In high-caliber match, the many ball bullets of both sides may meet simultaneously, meet, bump against among the narrow ballistic space at corresponding goal, the multiple result of attacking against each other will occur at last, whole process will be unusually brilliant, create mirable competition scenes and payoff;
If both sides are offensive attack simultaneously, then in the shortest time, will attack with group's bullet that the other side is lived in the advantage compacting of maximum with a side of the precision of maximum and the maximum ball bullets of dynamics tapping, at last more ball bullet is squeezed into, bangs into, sent into the other side's position, court, thereby create maximum score and triumph;
In the match mode of indirectly antagonism, after the ball bullet of both sides' specified quantity and form has been beaten, then can be considered independently end of the trifle ball match of complete attack echelons thatch of symbol, squeeze into the other side's ball bullet total quantity and total taste accounts for the superior's victory; But in the form of play of facedown, one square tube is crossed the ace-shot that the other side is shot at the ballistic goal, can continue as one's own side sportsman grabs, controls, and can be from the passback of the inferior space of door can form the new attack to the ballistic goal, certainly also can directly control ball forward to the other side's the offensive attacks such as goal, low latitude;
Process and the scene of the missile attack but above-mentioned ballistic goal and the many balls of many bullets are attacked against each other etc. simultaneously in the modern war of game mode simulate and anti-ballistic volley etc., when guided missile is attacked against each other and the large postwar of anti-missile interception, both sides sportsman can fight for and strive for the ball and make great efforts to hit the goal, low latitude of getting the other side to opponents' court, continuation extremely, thereby exploit success or retrieve the rough sledding of guided missile in attacking against each other, but the general flow process of its simulate and deduction modern war and shell type method.
8. according to claim 1,2 described ball game method and facility systems thereof, it is characterized in that: can adopt the space, vacant lot that can utilize efficiently city etc., have from the court apparatus system every the room cage of functions such as protecting, can modify tone, it both can be the pure cage construction form that only is made of corresponding skeleton and various net 29 etc., also can be roof and periphery have can be rainproof, the room formula version of the functions such as sunshade and even holding chamber internal gas pressure; At least be provided with a high-altitude goal system in the room cage type court apparatus system, can be provided with simultaneously the low latitude goal system of requirement; The places, locus such as room cage type court apparatus system can be built on the ground, waterborne and building roof;
Room cage type court apparatus system can adopt following more concrete different forms and form according to space, place, ball game type philosophy:
(1), high tower: this kind room cage type court apparatus system is similar to high wide larger point building at appearance profile, so can be described as: " high tower ", it is suitable for take empty day Great War---and the attack to the high-altitude goal system is main game exercise, because its relative floor space is less, the city high for site coverage also can adapt to preferably, the less that its goal, low latitude can be established is to adapt to the little characteristics of plane, court depth
According to needs such as space, place, plastic arts, the high tower court facility system of guided missile moulding can be set, its floor projection can be the difformity forms such as circle, ellipse;
In the room of high tower and some other forms cage type court apparatus system, because horizontal space size and place circumferential size are all relatively too small, can adopt accordingly height greater than width even the obvious larger goal, vertical low latitude of high wide ratio, to be convenient for people to falling spheres such as high-altitudes with head, shoot the goal with chest, abdomen, leg etc., simultaneously can stipulate and deliberately directly to attack above-mentioned vertical goal with pin that pin is attacked ball, and score and possession of the ball are not given to the other side yet; As required, in inside, vertical goal less goal can be set, even class is brought up the form such as chamber in ancient Chinese less goal can be set, less and even less goal can score the goal with pin for people;
(2), mongolia yurt type: it can be considered a kind of special shape of ridge room formula, its top can be the shape forms such as hemispheric, centrum formula, in the space of top bump configurable suitable form the high-altitude goal system, court, bottom etc. can be the forms such as circle, ellipse;
(3), the orange field device system of the forms such as above-mentioned guided missile formula, mongolia yurt type can be set as required can be under the effect of the power such as manpower can integrally rotated version, thereby make corresponding room cage type court apparatus system not only can make people carry out corresponding various ball game in the section space within it, also can allow people outside and inner by promoting or the mode such as pulling makes it carry out whole rotatablely moving to make people obtain to take exercise at it;
As required, can form that the motion such as ball of part population in inner place and the space responds to and cooperate with each other across a great distance with the collective motion that space externally (also can comprise inside) promoted and spurred the integrally rotated part population of whole apparatus system, the motion scene of phase mutual excitation etc.;
As required, the power that everybody drives the whole apparatus system of lower rotation can be converted into electric power by suitable mode, thereby make this exercise process can create certain energy and economic worth simultaneously, the electric power that produces can be directly or is supplied with the needs such as illumination of whole telecontrol equipment system by modes such as electric power storages;
As required, whole apparatus system can be by the main part of the apparatus system on the circuit orbit system of bottom, top, be located at some wheel constructions below the main part of apparatus system on top etc. and form; The main body of whole apparatus system can be in shuttling movement on the circular rail way system of bottom by some wheel constructions that its underpart arranges, the rotatablely moving of the low angular speed of the main body of whole apparatus system under the manpower effect can be changed the rotatablely moving of higher angular speed of some wheel constructions that its underpart arranges into, and some wheel constructions can directly or by necessary accelerator drive motor generate electricity; The process of generating also is the process that the resistance of motion is provided for whole telecontrol equipment and people's exercise motion; The adjustable resistance structural system that also can add independently as required or work simultaneously with TRT, thus the needs that people carry out motion and exercise preferably by driving the said apparatus system can be adapted to better;
As required, also can establish in the orange field device system of the forms such as the guided missile formula that is fixedly installed, mongolia yurt type can be under the effect of the power such as manpower can be around the structural system of orange field device rotation, thereby can in the complete actionless situation of whole room cage type court apparatus system main body, still can realize aforesaid in outside the venue simultaneously scene and the function of motion, still can make whole apparatus system performance multiple action; Can in the circuit orbit cocycle campaign of being located on the orange field device system periphery, can certainly allow to do shuttling movement by circular ring-shaped track provided thereon in the structures such as some steamboats of being located on the orange field device system periphery around the structural system that the orange field device rotates by the structure such as some steamboats provided thereon around the structural system of orange field device rotation; Thereby in the above-mentioned motion structure such as some steamboats can obtain higher rotating speed can be directly or by corresponding accelerator drive motor generating; The adjustable resistance structural system that also can add again independently as required or work simultaneously with TRT;
(4), ridge room formula: namely can be the room cage type court apparatus system that is similar to the construction style that contains the raised ridge structure in middle part and space, the space place raised at the middle part establishes the high-altitude goal system, the dimension of the court of this kind form is changeable, the setting at goal, low latitude is flexible choice according to circumstances also, can as one of principal mode of room cage type court apparatus system, can be applicable on the suitable space and place of vast Urban Areas generally;
(5), trapezoidal roof type: the vertical section of top ridge structure and space profiles is the room cage type court apparatus system of tapered in form, and it is more suitable for being provided with simultaneously in the ball game of two and a plurality of high-altitudes goal system;
(6), overhead type and hanging type: whole room cage type court apparatus system is located on a certain space by some strut supports of bottom or is relied on that corresponding syndeton is unsettled is affiliated on some larger structure and building system, because built on stilts or unsettled setting, so whole apparatus system can directly not take or only take minimum ground space, thereby can make ground under it and space as uses such as road, land use for greening, other athletic grounds;
As required, on the outside at overhead type and apparatus system top, hanging type court, can add outside upper high-altitude goal system, overhead type can consist of the grand formula of outdoor war court system with the place in apparatus system (outward) lower end, hanging type court and the peripheral certain limit thereof and space with outside upper high-altitude goal system etc., overhead type and hanging type room cage type court apparatus system are in the central area of the grand formula of above-mentioned outdoor war court space system, form the spatial relationship form of parcel room, outdoor court cage covered court;
As required, the outside in overhead type and apparatus system bottom, hanging type court also can hang outside lower high-altitude goal system simultaneously, and outside lower high-altitude goal system can be independently or consisted of the grand formula of outdoor war court system with outside upper high-altitude goal system with ground space etc. is common;
(7), greenhouse and " solar tower " formula---utilizing the materials such as plastics with impact resistance, glass to construct can be every the greenhouse type that protects, has an X-rayed, views and admires and can gather sunlight, the insulation degree court of moving, when whole greenhouse type motion court becomes the high tower shape form that is easier to poly-harvest season season sunlight, namely can be described as " solar tower " formula;
The setting of the means such as the daylighting by necessity, insulation, ventilation, sunshade, greenhouse and " solar tower " formula court system can create better natural cool in summer and warm in winter and air pressure adapt circumstance, thereby are particularly suitable for the use in the areas such as cold, severe cold and high height above sea level;
(8), that semi-underground type---court system bottom is in is underground, top is in the room cage type court system that contains underground sinking space form on the ground, it can take full advantage of the underground space, reduce whole court system ground level, have feature cool in summer and warm in winter, simultaneously the wall of under ground portion can naturally be built into easily again cheap and durable every protecting and the enclosed construction system, thereby reduce the cost of the life cycle management of system; And aerial part can be set as full cage net formula, contain the forms such as rain and sun roof type and aforesaid greenhouse and the sun be tower;
(9), cage in the cage: also can be described as room formula in the room (double deck formula), on the suitable location such as the center within the larger large room cage type court apparatus system in vertically height and space and space, can build less being similar to aforesaid bottom breaks away from ground fully and unsettled cabin cage type court apparatus system, the space that corresponding size should be continued to employ in cabin cage type court apparatus system top outer and the periphery outside is for the large high-altitude goal system that large room cage type court apparatus system is set and as the passage that large high-altitude goal system is attacked etc.;
Space and the facility system of the grand formula ball game of war of the completes such as spatial channel that the space of unsettled cabin cage type court apparatus system bottom is attacked with above-mentioned large high-altitude goal system and to large high-altitude goal system;
Above-mentioned method to set up can be utilized space and apparatus system more efficiently, it can not increase whole apparatus system and shared space size thereof, when the ball in the large room of the simultaneously not excessive impact cage type court apparatus system is fought the motion game, increase and corresponding cabin cage type court apparatus system, and to the larger cabin cage type court device of width further transverse region be separated out several less room cage type court apparatus systems;
Owing to be in the existence of the cabin cage type court apparatus system of zone position in the space, the high-altitude ball in the large room cage type court apparatus system is fought, and some is similar to mountain on the other way round and the artillery action of carrying out every sky and the war of guided missile;
When large room cage type court apparatus system adopts the partly-exposed basement form, the bottom of its inner cabin cage type court apparatus system that arranges can with ground with high, the also certain altitude that can be above the ground level, thereby form all cage---large systems of double deck formula in the cage good and that efficiently utilized the underground space of total use function and art of architectural modelling;
As required, in the cage cage type court apparatus system can be around the center according to big-and-middle contain contain in little, little less mode be designed to contain more multi-layered time the version of multiple sheathed formula;
(10), skeleton inflatable---court components of system as directed and even whole skeleton all adopt the version of the inflatable with functions such as can conveniently packing up, thereby consist of together the inflatable back bone network, on the inflatable back bone network, can establish the light-duty safeguard structure of the forms such as net formula, membrane type;
(11), inflatable in whole: the structures such as whole facility system periphery employing membrane type are sealed, and the space is filled with have certain air pressure that is higher than atmospheric environment air pressure, utilize the inside and outside draught head of system to prop up the membrane structure etc. of whole system periphery, simultaneously, ad hoc load-carrying members face above the goal system of high-altitude, establish the load-bearing skeleton net on the load-carrying members face and can rely on the come-up such as the closing membrane structure of the poor come-up of system's inner and outer air pressure, the load-bearing skeleton net can be made of main framing and branch's skeleton etc., branch's skeleton is distributed in equably on the whole load-carrying members face and with the come-up structure at each place, zonule and directly links to each other, combine, even with the buoyancy that makes progress that whole come-up structure is subject to, pass to fully branch's skeleton, main framing and whole load-bearing skeleton net, thereby can make each main framing and the whole load-bearing skeleton netting gear that are connected with all multiple-limb skeletons that suitable weight capacity is arranged, and then can on some main framings, directly hang and establish the high-altitude goal system;
As required, can set up simultaneously in the some zones that do not join some independently load-carrying members faces separately, thereby on the more large-area come-up structural plane with buoyancy that makes that corresponding gravity load can drop on whole interior inflatable facility system top more equably, can hang simultaneously on some load-carrying members faces and establish a high-altitude goal system, also can hang simultaneously and establish a plurality of high-altitudes goal system;
As required, the skeleton structure of the empty goal system of above-mentioned load-bearing skeleton net height etc. can further be set as the version of the lighter weight of the forms such as interior inflatable, can reduce like this gravity load of whole system, be beneficial to again the high-altitude goal system setting, pack up and safety, can make above-mentioned interior inflatable skeleton structure etc. with whole in the pneumatic system of inflatable court system unified mutually;
As required, also can ad hoc at least being exclusively used in of form such as arch hang the large span inflatable skeleton structure of establishing the high-altitude goal system in the apparatus system of inflatable court in whole, large span inflatable skeleton structure can connect as one with the come-up structures such as closing membrane that rely on the poor come-up of system's inner and outer air pressure; Because large span inflatable skeleton structure itself can be carried certain gravity load, acting in conjunction at the available larger buoyancy of come-up structure that adds the dependence inside and outside differential pressure that continuous area can be larger, can further make total can carry the weight loading of larger high-altitude goal system etc., certainly, pressure reduction inside and outside the space system of whole court is suitably reduced, keep the poor required relevant power consumption of whole court space system inner and outer air pressure more to adapt to the needs of people motion etc., can correspondingly reduce simultaneously;
The above-mentioned whole interior inflatable spatial structure system that contains large span inflatable skeleton structure, even do not establish the structures such as goal, high-altitude, not as the court apparatus system, its set-up mode is also favourable in many-side, can be applicable in other many interior inflatable spatial structure system;
Inflatable court facility system in the above-mentioned integral body is particularly suitable for place and the situation of the narrow spaces such as city, is particularly suitable for the ground of the unfavorable motion of high height above sea level rarefaction of air, is particularly suitable for relying on cold and the severe cold area of environment temperature in the lifter motion such as solar energy; It can be the morphology form such as tower, arched, ridge room formula on the whole; It should both fully satisfy the needs of space, can consider efficiently to utilize again the needs of solar energy, geothermal energy, thereby can adopt the membrane structure with abilities such as high-efficiency lighting insulations to reach the frame mode that optionally can adopt half ground formula;
(12), water boat formula---can utilize Water space to build fixing and the court system of water boat-shaped formula movably, this court system can all be built on the water surface deck, also can adopt the mode of similar aforesaid " semi-underground cell-type ", the bottom of court system is among the cabin that is lower than the water surface, even can make whole court system be built in the top of other appropriate architecture body on the ship, thereby the boat that makes whole ball war can have better space utilization ability, and the boat of ball war also can become the new-type travel tool with functions such as pleasure-boats, and the boat of large-scale ball war also can become the large-scale new-type pleasure-boat with brand-new characteristic; Certain above-mentioned ball war facility system also can be located among the boats and ships of other purposes, for uses such as crewman and passengers.
9. according to claim 1,2 described ball game method and facility systems thereof, it is characterized in that: can utilize the deliveries such as special vessel, car first and even " power " aircraft and armament systems to carry out corresponding game Great War:
At first, can on the suitable water surface, establish high-altitude and low latitude goal system, the Great Game that opposing teams can carry out corresponding ball game waterborne by Waterborne movable modes such as vessel, swimming;
Can imitate aforesaid ground set-up mode waterborne fixed high-altitude and the low latitude goal system of suitable form are set, to realize being similar to the game process waterborne of ground game process, can on all or part of competition vessel, establish simultaneously movable goal system, both sides sportsman not only can resemble in court, aforesaid ground match like that by attacking high-altitude and low latitude fixedly goal and score in the match, can also pass through movable goal on attack the other side ship and score;
High-altitude waterborne goal system and low latitude goal system can be located at relatively fixedly on vessel, the chinampa etc., the match that drives with at least one people can come and go, gallop on the whole match water surface with vessel, player on the vessel can utilize that hand, foot, other suitable position of health and club etc. are held ball, the batting instrument, realizing obtaining ball, ball-handling, and catch and create openings makes great efforts ball is shot the other side's goal, low latitude and goal, corresponding high-altitude;
Also can establish the portable goal system of moving with vessel in all or part of match of both sides on vessel, both sides match can be attacked goal on the opponent vessel with ball with the player on the vessel, hit and score, both sides' man-of-war will all be in the continuous motion in the match, can prevent preferably position and the state attacked to create favourable attack position and state and to form; Both sides drive between power hand that vessel advances and the player who is responsible for attacking etc. and want the close coordination of height of formation and cooperate, and reach fixedly effective attack at goal to create at the volley and to catch favourable attack opportunity to finish rapidly the other side is moved the goal;
After the movable goal on a certain match vessel is hit, the offense not only can remember minute, also can be in some cases, as hit the other side a certain lifeblood formula goal and non-lifeblood formula goal and repeatedly hit etc. in the situation, all players that can declare on this vessel and the ship stand down together, thereby make score side obtain the upper advantage in larger field, it is also consistent with the war rule such as real sea warfare simultaneously;
Can be equipped with some suitable model on each vessel of both sides, the attack ball of suitable number, the attack of the different model weight of ball, shape and size etc. can be not identical, be beneficial to in distance, just, size, sound, choice for use in the attack at the goal that the aspects such as speed are different, certainly, if the various attack of suitable number all is finished with ball, then corresponding vessel system will lose attacking ability, in the time of need not stood down but if it does not inflict heavy losses on, it on the one hand also can be as the fixing shield of goal system in the important vessel of other one's own side and low latitude, can also disturb and destroy in the mode of other allowance adversary's attack action on the other hand, such as passage, hinder that the other side passes through etc.;
Power hand in the above-mentioned vessel system and control hand etc. and can be among the space system of the safety that is surrounded by net protection structure 30 and cabin etc., so that its not under fire threat of ball, net protection structure 30 can consist of portable goal system on the vessel jointly with other web frame etc. simultaneously, when the ball of attack hits above-mentioned net protection structure 30 and other web frame, its impulsive force can by the absorptions such as door net with dissolve, the ball of attack can be at the ABC of ends off the net in effect whereabouts such as gravity, and can enter among the ad hoc ball gathering system through ad hoc collection channel, the situations such as the number of times of being hit by a bullet with this provable this ship, the used marble of both sides can have obviously not identical color as required, pattern is to make things convenient for differentiation etc.;
Attacking driving hand in the vessel system can nakedly be on the suitable location of vessel, also can freely move and obtain best attack position to implement efficient attack; The attacking driving hand can determine whether to undertake the protection of this ship goal system according to circumstances, and the removable goal system on each vessel also can determine whether to establish goal defence personnel according to circumstances;
If two, with court, displacement land, court waterborne, simultaneously above-mentioned vessel waterborne is become land car first, then can form game form and the game playing system of the land car first Great War of similar aforementioned vessel Great War waterborne;
Three, motion and the court of game can be located at waterborne and land area simultaneously, corresponding battle on water vessel and land battle Che Jiake participate in game simultaneously, form " land sea Great War ", its can be that is virtually reality like reality the certain situation of land sea Great War, and the game battlefield is among artificial space and the real place;
Four, can adopt with waterborne, on the ground have that motor-driven vessel, Che Jiawei than strong power supports and the nature's mystery system of traction participates in game, whole nature's mystery system can and be in the connection drive system at middle part and the connected system of flight system etc. by the flight system at the drive system of bottom, top and form; The aircraft system at top can be in higher space all the time; On the nature's mystery system, can establish some attacking driving hands, driver etc., establish at least one goal, high-altitude in the suitable location of nature's mystery system simultaneously, to consist of the high-altitude target target control system of the activity that can Gong accuse each other;
Aircraft system on the flight system at top can directly be on the connected system of middle part regularly, can be aircraft and provide on the motor platform system of Multidirectional motion space and Multidirectional motion ability on the connected system top, middle part also can flexibly be provided, thereby aircraft not only can be moved with the drive system part on the water surface, ground, also can in certain height and spatial dimension, have faster motor-driven abilities such as independently can carrying out top to bottom, left and right, front and rear, thereby further promote the comprehensive ability of fighting such as air mobile, attack and defence of aircraft system;
Because the power of nature's mystery system is large, its movement velocity can be apparently higher than the movement velocity that relies on manpower, weak motor-driven power-actuated vessel, car first system, can be in all the time higher locus and have preferably airmobility owing to it simultaneously, so no matter it is the attack to the activity that is in waterborne and ground and fixing goal, low latitude target, or all can form obvious advantage to the attack that is in than goal, the fixed high-altitude target in high-altitude;
High-altitude goal system in the nature's mystery system etc., also nature can become the active attack target of the ball bullet of launching on Ground Vehicle first, the water surface vessel etc., and both sides' nature's mystery system also can be among the game of target of attack each other certainly;
As required, whole nature's mystery system also can become the attack system by the solid of the common formation of the institute of the attacking system (player, batting instrument etc.) on the platform of the multi-level differing heights such as bottom drive system, middle connected system, top flight system, it not only can have height and the speed advantage of air attack like this, also has simultaneously the three-dimensional powerful attacking ability that can be similar to aircraft carrier fleet; Certainly on the other hand, correspondingly also can establish multi-level a plurality of goal system of the differing heights that can be used as the target attack on the nature's mystery system;
Five, different from aforesaid bottom motor driven nature's mystery system, also can establish as required rail mounted nature's mystery system:
By on the whole can with the direction of the perpendicular direction of high-altitude goal system and other matters on establish the flight track system that can move for quick high-altitudes of aircraft such as aircrafts, realize that the aircraft such as aircraft is in aspect advantages such as height and speed;
As required, the flight track system can be built on the domes system of large span of whole court system, certainly simultaneously can establish the systems such as high-altitude and goal, low latitude on the domes system of large span;
Rail mounted nature's mystery advantage of system is: set-up mode and structural system are relatively simple, and shortcoming is: the flight path of aircraft is limited on the specific track, makes it lose larger outmaneuver, becomes easily locked target with attacking;
Rail mounted nature's mystery system is more suitable for building land in, contain the land of the water surface, island, land and have on the water surface on island of more comparatively dense;
Six, by setting and the utilization of above-mentioned water, land and air sky system, can form the methods of the ball game of more complete simulation modern war:
In the ball game of above-mentioned situation and alternate manner of the present invention, can adopt directly as required, indirectly rely on the delivery device of manpower and other strength emission ball bullet and the ball pitching tool of other form to participate in match;
In the match, both sides can select first to hit the other side's reserve force or seize the critical positions that threatens the safety such as opponents' goal, thereby weaken and transfer the enemy, obtain battlefield supremacy;
The core bead door etc. of goal system that is in the positions such as low latitude at both sides' great depth rear can be considered one of game both sides' strategic interests of wanting most and lifeblood, the ground that both sides must go all out to fight the floods, so will become the most important attack of both sides and defended target, become simultaneously important the inducing and relying on that can transfer the other side's strength; As the fixed high-altitude goal system that can signify the important war system such as the empty day target such as satellite, the trajectory of missile attack, the node of anti-missile interception and key element aspect, it also is most important attack and defense target; Vessel, car first and nature's mystery etc. have the common both sides' of formation such as the technical equipment of the higher performance such as motor-driven and the power hand on it, driver, player, commanding effective strength, are the main bodys of game, are the keys and basis that determines victory or defeat.
10. according to claim 1,2,3 described ball game method and facility systems thereof, it is characterized in that: the setting of relevant court facility system can organically combine with natural environment, society's building in space, place:
At first owing to the setting of high-altitude goal system and to vertically reaching the efficient utilization in whole space, people many health strength that can strength of one's legs, hand-power etc. are relevant in the motions such as attack of high-altitude goal system and the time discharges fully, shows so the property made widely known bring into play, thereby also can obtain stronger place, survival ability in its space that is in the less urban cells of horizontal depth even make;
Two, in areas such as the high latitude of cold and severe cold, high height above sea level, can consider with the construction of the solar building system of building distance unified mutually, make many need to than 11 people of greater room and even ball game facility systems such as the grand formula football of war that can more numbers, can being located at better among following sun city;
Three, the high-altitude goal system directly can be located at the top of the tier building of bottom overhead type;
Four, the goal system of some differing heights can be located at multilayer and some intermediate spaces zone of skyscraper and even the top of building of built on stilts form, particularly, can in the middle of the building body, build the built on stilts part of some suitable forms, hanging garden can be done in the bottom of built on stilts part, can establish large high-altitude goal system on each hanging garden space;
In the structures such as protecting wire net, protective plate of can setting up defences between high-altitude goal system and the hanging garden greatly, it can make on the one hand on the court downstairs the ball to the attack of large high-altitude goal system attack can not fall among the hanging garden, the structure such as protection network, protective plate can make again hanging garden become cage space, a room on the other hand, forms simultaneously room cage hanging garden;
Can among room cage hanging garden, establish corresponding little high-altitude goal system as required, thereby make this hanging garden become aerial room cage type court, if certainly do not establish large high-altitude goal system on the garden aloft, the residing whole overhead space of hanging garden can be set as larger aerial room cage type court;
Five, being provided with the building of high-altitude goal system and window and the body of wall of relevant building of periphery thereof can adopt the flexible network structure with low noise and necessary intensity and durability to protect, the metope of the body of wall of building also can be done the protective processing that the anti-pellet impact of satisfying of other form and low noise etc. require, thereby the impact that the crowd in the building is subject to is very little, building is not caused damage yet, also can effectively utilize simultaneously the periphery building to the court form nature preferably every protecting;
Six, can utilize be in the middle of the court and peripheral overhead type individual layer, multilayer structure more easily arrange the high-altitude goal system, simultaneously hang corresponding court protecting film, every protecting wire net etc., thereby form the room cage type court system that relies on relevant building, this method can be applicable among the building system of villa, garden, hotel and even residential quarter, thereby forms corresponding cage villa court system, cage garden court system, cage hotel court system, cage residential quarter court system etc.;
Seven, at cold and severe cold area, when cage type court intrasystem building in above-mentioned room adopts east-west construction style, but can establish the light transmissive materials such as the glass of more efficient and film in directions such as its southern sides, then can add the better materials of performance such as insulation contain building system jointly to enclose inside solar building room cage type court system in directions such as its north sides in good time;
In solar building room cage type court internal system, the overhead space of the bottom of middle building system, the high-altitude net system space on top, and can jointly consist of the unobstructed annular space that surrounds middle building system around reaching between the space of building system south and north flanks, in the winter time and surrounding time, building surface and air in this zone, annular space south will be heated by sunlight, temperature rises, thereby the south and north flanks in building forms the temperature difference and draught head, and then in unobstructed annular space passage, will form the circulated air that the temperature difference and draught head promote, circulated air will be passed to the north side to the solar heat that the system southern side obtains naturally, pass to each position of annular space, so just be equivalent to middle building system formed one have be higher than environment temperature every protecting space and heat-insulation system, should can bring into play the lifting temperature to whole centre building system every protecting space and heat-insulation system, buffering and warming soft effect every protecting;
Annular space passage (namely every protecting space and heat-insulation system) as the ball game game play space, to naturally obtain the heat that greenhouse effects produce on the one hand, the middle building system institute dispersed heat that also will obtain to surround on the other hand, so its temperature can be higher than the temperature of ambient air more significantly, and its with higher temperature to middle building system every protect also can make in the middle of building system heat loss still less;
Eight, for more abundant space and the solar energy resources that utilizes efficiently the relevant range, can adopt the room cage covered court system that relies on the solar energy natural heating winter that makes---the distribution form that court, greenhouse system and outdoor open-air court system are arranged in order by the interval, north and south that suits;
For utilizing better whole resource, room cage covered court system can be set as semi-underground form, it can be single formula, also can be combined type, such as primary-secondary type etc., like this its both can to have utilized ground temperature to realize cool in summer and warm in winter etc., can unlikelyly take because whole height is too high again too much space and sunshine resource;
Some rows' court, greenhouse system can be set by six hour winter solstice minimums distance for sunlight such as sunshine, naturally heat with the solar energy of realizing the winter greenhouse court, certainly because the temperature of the spaces such as court can be starkly lower than the requirement of other human residential space, so can reduce according to circumstances actual relevant minimum distance for sunlight for utilizing space resources more efficiently;
Between the system of court, greenhouse, can establish the open-air court of some rows, the periphery of court, greenhouse system is gone along with sb. to guard him etc. every protection structure, not only can shield the official ball of covered court and protect, also can effectively shield the ball of the match that is in the outdoor court between the system of court, greenhouse and protect, thereby can make whole space and each court system of having realizes best positioning efficiency and service efficiency;
Nine, as required, thus can establish green vegetation etc. on the used cage net of above-mentioned court system etc. forms the green ecology movement space system of protecting of shielding;
Ten, as required, the high-altitude goal system can fix or flexibly be located on the square outside of the city and even important, between tall building, building and even the tall and big trees, can be hung under arch building and even the arch bridge pier, and can and corresponding place, ecological space, culture and space thereof etc. between form rational, efficient, artistic organically blending.
CN 201110195004 2011-07-11 2011-07-11 Ball game method imitating modern warfare game form, and facility system thereof Pending CN102872582A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110195004 CN102872582A (en) 2011-07-11 2011-07-11 Ball game method imitating modern warfare game form, and facility system thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110195004 CN102872582A (en) 2011-07-11 2011-07-11 Ball game method imitating modern warfare game form, and facility system thereof

Publications (1)

Publication Number Publication Date
CN102872582A true CN102872582A (en) 2013-01-16

Family

ID=47474232

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110195004 Pending CN102872582A (en) 2011-07-11 2011-07-11 Ball game method imitating modern warfare game form, and facility system thereof

Country Status (1)

Country Link
CN (1) CN102872582A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104571125A (en) * 2014-12-18 2015-04-29 北京控制工程研究所 Control method for utilizing standard trajectory to deal with multiple return conditions
CN108829904A (en) * 2018-03-09 2018-11-16 中国人民解放军海军大连舰艇学院 The calculation method in enemy plane and missile threat area in a kind of surface ship air-defense
CN111046497A (en) * 2019-12-24 2020-04-21 中国航空工业集团公司沈阳飞机设计研究所 Rapid assessment device for high-altitude high-speed airplane penetration viability
CN112894295A (en) * 2020-12-25 2021-06-04 中国科学院国家天文台南京天文光学技术研究所 High-precision self-learning segmented circular arc guide rail common circle splicing device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104571125A (en) * 2014-12-18 2015-04-29 北京控制工程研究所 Control method for utilizing standard trajectory to deal with multiple return conditions
CN104571125B (en) * 2014-12-18 2016-01-27 北京控制工程研究所 A kind ofly utilize the multiple control method returning condition of normal trajectory reply
CN108829904A (en) * 2018-03-09 2018-11-16 中国人民解放军海军大连舰艇学院 The calculation method in enemy plane and missile threat area in a kind of surface ship air-defense
CN108829904B (en) * 2018-03-09 2019-07-19 中国人民解放军海军大连舰艇学院 The calculation method in enemy plane and missile threat area in a kind of surface ship air-defense
CN111046497A (en) * 2019-12-24 2020-04-21 中国航空工业集团公司沈阳飞机设计研究所 Rapid assessment device for high-altitude high-speed airplane penetration viability
CN111046497B (en) * 2019-12-24 2023-04-07 中国航空工业集团公司沈阳飞机设计研究所 Rapid assessment device for high-altitude high-speed airplane penetration viability
CN112894295A (en) * 2020-12-25 2021-06-04 中国科学院国家天文台南京天文光学技术研究所 High-precision self-learning segmented circular arc guide rail common circle splicing device

Similar Documents

Publication Publication Date Title
US11266892B2 (en) Flying object water game
CN102872582A (en) Ball game method imitating modern warfare game form, and facility system thereof
US10589157B2 (en) Flying object game
US7857718B2 (en) GolfDiscney: GolfDiscney World, the Triple Star GolfDiscney World and SanXing GolfDiscney World for Triple-Star Golf, SanXing Golf of GolfRing, GolfDisc, GolfBall and Golfrisbee, RingBall Golf
CN103505869A (en) Method and facility system of ball game imitating modern warfare game form
Caldwell The Push: A Climber's Journey of Endurance, Risk, and Going Beyond Limits
Denver et al. Damn few: Making the modern SEAL warrior
Hicks The Rappahannock Line
CN1048905C (en) Union chess, military chess, modern chess, transition chess and great harmony chess
Caldwell The Push: A Climber's Search for the Path
O'Brien Battling for Saipan
Mann Inside SEAL team six: my life and missions with America's elite warriors
Gilbert Somme
Griesser Lions of Carentan, The: Fallschirmjager Regiment 6, 1943-1945
CN102824732B (en) Boundary line goal device and court system adopting same
RU114418U1 (en) GAME SYSTEM
CN103127675A (en) Ball game method provided with high-altitude goal and facility system thereof
Posey XVI Olympiad
CN202777677U (en) Ball field system
Rubaiyat Sports center Bhatiary, Chittagong
Webb et al. Among Heroes: A US Navy SEAL's True Story of Friendship, Heroism, and the Ultimate Sacrifice
Coyle Ambulancing on the French Front
Olafsen Wearing the Green Beret: A Canadian with the Royal Marine Commandos
Nelson Five Lieutenants: The Heartbreaking Story of Five Harvard Men who Led America to Victory in World War I
Park “Happy and Cheerful in This Fine Camp”: Sports, Recreation, and the United States Army at Fort Ord and Camp Roberts, 1940 to 1945

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130116