CN102865787A - Static blasting method - Google Patents

Static blasting method Download PDF

Info

Publication number
CN102865787A
CN102865787A CN2012102932285A CN201210293228A CN102865787A CN 102865787 A CN102865787 A CN 102865787A CN 2012102932285 A CN2012102932285 A CN 2012102932285A CN 201210293228 A CN201210293228 A CN 201210293228A CN 102865787 A CN102865787 A CN 102865787A
Authority
CN
China
Prior art keywords
volume
minutes
cracking agent
breaking agents
agent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012102932285A
Other languages
Chinese (zh)
Inventor
孟祥栋
汪龙
陈代耘
汪忠来
雷瑞欣
陈忠富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Urban Construction Holdings Group Co Ltd
CHONGQING BLASTING CONSTRUCTION CO LTD
Original Assignee
Chongqing Urban Construction Holdings Group Co Ltd
CHONGQING BLASTING CONSTRUCTION CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Urban Construction Holdings Group Co Ltd, CHONGQING BLASTING CONSTRUCTION CO LTD filed Critical Chongqing Urban Construction Holdings Group Co Ltd
Priority to CN2012102932285A priority Critical patent/CN102865787A/en
Publication of CN102865787A publication Critical patent/CN102865787A/en
Pending legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a static blasting method. The static blasting method comprises the following steps of: (a) preparing construction; (b) premixing breaking agents in the field: (1) determining the using quantity of raw materials; (2) weighing 1,000 grams of breaking agents by using a balance, pouring the breaking agents into a glass measure cup with the volume of 3,000ml, measuring water with the designed quantity by using a measuring cylinder, slowly pouring the water into the measuring cup, uniformly stirring the mixture by using a glass bar, and simultaneously recording the initial volume of the breaking agents; and (3) standing and observing for 12 to 15 minutes, adding inhibitor in the mixture if the volume of the freely expanded breaking agents is 2.5 times the initial volume of the breaking agent within 12 minutes, adding accelerant in the mixture if the volume of the freely expanded breaking agents is not 2.5 times the initial volume of the breaking agents after 15 minutes, finishing standing if the volume of the freely expanded breaking agents is 2.5 times the initial volume of the breaking agents after the breaking agents are freely expanded within 12 to 15 minutes, and simultaneously recording the inhibitor and the accelerant; (c) distributing and drilling holes, and preparing the breaking agents according to the premixing proportion; (d) filling and pouring; (e) keeping warm; (f) beginning to break; and (g) removing rock ballast.

Description

A kind of static blasting method
Technical field
The invention belongs to the technical field of explosion, relate in particular to a kind of static blasting method.
Background technology
At present usually static blasting at the scene be implemented as power less than 30%, seriously restricted applying of static blasting, simultaneously because product category, the specifications and models of cracking agent are a lot of both at home and abroad at present, different manufacturers, kind, specifications and models, batch, reaction time and expansion rate under ratio and different quality, water temperature, the temperature condition all differ widely, cause action effect unstable, particularly water quality is large especially on the impact of cracking agent, and in the place of carrying out blast working, be difficult to get suitable water source, also just cause demolition effect to be affected.Simultaneously, the defective of producer's raw material also can cause explosion unsuccessful.
There are two in existing explosion extremely, the one, blasting time too short (in half an hour), broken too short meeting of time causes water with quick lime sufficient reaction not to occur easily causing punching, threaten the safety of personnel and equipment, the 2nd, blasting time long (12-24 hour), relatively safe, but owing to the reaction time is long, therefore efficient is lower.
Summary of the invention
The technical problem to be solved in the present invention provides a kind of static blasting method, joins by scene examination, reaction time of fragmentation is controlled at one hour, and demolition effect is stable.
In order to solve the problems of the technologies described above, the invention provides following technical scheme: a kind of static blasting method may further comprise the steps:
A, determine required cracking agent model and Amount per unitvolume, aperture, position, hole, hole depth and mechanical personnel preparation according to actual prospecting situation, and carry out preparation of construction by this;
Cracking agent is joined in b, on-the-spot examination;
The ratio of mud of determining during (1), first by design calculates the consumption of water consumption and cracking agent;
(2), weigh in the balance and get 1000 gram cracking agents and pour the 3000ml burette into, measure the design water consumption with graduated cylinder again, slowly pour water into measuring cup and stir with glass bar, mixing time is no more than 40 seconds, records simultaneously the cracking agent initial volume;
(3), leave standstill and observed 12~15 minutes, if volume just reaches original 2.5 times after being lower than free wxpansion in 12 minutes, just should add inhibitor; If volume does not also reach original 2.5 times after the free wxpansion above 15 minutes, just should add and inspire agent; In 12~15 minutes, volume reaches 2.5 times of original volume and can use after its free wxpansion, records simultaneously inhibitor and inspires agent.
C, cloth hole, boring prepare cracking agent in the ratio that examination is joined simultaneously;
D, 5 minutes are with the interior filling perfusion of finishing cracking agent;
Use straw mattress or straw bag covering and heat insulating after e, the filling perfusion;
F, filling perfusion beginning fragmentation after 30 minutes;
G, beginning are adopted artificial after broken one hour or small-sized machine is removed rock ballast.
Compared with prior art, the invention has the advantages that: 1, by to the medium appropriate design (aperture that is broken, pitch-row, determining of hole depth etc.) and boring, with the dry powder-shaped cracking agent mobile shape slurry of suitable quantity of water furnishing, directly in the injection hole, utilize hydration reaction to make the cracking agent crystal modification, volumetric expansion, thereby quasistatic ground (can reach the bulbs of pressure 30Mpa~50Mpa) and impose on hole wall, after half an hour to one hour, when greater than the required bulbs of pressure of rock rupture (during 10Mpa~20Mpa), rock is spalling voluntarily, fragmentation, thus realize without slungshot, noiseless, friction, without shock wave, without toxic smog, safe and reliable broken rock.2, join cracking agent by the scene examination, can accurately control the expansion fragmentation deadline within 1 hour, shortened the construction period, saved fund, and can accurate controlled fragmentation particle diameter.Static blasting has had quick, accurate, controlled characteristics, avoided when construction different manufacturers, kind, specifications and models, batch, have influence on reaction time and expansion rate under ratio and different quality, water temperature, the temperature condition.3, can be at the raw material of examination timing check producer, for the producer of selecting raw material provides foundation.4, the present invention has historical relic, important buildings or structures near having solved preferably construction area, or owing to the social contradications such as expropriation of land, removal cause that the masses make an excuse big gun and decrease the resistance worker causes, keep off the problem such as worker, has good social benefit.5, equipment used in the present invention is the non-combustion that need not administrative permission, non-quick-fried article, easily stores, transports, takes care of, and uses safety, can be used at any time the job site, is conducive to guarantee the completion time of project.
Further, when carrying out described steps d, planning cracking agent filling order, what make filling perfusion process all is the boring of not loading cracking agent, prevents that punching from hurting sb.'s feelings.
The specific embodiment
Falling in the rainstorm weather situation, the landslide easily appears in cliff, often has megalith and breaks away from parent rock, and is crumbling, and for security needs crag progressively being disintegrated becomes the rubble of particle diameter 30~50cm, and rubble total amount<0.5m falls at every turn 3Phase can't guarantee because the uncontrollable whereabouts of bursting work scale, artificial chisel are done manual work, and only has employing " static blasting method " construction.
A kind of static blasting method may further comprise the steps:
A, conceptual design and preparation of construction
During the static blasting conceptual design, tackling attribute, the structure of the medium that is broken reconnoitres in detail, determine required cracking agent model and Amount per unitvolume, aperture, position, hole, hole depth and mechanical personnel preparation according to reality prospecting situation (the lumpiness size of material category, arrangement of reinforcement situation, rock proterties, fragmentation etc.), and carry out preparation of construction by this;
Unit volume cracking agent consumption is the principal element that affects crushing effect, and the common unit volume cracking agent of various crushing mediums consumption is as showing 5.2.2:
Sequence number The fractured rock kind The cracking agent consumption (kg/m3) Remarks
1 Weak rock is broken 35-37 ?
2 In, ragstone is broken 25-27 ?
3 Ragstone is broken 10-20 ?
4 Rock cutting 10-18 ?
5 Non-reinforced concrete is broken 10-20 ?
6 Armored concrete is broken 15-20 The cloth muscle is few
7 Armored concrete is broken 20-30 The cloth muscle is many
8 Boulder 10-15 ?
Table 5.2.2 unit volume cracking agent consumption
This engineering is middle hardness rock, and unit volume cracking agent Determination of quantity is 27kg/m 3
Cracking agent is joined in b, on-the-spot examination
According to statistics, usually static blasting at the scene be implemented as power less than 30%, seriously restricted applying of static blasting, join by the scene examination, static blasting has had quick, accurate, controlled characteristics.Because product category, the specifications and models of cracking agent are a lot of both at home and abroad at present, different manufacturers, kind, specifications and models, batch, reaction time and expansion rate under ratio and different quality, water temperature, the temperature condition all differ widely, and causes the difficult problem of the unstable and long action time (12-24 hour) of the action effect that is difficult to overcome.Join by the scene examination, can accurately control the expansion fragmentation deadline within 1 hour, and can accurate controlled fragmentation particle diameter.
This operation is the key technology of static blasting construction.Its operation is as follows:
The ratio of mud of determining during 1, first by design calculates the consumption of water consumption and cracking agent;
2, weigh in the balance and get 1000 gram cracking agents and pour the 3000ml burette into, measure the design water consumption with graduated cylinder again, slowly pour water into measuring cup and stir with glass bar, mixing time should not surpass 40 seconds, record simultaneously the cracking agent initial volume;
3, leave standstill observation, the beginning timing.Read the cracking agent final volume after free wxpansion reaction is finished, after beginning with timing in 12 ~ 15 minutes, volume reaches 2.5 times of original volume and is advisable after its free wxpansion.;
If 4 are lower than that volume just reaches original 2.5 times after the free wxpansion in 12 minutes, just should add inhibitor; If volume does not also reach original 2.5 times after the free wxpansion above 15 minutes, just should add and inspire agent.
C, cloth hole, boring prepare cracking agent in the ratio that examination is joined simultaneously;
At first determine more than one at least free face (scope of freedom) before the cloth hole, and as far as possible free face (scope of freedom) of creating more.The cloth well format depends primarily on situation and the broken requirement of rock, and when many rounds, spread pattern mainly is the plum blossom arrangement.
Boring direction should be accomplished parallel with free face (scope of freedom) as far as possible; Boring should be selected upright opening as far as possible, uses less lateral aperture, in order to avoid cause operating difficulties and prolong the filling time.
The common hole arrangement parameters of various crushing mediums is as follows:
Formation hardness f=4 f=6 f=8 f=12 The element concrete Reinforced concrete
Pitch-row (cm) 5-100 40 30 20 30 20
Array pitch (cm) 80 50 40 30 40 30
This engineering is middle hardness rock, and the hole array pitch answers optional holes apart from 30cm, array pitch 40cm, in order to satisfy the requirement of row's danger particle diameter, is defined as 25cm * 25cm.
Isolated rock and concrete drill hole depth are 80% ~ 90% of the broken body of target; Large volume needs substep fragmented rock and concrete block, and drilling depth can be selected according to construction requirement, generally at 2 meters better.Shot depth is 100% of hole depth.
D, filling perfusion
1, the cracking agent slurry that stirs must be finished with interior at 5 minutes, otherwise can have influence on its flowability and crushing effect.Downward and downward-sloping eyelet, cracking agent mixed liquid state (pulpous state) after, pour in the hole rapidly.
2, the boring of horizontal direction and upward direction, the available high-strength long fibered paper more smaller than bore diameter be packed to enter cracking agent, soaks fully 30~50 seconds with clean water, and powder stick is fully moistening, when not emitting bubble fully, take out powder stick and at the bottom of the hole, begin to pack into one by one, be loaded into densely the aperture.
3, cracking agent filling should be according to broken body direction, planning cracking agent filling order, and the limit rim moves back, must not be through loading the boring of cracking agent, prevent that punching from hurting sb.'s feelings.
E, covering and heat insulating;
Use straw mattress (bag) covering and heat insulating behind the grout, seam can be watered for water after occurring in the crack, with the generation of acceleration turgor pressure and the expansion in crack.
F, beginning fragmentation;
After filling cracking agent, generally began to produce the crack at 30 minutes, along with the growth of time, the crack can be increasing, finishes fragmentation in 1 hour;
G, again after 1 hour, can remove rock ballast with artificial or small-sized machine.
Points for attention:
1, inspection opening position (pitch-row, array pitch), hole depth can not surpass design size deviation ± 5cm.
2, join the output control ratio of mud and additive amount in strict accordance with examination.
3, just bored the boring of hole and just punching, the hole wall temperature is higher, and should determine could powder charge when temperature meets the requirements.
4, use cracking agent must same factory, same model, with batch, the dry point position of mixing water must be fixed, and is constant to guarantee the water quality composition.
5, cracking agent and mixing water are deposited in shady and cool dry place, avoid tanning by the sun.
6, cracking agent is answered protection against the tide in transportation with in depositing.Should use immediately behind the Kaifeng.As once not using, should tightly prick immediately sack, need the time spent to break a seal again.
For a person skilled in the art, under the prerequisite that does not break away from structure of the present invention, can also make some distortion and improvement, these also should be considered as protection scope of the present invention, and these can not affect effect of the invention process and practical applicability.
The soft protecting net arrangement and method for construction
The SNS soft protecting net is arranged on Dangerous Rock Body below toe, and the Dangerous Rock under the avalanche is played the energy dissipating effect, prevents that to greatest extent Dangerous Rock from bouncing again, prevents that block is flushed to the scope that widens one's influence under the slope.Protection network arranges according to actual landform, and the SNS soft protecting net arranges height 4m, and every 10m arranges a steel column, and intercolumniation adopts rhombus steel rope net, SNS soft protecting net total length 1000m.
Above-described only is preferred embodiment of the present invention, should be understood that for a person skilled in the art, under the prerequisite that does not break away from structure of the present invention, can also make some distortion and improvement, these can not affect effect of the invention process and practical applicability.

Claims (2)

1. static blasting method is characterized in that may further comprise the steps:
A, determine required cracking agent model and Amount per unitvolume, aperture, position, hole, hole depth and mechanical personnel preparation according to actual prospecting situation, and carry out preparation of construction by this;
Cracking agent is joined in b, on-the-spot examination;
The ratio of mud of determining during (1), first by design calculates the consumption of water consumption and cracking agent;
(2), weigh in the balance and get 1000 gram cracking agents and pour the 3000ml burette into, measure the design water consumption with graduated cylinder again, slowly pour water into measuring cup and stir with glass bar, mixing time is no more than 40 seconds, records simultaneously the cracking agent initial volume;
(3), leave standstill and observed 12~15 minutes, if volume just reaches original 2.5 times after being lower than free wxpansion in 12 minutes, just should add inhibitor; If volume does not also reach original 2.5 times after the free wxpansion above 15 minutes, just should add and inspire agent; In 12~15 minutes, volume reaches 2.5 times of original volume and can use after its free wxpansion, records simultaneously inhibitor and inspires agent;
C, cloth hole, boring prepare cracking agent in the ratio that examination is joined simultaneously;
D, 5 minutes are with the interior filling perfusion of finishing cracking agent;
Use straw mattress or straw bag covering and heat insulating after e, the filling perfusion;
F, filling perfusion beginning fragmentation after 30 minutes;
G, beginning are adopted artificial after broken one hour or small-sized machine is removed rock ballast.
2. static blasting method as claimed in claim 1 is characterized in that: when carrying out described steps d, and planning cracking agent filling order, what make filling perfusion process all is the boring of not loading cracking agent.
CN2012102932285A 2012-08-17 2012-08-17 Static blasting method Pending CN102865787A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102932285A CN102865787A (en) 2012-08-17 2012-08-17 Static blasting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012102932285A CN102865787A (en) 2012-08-17 2012-08-17 Static blasting method

Publications (1)

Publication Number Publication Date
CN102865787A true CN102865787A (en) 2013-01-09

Family

ID=47444813

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102932285A Pending CN102865787A (en) 2012-08-17 2012-08-17 Static blasting method

Country Status (1)

Country Link
CN (1) CN102865787A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103322414A (en) * 2013-06-29 2013-09-25 中国人民解放军后勤工程学院 Method for fast and safely excavating oil-gas pipeline rock section emergent repair working pit
CN105019901A (en) * 2015-06-11 2015-11-04 北京理工大学 Thermal expansion stone splitting agent equal proportion structure large-area stone splitting method
CN105651132A (en) * 2016-01-28 2016-06-08 湖南航天建筑工程有限公司 Directional static blasting construction method for foundation pit stratum and combined guiding device for directional static blasting construction method
CN107976130A (en) * 2017-12-12 2018-05-01 中国冶集团有限公司 The quick soundless cracking method of rock
CN109373836A (en) * 2018-11-27 2019-02-22 福建省永富建设集团有限公司 A kind of method of static blasting
CN109579650A (en) * 2019-01-28 2019-04-05 中交第二公路工程局有限公司 A kind of static blasting method of no free boundary rock mass
CN113154979A (en) * 2021-04-22 2021-07-23 湖南军凯静爆科技有限公司 Static rock breaking construction method of large-inclination-angle wet drilling expanding agent
CN113846870A (en) * 2021-10-12 2021-12-28 上海建工集团股份有限公司 Concrete supporting static force crushing method using existing cracks as guide

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6236483A (en) * 1985-08-12 1987-02-17 Agency Of Ind Science & Technol Method of static shattering and expandable solid agent for shattering
JPS62131082A (en) * 1985-12-04 1987-06-13 Asahi Chem Ind Co Ltd Static crushing method
CN87102228A (en) * 1987-03-25 1987-11-18 铁道部第二工程局 Novel static breaking agent
CN101191415A (en) * 2006-11-27 2008-06-04 杨仁树 Method for crushing rock formation of coal mine
CN101196117A (en) * 2008-01-04 2008-06-11 中铁二院工程集团有限责任公司 Non-blasting digging method for tunnel and underground project
CN102536251A (en) * 2012-02-17 2012-07-04 中国建筑第六工程局有限公司 Adjacent construction excavating method for upper and lower dual-layer tunnel

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6236483A (en) * 1985-08-12 1987-02-17 Agency Of Ind Science & Technol Method of static shattering and expandable solid agent for shattering
JPS62131082A (en) * 1985-12-04 1987-06-13 Asahi Chem Ind Co Ltd Static crushing method
CN87102228A (en) * 1987-03-25 1987-11-18 铁道部第二工程局 Novel static breaking agent
CN101191415A (en) * 2006-11-27 2008-06-04 杨仁树 Method for crushing rock formation of coal mine
CN101196117A (en) * 2008-01-04 2008-06-11 中铁二院工程集团有限责任公司 Non-blasting digging method for tunnel and underground project
CN102536251A (en) * 2012-02-17 2012-07-04 中国建筑第六工程局有限公司 Adjacent construction excavating method for upper and lower dual-layer tunnel

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张爱莉等: ""静态***的设计及应用"", 《建筑技术》 *
陈雷等: ""静态破碎剂的性能优化与工程应用"", 《安徽科技》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103322414A (en) * 2013-06-29 2013-09-25 中国人民解放军后勤工程学院 Method for fast and safely excavating oil-gas pipeline rock section emergent repair working pit
CN103322414B (en) * 2013-06-29 2016-01-13 中国人民解放军后勤工程学院 A kind of method fast and safely excavating oil and gas pipes cubic meter of stone section repairing working pit
CN105019901A (en) * 2015-06-11 2015-11-04 北京理工大学 Thermal expansion stone splitting agent equal proportion structure large-area stone splitting method
CN105651132A (en) * 2016-01-28 2016-06-08 湖南航天建筑工程有限公司 Directional static blasting construction method for foundation pit stratum and combined guiding device for directional static blasting construction method
CN107976130A (en) * 2017-12-12 2018-05-01 中国冶集团有限公司 The quick soundless cracking method of rock
CN107976130B (en) * 2017-12-12 2019-12-06 中国一冶集团有限公司 quick and soundless rock breaking method
CN109373836A (en) * 2018-11-27 2019-02-22 福建省永富建设集团有限公司 A kind of method of static blasting
CN109579650A (en) * 2019-01-28 2019-04-05 中交第二公路工程局有限公司 A kind of static blasting method of no free boundary rock mass
CN113154979A (en) * 2021-04-22 2021-07-23 湖南军凯静爆科技有限公司 Static rock breaking construction method of large-inclination-angle wet drilling expanding agent
CN113846870A (en) * 2021-10-12 2021-12-28 上海建工集团股份有限公司 Concrete supporting static force crushing method using existing cracks as guide

Similar Documents

Publication Publication Date Title
CN102865787A (en) Static blasting method
Cristelo et al. Rheological properties of alkaline activated fly ash used in jet grouting applications
CN105651132B (en) Directional static blasting construction method for foundation pit stratum and combined guiding device for directional static blasting construction method
CN101196117A (en) Non-blasting digging method for tunnel and underground project
CN105569660B (en) A kind of multiple-layer overlapped dead zone and section step medium-length hole avalanche processing method
CN108316346A (en) A kind of green processing method in discarded underground people's air defense hole
CN104404838A (en) Collapsed loess subgrade base treatment method for railway with speed more than 200km
CN101793486A (en) High-grade highway rock cutting blasting construction process
CN108487286A (en) A kind of construction method of the continuous supporting course of beading karst region super long pile
CN103742146A (en) Coal mining technology by pier stud type filling method
CN105297741A (en) Prevention method for foundation pit retaining structure hole-punching and water-gushing caused by blast of stratum with soft upper portion and hard lower portion
CN103243702A (en) Sand wrapped gravel pile construction method
CN105484269A (en) Leakage prevention construction method of foundation pit support structure under blasting condition
CN105954076B (en) A kind of modelling system for physical simulation experiment
CN110056360A (en) A kind of construction method in highway stone matter tunnel
CN103061224A (en) Method for thawing and strengthening permafrost foundations by quicklime-sand piles
CN105350516B (en) A kind of rock-soil layer material feeding modified reinforcing method
CN107326765B (en) Lime pile for treating island-shaped frozen soil foundation and construction method thereof
CN110409413A (en) The construction method of self-expansion type compaction pile
CN109356175A (en) The ecological slope protection structure and bank protecting method that plant urase-stalk-plantation combines
Pellegrini et al. Sao Paulo Metro Project–Control of Settlements in variable soil conditions through EPB pressure and bicomponent backfill grout
CN108575166A (en) A kind of sandy land soil body builds structure and its method
Niu The Environmental Effect of Application of Chemical Grouting in Slope Reinforcement.
CN110093918A (en) A kind of deep layer displacement dynamic-ramming gravel pile soil matrix reinforcement means
CN104032736A (en) Construction method of cement-soil mixed pile in coral-reef limestone stratum

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130109