CN102837978B - Shipment method combining large constructional element rolling and floating crane - Google Patents

Shipment method combining large constructional element rolling and floating crane Download PDF

Info

Publication number
CN102837978B
CN102837978B CN201210365081.6A CN201210365081A CN102837978B CN 102837978 B CN102837978 B CN 102837978B CN 201210365081 A CN201210365081 A CN 201210365081A CN 102837978 B CN102837978 B CN 102837978B
Authority
CN
China
Prior art keywords
harbour
ship
special
fortune beam
constructional element
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210365081.6A
Other languages
Chinese (zh)
Other versions
CN102837978A (en
Inventor
宿有为
杨阳
韩鹏飞
朱小明
李守阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu xinzhongtai Bridge Steel Structure Engineering Co. Ltd.
Original Assignee
JIANGSU ZHONGTAI BRIDGE STEEL STRUCTURE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU ZHONGTAI BRIDGE STEEL STRUCTURE CO Ltd filed Critical JIANGSU ZHONGTAI BRIDGE STEEL STRUCTURE CO Ltd
Priority to CN201210365081.6A priority Critical patent/CN102837978B/en
Publication of CN102837978A publication Critical patent/CN102837978A/en
Application granted granted Critical
Publication of CN102837978B publication Critical patent/CN102837978B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The invention relates to a shipment method combining large constructional element rolling and floating crane, mainly relates to a rolling and floating crane combined technology during shipment, and belongs to the technical field of building material transportation. The shipment method adopts the following steps of: stopping a special beam carrying ship in a wharf, taking a large constructional element, and utilizing two large flatcars to carry the large constructional element to the wharf; selecting an appropriate tidal level, arranging two parallel overlapping platforms on the special beam carrying ship, and paving two rows of rails which are mutually parallel between the overlapping platforms; loading the special large flatcars for loading the large constructional element to a ship in a rolling way through rails, using the floating crane to lift, slowly moving to the frontage of a transport ship wharf, stopping a steel lagging box, and carrying out colligation; and transporting to the special beam carrying ship; and enabling a transport ship to move to the wharf, stopping the constructional element, and carrying out colligation and fixation. According to the invention, the large constructional element can be safely and smoothly stopped on the transport ship, the operation is easy, the shipment safety is guaranteed, the construction cost is reduced, and the existing wharfs, ships and floating cranes are fully utilized.

Description

A kind of large component rolls dress and ties shipment method mutually with crane barge
Technical field
The present invention relates to a kind of large component to roll dress and tie shipment method mutually with crane barge, relate generally to rolling in shipment process and fill and crane barge combined technology, belong to building materials technical field of transportation.
Background technology
Large component stock size is large, and total amount is large, proposes very high requirement to shipment shipping, prior art is for this type of large component, general employing roll dress, or directly to go on board with large-scale floating crane lifting, the hanger of these two kinds of shipment technology to harbour, ships that transport, crane barge and component arrange all require very high.Due to the restriction of crane barge length of boom, the requirement stage of growing up needs lateral arrangement along the coastline, the crane barge that crouching position is very large need be called, costly, and roll dress when longitudinally loading onto ship, be subject to again the restriction of tidal conditions to a great extent, running into camp site sometimes when sections shipping exists the obstacle that cannot remove or cross over simultaneously, cause steel box-girder movement track on the bank cannot get on the right track with ship to dock, therefore adopt single shipment mode, cause shipment difficulty greatly, costly.
Summary of the invention
The object of the invention is to overcome above-mentioned deficiency, provide a kind of large component to roll dress and tie shipment method mutually with crane barge, this shipment method is easy to operation, ensures shipment safety, and can reduce executive cost.
According to technical scheme provided by the invention, a kind of large component rolls dress and ties shipment method mutually with crane barge, and step is:
(1) shipping prepares: rest on harbour by special fortune beam ship, harbour is overlapped with trestle, and harbour front arranges and puts pier, and puts on pier before making stern rest harbour; Get large component, be transported to harbour with two iant flat trucks, and carry out the inspection before shipping;
(2) roll-on-roll-off ship oceangoing ship and floating crane positioning: select suitable tidal level, boats and ships are when the tidal level of 2 ~ 3m, and deck is concordant with harbour; Beam section is gone on board and must carried out at the incoming tide, and requires at duration of tide to be 40 ~ 60min, so that iant flat truck is gone on board smoothly and gone ashore;
To cast anchor location by the position designed in advance; On direction horizontal along the coastline, the overlap joint platform that layout two is parallel on special fortune beam ship, and between overlap joint platform, lay two rows track parallel to each other;
(3) component rolls and takes on board: the special iant flat truck loading large component is rolled by track and takes on board, and is rolling in process of assembling, by the cabin water of row pressure special fortune beam ship, makes special fortune beam ship keep concordant with harbour;
(4) crane barge: carrier rests in raises boat landing; Iant flat truck rolls and is filled to special fortune beam ship, and rolling dress length is 50 ~ 60m, should try one's best and lean on forward, make casing close to operator's compartment; With floating-crane lifting, slowly move to carrier harbour front, steel jacket box is bold and generous, colligation; Be transported on special fortune beam ship, hang after sending, special fortune beam ship exits harbour, and carrier drives harbour into, and component is bold and generous, colligation is fixed.
Tool of the present invention has the following advantages: large component is safely and smoothly bold and generous on carrier, is easy to operation, ensures shipment safety, and can reduce executive cost; Take full advantage of existing harbour, boats and ships, crane barge.
Accompanying drawing explanation
Fig. 1 the present invention transports preparation front view.
Fig. 2 the present invention transports diagrammatic top view.
Detailed description of the invention
Embodiment 1 one kinds of large components roll dress and tie shipment method mutually with crane barge, and step is:
(1) shipping prepares: rest on harbour 3 by special fortune beam ship, harbour 3 is overlapped with trestle 2, and harbour 3 front arranges and puts pier 1, and puts on pier 1 before making stern rest harbour 3; Get large component, be transported to harbour 3 with two iant flat trucks, and carry out the inspection before shipping;
(2) roll-on-roll-off ship oceangoing ship and floating crane positioning: select suitable tidal level, boats and ships are when the tidal level of 2m, and deck is concordant with harbour; Beam section is gone on board and must carried out at the incoming tide, and requires at duration of tide to be 40min, so that iant flat truck is gone on board smoothly and gone ashore;
To cast anchor location by the position designed in advance; On direction horizontal along the coastline, the overlap joint platform that layout two is parallel on special fortune beam ship, and between overlap joint platform, lay two rows track parallel to each other;
(3) component rolls and takes on board: the special iant flat truck loading large component is rolled by track and takes on board, and is rolling in process of assembling, by the cabin water of row pressure special fortune beam ship, makes special fortune beam ship keep concordant with harbour;
(4) crane barge: carrier rests in raises boat landing; Iant flat truck rolls and is filled to special fortune beam ship, and rolling dress length is 50m, should try one's best and lean on forward, make casing close to operator's compartment; With floating-crane lifting, slowly move to carrier harbour front, steel jacket box is bold and generous, colligation; Be transported on special fortune beam ship, hang after sending, special fortune beam ship exits harbour, and carrier drives harbour into, and component is bold and generous, colligation is fixed.
Embodiment 2 one kinds of large components roll dress and tie shipment method mutually with crane barge, and step is:
(1) shipping prepares: rest on harbour 3 by special fortune beam ship, harbour 3 is overlapped with trestle 2, and harbour 3 front arranges and puts pier 1, and puts on pier 1 before making stern rest harbour 3; Get large component, be transported to harbour 3 with two iant flat trucks, and carry out the inspection before shipping;
(2) roll-on-roll-off ship oceangoing ship and floating crane positioning: select suitable tidal level, boats and ships are when the tidal level of 3m, and deck is concordant with harbour; Beam section is gone on board and must carried out at the incoming tide, and requires at duration of tide to be 60min, so that iant flat truck is gone on board smoothly and gone ashore;
To cast anchor location by the position designed in advance; On direction horizontal along the coastline, the overlap joint platform that layout two is parallel on special fortune beam ship, and between overlap joint platform, lay two rows track parallel to each other;
(3) component rolls and takes on board: the special iant flat truck loading large component is rolled by track and takes on board, and is rolling in process of assembling, by the cabin water of row pressure special fortune beam ship, makes special fortune beam ship keep concordant with harbour;
(4) crane barge: carrier rests in raises boat landing; Iant flat truck rolls and is filled to special fortune beam ship, and rolling dress length is 60m, should try one's best and lean on forward, make casing close to operator's compartment; With floating-crane lifting, slowly move to carrier harbour front, steel jacket box is bold and generous, colligation; Be transported on special fortune beam ship, hang after sending, special fortune beam ship exits harbour, and carrier drives harbour into, and component is bold and generous, colligation is fixed.
Embodiment 3 one kinds of large components roll dress and tie shipment method mutually with crane barge, and step is:
(1) shipping prepares: rest on harbour 3 by special fortune beam ship, harbour 3 is overlapped with trestle 2, and harbour 3 front arranges and puts pier 1, and puts on pier 1 before making stern rest harbour 3; Get large component, be transported to harbour 3 with two iant flat trucks, and carry out the inspection before shipping;
(2) roll-on-roll-off ship oceangoing ship and floating crane positioning: select suitable tidal level, boats and ships are when the tidal level of 2.63m, and deck is concordant with harbour; Beam section is gone on board and must carried out at the incoming tide, and requires at duration of tide to be 45min, so that iant flat truck is gone on board smoothly and gone ashore;
To cast anchor location by the position designed in advance; On direction horizontal along the coastline, the overlap joint platform that layout two is parallel on special fortune beam ship, and between overlap joint platform, lay two rows track parallel to each other;
(3) component rolls and takes on board: the special iant flat truck loading large component is rolled by track and takes on board, and is rolling in process of assembling, by the cabin water of row pressure special fortune beam ship, makes special fortune beam ship keep concordant with harbour;
(4) crane barge: carrier rests in raises boat landing; Iant flat truck rolls and is filled to special fortune beam ship, and rolling dress length is 55m, should try one's best and lean on forward, make casing close to operator's compartment; With floating-crane lifting, slowly move to carrier harbour front, steel jacket box is bold and generous, colligation; Be transported on special fortune beam ship, hang after sending, special fortune beam ship exits harbour, and carrier drives harbour into, and component is bold and generous, colligation is fixed.

Claims (1)

1. large component rolls dress and ties a shipment method mutually with crane barge, it is characterized in that: adopt following steps:
(1) shipping prepare: special fortune beam ship is rested on harbour (3), harbour (3) is overlapped with trestle (2), harbour (3) front arrange put pier (1), and make stern rest harbour (3) front put on pier (1); Get large component, be transported to harbour (3) with two iant flat trucks, and carry out the inspection before shipping;
(2) roll-on-roll-off ship oceangoing ship and floating crane positioning: select suitable tidal level, boats and ships are when the tidal level of 2 ~ 3m, and deck is concordant with harbour; Beam section is gone on board and must carried out at the incoming tide, and requires at duration of tide to be 40 ~ 60min, so that iant flat truck is gone on board smoothly and gone ashore;
(3) to cast anchor location by the position designed in advance; On direction horizontal along the coastline, the overlap joint platform that layout two is parallel on special fortune beam ship, and between overlap joint platform, lay two rows track parallel to each other;
(4) component rolls and takes on board: the special iant flat truck loading large component is rolled by track and takes on board, and is rolling in process of assembling, by the cabin water of row pressure special fortune beam ship, makes special fortune beam ship keep concordant with harbour;
(5) crane barge: carrier rests in raises boat landing; Iant flat truck rolls and is filled to special fortune beam ship, and rolling dress length is 50 ~ 60m, should try one's best and lean on forward, make casing close to operator's compartment; With floating-crane lifting, slowly move to carrier harbour front, steel jacket box is bold and generous, colligation; Be transported on special fortune beam ship, hang after sending, special fortune beam ship exits harbour, and carrier drives harbour into, and component is bold and generous, colligation is fixed.
CN201210365081.6A 2012-09-26 2012-09-26 Shipment method combining large constructional element rolling and floating crane Expired - Fee Related CN102837978B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210365081.6A CN102837978B (en) 2012-09-26 2012-09-26 Shipment method combining large constructional element rolling and floating crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210365081.6A CN102837978B (en) 2012-09-26 2012-09-26 Shipment method combining large constructional element rolling and floating crane

Publications (2)

Publication Number Publication Date
CN102837978A CN102837978A (en) 2012-12-26
CN102837978B true CN102837978B (en) 2014-12-24

Family

ID=47365753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210365081.6A Expired - Fee Related CN102837978B (en) 2012-09-26 2012-09-26 Shipment method combining large constructional element rolling and floating crane

Country Status (1)

Country Link
CN (1) CN102837978B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106275287A (en) * 2016-09-05 2017-01-04 江苏中铁山桥重工有限公司 A kind of large-scale truss whole sections shipment method
CN107628201A (en) * 2017-08-25 2018-01-26 中国海洋石油总公司 The technics of shipment of large-sized deep water piling bar

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2615042Y (en) * 2003-04-25 2004-05-12 中铁大桥局集团有限公司 Special crane ship for transporting & erecting bridges on sea
KR20090022045A (en) * 2007-08-29 2009-03-04 에스티엑스조선주식회사 Method to load big size block to floating dock and rendezvous on the sea for erection using the same
CN101774422A (en) * 2009-12-30 2010-07-14 天津市海王星海上工程技术有限公司 Novel offshore installation construction resource-combined type pontoon barge

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2615042Y (en) * 2003-04-25 2004-05-12 中铁大桥局集团有限公司 Special crane ship for transporting & erecting bridges on sea
KR20090022045A (en) * 2007-08-29 2009-03-04 에스티엑스조선주식회사 Method to load big size block to floating dock and rendezvous on the sea for erection using the same
CN101774422A (en) * 2009-12-30 2010-07-14 天津市海王星海上工程技术有限公司 Novel offshore installation construction resource-combined type pontoon barge

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
崇启大桥大节段滚装上船技术研究;宿有为;《2011全国钢结构学术年会论文集》;20111018;全文 *

Also Published As

Publication number Publication date
CN102837978A (en) 2012-12-26

Similar Documents

Publication Publication Date Title
CN102556691B (en) Roll-on/roll-off shipping method for long large steel box girder segment across obstacles
US6802684B2 (en) Container tranfer terminal system and method
CN103233452B (en) The pre-splicing 1/4 cylinder transportation resources of a kind of lattice steel sheet pile large cylinder nominative sheet pile
CN102337736B (en) Installation process of upper module on offshore oil platform
CN107499968A (en) A kind of unloading method of bridge crane in shallow draft quay
CN203866772U (en) Multipurpose shipping dock capable of being adapted to tidal level change
CN104555493A (en) Wharf transportation and loading/unloading process for slender structure
CN102660923A (en) Assembly construction process of prefabricated 40m T-beam in intertidal zone of open sea
CN102837978B (en) Shipment method combining large constructional element rolling and floating crane
CN101941510A (en) Method for improving ship handling efficiency of containers (or bulk cargo) and equipment thereof
CN115893042A (en) Method for sliding wind power pipe pile onto ship
CN104060592B (en) Method for 1/4 land territory preassembling and overwater dispersion of large cylinder main grids of cellular steel sheet piles
CN103640909B (en) Large component roll-roll shipment
CN111285141B (en) Ship unloaders transportation and delivery process
CN202642027U (en) Floating fitting-out device
CN103603275B (en) A kind of system and method for sections steel box-girder slippage disembarkation
CN204979163U (en) A overhang slope multilane rolls adorns landing stage for inland river
CN103603318A (en) Floating type bollard
CN207208388U (en) A kind of bridge roll-on transport ship
CN201587808U (en) Track system for moving ship unloaders
CN109747796A (en) Large-scale floating dock is waterborne to widen remodeling method
CA3224947A1 (en) Method for preparing an integrated production complex on a gravity-based structure (gbs)
KR101166718B1 (en) Stabilized Container Crane With Improved Legs
KR101068662B1 (en) Hybrid mobile floating port
CN105926466A (en) Device and construction method for steel truss bridge integral transporting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170929

Address after: 214521 Jiangsu city of Wuxi province Jingjiang Jiangyin economic development zone with Kang Road No. 15

Patentee after: Jiangsu xinzhongtai Bridge Steel Structure Engineering Co. Ltd.

Address before: 214521 Jiangsu city of Taizhou province Jingjiang city Jingjiang park with Kang Road No. 15

Patentee before: Jiangsu Zhongtai Bridge Steel Structure Co., Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141224

Termination date: 20180926

CF01 Termination of patent right due to non-payment of annual fee