Summary of the invention
The object of the invention is to overcome above-mentioned deficiency, provide a kind of large component to roll dress and tie shipment method mutually with crane barge, this shipment method is easy to operation, ensures shipment safety, and can reduce executive cost.
According to technical scheme provided by the invention, a kind of large component rolls dress and ties shipment method mutually with crane barge, and step is:
(1) shipping prepares: rest on harbour by special fortune beam ship, harbour is overlapped with trestle, and harbour front arranges and puts pier, and puts on pier before making stern rest harbour; Get large component, be transported to harbour with two iant flat trucks, and carry out the inspection before shipping;
(2) roll-on-roll-off ship oceangoing ship and floating crane positioning: select suitable tidal level, boats and ships are when the tidal level of 2 ~ 3m, and deck is concordant with harbour; Beam section is gone on board and must carried out at the incoming tide, and requires at duration of tide to be 40 ~ 60min, so that iant flat truck is gone on board smoothly and gone ashore;
To cast anchor location by the position designed in advance; On direction horizontal along the coastline, the overlap joint platform that layout two is parallel on special fortune beam ship, and between overlap joint platform, lay two rows track parallel to each other;
(3) component rolls and takes on board: the special iant flat truck loading large component is rolled by track and takes on board, and is rolling in process of assembling, by the cabin water of row pressure special fortune beam ship, makes special fortune beam ship keep concordant with harbour;
(4) crane barge: carrier rests in raises boat landing; Iant flat truck rolls and is filled to special fortune beam ship, and rolling dress length is 50 ~ 60m, should try one's best and lean on forward, make casing close to operator's compartment; With floating-crane lifting, slowly move to carrier harbour front, steel jacket box is bold and generous, colligation; Be transported on special fortune beam ship, hang after sending, special fortune beam ship exits harbour, and carrier drives harbour into, and component is bold and generous, colligation is fixed.
Tool of the present invention has the following advantages: large component is safely and smoothly bold and generous on carrier, is easy to operation, ensures shipment safety, and can reduce executive cost; Take full advantage of existing harbour, boats and ships, crane barge.
Detailed description of the invention
Embodiment 1 one kinds of large components roll dress and tie shipment method mutually with crane barge, and step is:
(1) shipping prepares: rest on harbour 3 by special fortune beam ship, harbour 3 is overlapped with trestle 2, and harbour 3 front arranges and puts pier 1, and puts on pier 1 before making stern rest harbour 3; Get large component, be transported to harbour 3 with two iant flat trucks, and carry out the inspection before shipping;
(2) roll-on-roll-off ship oceangoing ship and floating crane positioning: select suitable tidal level, boats and ships are when the tidal level of 2m, and deck is concordant with harbour; Beam section is gone on board and must carried out at the incoming tide, and requires at duration of tide to be 40min, so that iant flat truck is gone on board smoothly and gone ashore;
To cast anchor location by the position designed in advance; On direction horizontal along the coastline, the overlap joint platform that layout two is parallel on special fortune beam ship, and between overlap joint platform, lay two rows track parallel to each other;
(3) component rolls and takes on board: the special iant flat truck loading large component is rolled by track and takes on board, and is rolling in process of assembling, by the cabin water of row pressure special fortune beam ship, makes special fortune beam ship keep concordant with harbour;
(4) crane barge: carrier rests in raises boat landing; Iant flat truck rolls and is filled to special fortune beam ship, and rolling dress length is 50m, should try one's best and lean on forward, make casing close to operator's compartment; With floating-crane lifting, slowly move to carrier harbour front, steel jacket box is bold and generous, colligation; Be transported on special fortune beam ship, hang after sending, special fortune beam ship exits harbour, and carrier drives harbour into, and component is bold and generous, colligation is fixed.
Embodiment 2 one kinds of large components roll dress and tie shipment method mutually with crane barge, and step is:
(1) shipping prepares: rest on harbour 3 by special fortune beam ship, harbour 3 is overlapped with trestle 2, and harbour 3 front arranges and puts pier 1, and puts on pier 1 before making stern rest harbour 3; Get large component, be transported to harbour 3 with two iant flat trucks, and carry out the inspection before shipping;
(2) roll-on-roll-off ship oceangoing ship and floating crane positioning: select suitable tidal level, boats and ships are when the tidal level of 3m, and deck is concordant with harbour; Beam section is gone on board and must carried out at the incoming tide, and requires at duration of tide to be 60min, so that iant flat truck is gone on board smoothly and gone ashore;
To cast anchor location by the position designed in advance; On direction horizontal along the coastline, the overlap joint platform that layout two is parallel on special fortune beam ship, and between overlap joint platform, lay two rows track parallel to each other;
(3) component rolls and takes on board: the special iant flat truck loading large component is rolled by track and takes on board, and is rolling in process of assembling, by the cabin water of row pressure special fortune beam ship, makes special fortune beam ship keep concordant with harbour;
(4) crane barge: carrier rests in raises boat landing; Iant flat truck rolls and is filled to special fortune beam ship, and rolling dress length is 60m, should try one's best and lean on forward, make casing close to operator's compartment; With floating-crane lifting, slowly move to carrier harbour front, steel jacket box is bold and generous, colligation; Be transported on special fortune beam ship, hang after sending, special fortune beam ship exits harbour, and carrier drives harbour into, and component is bold and generous, colligation is fixed.
Embodiment 3 one kinds of large components roll dress and tie shipment method mutually with crane barge, and step is:
(1) shipping prepares: rest on harbour 3 by special fortune beam ship, harbour 3 is overlapped with trestle 2, and harbour 3 front arranges and puts pier 1, and puts on pier 1 before making stern rest harbour 3; Get large component, be transported to harbour 3 with two iant flat trucks, and carry out the inspection before shipping;
(2) roll-on-roll-off ship oceangoing ship and floating crane positioning: select suitable tidal level, boats and ships are when the tidal level of 2.63m, and deck is concordant with harbour; Beam section is gone on board and must carried out at the incoming tide, and requires at duration of tide to be 45min, so that iant flat truck is gone on board smoothly and gone ashore;
To cast anchor location by the position designed in advance; On direction horizontal along the coastline, the overlap joint platform that layout two is parallel on special fortune beam ship, and between overlap joint platform, lay two rows track parallel to each other;
(3) component rolls and takes on board: the special iant flat truck loading large component is rolled by track and takes on board, and is rolling in process of assembling, by the cabin water of row pressure special fortune beam ship, makes special fortune beam ship keep concordant with harbour;
(4) crane barge: carrier rests in raises boat landing; Iant flat truck rolls and is filled to special fortune beam ship, and rolling dress length is 55m, should try one's best and lean on forward, make casing close to operator's compartment; With floating-crane lifting, slowly move to carrier harbour front, steel jacket box is bold and generous, colligation; Be transported on special fortune beam ship, hang after sending, special fortune beam ship exits harbour, and carrier drives harbour into, and component is bold and generous, colligation is fixed.