CN102826473A - Multi-functional electrical equipment lifting hold lever tool - Google Patents

Multi-functional electrical equipment lifting hold lever tool Download PDF

Info

Publication number
CN102826473A
CN102826473A CN2012103296840A CN201210329684A CN102826473A CN 102826473 A CN102826473 A CN 102826473A CN 2012103296840 A CN2012103296840 A CN 2012103296840A CN 201210329684 A CN201210329684 A CN 201210329684A CN 102826473 A CN102826473 A CN 102826473A
Authority
CN
China
Prior art keywords
pulley
main support
electrical equipment
lifting
packed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103296840A
Other languages
Chinese (zh)
Other versions
CN102826473B (en
Inventor
朱江
于东洋
宋喜贵
吴坚
李寿清
张耀伟
李震
隋万利
都兴云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jixi Electric Power Bureau
State Grid Corp of China SGCC
Original Assignee
Jixi Electric Power Bureau
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jixi Electric Power Bureau, State Grid Corp of China SGCC filed Critical Jixi Electric Power Bureau
Priority to CN201210329684.0A priority Critical patent/CN102826473B/en
Publication of CN102826473A publication Critical patent/CN102826473A/en
Application granted granted Critical
Publication of CN102826473B publication Critical patent/CN102826473B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses a multi-functional electrical equipment lifting hold lever tool which relates to a special tool for lifting and hanging, so as to solve the problems that an existing lifting hold lever occupies a large area and cannot be fixedly arranged on an electrical equipment support uprightly, the load bearing capability cannot be adjusted, the overhaul of transformation equipment is not adapted to, and the electrical equipment cannot be lifted when part of a transformation substation powers off. The lower end of a main support is connected with a base, and the top end of the main support is fixedly connected with the low position end of an oblique beam; one end of a traction oil wire rope is wound on a grinder, and the other end of the traction oil wire rope is wound on a fifth pulley through a first pulley, a second pulley, a third pulley and a fourth pulley; the first pulley is fixedly arranged on a first pulley frame; the second pulley is fixedly arranged on the base; the third pulley is fixedly arranged below the oblique beam; the fourth pulley is fixedly arranged below the high position end of the oblique beam; a lifting hook is arranged on the fifth pulley; a plurality of shackles are staggered up and down along the inner side surface and the outer side surface of the main support; and one end of a reinforced oil wire rope is wound on the grinder, and the other end of the reinforced oil wire rope is wound on a sixth pulley. The multi-functional electrical equipment lifting hold lever tool is used for the overhaul of the transformation equipment.

Description

Multifunctional electric equipment hoisting pole instrument
Technical field
The present invention relates to a kind ofly hang installation and dismantling and hang special tool, be specifically related to a kind of multifunctional electric equipment hoisting pole instrument.
Background technology
Along with the continuous expansion of domestic scale of power, the technology innovation project project also constantly increases thereupon.In the construction of in the past power transformation engineering, generally adopt crane integral hoisting power transformation engineering equipment, but along with the propelling of carrying out of electric network state maintenance, increasingly high to the reliability requirement of power transformation engineering equipment.The full chance that is had a power failure is fewer and feweri.Thereby maintenance in recent years, technological transformation and engineer operation, majority is that part has a power failure, and two side bus are all charged, and the power failure scope is little, and existing crane (pole) is big owing to floor area, and enters not go the scene; For this reason, usually use that lifting rope replaces that crane overhauls, technological transformation and engineer operation, the safety factor of lifting rope lifting is low to bring great threat to the operating personnel of work-site and the safety of equipment.In addition, the most delivery electrical engineerings that are fit to of pole on the market are used, and uprightly can't be fixed on the electrical equipment support, and bearing capacity can not adjust, thereby can not adapt to the requirement of transformer maintenance, can't carry out the lifting of substation's electrical equipment when partly having a power failure.
Summary of the invention
The objective of the invention is for solving existing lifting pole instrument floor area big; Uprightly can't be fixed on the electrical equipment support; The nonadjustable shortcoming of bearing capacity; Incompatibility transformer maintenance can't be carried out the problem of substation's electrical equipment lifting when partly having a power failure, and a kind of multifunctional electric equipment hoisting pole instrument is provided.
The objective of the invention is to realize through following technical scheme:
The present invention includes main support, cant beam, pedestal, traction oil thread rope, strand mill, first pulley, second pulley, the 3rd pulley, the 4th pulley, the 5th pulley, first pulley yoke, suspension hook, reinforcement oil thread rope, the 6th pulley and second pulley yoke and several feet nail, the lower end of said main support is connected with pedestal, and the lower position end of the top of main support and cant beam is affixed; One end of traction oil thread rope is wrapped on the strand mill; The other end of the first traction oil thread rope is wrapped on the 5th pulley behind first pulley, second pulley, the 3rd pulley, the 4th pulley, and first pulley is packed on first pulley yoke, and second pulley is packed on the pedestal; The 3rd pulley be arranged on second pulley directly over; And the 3rd pulley be packed in cant beam below, the 4th pulley and the 3rd pulley laterally arrange, and the 4th pulley be packed in cant beam the high position end below; The 5th pulley be positioned at the 4th pulley under; Suspension hook is installed on the 5th pulley, and the several feet nail is crisscross arranged up and down along the side, innner and outer of main support, and an end of strengthening oil thread rope is wrapped on the strand mill; The other end of strengthening oil thread rope is wrapped on the 6th pulley, and the 6th pulley is packed on second pulley yoke.
Compared with present technology the present invention has following beneficial effect:
One, lifting pole instrument of the present invention is fixed on the electrical equipment support; Utilize strand mill 5 to draw, carry out the lifting of transformer maintenance through the transmission of traction oil thread rope 4, first pulley 6, second pulley 7, the 3rd pulley 8, the 4th pulley 9, the 5th pulley 10 and suspension hook 12.Floor area of the present invention is little, can uprightly be fixed on the electric hanging device, but implementation part has a power failure or the lifting and the dismounting of power transformation engineering equipment during operation among a small circle such as single loop power failure, and therefore, the present invention is more suitable for overhauling in transformer.
Two, the design of pin nail 13 has solved the danger that on electric hanging device, puts up a ladder, can be according to weight of equipment, the different lengthening of height main support adjustment carrying dynamics, so that field staff's operation.
Three, the present invention also has the auxiliary function of hanging circuit breaker, CT, PT and other high-tension apparatus of tearing open.Tearing open when hanging SW2-60 type circuit breaker, can remove pedestal 3, main support 1 is fixed on two channel-section steels of former circuit breaker support, be convenient to parallel move to tear open hang circuit breaker.
Four, the present invention has carried out the lifting test in Jixi Electric Power Bureau, obtains good effect.Application of the present invention has not only realized state net company " intensification " management, keeps on improving to do the requirement of technological transformation.More important also successfully solved partly has a power failure and the difficult problem of operation lifting and disassemblerassembler among a small circle; Promote engineering and operation quality, improved safety factor of workers, alleviated operating personnel's work capacity 50%; Shorten production time 30%, reduced kwh loss 30%.By annual technology innovation project amount more than 20 of exchange device more, use the present invention, the repair time shortens 50 hours at least, by delivery 20000KVA per hour, just can improve electricity sales amount 800000KWH, and by the electric 0.5 yuan of calculating of every degree, the sale of electricity that can increase by 400000 yuan is taken in.By need employing every year crane to calculate, 8 operation employ 8 cranes at least, 5000 yuan of crane costs, but surplus the cost saving in every year 40000 yuan.Above-mentioned several can cost saving reach 450,000 yuan.
Description of drawings
Fig. 1 is the integral structure front view of lifting pole instrument of the present invention.
The specific embodiment
The specific embodiment one: combine Fig. 1 that this embodiment is described; This embodiment comprises main support 1, cant beam 2, pedestal 3, traction oil thread rope 4, strand mill 5, first pulley 6, second pulley 7, the 3rd pulley 8, the 4th pulley 9, the 5th pulley 10, first pulley yoke 11, suspension hook 12, strengthens oil thread rope 14, the 6th pulley 15 and second pulley yoke 16 and several feet nail 13, and the lower end of said main support 1 is connected with pedestal 3, and the lower position end of the top of main support 1 and cant beam 2 is affixed; One end of traction oil thread rope 4 is wrapped on the strand mill 5; The other end of the first traction oil thread rope 4 is wrapped on the 5th pulley 10 behind first pulley 6, second pulley 7, the 3rd pulley 8, the 4th pulley 9, and first pulley 6 is packed on first pulley yoke 11, and second pulley 7 is packed on the pedestal 3; The 3rd pulley 8 be arranged on second pulley 7 directly over; And the 3rd pulley 8 be packed in cant beam 2 below, the 4th pulley 9 and the 3rd pulley 8 laterally arrange, and the 4th pulley 9 be packed in cant beam 2 the high position end below; The 5th pulley 10 be positioned at the 4th pulley 9 under; Suspension hook 12 is installed on the 5th pulley 10, and several feet nail 13 sides, innner and outer along main support 1 are crisscross arranged up and down, and an end of strengthening oil thread rope 14 is wrapped on the strand mill 5; The other end of strengthening oil thread rope 14 is wrapped on the 6th pulley 15, and the 6th pulley 15 is packed on second pulley yoke 16.The steel pipe that main support 1 adopts
Figure BDA00002112637500031
; The weight of steel pipe is no more than 40 kilograms, and maximum degree has alleviated pole deadweight and substance.The operating personnel climbs the height of wanting operation through pin nail 13.During use, pedestal 3 is fixed on the electrical equipment support that needs lifting, main support 1 is captiveed joint with pedestal 3, each pulley and oil thread rope are installed, draw, reach the purpose that power transformation engineering equipment is changed in lifting with strand mill 7.
The specific embodiment two: combine Fig. 1 that this embodiment is described, the main support 1 of this embodiment is made up of at least two steel pipe 1-1 and at least one flange 1-2, and at least two steel pipe 1-1 are provided with up and down, and two steel pipe 1-1 connect through flange 1-2.According to the lifting lengths needed, the length of regulating main support 1 through flange 1-2 can be according to the difference of hanging device weight, increases or reduces steel pipe 1-1 and adjust that it is stressed, and the power failure scope is little to adapt to, in the operation of substation's part or the place of hard transportation.Other composition and annexation are identical with the specific embodiment one.

Claims (2)

1. multifunctional electric equipment hoisting pole instrument; It is characterized in that: said lifting pole instrument comprises main support (1), cant beam (2), pedestal (3), traction oil thread rope (4), strand mill (5), first pulley (6), second pulley (7), the 3rd pulley (8), the 4th pulley (9), the 5th pulley (10), first pulley yoke (11), suspension hook (12), strengthens oil thread rope (14), the 6th pulley (15) and second pulley yoke (16) and several feet nail (13); The lower end of said main support (1) is connected with pedestal (3); The lower position end of the top of main support (1) and cant beam (2) is affixed; One end of traction oil thread rope (4) is wrapped on the strand mill (5); The other end of the first traction oil thread rope (4) is wrapped on the 5th pulley (10) behind first pulley (6), second pulley (7), the 3rd pulley (8), the 4th pulley (9), and first pulley (6) is packed on first pulley yoke (11), and second pulley (7) is packed on the pedestal (3); The 3rd pulley (8) be arranged on second pulley (7) directly over; And the 3rd pulley (8) be packed in cant beam (2) below, the 4th pulley (9) and the 3rd pulley (8) laterally arrange, and the 4th pulley (9) be packed in cant beam (2) the high position end below; The 5th pulley (10) be positioned at the 4th pulley (9) under; Suspension hook (12) is installed on the 5th pulley (10), and several feet nail (13) is crisscross arranged up and down along the side, innner and outer of main support (1), and an end of strengthening oil thread rope (14) is wrapped on the strand mill (5); The other end of strengthening oil thread rope (14) is wrapped on the 6th pulley (15), and the 6th pulley (15) is packed on second pulley yoke (16).
2. according to the said multifunctional electric equipment hoisting of claim 1 pole instrument; It is characterized in that: said main support (1) is made up of at least two steel pipes (1-1) and at least one flange (1-2); At least two steel pipes (1-1) are provided with up and down, and two steel pipes (1-1) connect through flange (1-2).
CN201210329684.0A 2012-09-07 2012-09-07 Multi-functional electrical equipment lifting hold lever tool Expired - Fee Related CN102826473B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210329684.0A CN102826473B (en) 2012-09-07 2012-09-07 Multi-functional electrical equipment lifting hold lever tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210329684.0A CN102826473B (en) 2012-09-07 2012-09-07 Multi-functional electrical equipment lifting hold lever tool

Publications (2)

Publication Number Publication Date
CN102826473A true CN102826473A (en) 2012-12-19
CN102826473B CN102826473B (en) 2015-02-18

Family

ID=47329825

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210329684.0A Expired - Fee Related CN102826473B (en) 2012-09-07 2012-09-07 Multi-functional electrical equipment lifting hold lever tool

Country Status (1)

Country Link
CN (1) CN102826473B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000184525A (en) * 1998-12-18 2000-06-30 Fuji Electric Co Ltd Lifter for handling of switchboard apparatus
JP2002058118A (en) * 2000-08-09 2002-02-22 Yaskawa Electric Corp Unit device having replacing jig
CN1343588A (en) * 2001-04-16 2002-04-10 刘发财 Method for standing up trolley line pole(s)
CN1600670A (en) * 2004-10-19 2005-03-30 辽阳电业局 Dedicated hoisting crane having replacing isolating switch
CN201252356Y (en) * 2008-07-29 2009-06-03 淄博供电公司 On-site disassembly overhaul special tool for high-voltage isolating switch
CN201781203U (en) * 2010-08-30 2011-03-30 荥阳市电业局 Disconnecting link overhaul hoisting device
CN102447224A (en) * 2011-11-09 2012-05-09 吉林省电力有限公司白山供电公司 Disconnector maintenance hoisting bracket
CN202717539U (en) * 2012-09-07 2013-02-06 鸡西电业局 Hoisting derrick tool of multifunctional electric equipment

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000184525A (en) * 1998-12-18 2000-06-30 Fuji Electric Co Ltd Lifter for handling of switchboard apparatus
JP2002058118A (en) * 2000-08-09 2002-02-22 Yaskawa Electric Corp Unit device having replacing jig
CN1343588A (en) * 2001-04-16 2002-04-10 刘发财 Method for standing up trolley line pole(s)
CN1600670A (en) * 2004-10-19 2005-03-30 辽阳电业局 Dedicated hoisting crane having replacing isolating switch
CN201252356Y (en) * 2008-07-29 2009-06-03 淄博供电公司 On-site disassembly overhaul special tool for high-voltage isolating switch
CN201781203U (en) * 2010-08-30 2011-03-30 荥阳市电业局 Disconnecting link overhaul hoisting device
CN102447224A (en) * 2011-11-09 2012-05-09 吉林省电力有限公司白山供电公司 Disconnector maintenance hoisting bracket
CN202717539U (en) * 2012-09-07 2013-02-06 鸡西电业局 Hoisting derrick tool of multifunctional electric equipment

Also Published As

Publication number Publication date
CN102826473B (en) 2015-02-18

Similar Documents

Publication Publication Date Title
CN102795555B (en) Large slalom crane for offshore platform
CN204917648U (en) Turbine rotor lifts by crane instrument
CN202717539U (en) Hoisting derrick tool of multifunctional electric equipment
CN102689849A (en) Lifting device for replacing transformer
CN105058052A (en) Method for installation of 3 MW wind generating set
CN201809086U (en) Anchor ear connecting frame for construction of tower frame of tubular flare tower
CN201266542Y (en) Suspended core stent of trestle type distribution transformer
CN203715054U (en) 3,000t combinable lifting balance beam
CN201656340U (en) Tool for replacing supporting insulator of high-voltage tube bus
CN203112390U (en) Super-lifting device of crane and all-terrain crane
CN203667798U (en) Light-weight high-strength cross beam lifting appliance
CN206148848U (en) Large -tonnage electrified conducting wire's hoisting device
CN103738861A (en) Integral hoisting method for A type column of steel pipe of ultra-high voltage transformer station
CN103332608A (en) Special suspender for replacing GW6 disconnector knob insulator
CN102826473A (en) Multi-functional electrical equipment lifting hold lever tool
CN203021172U (en) Marine 35-ton lifting hook set
CN201857235U (en) Power off-free disconnect switch lifting appliance
CN108502700A (en) Engine rooms of wind power generators suspender
CN206195251U (en) Line ware is carried to eight split conductors on 1000kV ultra -high voltage transmission line way
CN204897220U (en) Frame bridge crane's bridge hoisting structure
CN202754692U (en) Lifting device for base-ring manufacturing for wind power generation
CN202899720U (en) Steel pole provided with foot treadles and used for high-tension transmission line iron tower
CN102992183A (en) Marine 15-ton lifting hook group
CN203486789U (en) Portable dual-flat-arm floor type derrick
CN202482779U (en) Box girder lifting system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150218

Termination date: 20170907