CN102787848B - 一种隧道仰拱滑模砼衬砌钢模台车 - Google Patents
一种隧道仰拱滑模砼衬砌钢模台车 Download PDFInfo
- Publication number
- CN102787848B CN102787848B CN201110127414.7A CN201110127414A CN102787848B CN 102787848 B CN102787848 B CN 102787848B CN 201110127414 A CN201110127414 A CN 201110127414A CN 102787848 B CN102787848 B CN 102787848B
- Authority
- CN
- China
- Prior art keywords
- inverted arch
- lining steel
- sliding mode
- steel mould
- tunnel lining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
本发明涉及一种隧道仰拱滑模砼衬砌钢模台车,其特征在于包括滑行模板(5)、主机架(1)、调整千斤(3)和纠偏调整拉杆(2);滑行模板(5)上设有底部纠偏机架(4),底部纠偏机架(4)通过调整千斤(3)和纠偏调整拉杆(2)与主机架(1)连接;主机架(1)的中部设有框架,框架内设有用于输送混凝土的主皮带输送机(8)和分散主皮带输送机上的混凝土于设备两侧的副皮带输送机(19、20),框架的尾部设有进料斗(7),进料斗(7)的下方设有从动滚筒(6),框架的下方设有为主皮带输送机(8)提供尾部支撑的从动行走轮(21)和行走轨道(22);该设备克服了传统的针梁式或其它形式的仰拱混凝土封闭浇筑施工方式易形成气泡缺陷。
Description
技术领域
本发明涉及台车,具体地讲,涉及钢模台车设备。
背景技术
长期以来,世界各国在竭力控制隧洞大块模板混凝土浇筑过程中所产生的各类施工缺陷,诸如战胜气泡、无法全面振捣、原浆抹面、砼光洁度等等隧道病害方面付出了艰辛的努力,尚未取得满意的效果。
隧道(隧洞)仰拱滑模砼衬砌钢模台车,涉及到隧道在开挖后,采用传统的混凝土浇筑施工方式易形成气泡、且振捣与夯实不严而造成隧道病害的情况下,使用该仰拱滑模砼衬砌钢模台车进行隧道仰拱混凝土浇筑即消除或极大地减少隧道病害。
发明内容
本发明提出的隧道仰拱滑模砼衬砌钢模台车设备,克服了传统的针梁式或其它形式的仰拱混凝土封闭浇筑施工方式易形成气泡,主要是由于无法全面振捣与全面夯实而造成的隧道病害,极大降低施工人员的工作强度,减轻施工单位人员紧张和施工经济负担;提高效率。
本发明提供的一种隧道仰拱滑模砼衬砌钢模台车,其改进之处在于包括滑行模板、主机架、调整千斤顶和纠偏调整拉杆;所述滑行模板上设有底部纠偏机架,底部纠偏机架通过调整千斤顶和纠偏调整拉杆与主机架连接;所述主机架的中部设有框架,框架内设有用于输送混凝土的主皮带输送机和分散主皮带输送机上的混凝土于设备两侧的副皮带输送机,所述框架的尾部设有进料斗,进料斗的下方设有从动滚筒,所述框架的下方设有为主皮带输送机提供尾部支撑的从动行走轮和行走轨道。
本发明提供的第一优选的隧道仰拱滑模砼衬砌钢模台车,所述主机架的两端下方设有可供隧道仰拱滑模砼衬砌钢模台车行走的轨道、支撑轨道的牛腿和支撑牛腿的支撑梁,所述支撑轨道的牛腿通过L型压块固定在支撑牛腿的支撑梁上。
本发明提供的第二优选的隧道仰拱滑模砼衬砌钢模台车,所述主机架上方设有吊车组梁,吊车组梁上设有起吊电动葫芦。
本发明提供的第三优选的隧道仰拱滑模砼衬砌钢模台车,所述副皮带输送机位于主皮带输送机的两侧。
本发明提供的第四优选的隧道仰拱滑模砼衬砌钢模台车,所述主机架两侧、支撑牛腿的支撑梁上设有同步的油缸和自动限位装置。
本发明提供的第五优选的隧道仰拱滑模砼衬砌钢模台车,所述主机架形状为T形。
本发明提供的第六优选的隧道仰拱滑模砼衬砌钢模台车,所述油缸和自动限位装置通过销轴连接。
本发明提供的第七优选的隧道仰拱滑模砼衬砌钢模台车,所述起吊电动葫芦可单动或联动。
本发明提供的第八优选的隧道仰拱滑模砼衬砌钢模台车,所述轨道位于支撑牛腿的支撑梁上。
本发明提出的隧道仰拱滑模砼衬砌钢模台车设备包括:滑行模板上设底部纠偏机架与上部主机架通过调整千斤顶和纠偏调整拉杆形成一个整体装置;位于整体装置下部的左右两侧设置有可供仰拱滑模砼衬砌钢模台车行走的轨道与支撑轨道的牛腿和支撑牛腿的支撑梁;位于整体装置上部的左右两侧设置有单动或联动的起吊电动葫芦,吊装可供仰拱滑模砼衬砌钢模台车前后循环行走的轨道与支撑轨道的牛腿和支撑牛腿的支撑梁;位于整体装置中部设置有输送混凝土的主皮带输送机和分散主皮带输送机上的混凝土于设备两侧的副皮带输送机;位于整体装置后部的左右两侧设置有同步的油缸和自动限位装置,并可控制前后运行速度。
与现有技术相比,本发明提供的一种隧道仰拱滑模砼衬砌钢模台车具有以下优点:
1.组成整体结构后,便于调整仰角;纠偏机架便于隧洞直线和曲线混凝土衬砌以满足设计要求;调整千斤顶与纠偏拉杆便于隧洞转弯段和模板仰角混凝土衬砌以满足设计要求。
2.行走规定和支撑牛腿及支撑梁,以满足隧洞混凝土衬砌往返重复使用,以降低施工成本,且其稳定性更佳。
3.由于隧洞空间限制,其左右两侧设置起吊电动葫芦,用以减轻劳动强度,安全性更佳。
4.采用皮带输送机防止混凝土离析,减轻劳动强度,降低入仓成本,有利于混凝土浇筑和施工直线延伸距离,实现长距离浇筑,减少施工机械相互干扰;
5.同步油缸和自动限位装置极大地使该设备达到准确、快速、完美的施工。
附图说明
图1是:本发明提供的一种隧道仰拱滑模砼衬砌钢模台车用于施工的正视图。
图2是:本发明提供的一种隧道仰拱滑模砼衬砌钢模台车的中心剖视图。
图3是:本发明提供的一种隧道仰拱滑模砼衬砌钢模台车的立体图。
图中:1、主机架;2、纠偏调整拉杆;3、调整千斤顶;4、底部纠偏机架;5、滑行模板;6、从动滚筒;7、进料斗;8、主皮带输送机;9、轨道;10、吊车的组梁;11、钢丝绳;12、起吊电动葫芦;13、油缸;14、自动限位装置;15、支撑牛腿的支撑梁;16、支撑轨道的牛腿;17、L型压块;18、轨道;19、副皮带输送机;20、副皮带输送机;21、从动行走轮;22、行走轨道。
具体实施方式
下面结合附图和具体实施例对本发明提供的一种隧道仰拱滑模砼衬砌钢模台车作以详细描述。
实施例1
本实施例的隧道仰拱滑模砼衬砌钢模台车,如图1-3所示,包括滑行模板5、主机架1、调整千斤顶3和纠偏调整拉杆2;滑行模板5上设有底部纠偏机架4,底部纠偏机架4通过调整千斤顶3和纠偏调整拉杆2与主机架1连接;主机架1的中部设有框架,框架内设有用于输送混凝土的主皮带输送机8和分散主皮带输送机上的混凝土于设备两侧的副皮带输送机19、20;框架的尾部设有进料斗7,进料斗7的下方设有从动滚筒6,框架的下方设有为主皮带输送机8提供尾部支撑的从动行走轮21和行走轨道22。
主机架1的两端下方设有可供隧道仰拱滑模砼衬砌钢模台车行走的轨道18、支撑轨道的牛腿16和支撑牛腿的支撑梁15,支撑轨道的牛腿16通过L型压块固定在支撑牛腿的支撑梁15上,且轨道9、18位于支撑梁15上。
主机架1上方设有吊车组梁10,吊车组梁10上设有起吊电动葫芦12,副皮带输送机19、20分别位于主皮带输送机8的两侧。主机架1两侧、支撑牛腿的支撑梁15上设有同步的油缸13和自动限位装置14,主机架1形状为T形,油缸13和自动限位装置14通过销轴连接,起吊电动葫芦12可单动或联动,支撑牛腿的支撑梁15上设有皮带9。
本实施例用于隧道(隧洞)开挖后,采用仰拱滑模砼衬砌钢模台车进行快速的仰拱施工,该设备通过滑行模板5上设底部纠偏机架4与上部主机架1通过调整千斤顶3和前后左右的纠偏调整拉杆2形成一个整体装置;位于整体装置下部的左右两侧设置有可供仰拱滑模砼衬砌钢模台车行走的轨道18与支撑轨道的牛腿16和支撑牛腿的支撑梁15;通过压板螺拴促使L型压块17固定行走的轨道18(或9)。
单动或联动的起吊电动葫芦12,吊装可供仰拱滑模砼衬砌钢模台车前后循环行走的轨道9、18与支撑轨道的牛腿16和支撑牛腿的支撑梁15附属机构;主皮带输送机8所在的框架尾部设置的进料斗7,通过前后驱动电机和从动滚筒6使混凝土进入副皮带输送机20后分布与左右侧入仓,其多余的混凝土或需强制改变位置的混凝土可通过漏斗或溜筒传入滑行模板5的前部任一处,然后利用***式震捣器和附着式震捣器进行全面振捣夯实;同步的油缸13和自动限位装置14,并可控制前后运行速度。
以上实施例仅用以说明本发明的技术方案而非对其限制,尽管本领域的技术人员阅读本申请后,参照上述实施例对本发明进行种种修改或变更,但这些修改或变更,均在申请待批本发明的权利申请要求保护范围之内。
Claims (9)
1.一种隧道仰拱滑模砼衬砌钢模台车,其特征在于包括滑行模板(5)、主机架(1)、调整千斤顶(3)和纠偏调整拉杆(2);所述滑行模板(5)上设有底部纠偏机架(4),底部纠偏机架(4)通过调整千斤顶(3)和纠偏调整拉杆(2)与主机架(1)连接;所述主机架(1)的中部设有框架,框架内设有用于输送混凝土的主皮带输送机(8)和分散主皮带输送机上的混凝土于设备两侧的副皮带输送机(19,20),所述框架的尾部设有进料斗(7),进料斗(7)的下方设有从动滚筒(6),所述框架的下方设有为主皮带输送机(8)提供尾部支撑的从动行走轮(21)和行走轨道(22)。
2.根据权利要求1所述的隧道仰拱滑模砼衬砌钢模台车,其特征在于所述主机架(1)的两端下方设有可供隧道仰拱滑模砼衬砌钢模台车行走的轨道(9,18)、支撑轨道的牛腿(16)和支撑牛腿的支撑梁(15),所述支撑轨道的牛腿(16)通过L型压块固定在支撑牛腿的支撑梁(15)上。
3.根据权利要求1所述的隧道仰拱滑模砼衬砌钢模台车,其特征在于所述主机架(1)上方设有吊车组梁(10),吊车组梁(10)上设有起吊电动葫芦(12)。
4.根据权利要求1所述的隧道仰拱滑模砼衬砌钢模台车,其特征在于所述副皮带输送机(19,20)位于主皮带输送机(8)的两侧。
5.根据权利要求2所述的隧道仰拱滑模砼衬砌钢模台车,其特征在于所述主机架(1)两侧、支撑牛腿的支撑梁(15)上设有同步的油缸(13)和自动限位装置(14)。
6.根据权利要求1-5之任一所述的隧道仰拱滑模砼衬砌钢模台车,其特征在于所述主机架(1)形状为T形。
7.根据权利要求5所述的隧道仰拱滑模砼衬砌钢模台车,其特征在于所述油缸(13)和自动限位装置(14)通过销轴连接。
8.根据权利要求3所述的隧道仰拱滑模砼衬砌钢模台车,其特征在于所述起吊电动葫芦(12)可单动或联动。
9.根据权利要求2所述的隧道仰拱滑模砼衬砌钢模台车,其特征在于所述轨道(9,18)位于支撑牛腿的支撑梁(15)上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110127414.7A CN102787848B (zh) | 2011-05-17 | 2011-05-17 | 一种隧道仰拱滑模砼衬砌钢模台车 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110127414.7A CN102787848B (zh) | 2011-05-17 | 2011-05-17 | 一种隧道仰拱滑模砼衬砌钢模台车 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102787848A CN102787848A (zh) | 2012-11-21 |
CN102787848B true CN102787848B (zh) | 2014-11-05 |
Family
ID=47153409
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110127414.7A Active CN102787848B (zh) | 2011-05-17 | 2011-05-17 | 一种隧道仰拱滑模砼衬砌钢模台车 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102787848B (zh) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104033163B (zh) * | 2014-05-06 | 2016-04-06 | 中铁十七局集团第二工程有限公司 | 水工隧洞底板与边墙混凝土浇注一次成型方法 |
CN104533455A (zh) * | 2014-12-12 | 2015-04-22 | 中铁十九局集团有限公司 | 高速铁路隧道整体式仰拱背模混凝土浇筑工艺 |
CN105041338B (zh) * | 2015-07-24 | 2017-07-04 | 四川省创力隧道机械设备有限公司 | 一种履带式仰拱栈桥台车 |
CN108035741A (zh) * | 2018-02-05 | 2018-05-15 | 三门峡市水利勘测设计有限责任公司 | 一种顶模台车 |
CN109736316B (zh) * | 2019-01-14 | 2020-09-18 | 中电建十一局工程有限公司 | 一种尾水洞弯管段钢模台车砼衬砌施工方法 |
CN109736852A (zh) * | 2019-03-20 | 2019-05-10 | 中建四局第三建筑工程有限公司 | 一种隧道仰拱一次浇筑成型装置及方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1904315A (zh) * | 2006-05-12 | 2007-01-31 | 中铁西南科学研究院有限公司 | 一种具有浮动式行车底架的隧道仰拱模板台车 |
CN101215970A (zh) * | 2008-01-02 | 2008-07-09 | 中铁五局(集团)有限公司 | 隧道仰拱作业台车 |
CN101929341A (zh) * | 2010-01-12 | 2010-12-29 | 中铁隧道集团二处有限公司 | Tbm同步衬砌施工方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5355175B2 (ja) * | 2009-03-27 | 2013-11-27 | 株式会社熊谷組 | 路盤鉄筋コンクリートの施工装置及び施工方法 |
JP2011058314A (ja) * | 2009-09-11 | 2011-03-24 | Daiei Koki Kk | 門型架台及びセントル台車 |
-
2011
- 2011-05-17 CN CN201110127414.7A patent/CN102787848B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1904315A (zh) * | 2006-05-12 | 2007-01-31 | 中铁西南科学研究院有限公司 | 一种具有浮动式行车底架的隧道仰拱模板台车 |
CN101215970A (zh) * | 2008-01-02 | 2008-07-09 | 中铁五局(集团)有限公司 | 隧道仰拱作业台车 |
CN101929341A (zh) * | 2010-01-12 | 2010-12-29 | 中铁隧道集团二处有限公司 | Tbm同步衬砌施工方法 |
Non-Patent Citations (2)
Title |
---|
JP特开2010-229761A 2010.10.14 * |
JP特开2011-58314A 2011.03.24 * |
Also Published As
Publication number | Publication date |
---|---|
CN102787848A (zh) | 2012-11-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102787848B (zh) | 一种隧道仰拱滑模砼衬砌钢模台车 | |
CN202181900U (zh) | 一种隧道仰拱滑模砼衬砌钢模台车 | |
CN204386615U (zh) | 一种自行式隧道仰拱施工台车 | |
CN203247031U (zh) | 遮板运输吊装装置 | |
CN201835851U (zh) | 采煤工作面端头支护充填转载*** | |
CN105714743A (zh) | 一种履带式多功能混凝土衬砌机 | |
CN201704600U (zh) | 框架式摊铺机的可拆卸输料装置 | |
CN203779697U (zh) | 地仓式配料站 | |
CN103422675A (zh) | 自动传送上料喷浆机 | |
CN102912713B (zh) | 一种现浇路缘石用机具及其使用方法 | |
CN109826646A (zh) | 一次成型的隧道拼装管片 | |
CN203937761U (zh) | 一种挖掘机运输用托架 | |
CN205870803U (zh) | 小型混凝土构件预制半自动装置 | |
CN206407678U (zh) | 一种改进的自动布料机 | |
CN205578007U (zh) | 一种平巷喷浆机械上料装置 | |
CN206483550U (zh) | 移动锤式破碎站 | |
CN203796282U (zh) | 一种车载喷浆机 | |
CN204851281U (zh) | 一种隧道施工衬砌量确定装置 | |
CN202849910U (zh) | 现浇路缘石用机具 | |
CN203284764U (zh) | 大型渠道边坡垫层摊铺机 | |
CN203096535U (zh) | 一种铁路自密实混凝土移动灌注机 | |
CN207633804U (zh) | 一种中小型全装配活动式钢筋加工棚 | |
CN205677642U (zh) | 一种电力隧道内永久隔板的运输铺设装置 | |
CN202165091U (zh) | 一种隧道中隔墙衬砌模板台车 | |
CN205934620U (zh) | 轨道用砂浆作业设备 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 5 Huichun Road North Yili, Qingxiu District, Nanning City, Guangxi Zhuang Autonomous Region Co-patentee after: Yan Hong Patentee after: China anergy Group First Engineering Bureau Co., Ltd Address before: 530028 No.1 hydropower corps of armed police force, No.23 Jinzhou Road, Nanning City, Guangxi Zhuang Autonomous Region Co-patentee before: Yan Hong Patentee before: JIANGNAN WATER RESOURCE & HYDROPOWER ENGINEERING Co.,Ltd. |
|
CP03 | Change of name, title or address |