CN102759670A - Method for evaluating operation state of dry type transformer - Google Patents
Method for evaluating operation state of dry type transformer Download PDFInfo
- Publication number
- CN102759670A CN102759670A CN2011104598218A CN201110459821A CN102759670A CN 102759670 A CN102759670 A CN 102759670A CN 2011104598218 A CN2011104598218 A CN 2011104598218A CN 201110459821 A CN201110459821 A CN 201110459821A CN 102759670 A CN102759670 A CN 102759670A
- Authority
- CN
- China
- Prior art keywords
- type transformer
- parameter
- dry
- index
- running status
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Housings And Mounting Of Transformers (AREA)
Abstract
The invention relates to the technical field for evaluating the operation state of a transformer, in particular to a method for evaluating the operation state of a dry type transformer. Influences of parameters to the operation state of the dry type transformer are integrated, reliable level analysis is carried out on the operation state of the dry type transformer, and the convenience is brought for operators to hold the operation condition of the dry type transformer in real time and immediately make condition based maintenance. The method comprises the following steps of: 1) detecting parameter data of the operation state and an operation environment of the dry type transformer, and obtaining inherent characteristics of the dry type transformer and parameter data of the operation history; 2) normalizing parameter data of the operation states, the operation environment, the inherent characteristics and the operation history of the dry type transformer; 3) obtaining each parameter membership corresponding to a comment through a membership function of each parameter and the comment, and obtaining a single factor judge matrix; 4) obtaining a comprehensive judge matrix by combining weights of the parameters; and 5) obtaining a comprehensive evaluation value the operation state of the dry type transformer. The operation state of the dry type transformer can be reflected through the evaluation value.
Description
Technical field
The present invention relates to the transformer running status and detect the assessment technology field, be specifically related to a kind of dry-type transformer running status comprehensive estimation method.
Background technology
In recent years, along with the continuous increase of network load, dry-type transformer is owing to its outstanding advantage is widely used.But dry-type transformer is in operation and happens occasionally owing to insulation breakdown causes accident on fire from explosion, and not only the personal safety to the field operator threatens, and also influences safety, the even running of electrical network simultaneously.
At present, the judgement to the dry-type transformer operation conditions mainly realizes through monitoring parameters such as its temperature, humidity, voltage, electric current and power.Wherein, winding temperature can reflect dry-type transformer built-in electrical insulation situation to a certain extent, when temperature value or temperature rise value surpass threshold value, carries out operations such as interruption maintenance.But these methods all are the state analysis method based on a certain parameter, can not scientifically assess out the operation conditions and the state development trend of dry-type transformer.
The dry-type transformer running status receives influence of various factors, and its running status also is in the dynamic development and change, and this just need set up dry-type transformer running status comprehensive assessment model.Through real-time analysis to data, the operation conditions of comprehensive assessment dry-type transformer and possible development of defects trend, thereby the time and the localization of faults that come the suggestion dry-type transformer to overhaul.
Summary of the invention
Given this; In order to address the above problem; The invention discloses and a kind ofly judge that through the comprehensive assessment model dry-type transformer running status of dry-type transformer running status detects appraisal procedure, comprehensively each parameter is made reliable grade analysis to the influence of dry-type transformer operation conditions to the dry-type transformer running status; So that the operations staff can grasp dry-type transformer ruuning situation in real time, in time make repair based on condition of component.
The objective of the invention is to realize like this: the dry-type transformer running status detects appraisal procedure, comprises the steps:
1) detects the operating condition of dry-type transformer and the parametric data of running environment, and obtain the inherent characteristic of dry-type transformer and the parametric data of history run;
2) parametric data of operating condition, running environment, inherent characteristic and the history run of dry-type transformer being carried out normalization handles;
3) through the membership function of each parameter and comment, obtain the degree of membership of the corresponding comment of each parameter, and obtain single factor judge matrix R:
The running status comment collection of dry-type transformer comprises well, general, attention, serious 4 grades, representes with V1, V2, V3, V4 respectively; r
IjRepresent that i parameter belongs to grade V
jDegree; I=1,2,3 ..., m; J=1,2,3,4; M is an index parameter number;
4) combine the weights of each parameter, obtain comprehensive evaluation matrix B;
W is the index weight sets; w
i(i=1,2 ..., m) be the variable weight of each evaluation factor; b
j(j=1,2,3,4) are the fuzzy overall evaluation index;
5) obtain dry-type transformer running status comprehensive assessment value V;
h
jFor four kinds of pairing score values of state of V1~V4, be respectively 1~4; b
jBe the evaluation index that obtains through fuzzy comprehensive evoluation.
In the said step 1), inherent characteristic X1 comprises class of insulation X11, dielectric level X12, cooling structure X13, these four index parameters of types of housings X14; Operating condition X2 comprises load level X21, medial temperature X22, temperature rise horizontal X 23, these four index parameters of noise level X24; Running environment X3 comprises environment temperature X31, ambient humidity X32, THD value X33, these four index parameters of voltage deviation X34; History run X4 comprises X41 tenure of use, maintenance record X42, alarm logging X43, these four index parameters of protection action X44.
Further, said step 2) in, the qualitative index parameter adopts expert's methods of marking to obtain, and the scoring interval is [0,1], and score value is big more, and the index performance is excellent more; Quantitatively property index parameter carries out the following method of normalization processing employing;
x
iIt is the normalized value of i parameter; C
0Permissible value for this parameter; C
MaxUltimate value for this index; C
iMeasured value for this index; K is that parameter quantitative index parameter comprises load level X21, medial temperature X22, temperature rise horizontal X 23, noise level X24, environment temperature X31, ambient humidity X32, THD value X33, voltage deviation X34, tenure of use X41, and the qualitative index parameter comprises class of insulation X11, dielectric level X12, cooling structure X13, types of housings X14, maintenance record X42, alarm logging X43, protection action X44; All the other are the qualitative index parameter.
Further, in the step 4), the weights of each parameter obtain through following method:
41) according to the relative importance between each factor, confirm precedence relationship matrix F 1, matrix F 1 adopts 0.1~0.9 scaling law structure;
42) convert precedence relationship matrix F 1 into Fuzzy consistent matrix F2:
At first with precedence relationship matrix F 1=(f
Ij)
N * nBy the row summation, be designated as
Carry out following mathematic(al) manipulation: r then
Ij=(r
i-r
j)/2 (n-1)+0.5, then the matrix after the conversion is Fuzzy consistent matrix F2;
43) confirm the normal weight w of each parameter according to the factor relation method
i
The expression formula of factor relation method is:
β representes the poor of weight, and β is more little, and the difference of weight is big more;
44), obtain the change weights of each parameter factor by following formula according to each parameter normalized value:
x
iBe i the value of passing judgment on parameter, m is for passing judgment on parameter number, w
iBe the variable weight of i kind parameter, w
i 0Be the Chang Quanchong of i kind parameter, α is a balance factor.
Further, in the step 4), the normal weights of each parameter are following:
X1, X2, X3, the normal weights of X4 are respectively 0.1833,0.3167,0.2278,0.2722;
X11, X12, X13, the normal weights of X14 are respectively 0.1945,0.1833,0.3278,0.2944;
X21, X22, X23, the normal weights of X24 are respectively 0.2167,0.3166,0.3389,0.1278;
X31, X32, X33, the normal weights of X34 are respectively 0.15,0.1944,0.35,0.3056;
X41, X42, X43, the normal weights of X44 are respectively 0.2389,0.3167,0.2611,0.183
Further, in the step 3), the quantitative target parameter adopts half distribution function trapezoidal and that half mountain range shape combines to confirm its degree of membership; The qualitative index parameter adopts the half trapezoidal distribution function that combines with triangle to confirm its degree of membership.
Further; In the step 5); Assessed value V and dry-type transformer running status mapping table are following: 0<V≤1 expression dry-type transformer running status is good; 1<V≤2 expression dry-type transformer running statuses are general, and 2<V≤3 expression dry-type transformer running statuses are for noticing that 3<V≤4 expression dry-type transformer running statuses are serious.
Beneficial effect of the present invention is following: dry-type transformer running status comprehensive estimation method disclosed by the invention; Through of the influence of each parameter such as comprehensive inherent characteristic, operating condition, running environment, maintenance history to the dry-type transformer operation conditions; Utilize Fuzzy AHP to confirm the weight of each index parameter; Theoretical according to the change of balance function power then, according to passing judgment on the level that parameter departs from normal value, the fixedly Chang Quan of each index parameter is revised; Can analyze the operation conditions of dry-type transformer effectively; The dry-type transformer running status is carried out objective quantitative evaluation,, in time make repair based on condition of component so that the operations staff can grasp dry-type transformer ruuning situation in real time.The present invention has stronger operability, and can be dry-type transformer state evaluation and definite repair time provides effective theoretical foundation, and is significant to safety, the stable operation of electrical network.
Description of drawings
In order to make the object of the invention, technical scheme and advantage clearer, will combine accompanying drawing that the present invention is made further detailed description below:
Fig. 1 is a schematic flow sheet of the present invention;
Fig. 2 is the dry-type transformer running status judging quota system that the present invention sets up;
Fig. 3 is a membership function distribution plan partly trapezoidal and that half mountain range shape combines;
Fig. 4 is the half trapezoidal membership function distribution plan that combines with triangle.
Embodiment
Below will carry out detailed description to the preferred embodiment of invention.
Referring to Fig. 1, the dry-type transformer running status detects appraisal procedure, comprises the steps:
1) detects the operating condition of dry-type transformer and the parametric data of running environment, and obtain the inherent characteristic of dry-type transformer and the parametric data of history run; Set up three layers of dry-type transformer running status judging quota system; Referring to Fig. 2; Three layers of dry-type transformer running status judging quota system comprise destination layer, item layer, indicator layer; Destination layer is the dry-type transformer running status, and item layer comprises inherent characteristic X1, operating condition X2, running environment X3, history run X4;
In the indicator layer, inherent characteristic X1 comprises class of insulation X11, dielectric level X12, cooling structure X13, these four index parameters of types of housings X14; Operating condition X2 comprises load level X21, medial temperature X22, temperature rise horizontal X 23, these four index parameters of noise level X24; Running environment X3 comprises environment temperature X31, ambient humidity X32, THD value X33, these four index parameters of voltage deviation X34; History run X4 comprises X41 tenure of use, maintenance record X42, alarm logging X43, these four index parameters of protection action X44.
Inherent characteristic X1 comprises class of insulation X11, dielectric level X12, cooling structure X13, these four index parameters of types of housings X14; Operating condition X2 comprises load level X21, medial temperature X22, temperature rise horizontal X 23, these four index parameters of noise level X24; Running environment X3 comprises environment temperature X31, ambient humidity X32, THD value X33, these four index parameters of voltage deviation X34; History run X4 comprises X41 tenure of use, maintenance record X42, alarm logging X43, these four index parameters of protection action X44.The quantitative target parameter comprises load level X21, medial temperature X22, temperature rise horizontal X 23, noise level X24, environment temperature X31, ambient humidity X32, THD value X33, voltage deviation X34, tenure of use X41, and the qualitative index parameter comprises class of insulation X11, dielectric level X12, cooling structure X13, types of housings X14, maintenance record X42, alarm logging X43, protection action X44; All the other are the qualitative index parameter.
2) parametric data of operating condition, running environment, inherent characteristic and the history run of dry-type transformer being carried out normalization handles; The qualitative index parameter adopts expert's methods of marking to obtain, and the scoring interval is [0,1], and score value is big more, and the index performance is excellent more; Quantitatively property index parameter carries out the following method of normalization processing employing;
x
iIt is the normalized value of i parameter; C
0Permissible value for this parameter; C
MaxUltimate value for this index; C
iMeasured value for this index; K is that parameter changes the influence degree to equipment state;
3) through the membership function of each parameter and comment, obtain the degree of membership of the corresponding comment of each parameter, and obtain single factor judge matrix R:
The running status comment collection of dry-type transformer comprises well, general, attention, serious 4 grades, representes with V1, V2, V3, V4 respectively; r
IjRepresent that i parameter belongs to grade V
jDegree; I=1,2,3 ..., m; J=1,2,3,4; M is an index parameter number;
4) combine the weights of each parameter, obtain comprehensive evaluation matrix B;
W is the index weight sets; w
i(i=1,2 ..., m) be the variable weight of each evaluation factor; b
j(j=1,2,3,4) are the fuzzy overall evaluation index;
In the step 4), the weights of each parameter obtain through following method:
41) according to the relative importance between each factor, confirm precedence relationship matrix F 1, matrix F 1 adopts 0.1~0.9 scaling law structure;
The definition of table 10.1~0.9 scale
For example the precedence relationship matrix F 1 of item layer is expressed as:
42) convert precedence relationship matrix F 1 into Fuzzy consistent matrix F2:
At first with precedence relationship matrix F 1=(f
Ij)
N * nBy the row summation, be designated as
Carry out following mathematic(al) manipulation: r then
Ij=(r
i-r
j)/2 (n-1)+0.5, then the matrix after the conversion is Fuzzy consistent matrix F2; For example the precedence relationship matrixing of item layer is that Fuzzy consistent matrix is:
43) confirm the normal weight w of each parameter according to the factor relation method
i
The expression formula of factor relation method is:
β representes the poor of weight, and β is more little, and the difference of weight is big more; When β=(n-1)/2, the difference of weight reaches maximal value.In order to pay attention to significance level difference between element, get β=(n-1)/2 in this method.
The normal weights of each parameter are following:
44), obtain the change weights of each parameter factor by following formula according to each parameter normalized value:
x
iBe i the value of passing judgment on parameter, m is for passing judgment on parameter number, w
iBe the variable weight of i kind parameter, w
i 0Be the Chang Quanchong of i kind parameter, α is a balance factor;
45) obtain the membership function of each quantitative target parameter and qualitative index parameter.Referring to Fig. 3, the quantitative target parameter adopts half distribution function trapezoidal and that half mountain range shape combines to confirm its degree of membership; For example the membership function table of load level X21 and running temperature X22 is as shown in table 3;
The membership function table of table 3 load level X21 and running temperature X22
Referring to Fig. 4, the qualitative index parameter adopts the half trapezoidal distribution function that combines with triangle to confirm its degree of membership.For example the membership function table of alarm logging X43 and protection action X44 such as table 4 are not;
The membership function table of table 4 alarm logging X43 and protection action X44
5) obtain dry-type transformer running status comprehensive assessment value V through following formula, assessed value V promptly representes the dry-type transformer running status:
h
jFor four kinds of pairing score values of state of V1~V4, be respectively 1~4; b
jBe the evaluation index that obtains through fuzzy comprehensive evoluation.Assessed value and dry-type transformer running status mapping table are following:
Assessed value V | The dry-type |
0<V≤1 | Grade good (V1) |
1<V≤2 | Grade general (V2) |
2<V≤3 | Note (V3) |
3<V≤4 | Seriously (V4) |
Grade good (V1) expression dry-type transformer overall performance is good, and running status is stable; Grade general (V2) expression dry-type transformer overall performance descends to some extent, and operation conditions can satisfy the demands basically, and the possibility that breaks down is smaller, needs multi-track to observe during operation; It is bigger that grade notices that (V3) expression dry-type transformer overall performance descends, and existence possibly damage the risk of transformer, and operation can be carried out, but the possibility that breaks down is bigger, should overhaul under the situation of having ready conditions; Grade seriously (V4) expression dry-type transformer overall performance descends seriously, and some position possibly damaged, and it is seriously undesired to move, and needs interruption maintenance or replacing transformer immediately.
The above is merely the present invention that preferably is not limited to of the present invention, and obviously, those skilled in the art can carry out various changes and modification and not break away from the spirit and scope of the present invention the present invention.Like this, belong within the scope of claim of the present invention and equivalent technologies thereof if of the present invention these are revised with modification, then the present invention also is intended to comprise these changes and modification interior.
Claims (8)
1. the dry-type transformer running status detects appraisal procedure, it is characterized in that: comprise the steps:
1) detects the operating condition of dry-type transformer and the parametric data of running environment, and obtain the inherent characteristic of dry-type transformer and the parametric data of history run;
2) parametric data of operating condition, running environment, inherent characteristic and the history run of dry-type transformer being carried out normalization handles;
3) through the membership function of each parameter and comment, obtain the degree of membership of the corresponding comment of each parameter, and obtain single factor judge matrix R:
The running status comment collection of dry-type transformer comprises well, general, attention, serious 4 grades, representes with V1, V2, V3, V4 respectively; r
IjRepresent that i parameter belongs to grade V
jDegree; I=1,2,3 ..., m; J=1,2,3,4; M is an index parameter number;
4) combine the weights of each parameter, obtain comprehensive evaluation matrix B;
W is the index weight sets; w
i(i=1,2 ..., m) be the variable weight of each evaluation factor; b
j(j=1,2,3,4) are the fuzzy overall evaluation index;
5) obtain dry-type transformer running status comprehensive assessment value V;
h
jFor four kinds of pairing score values of state of V1~V4, be respectively 1~4; b
jBe the evaluation index that obtains through fuzzy comprehensive evoluation.
2. dry-type transformer running status as claimed in claim 1 detects appraisal procedure, and it is characterized in that: in the said step 1), inherent characteristic X1 comprises class of insulation X11, dielectric level X12, cooling structure X13, these four index parameters of types of housings X14; Operating condition X2 comprises load level X21, medial temperature X22, temperature rise horizontal X 23, these four index parameters of noise level X24; Running environment X3 comprises environment temperature X31, ambient humidity X32, THD value X33, these four index parameters of voltage deviation X34; History run X4 comprises X41 tenure of use, maintenance record X42, alarm logging X43, these four index parameters of protection action X44.
3. dry-type transformer running status as claimed in claim 2 detects appraisal procedure, it is characterized in that: said step 2), the qualitative index parameter adopts expert's methods of marking to obtain, and the scoring interval is [0,1], and score value is big more, and the index performance is excellent more; Quantitatively property index parameter carries out the following method of normalization processing employing;
x
iIt is the normalized value of i parameter; C
0Permissible value for this parameter; C
MaxUltimate value for this index; C
iMeasured value for this index; K is that parameter changes the influence degree to equipment state; The quantitative target parameter comprises load level X21, medial temperature X22, temperature rise horizontal X 23, noise level X24, environment temperature X31, ambient humidity X32, THD value X33, voltage deviation X34, tenure of use X41, and the qualitative index parameter comprises class of insulation X11, dielectric level X12, cooling structure X13, types of housings X14, maintenance record X42, alarm logging X43, protection action X44; All the other are the qualitative index parameter.
4. the dry-type transformer running status described in claim 3 detects appraisal procedure, and it is characterized in that: in the step 4), the weights of each parameter obtain through following method:
41) according to the relative importance between each factor, confirm precedence relationship matrix F 1, matrix F 1 adopts 0.1~0.9 scaling law structure;
42) convert precedence relationship matrix F 1 into Fuzzy consistent matrix F2:
At first with precedence relationship matrix F 1=(f
Ij)
N * nBy the row summation, be designated as
Carry out following mathematic(al) manipulation: r then
Ij=(r
i-r
j)/2 (n-1)+0.5, then the matrix after the conversion is Fuzzy consistent matrix F2;
43) confirm the normal weight w of each parameter according to the factor relation method
i
The expression formula of factor relation method is:
β representes the poor of weight, and β is more little, and the difference of weight is big more;
44), obtain the change weights of each parameter factor by following formula according to each parameter normalized value:
x
iBe i the value of passing judgment on parameter, m is for passing judgment on parameter number, w
iBe the variable weight of i kind parameter, w
i 0Be the Chang Quanchong of i kind parameter, α is a balance factor.
5. dry-type transformer running status as claimed in claim 4 detects appraisal procedure, it is characterized in that: step 43) in, β=(n-1)/2.
6. dry-type transformer running status as claimed in claim 5 detects appraisal procedure, and it is characterized in that: in the step 4), the normal weights of each parameter are following:
X1, X2, X3, the normal weights of X4 are respectively 0.1833,0.3167,0.2278,0.2722;
X11, X12, X13, the normal weights of X14 are respectively 0.1945,0.1833,0.3278,0.2944;
X21, X22, X23, the normal weights of X24 are respectively 0.2167,0.3166,0.3389,0.1278;
X31, X32, X33, the normal weights of X34 are respectively 0.15,0.1944,0.35,0.3056;
X41, X42, X43, the normal weights of X44 are respectively 0.2389,0.3167,0.2611,0.1833.
7. detect appraisal procedure like each described dry-type transformer running status in the claim 1 to 6, it is characterized in that: in the step 3), the quantitative target parameter adopts half distribution function trapezoidal and that half mountain range shape combines to confirm its degree of membership; The qualitative index parameter adopts the half trapezoidal distribution function that combines with triangle to confirm its degree of membership.
8. detect appraisal procedure like each described dry-type transformer running status among the claim 1-7; It is characterized in that: in the step 5); Assessed value V and dry-type transformer running status mapping table are following: 0<V≤1 expression dry-type transformer running status is good; 1<V≤2 expression dry-type transformer running statuses are general, and 2<V≤3 expression dry-type transformer running statuses are for noticing that 3<V≤4 expression dry-type transformer running statuses are serious.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011104598218A CN102759670A (en) | 2011-12-31 | 2011-12-31 | Method for evaluating operation state of dry type transformer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011104598218A CN102759670A (en) | 2011-12-31 | 2011-12-31 | Method for evaluating operation state of dry type transformer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102759670A true CN102759670A (en) | 2012-10-31 |
Family
ID=47054183
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011104598218A Pending CN102759670A (en) | 2011-12-31 | 2011-12-31 | Method for evaluating operation state of dry type transformer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102759670A (en) |
Cited By (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102967798A (en) * | 2012-11-15 | 2013-03-13 | 深圳大学 | Failure warning method and system of power device |
CN102981108A (en) * | 2012-11-29 | 2013-03-20 | 重庆大学 | Transformer internal insulation aging diagnosis method based on multi-feature information fusion technology |
CN103678765A (en) * | 2013-10-31 | 2014-03-26 | 上海交通大学 | Transformer operating state comprehensive evaluation method based on on-line monitoring |
CN103728517A (en) * | 2014-01-10 | 2014-04-16 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | Correcting algorithm for transformer state assessment by considering poor working conditions |
CN104020401A (en) * | 2014-06-17 | 2014-09-03 | 国家电网公司 | Cloud-model-theory-based method for evaluating insulation thermal ageing states of transformer |
CN104034444A (en) * | 2014-05-16 | 2014-09-10 | 国家电网公司 | Main transformer temperature state detection method |
CN104267270A (en) * | 2014-08-06 | 2015-01-07 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | Transformer key parameter extraction method based on vector similarity |
CN104268367A (en) * | 2014-08-06 | 2015-01-07 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | Substation equipment state evaluation weight correction method and system based on multiple linear regression |
CN104391086A (en) * | 2014-11-26 | 2015-03-04 | 广东电网有限责任公司电力科学研究院 | Method and system for measuring humidity parameter of external environment of transformer |
CN104483995A (en) * | 2014-11-06 | 2015-04-01 | 深圳太辰光通信股份有限公司 | Method used for adjusting transformer work load |
CN104535865A (en) * | 2014-12-30 | 2015-04-22 | 西安工程大学 | Comprehensive diagnosing method for operation troubles of power transformer based on multiple parameters |
CN104659778A (en) * | 2015-02-27 | 2015-05-27 | 国家电网公司 | Priority considered power quality and noise comprehensive evaluation method for convertor transformer |
CN105353256A (en) * | 2015-11-30 | 2016-02-24 | 上海交通大学 | Electric transmission and transformation device state abnormity detection method |
CN106383286A (en) * | 2016-11-30 | 2017-02-08 | 国网福建省电力有限公司 | Electric power line fault alarm device |
CN107843718A (en) * | 2017-10-20 | 2018-03-27 | 广东电网有限责任公司河源供电局 | A kind of method that transformer insulation oil ageing state is assessed |
CN109031014A (en) * | 2017-12-28 | 2018-12-18 | 国网湖北省电力公司宜昌供电公司 | A kind of transformer synthesis reliability assessment and prediction technique based on operation data |
CN109102163A (en) * | 2018-07-20 | 2018-12-28 | 河海大学 | Power distribution network CPS methods of risk assessment based on variable weight Fuzzy AHP |
CN109188227A (en) * | 2018-10-23 | 2019-01-11 | 西安热工研究院有限公司 | A kind of double feed wind power generator Condition assessment of insulation method and system |
CN110363404A (en) * | 2019-06-27 | 2019-10-22 | 昆明理工大学 | A kind of dry-type air-core reactor status data analysis method |
CN110503305A (en) * | 2019-07-25 | 2019-11-26 | 西安理工大学 | A kind of transformer performance appraisal procedure |
CN110763942A (en) * | 2019-11-18 | 2020-02-07 | 许继变压器有限公司 | Method and device for detecting residual life of dry-type transformer |
CN110988745A (en) * | 2019-11-12 | 2020-04-10 | 中国海洋石油集团有限公司 | Method and system for evaluating operation state of dry-type transformer of offshore platform |
CN111077380A (en) * | 2018-10-18 | 2020-04-28 | 江苏绿洁节能有限公司 | Full-automatic detection system for operation capacity of transformer |
CN111142003A (en) * | 2020-02-04 | 2020-05-12 | 北方民族大学 | System and method for power capacitor state monitoring and reliability analysis |
CN112965011A (en) * | 2021-02-09 | 2021-06-15 | 重庆大学 | Power transformer state evaluation method and device |
CN113341241A (en) * | 2021-04-25 | 2021-09-03 | 国网山东省电力公司淄博供电公司 | Transformer running state diagnosis method based on multiple elements |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101614775A (en) * | 2009-07-15 | 2009-12-30 | 河北科技大学 | Transformer State Assessment system and appraisal procedure thereof based on Multi-source Information Fusion |
-
2011
- 2011-12-31 CN CN2011104598218A patent/CN102759670A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101614775A (en) * | 2009-07-15 | 2009-12-30 | 河北科技大学 | Transformer State Assessment system and appraisal procedure thereof based on Multi-source Information Fusion |
Non-Patent Citations (6)
Title |
---|
吕跃进: "基于模糊一致矩阵的模糊层次分析法的排序", 《模糊***与数学》, vol. 16, no. 2, 30 June 2002 (2002-06-30) * |
杨丽徙等: "基于物元理论的变压器绝缘状态分级评估", 《电力自动化设备》, vol. 30, no. 06, 30 June 2010 (2010-06-30) * |
熊兰等: "模糊变权法在绝缘子状态综合评判中的应用", 《电力***及其自动化学报》, vol. 22, no. 01, 28 February 2010 (2010-02-28) * |
王有元: "基于可靠性和风险评估的电力变压器状态维修决策方法研究", 《中国博士学位论文全文数据库 工程科技Ⅱ辑》, no. 6, 15 June 2009 (2009-06-15) * |
韩富春等: "高压断路器运行状态的多级模糊综合评估", 《电力***保护与控制》, vol. 37, no. 17, 1 September 2009 (2009-09-01) * |
骆思佳等: "带变权的电力变压器状态模糊综合评判", 《高电压技术》, vol. 33, no. 08, 31 August 2007 (2007-08-31) * |
Cited By (40)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102967798B (en) * | 2012-11-15 | 2015-10-21 | 深圳大学 | A kind of fault alarm method of power equipment and system |
CN102967798A (en) * | 2012-11-15 | 2013-03-13 | 深圳大学 | Failure warning method and system of power device |
CN102981108B (en) * | 2012-11-29 | 2015-03-11 | 重庆大学 | Transformer internal insulation aging diagnosis method based on multi-feature information fusion technology |
CN102981108A (en) * | 2012-11-29 | 2013-03-20 | 重庆大学 | Transformer internal insulation aging diagnosis method based on multi-feature information fusion technology |
CN103678765A (en) * | 2013-10-31 | 2014-03-26 | 上海交通大学 | Transformer operating state comprehensive evaluation method based on on-line monitoring |
CN103678765B (en) * | 2013-10-31 | 2016-04-27 | 上海交通大学 | Based on the running state of transformer comprehensive estimation method of on-line monitoring |
CN103728517A (en) * | 2014-01-10 | 2014-04-16 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | Correcting algorithm for transformer state assessment by considering poor working conditions |
CN103728517B (en) * | 2014-01-10 | 2017-02-01 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | Correcting algorithm for transformer state assessment by considering poor working conditions |
CN104034444A (en) * | 2014-05-16 | 2014-09-10 | 国家电网公司 | Main transformer temperature state detection method |
CN104020401A (en) * | 2014-06-17 | 2014-09-03 | 国家电网公司 | Cloud-model-theory-based method for evaluating insulation thermal ageing states of transformer |
CN104020401B (en) * | 2014-06-17 | 2016-11-23 | 国家电网公司 | The appraisal procedure of transformer insulated heat ageing state based on cloud models theory |
CN104268367A (en) * | 2014-08-06 | 2015-01-07 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | Substation equipment state evaluation weight correction method and system based on multiple linear regression |
CN104268367B (en) * | 2014-08-06 | 2018-01-16 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | Transformer state evaluation weight modification method and system based on multiple linear regression |
CN104267270A (en) * | 2014-08-06 | 2015-01-07 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | Transformer key parameter extraction method based on vector similarity |
CN104267270B (en) * | 2014-08-06 | 2017-04-05 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | Transformer key parameters extracting method based on vector similitude |
CN104483995A (en) * | 2014-11-06 | 2015-04-01 | 深圳太辰光通信股份有限公司 | Method used for adjusting transformer work load |
CN104483995B (en) * | 2014-11-06 | 2016-09-28 | 深圳太辰光通信股份有限公司 | A kind of method adjusting transformator live load |
CN104391086B (en) * | 2014-11-26 | 2016-01-06 | 广东电网有限责任公司电力科学研究院 | Transformer external environment condition humidity parameter measuring method and system |
CN104391086A (en) * | 2014-11-26 | 2015-03-04 | 广东电网有限责任公司电力科学研究院 | Method and system for measuring humidity parameter of external environment of transformer |
CN104535865A (en) * | 2014-12-30 | 2015-04-22 | 西安工程大学 | Comprehensive diagnosing method for operation troubles of power transformer based on multiple parameters |
CN104659778A (en) * | 2015-02-27 | 2015-05-27 | 国家电网公司 | Priority considered power quality and noise comprehensive evaluation method for convertor transformer |
CN105353256A (en) * | 2015-11-30 | 2016-02-24 | 上海交通大学 | Electric transmission and transformation device state abnormity detection method |
CN105353256B (en) * | 2015-11-30 | 2018-05-25 | 上海交通大学 | A kind of power transmission and transformation equipment state method for detecting abnormality |
CN106383286A (en) * | 2016-11-30 | 2017-02-08 | 国网福建省电力有限公司 | Electric power line fault alarm device |
CN107843718A (en) * | 2017-10-20 | 2018-03-27 | 广东电网有限责任公司河源供电局 | A kind of method that transformer insulation oil ageing state is assessed |
CN107843718B (en) * | 2017-10-20 | 2020-06-09 | 广东电网有限责任公司河源供电局 | Method for evaluating aging state of transformer insulating oil |
CN109031014A (en) * | 2017-12-28 | 2018-12-18 | 国网湖北省电力公司宜昌供电公司 | A kind of transformer synthesis reliability assessment and prediction technique based on operation data |
CN109031014B (en) * | 2017-12-28 | 2020-08-14 | 国网湖北省电力公司宜昌供电公司 | Transformer comprehensive reliability assessment and prediction method based on operation data |
CN109102163A (en) * | 2018-07-20 | 2018-12-28 | 河海大学 | Power distribution network CPS methods of risk assessment based on variable weight Fuzzy AHP |
CN111077380A (en) * | 2018-10-18 | 2020-04-28 | 江苏绿洁节能有限公司 | Full-automatic detection system for operation capacity of transformer |
CN109188227B (en) * | 2018-10-23 | 2020-12-29 | 西安热工研究院有限公司 | Double-fed wind driven generator insulation state evaluation method and system |
CN109188227A (en) * | 2018-10-23 | 2019-01-11 | 西安热工研究院有限公司 | A kind of double feed wind power generator Condition assessment of insulation method and system |
CN110363404A (en) * | 2019-06-27 | 2019-10-22 | 昆明理工大学 | A kind of dry-type air-core reactor status data analysis method |
CN110503305A (en) * | 2019-07-25 | 2019-11-26 | 西安理工大学 | A kind of transformer performance appraisal procedure |
CN110503305B (en) * | 2019-07-25 | 2022-02-01 | 西安理工大学 | Transformer performance evaluation method |
CN110988745A (en) * | 2019-11-12 | 2020-04-10 | 中国海洋石油集团有限公司 | Method and system for evaluating operation state of dry-type transformer of offshore platform |
CN110763942A (en) * | 2019-11-18 | 2020-02-07 | 许继变压器有限公司 | Method and device for detecting residual life of dry-type transformer |
CN111142003A (en) * | 2020-02-04 | 2020-05-12 | 北方民族大学 | System and method for power capacitor state monitoring and reliability analysis |
CN112965011A (en) * | 2021-02-09 | 2021-06-15 | 重庆大学 | Power transformer state evaluation method and device |
CN113341241A (en) * | 2021-04-25 | 2021-09-03 | 国网山东省电力公司淄博供电公司 | Transformer running state diagnosis method based on multiple elements |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102759670A (en) | Method for evaluating operation state of dry type transformer | |
CN106446426B (en) | A kind of power transformer appraisal procedure based on health index | |
CN111289829B (en) | Distribution transformer online monitoring method and system based on multi-source information fusion | |
CN111784175A (en) | Distribution transformer risk assessment method and system based on multi-source information | |
CN102997838B (en) | Transformer winding deformation fault diagnosis method based on frequency sweep short circuit characteristics | |
CN104020754B (en) | Method for enabling state monitoring information of transformer station primary main equipment to access to regulation and control system | |
CN103576050B (en) | A kind of running status appraisal procedure of capacitance type potential transformer | |
CN103150633B (en) | Power equipment state real-time evaluation and auxiliary decision-making system | |
CN103793859B (en) | A kind of wind power plant operation monitoring and event integrated evaluating method | |
CN103235991A (en) | Condition evaluation method of distribution network transformer based on fuzzy theory | |
CN103324992A (en) | Transformer risk prediction method based on markov and entropy weight fuzzy comprehensive evaluation | |
CN109188082A (en) | A kind of Transformer condition evaluation based on BP neural network | |
CN110940374A (en) | Transformer health grade evaluation system and method based on big data fusion | |
CN110363404A (en) | A kind of dry-type air-core reactor status data analysis method | |
CN108629491A (en) | A kind of change of current change repair quality comprehensive estimation method | |
CN117368644A (en) | Sensor cable detection method | |
CN112418638A (en) | Early warning system and early warning method for operation and maintenance risks of DC power supply system for station | |
CN115308465A (en) | Power supply potential safety hazard intelligent diagnosis system and method based on BP-SOM combined neural network | |
CN103578042B (en) | A kind of Hieratical assessment method for degree of reliability of power transformer | |
CN114781657A (en) | Power equipment maintenance system and method based on artificial intelligence | |
CN107328438A (en) | A kind of power transformer runs comprehensive monitor system | |
CN106651206A (en) | Method for evaluating testability evaluation index system of relay protection | |
CN111077380A (en) | Full-automatic detection system for operation capacity of transformer | |
CN110739689B (en) | Method and system for identifying operation safety of power distribution network line system | |
CN116402349A (en) | Risk early warning method for cable trench pipe well |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20121031 |