CN102748035A - 人工山体法隧道施工进洞方法 - Google Patents

人工山体法隧道施工进洞方法 Download PDF

Info

Publication number
CN102748035A
CN102748035A CN2012102082204A CN201210208220A CN102748035A CN 102748035 A CN102748035 A CN 102748035A CN 2012102082204 A CN2012102082204 A CN 2012102082204A CN 201210208220 A CN201210208220 A CN 201210208220A CN 102748035 A CN102748035 A CN 102748035A
Authority
CN
China
Prior art keywords
massif
artificial
tunnel
mountain body
original
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012102082204A
Other languages
English (en)
Inventor
王学哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 13th Bureau Group Co Ltd
Original Assignee
China Railway 13th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 13th Bureau Group Co Ltd filed Critical China Railway 13th Bureau Group Co Ltd
Priority to CN2012102082204A priority Critical patent/CN102748035A/zh
Publication of CN102748035A publication Critical patent/CN102748035A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Prostheses (AREA)

Abstract

一种人工山体法隧道施工进洞方法,在山体受偏压一侧修建人工山体,通过人工山体来平衡原有山体,再在被平衡的山体内修建隧道洞口段。本发明通过在原有山体偏压侧修建人工山体,以实现隧道进洞口山体平衡稳定,最后在平衡稳定的山体坡面处进行隧道进洞施工。修建人工山体的原材料简单、隧道结构偏压受力小、施工中安全度高、隧道结构耐久性强。

Description

人工山体法隧道施工进洞方法
技术领域
本发明属于隧道施工技术领域,具体涉及一种通过修建人工山体,解决隧道进口端偏压状态下安全进洞的施工方法。
背景技术
现在隧道进洞施工中,有时会不可避免地选择大偏压山体作为隧道的进洞口。由于山体处于偏压状态,隧道进洞施工时会导致山体失稳,给施工安全带来隐患;有时在隧道修建完成后,由于山体偏压问题没有得到很好的解决,就需要完全靠隧道的二次衬砌来平衡,同样会导致隧道衬砌开裂,出现不合格工程。
发明内容
本发明的目的是要提供一种人工山体法隧道施工进洞方法,该方法采用人工修建山体来平衡原有山体,原材料简单、隧道结构偏压受力小、施工中安全度高、隧道结构耐久性强。
如上构思,本发明的技术方案是:一种人工山体法隧道施工进洞方法,其特征在于:在山体受偏压一侧修建人工山体,通过人工山体来平衡原有山体,人工山体填筑完成后,首先施工远离人工山体一侧的隧道,再施工近人工山体一侧的隧道。
上述人工修建山体的方法是:①清理原有山体,在原有山体表面上挖台阶;②按照3:7的比例拌制石灰土;③采用石灰土分层填筑被受压一侧人工山体。
上述在原有山体表面每隔1米挖1个台阶。
本发明通过在原有山体偏压侧修建人工山体,以实现隧道进洞口山体平衡稳定,最后在平衡稳定的山体坡面处进行隧道进洞施工,这样可以保证隧道施工安全、可行。另外,修建人工山体的原材料简单、隧道结构偏压受力小、施工中安全度高、隧道结构耐久性强。
附图说明:
图1是偏压山体主视图;
图2是修建人工山体后偏压山体主视图;
图3是隧道进口与山体间关系主视图。
图1-3中,1-原有山体,2-人工山体,3-隧道口。
具体实施方式:
如图所示:一种人工山体法隧道施工进洞方法,在山体受偏压一侧人工修建山体,通过人工修建山体来平衡原有山体,再在被平衡的山体内修建隧道洞口段,可以保证隧道施工安全、可行。上述人工修建山体的方法是:首先清除山体原有植被和杂物,在原有山体表面每隔1米挖1个台阶。拌制3:7石灰土,分层填筑人工山体,分层厚度20厘米,采用小型冲击夯夯实。在人工山体表面采用腐植土覆盖,并植草。人工山体填筑完成后,首先施工远离人工山体一侧的隧道,再施工近人工山体一侧的隧道。

Claims (3)

1.一种人工山体法隧道施工进洞方法,其特征在于:在山体受偏压一侧修建人工山体,通过人工山体来平衡原有山体,人工山体填筑完成后,首先施工远离人工山体一侧的隧道,再施工近人工山体一侧的隧道。
2.根据权利要求1所述的人工山体法隧道施工进洞方法,其特征在于:上述人工修建山体的方法是:①清理原有山体,在原有山体表面上挖台阶;②按照3:7的比例拌制石灰土;③采用石灰土分层填筑被受压一侧人工山体;④隧道左、右洞先后进洞施工。
3.根据权利要求2所述的人工山体法隧道施工进洞方法,其特征在于:上述在原有山体表面每隔1米挖1个台阶。
CN2012102082204A 2012-06-21 2012-06-21 人工山体法隧道施工进洞方法 Pending CN102748035A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102082204A CN102748035A (zh) 2012-06-21 2012-06-21 人工山体法隧道施工进洞方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012102082204A CN102748035A (zh) 2012-06-21 2012-06-21 人工山体法隧道施工进洞方法

Publications (1)

Publication Number Publication Date
CN102748035A true CN102748035A (zh) 2012-10-24

Family

ID=47028489

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102082204A Pending CN102748035A (zh) 2012-06-21 2012-06-21 人工山体法隧道施工进洞方法

Country Status (1)

Country Link
CN (1) CN102748035A (zh)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101806217A (zh) * 2010-03-12 2010-08-18 中铁四局集团有限公司 三线并行小净距浅埋、偏压隧道群进洞施工方法
JP2010185189A (ja) * 2009-02-10 2010-08-26 Taisei Corp 地中構造物および地中構造物の構築方法
CN101864960A (zh) * 2010-05-17 2010-10-20 中铁二十局集团有限公司 岩溶地区双连拱公路隧道施工方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010185189A (ja) * 2009-02-10 2010-08-26 Taisei Corp 地中構造物および地中構造物の構築方法
CN101806217A (zh) * 2010-03-12 2010-08-18 中铁四局集团有限公司 三线并行小净距浅埋、偏压隧道群进洞施工方法
CN101864960A (zh) * 2010-05-17 2010-10-20 中铁二十局集团有限公司 岩溶地区双连拱公路隧道施工方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张军: "龙潭隧道洞口浅埋偏压段处治技术", 《国防交通工程与技术》 *
杨帆: "隧道浅埋偏压段地表回填注浆及开挖支护施工技术", 《铁道标准设计》 *

Similar Documents

Publication Publication Date Title
CN103867209A (zh) 一种地铁竖井分层、分段转横通道施工开挖进洞的方法
CN201695407U (zh) 有盾构隧道下穿的地铁车站基坑围护结构
CN203755711U (zh) 一种轻型工具式孔桩防护装置
CN205063323U (zh) ***式脚手架管连接件
CN106337687B (zh) 矿山斜溜井便捷式分段支护方法
CN204492828U (zh) 一种土压平衡盾构机土仓泥饼探测装置
CN105507144A (zh) 一种桥梁外防撞护栏及其安全施工方法
CN102748035A (zh) 人工山体法隧道施工进洞方法
CN204608833U (zh) 市政检查井
CN203374282U (zh) 矿山井下落地多绳提升***天轮硐室布置结构
CN204492851U (zh) 地铁暗挖隧道横通道临时支撑构件
CN204386506U (zh) 一种多功能挖掘机可拆卸钻头
CN204530357U (zh) 岩崖边坡栈道
CN209100054U (zh) 一种回填及固结灌浆用钢模台车预埋灌浆管结构
CN203170374U (zh) 简易碎石机的下降块
CN203755319U (zh) 破碎岩带边坡开挖准备结构
CN204225107U (zh) 自落式打桩器
CN204125965U (zh) 具有压力分散型布置高强预应力锚杆/锚索的风机基础
CN205475220U (zh) 一种预应力锚索结构
CN205532675U (zh) 一种综采支架拆除平台的机头装置
CN104264724A (zh) 既有建构筑物下方基础内部水平深孔注浆加固方法
CN202755877U (zh) 用于地下矿切割天井作业的组合梯
CN204875805U (zh) 一种复合深基坑支护体系
WO2012114249A3 (en) A method and equipment for tunnelling
CN204707447U (zh) 一种便携式植树挖坑机

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20121024

RJ01 Rejection of invention patent application after publication