CN102738789A - Economical dispatch control system for cascade power station - Google Patents

Economical dispatch control system for cascade power station Download PDF

Info

Publication number
CN102738789A
CN102738789A CN2012100853984A CN201210085398A CN102738789A CN 102738789 A CN102738789 A CN 102738789A CN 2012100853984 A CN2012100853984 A CN 2012100853984A CN 201210085398 A CN201210085398 A CN 201210085398A CN 102738789 A CN102738789 A CN 102738789A
Authority
CN
China
Prior art keywords
power station
station
level
formula
reservoir
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100853984A
Other languages
Chinese (zh)
Other versions
CN102738789B (en
Inventor
路振刚
王永潭
杨克
姚贵宇
王立勇
崔孝强
夏守筠
于海东
吴正义
单鹏珠
徐麟
阎应飞
程国清
姚峰
张金华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JILIN SONGJIANGHE HYDROPOWER Co Ltd
STATE GRID XINYUAN HYDROPOWER CO Ltd
State Grid Corp of China SGCC
Original Assignee
JILIN SONGJIANGHE HYDROPOWER Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JILIN SONGJIANGHE HYDROPOWER Co Ltd filed Critical JILIN SONGJIANGHE HYDROPOWER Co Ltd
Priority to CN201210085398.4A priority Critical patent/CN102738789B/en
Publication of CN102738789A publication Critical patent/CN102738789A/en
Application granted granted Critical
Publication of CN102738789B publication Critical patent/CN102738789B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to an economical dispatch control system for a cascade power station. The system is characterized in that a host server, a history server and a voice workstation serve as an engineering work station, and an operator workstation, a large-screen projection and a GPS (Global Positioning System) system are connected in parallel on a main control line; and through the reverse regulation of an upper-level large capacity power station by a small capacity power station, a load difference is safely and smoothly transferred to another adjustable power station. By using the economical dispatch control system for the cascade power station provided by the invention, the flow of an upper-level power station unit can be effectively controlled through the flow of a lower-level power station; the water rate is lowered, the economic benefit of the power station is increased, the cost recovery time is effectively reduced, and thus the current low-carbon economic development trend is conformed to.

Description

The economic dispatch control system that is used for the step hydropower station
Technical field
The present invention relates to a kind of economic dispatch control system, particularly be used for the economic dispatch control system of step hydropower station in the control of basin, domestic water power station, belong to water power industry monitoring technique field.
Background technology
At present; Each water power step basin is all in the Development Strategy of carrying out " river basin development; develop at a progressive speed "; But in basin hydroelectric development process, exist all dependence experiences of cascaded hydropower stations and do generation schedule, not only wasted preferential hydropower resources, and be unfavorable for step hydropower station crowd's sustainable development really.In addition, any one has an accident and all can influence the generator operation in other power stations in running in each power station, also causes unnecessary influence for power scheduling.
Because domestic basin economic dispatch control industrialization still is in developing stage; Some specific control model is also had blank; When handling subordinate's power station maximum generation flow than the little operating mode of higher level power station maximum generation flow; Basically be that the relation of exerting oneself of leaning on the operations staff rule of thumb to come to fix related power station according to certain ratio is controlled subordinate's power station water level in safe range, waste time and energy and effectively to utilize the adjustable nargin in power station.The deficiency that basin, domestic water power station is controlled at when handling the less operating mode of subordinate's power plant discharge has: (1), the no subordinate of software power station itself are to the reverse regulatory function in higher level power station; (2), the ratio of exerting oneself that manually matees related power station based on operating experience by the power station operations staff; (3), related power station adjustable extent underaction; (4), operations staff's prison dish pressure is big.
Summary of the invention
The object of the present invention is to provide a kind of economic dispatch control system that is used for the step hydropower station; It is through each hydroelectric plant's combined dispatching of step and optimization operation; Confirm the reasonable operational mode of reservoir and unit, realize the safety and economic operation of basin reservoirs at different levels and unit, improve hydroelectric plant's efficient; Reduce frequent manual adjustment, create the business economic benefit.
Technical scheme of the present invention is achieved in that the economic dispatch control system that is used for the step hydropower station, by host server, and history server, phonological working station; The engineer work station, operator workstation, large screen projection, gps system is formed; It is characterized in that: host server, history server, phonological working station, engineer work station; Operator workstation, large screen projection, gps system are connected in parallel on the master control circuit;
Host server adopts the two-node cluster hot backup working method, has universal character QWERTY keyboard (band mouse), LCD, the operation automation of its management " each power station ", the i.e. automatic generation control in each power station (AGC); Automatism voltage control (AVC); Host server and each monitoring power station system carry out communication, obtain each power station real-time electric power information, issue the regulating and controlling order;
History server adopts the Mysql database software to be installed in the 2 cover redundant servers, and each monitoring power station system, trapeziodal modulation central monitor system all devices service data are carried out long preservation;
Operator workstation is done real time monitoring to production, the equipment operation of power plant; Obtain required various information; The operating right that operator workstation provides many group different safety class for the operations staff of different responsibilities, should be able to discern several has the user of password separately to each rank operating right down, before the entering; Authorize the operations staff must register " user name ", pass word, make each user independently to get into and to withdraw from through the password operation; The graphics system of operator workstation is a full graphics Chinese dynamic menu; Have complete means and realize figure roaming, zoom and mobile arbitrarily; Can be easily figure be set up, expanded, amplification, translation, increases/delete, stirs etc.; Operator workstation can be automatically or through operations staff's calling, show in real time running status, the capital equipment of " each power station " interior main system dynamic operation process, accident and fault, related parameter and operation monitoring figure arranged, operate pictures such as winding diagram, and trend curve, various list, measuring point index etc.; Status of equipment on the periodic refreshing picture and service data; And the picture to accident alarming has highest priority, can cover other picture that is showing, releases picture during accident automatically and instructs with handling; And can show relevant history parameters and form through operations staff's calling; The engineer work station is to system maintenance, administrative staff make amendment system parameters, revise definite value, increase and revise database, picture and form;
Functions such as voice/telephone call, Help by Phone, accident automatic paging (ON-CALL) and SMS warning are accomplished at the phonological working station;
Be furnished with 2 GPS main frames and 1 redundant switching device shifter, 1 cover signal extension device in the gps system; In the signal extension device, contain 4 RS232; 8 RJ-45 interfaces, 2 GPS main frames are accepted satellite-signal respectively and are transmitted signals in the signal extension device through switching device shifter, and insert 2 cover host exchanges through Ethernet interface respectively; Through monitor network, to the computer in the whole network carry out clock to the time.
Its concrete operating procedure is following:
1) host server receives power station, the full basin gross capability that net that real-time monitoring system sends transfers the EMS system to assign; The basin water rain condition information in the exerting oneself of each power station of collection site, each unit, state information and the water adjusting system simultaneously; With reference to the historical datas such as various control strategies of storing in the history server; Calculate the controlled target in each power station and each unit output in the basin through economy, safe operation boundary conditions such as full basin gross capability, head, unit efficiency, unit associating vibrating area, letdown flow, lower reservoir water-heads, calculate according to the operational formula of following target function:
(1)
N is the number in hydroelectric station in the formula; Zui is an i level power station upper pond level; Zsi is the upper reaches, i level power station designated water levels; Qi is an i level power plant discharge.When | Zui – Zsi|>=△ Zi,
Figure 2012100853984100002DEST_PATH_IMAGE002
=1; When | Zui – Zsi|<△ Zi, =0; △ Zi is the dead band value of the upper reaches, i level power station designated water level.
Constraints
(1) network load balance
Figure 618230DEST_PATH_IMAGE003
(2)
Pi is to exert oneself in i level hydroelectric station in the formula; Ps is that constant load is given in whole step dispatching of power netwoks.
(2) water balance condition
Figure 2012100853984100002DEST_PATH_IMAGE004
(3)
Vi in the formula, t are i reservoir capacity at the beginning of the t period; Vi, t+1 are t period Mo i reservoir capacity; Spacer segment when Δ t is; QINi, t are i level power station t period reservoir inflow; Qi, t fully utilize flow the i level power station t period.
Figure 829418DEST_PATH_IMAGE005
(4)
Figure 2012100853984100002DEST_PATH_IMAGE006
is that i level power station t period interval natural comes water in the formula;
Figure 332206DEST_PATH_IMAGE007
to be i-1 level power station reach the time to the current stream in i level power station.
(3) reservoir reservoir level constraint
Figure 2012100853984100002DEST_PATH_IMAGE008
(5)
Figure 964788DEST_PATH_IMAGE009
is i level power station upper pond level lower limit in the formula;
Figure 2012100853984100002DEST_PATH_IMAGE010
is the i upper limit.
(4) output of power station constraint
Pimin?≤?Pi ≤?Pijl (6)
Pijh?≤?Pi ≤?Pikl ?(7)
Pimh?≤?Pi ≤?Pimax (8)
Pijl is the lower limit of exerting oneself that i level power station j can not the operation area in the formula; Pijh is the upper limit of exerting oneself that i level power station j can not the operation area; M be can not the Operational Zone number; J=1 ~ m; K=j+1.
Derivation algorithm wherein
Calculate the working head of hydraulic generator unit
The general computing formula of
Figure 759884DEST_PATH_IMAGE011
is:
Figure 2012100853984100002DEST_PATH_IMAGE012
(9)
Figure 615714DEST_PATH_IMAGE013
is the upper pond level behind the trash rack of i level power station in the formula;
Figure 2012100853984100002DEST_PATH_IMAGE014
is i level power plant tail water position.
Be difficult for to survey certainly because of the power plant tail water position,, can obtain practicality and head computing formula more accurately according to bernoulli equation:
(10)
is each unit volute hydraulic pressure average of generating electricity of i level power station in the formula, and
Figure 861942DEST_PATH_IMAGE017
is i level power head correction factor.
Calculate power plant discharges at different levels
Figure 2012100853984100002DEST_PATH_IMAGE018
Because of each unit model of each power station of step, capacity basically identical, can certain power station equivalence be become a unit, can obtain certain grade of plant generator by the unit output computing formula and exert oneself:
Figure 978715DEST_PATH_IMAGE019
(11)
is the efficient of equivalent unit in the formula.
Can get the generating flow in chopped-off head power station by formula (2), (4), (11):
(12)
Can calculate the generating flow in other power stations at different levels according to formula (4).
Calculating plant generators at different levels exerts oneself
Obtain
Figure 2012100853984100002DEST_PATH_IMAGE022
, under the condition of
Figure 368163DEST_PATH_IMAGE023
; Can calculate plant generators at different levels according to formula (11) and exert oneself, be called initial solution.
The load adjustment
To above-mentioned initial solution, need the non-chopped-off head of inspection power station reservoir level, and suitably adjust exerting oneself of power station in normal range (NR) so that reservoir level is moved according to its reservoir level.The main thought of cascaded hydropower stations EDC load adjustment strategy is when certain grade of power station reservoir level of non-chopped-off head is too high, the many on-loads in this grade power station, otherwise, the few on-load in this grade power station.For certain grade of power station reservoir level, too high, normal, excessively low three kinds of states possibly appear, and the combinations of states of the power stations at different levels reservoir level of so non-chopped-off head just has 3 (N-1) to plant.
The maximum adjustment load △ Pmax of step hydropower station:
Figure 2012100853984100002DEST_PATH_IMAGE024
(13)
In the formula:
Figure 360520DEST_PATH_IMAGE025
is the load adjusted value of unit reservoir level;
Figure 2012100853984100002DEST_PATH_IMAGE026
is the maximum of reservoir level and ordinary water level absolute difference in the step power stations at different levels.
Confirm certain reservoir level combination load increase and decrease situation in power stations at different levels down, increase load value and reduce load value and equate, specifically increase load value △ P+i, minimizing load value △ P-i difference formula as follows:
Figure 822595DEST_PATH_IMAGE027
(14)
In the formula:
Figure 2012100853984100002DEST_PATH_IMAGE028
;
Figure 145692DEST_PATH_IMAGE029
is that i level power station increases load umber (i.e. "+" number); Constant maybe the needs reduces if load in i level power station, and then
Figure 106957DEST_PATH_IMAGE029
is 0.
Figure 2012100853984100002DEST_PATH_IMAGE030
(15)
In the formula:
Figure 708315DEST_PATH_IMAGE031
;
Figure 2012100853984100002DEST_PATH_IMAGE032
is that load umber (i.e. "-" number) is reduced in i level power station; Constant maybe the needs increases if load in i level power station, and then
Figure 537862DEST_PATH_IMAGE032
is 0.
2) controlled target that above-mentioned computing is obtained affacts each local control unit through northeast DianKeYuan centralized control system or unified platform I district supervisory control system; Realization to unit output, open/stop state and each all controlled device of power station in real time, accurately, reliable and control effectively, reach the maximized target of step hydropower station waterpower utilization rate; The control strategy that forms is stored to and is used for reference and the historical query that form control strategy next time in the history server; Operator workstation is that system provides man-machine interface, and display message is sent in the large screen projection, and the operator realizes the real-time monitoring to system through it; When fault or accident generation, send audio alert by the phonological working station, and fault or accident information unification are sent in the history server, one-way transmission to III district (not expression in the accompanying drawing) integrated warning system sends note and network alarming; The engineer work station is used for the maintenance of each server and network; Gps system 10 is connected in parallel on the master control circuit to each station server, work station provide unified clock, for the system failure and accident analysis provide foundation; Through of the reverse adjusting of little storage capacity power station, the difference of will loading safety, smoothly transfer to other adjustable power stations to the big storage capacity of higher level power station.
Good effect of the present invention is that each basin collection control central monitor system has adopted high performance computer and network system; With these high-performance computers and network is that the basin economic dispatch provides technical foundation; And adopt basin centralized management system with each collection control center, basin; Uniform dispatching is implemented in power station, whole basin, for the basin economic dispatch provides reliable management guarantee; For the step hydropower station, the Northeast; Under the freezing in the winter time situation in medium and small storage capacity power station; Little storage capacity power station receives in the winter time that gate is freezing to be influenced, and can not carry out effective storage capacity and regulate, for fear of causing the dam accident of overflowing; Require higher level power station letdown flow can not surpass subordinate's power station maximum generation and quote flow, therefore can control higher level power station unit flow through the flow in subordinate power station effectively; Can reduce rate of water consumption; Improving the effect of power station economic benefit more obviously shows; Reduced the cost recovery time effectively, met current low charcoal expanding economy trend, for step hydropower station, basin crowd's centralized control and economical operation provides reference; Under the prospect of each basin water TV university exploitation at present, this achievement has wide applications and higher promotional value.
Description of drawings
Fig. 1 is a hardware facility layout plan of the present invention.
Fig. 2 is a control structure block diagram of the present invention.
Embodiment
Below in conjunction with accompanying drawing and embodiment the present invention is further described: as shown in Figure 1, host server 1 adopts two-node cluster hot backup working method, any station server fault with host server 2 servers; System still can normally move; Dispose a complete set of external equipment, had universal character QWERTY keyboard (band mouse), LCD; Host server 1, host server 2 are managed the operation automation in " each power station ", the i.e. automatic generation control in each power station (AGC) respectively; Automatism voltage control (AVC); Host server 1, host server 2 carry out communication with each monitoring power station system, obtain each power station real-time electric power information, issue the regulating and controlling order; Each monitoring power station system, trapeziodal modulation central monitor system all devices service data are carried out long preservation, and in history server 3 and the history server 4, server adopts the Mysql database software to be installed in the 2 cover redundant servers; Operator workstation 7 can be done real time monitoring to production, the equipment operation of power plant with operator workstation 8; Obtain required various information; The operating right that operator workstation provides many group different safety class for the operations staff of different responsibilities, should be able to discern several has the user of password separately to each rank operating right down, before the entering; Authorize the operations staff must register " user name ", pass word, make each user independently to get into and to withdraw from through the password operation.Operator workstation can send as: unit is opened/is stopped, active power increases/subtracts, reactive power increases/subtracts, the branch of circuit breaker branch/combined floodgate order, gate opening/shutdown command, isolating switch/order such as close, and can be provided with and revise each item set-point and limit value.The graphics system of operator workstation 8 is a full graphics Chinese dynamic menu; Have complete means and realize figure roaming, zoom and mobile arbitrarily; Can be easily figure be set up, expanded, amplification, translation, increases/delete, stirs etc.; Operator workstation can be automatically or through operations staff's calling, show in real time running status, the capital equipment of " each power station " interior main system dynamic operation process, accident and fault, related parameter and operation monitoring figure arranged, operate pictures such as winding diagram, and trend curve, various list, measuring point index etc.; Status of equipment on the periodic refreshing picture and service data; And the picture to accident alarming has highest priority, can cover other picture that is showing, releases picture during accident automatically and instructs with handling.And can show relevant history parameters and form etc. through operations staff's calling.Picture icon and Show Color definition should meet the regulation of China Power portion " computer control for hydropower station system basic fundamental condition (DL/T578-2008) " promulgated by the ministries or commissions of the Central Government.
6 pairs of system maintenances of engineer work station, administrative staff make amendment system parameters, revise definite value, increase and revise database, picture and form; The phonological working station 5 main functions such as voice/telephone call, Help by Phone, accident automatic paging (ON-CALL) and SMS warning of accomplishing, supervisory control system is removed the generation general alarm and is also produced telephone phonic alarm when important fault and accident appear in supervisory control system, and call voice is reported to the police automatically and is supported 4 road dialing automatically simultaneously; Telephone phonic alarm can dial according to predesignating automatically; Dialing sequence is undertaken by mode from rudimentary to senior, when certain one-level is a busy tone or when nobody answers at the appointed time, from its high one-level dialing of trend; Behind the other side's off-hook; Tell the other side's alarm content immediately, dispose 2 cover short message transmitting apparatus simultaneously, can important warning message be carried out short message and send; Send mode comprises: can select mass-sending also can select selectively to send automatically by object, by the period, different by supervisory level; Be furnished with 2 GPS main frames and 1 redundant switching device shifter, 1 cover signal extension device in the gps system 10; In the signal extension device, contain 4 RS232; 8 RJ-45 interfaces, 2 GPS main frames are accepted satellite-signal respectively and are transmitted signals in the signal extension device through switching device shifter, and insert 2 cover host exchanges through Ethernet interface respectively; Through monitor network, to the computer in the whole network carry out clock to the time.
Embodiment 1
Guia Hill reservoir and two ditch hydropower reservoir station storage capacity are bigger; Has a year regulating power; And Guia Hill reservoir and hill hydropower reservoir station are through overflowing loose diversion tunnel cascade; Therefore can regard the hill hydropower reservoir station as a year balancing reservoir (the hill water level is more than 671 meters the time--671 meters of-Guia Hill dead water levels when the Reservoir Inflow water level is lower than 671 meters, do not possess regulating power basically); Stone dragon hydropower reservoir station storage capacity is less, is daily regulation reservoir, does not possess regulating power basically.Winter must the northern river of the assurance power plant casual dam of water level in addition.The interval water consumption in power stations at different levels is very little, does not consider interval water consumption problem generally speaking.Local inflow can be set according to actual conditions.According to each power station distribution situation of step, can not consider that current stream reaches the time between the cascaded hydropower stations.
To characteristics such as the cascaded hydropower stations distribution of river, Songjiang, storage capacity, installed capacitys, set up based on river, the Songjiang cascaded hydropower stations EDC that optimizes the operation principle with reference to Mathematical Modeling.
1, target function
(1)
N is the number in hydroelectric station in the formula; Zui is an i level power station upper pond level; Zsi is the upper reaches, i level power station designated water levels; Qi is an i level power plant discharge.When | Zui – Zsi|>=△ Zi,
Figure 623465DEST_PATH_IMAGE002
=1; When | Zui – Zsi|<△ Zi,
Figure 324836DEST_PATH_IMAGE002
=0; △ Zi is the dead band value of the upper reaches, i level power station designated water level.
2, constraints
(1) network load balance
Figure 2012100853984100002DEST_PATH_IMAGE034
(2)
Pi is to exert oneself in i level hydroelectric station in the formula; Ps is that constant load is given in whole step dispatching of power netwoks.
(2) water balance condition
Figure 284307DEST_PATH_IMAGE035
(3)
Vi in the formula, t are i reservoir capacity at the beginning of the t period; Vi, t+1 are t period Mo i reservoir capacity; Spacer segment when Δ t is; QINi, t are i level power station t period reservoir inflow; Qi, t fully utilize flow the i level power station t period.
Figure 2012100853984100002DEST_PATH_IMAGE036
(4)
Figure 387523DEST_PATH_IMAGE037
is that i level power station t period interval natural comes water in the formula;
Figure 392388DEST_PATH_IMAGE007
to be i-1 level power station reach the time to the current stream in i level power station.
(3) reservoir reservoir level constraint
Figure 2012100853984100002DEST_PATH_IMAGE038
(5)
Figure 578126DEST_PATH_IMAGE009
is i level power station upper pond level lower limit in the formula;
Figure 61060DEST_PATH_IMAGE010
is the i upper limit.
(4) output of power station constraint
Pimin?≤?Pi ≤?Pijl (6)
Pijh?≤?Pi ≤?Pikl ?(7)
Pimh?≤?Pi ≤?Pimax (8)
Pijl is the lower limit of exerting oneself that i level power station j can not the operation area in the formula; Pijh is the upper limit of exerting oneself that i level power station j can not the operation area; M be can not the Operational Zone number; J=1 ~ m; K=j+1.
3, derivation algorithm
The method of finding the solution above-mentioned model has a lot; Such as linear programming technique, Nonlinear Programming Method, dynamic programming etc.; But along with increasing of inequality constraints condition; Must cause finding the solution that difficulty increases and the time of finding the solution increases, even can not get feasible solution, seriously influence applying of cascaded hydropower stations EDC.For this reason, adopted simple and practical through engineering approaches algorithm.
Calculate the working head
Figure 159728DEST_PATH_IMAGE011
of hydraulic generator unit
The general computing formula of
Figure 397811DEST_PATH_IMAGE011
is:
Figure 952070DEST_PATH_IMAGE039
(9)
Figure 238695DEST_PATH_IMAGE013
is the upper pond level behind the trash rack of i level power station in the formula;
Figure 988608DEST_PATH_IMAGE014
is i level power plant tail water position.
Be difficult for to survey certainly because of the power plant tail water position,, can obtain practicality and head computing formula more accurately according to bernoulli equation:
Figure 2012100853984100002DEST_PATH_IMAGE040
(10)
Figure 145395DEST_PATH_IMAGE016
is each unit volute hydraulic pressure average of generating electricity of i level power station in the formula, and
Figure 620239DEST_PATH_IMAGE017
is i level power head correction factor.
4, calculate power plant discharges at different levels
Figure 274336DEST_PATH_IMAGE018
Because of each unit model of each power station of step, capacity basically identical, can certain power station equivalence be become a unit, can obtain certain grade of plant generator by the unit output computing formula and exert oneself:
Figure 580553DEST_PATH_IMAGE019
(11)
Figure 449852DEST_PATH_IMAGE020
is the efficient of equivalent unit in the formula.
Can get the generating flow in chopped-off head power station by formula (2), (4), (11):
Figure 975773DEST_PATH_IMAGE021
(12)
Can calculate the generating flow in other power stations at different levels according to formula (4).
5, calculating plant generators at different levels exerts oneself
Obtain , under the condition of
Figure 653672DEST_PATH_IMAGE023
; Can calculate plant generators at different levels according to formula (11) and exert oneself, be called initial solution.
6, load adjustment
To above-mentioned initial solution, need the non-chopped-off head of inspection power station reservoir level, and suitably adjust exerting oneself of power station in normal range (NR) so that reservoir level is moved according to its reservoir level.The main thought of cascaded hydropower stations EDC load adjustment strategy is when certain grade of power station reservoir level of non-chopped-off head is too high, the many on-loads in this grade power station, otherwise, the few on-load in this grade power station.For certain grade of power station reservoir level, too high, normal, excessively low three kinds of states possibly appear, and the combinations of states of the power stations at different levels reservoir level of so non-chopped-off head just has 3 (N-1) to plant.
The maximum adjustment load △ Pmax of step hydropower station:
Figure 138880DEST_PATH_IMAGE024
(13)
In the formula:
Figure 152098DEST_PATH_IMAGE025
is the load adjusted value of unit reservoir level;
Figure 646533DEST_PATH_IMAGE026
is the maximum of reservoir level and ordinary water level absolute difference in the step power stations at different levels.
Can confirm certain reservoir level combination load increase and decrease situation in power stations at different levels down according to the load of table 1 adjustment Policy Table, increase load value and reduce load value and equate, specifically increase load value △ P+i, minimizing load value △ P-i difference formula as follows:
Figure 166157DEST_PATH_IMAGE027
(14)
In the formula: ;
Figure 385097DEST_PATH_IMAGE029
is that i level power station increases load umber (i.e. "+" number); Constant maybe the needs reduces if load in i level power station, and then is 0.
Figure 317073DEST_PATH_IMAGE030
(15)
In the formula: ;
Figure 69577DEST_PATH_IMAGE032
is that load umber (i.e. "-" number) is reduced in i level power station; Constant maybe the needs increases if load in i level power station, and then is 0.
7, load is checked
When reservoir level is between lowest water level and the peak level in non-chopped-off head power station,, pays the utmost attention to and satisfy the scheduling burden requirement if its water level of control occurs and satisfy the conflicting situation of scheduling burden requirement; Otherwise reservoir level is higher than peak level or is lower than under the lowest water level condition in non-chopped-off head power station, pays the utmost attention to its reservoir level of control.When causing scheduling set point and EDC apportioning cost to differ by more than the permissible value of scheduling set point and cascaded hydropower stations EDC apportioning cost difference because of above-mentioned adjustment; Need the power station load that reservoir level is between lowest water level and the peak level is readjusted, up to satisfying the scheduling burden requirement to greatest extent.
8, safe operation
(1) northern river reverse regulation
Special, when the Songjiang river valley is in winter,, can not open at Bei Jiang power station spillway arc door because freezing, and therefore, Shi Long power station unit letdown flow can not surpass the maximum generation in Bei Jiang power station and quote flow, to avoid causing casual dam, Bei Jiang power station accident.It is 123.59 m that Shi Long power station unit is quoted flow 3/ s, and the maximum generation in Bei Jiang power station is quoted flow 100 m 3/ s; Therefore the flow control Shi Long power station unit flow in power station, river to the north of necessary; Must guarantee that all unit flows of Shi Long power station are no more than Bei Jiang power station unit flow; The unit generation flow in corresponding Shuan Gou power station can not surpass Bei Jiang power station unit flow, and hill power station unit flow then can be unrestricted.
(2) water level arrives the locking of limit value flow
When the water level in subordinate power station arrived the capping value, higher level power station letdown flow can not surpass the current letdown flow in subordinate power station, to avoid causing casual dam, Bei Jiang power station accident.
(3) withdraw from automatically and automatic alarm function
Economic dispatch control (EDC) has automatic exit function of accident and automatic alarm function, can judge according to the real-time running state of each power station and electrical network, and the relevant important information of prompting operations staff guarantees safe, reliable, the stable operation of EDC system.
When multistage power station accident appears, crucial sampling source data is unreliable, water level abnormality is high/during situation such as low and relevant power station is uncontrollable, EDC can withdraw from and produce relevant audible and visual alarm information indicating operations staff manual intervention automatically and handle.
When manual operation occurring and do not satisfy the current safety service requirement, produce warning information and refusal when time operation; In the time of in water level gets into unusual dead zone range, produce early warning information.
(4) little sharing of load
For solving the step hydropower station to the slow problem of little load adjustment response speed, special consideration is carried out individual processing to little load value of establishing.
At first, set point needs within the rotation adjustable extent;
Secondly, the difference of twice set point in front and back is within little sharing of load difference range; Then, judge each power station water level situation and whether participate in EDC that the water level height preferentially increases, water level hangs down the principle that preferentially subtracts, and little load variations is exerted oneself born by a station.
(5) automatic startup-shutdown
Discharge characteristic according to river, Songjiang power plant; Analyze its combination of unit generation with long-time steady operation; In conjunction with artificial startup-shutdown priority and the current unit operation pattern of setting, draw unique startup-shutdown sequence, and according to current each unit controllable state; Calculate start in the sequence can not the Operational Zone with shutdown sequence in can not the Operational Zone, and the corresponding load threshold values and the load threshold values of shutting down correspondence of the platform number of respectively starting shooting.
When the assumed load value surpasses the controlled maximum size of rotation, get into the Auto Power On flow process, according to the comparison between set point and each threshold values, judging currently needs the start number and drives which platform machine, and triggering starts shooting makes.
When the assumed load value satisfies halt condition, shut down the comparison between the threshold values according to set point and each, judge which platform unit current needs stop, trigger and shut down order.

Claims (2)

1. the economic dispatch control system that is used for the step hydropower station, by host server, history server, phonological working station; The engineer work station, operator workstation, large screen projection, gps system is formed; It is characterized in that: host server, history server, the phonological working station is the engineer work station; Operator workstation,, large screen projection, gps system are connected in parallel on the master control circuit;
Host server adopts the two-node cluster hot backup working method, has universal character QWERTY keyboard (band mouse), LCD, the operation automation of its management " each power station ", the i.e. automatic generation control in each power station (AGC); Automatism voltage control (AVC); Host server and each monitoring power station system carry out communication, obtain each power station real-time electric power information, issue the regulating and controlling order;
History server adopts the Mysql database software to be installed in the 2 cover redundant servers, and each monitoring power station system, trapeziodal modulation central monitor system all devices service data are carried out long preservation;
Operator workstation is done real time monitoring to production, the equipment operation of power plant; Obtain required various information; The operating right that operator workstation provides many group different safety class for the operations staff of different responsibilities, should be able to discern several has the user of password separately to each rank operating right down, before the entering; Authorize the operations staff must register " user name ", pass word, make each user independently to get into and to withdraw from through the password operation; The graphics system of operator workstation is a full graphics Chinese dynamic menu; Have complete means and realize figure roaming, zoom and mobile arbitrarily; Can be easily figure be set up, expanded, amplification, translation, increases/delete, stirs etc.; Operator workstation can be automatically or through operations staff's calling, show in real time running status, the capital equipment of " each power station " interior main system dynamic operation process, accident and fault, related parameter and operation monitoring figure arranged, operate pictures such as winding diagram, and trend curve, various list, measuring point index etc.; Status of equipment on the periodic refreshing picture and service data; And the picture to accident alarming has highest priority, can cover other picture that is showing, releases picture during accident automatically and instructs with handling; And can show relevant history parameters and form through operations staff's calling;
The engineer work station is to system maintenance, administrative staff make amendment system parameters, revise definite value, increase and revise database, picture and form;
Functions such as voice/telephone call, Help by Phone, accident automatic paging (ON-CALL) and SMS warning are accomplished at the phonological working station;
Be furnished with 2 GPS main frames and 1 redundant switching device shifter, 1 cover signal extension device in the gps system; In the signal extension device, contain 4 RS232; 8 RJ-45 interfaces, 2 GPS main frames are accepted satellite-signal respectively and are transmitted signals in the signal extension device through switching device shifter, and insert 2 cover host exchanges through Ethernet interface respectively; Through monitor network, to the computer in the whole network carry out clock to the time.
2. the economic dispatch control system that is used for the step hydropower station according to claim 1 is characterized in that described concrete operating procedure is following:
1) host server receives power station, the full basin gross capability that net that real-time monitoring system sends transfers the EMS system to assign; The basin water rain condition information in the exerting oneself of each power station of collection site, each unit, state information and the water adjusting system simultaneously; With reference to the historical datas such as various control strategies of storing in the history server; Calculate the controlled target in each power station and each unit output in the basin through economy, safe operation boundary conditions such as full basin gross capability, head, unit efficiency, unit associating vibrating area, letdown flow, lower reservoir water-heads, calculate according to the operational formula of following target function:
Figure 242581DEST_PATH_IMAGE001
(1)
N is the number in hydroelectric station in the formula; Zui is an i level power station upper pond level; Zsi is the upper reaches, i level power station designated water levels; Qi is an i level power plant discharge;
When | Zui – Zsi|>=△ Zi, =1; When | Zui – Zsi|<△ Zi,
Figure 679563DEST_PATH_IMAGE002
=0; △ Zi is the dead band value of the upper reaches, i level power station designated water level;
Constraints
The network load balance
Figure 781161DEST_PATH_IMAGE003
(2)
Pi is to exert oneself in i level hydroelectric station in the formula; Ps is that constant load is given in whole step dispatching of power netwoks;
The water balance condition
(3)
Vi in the formula, t are i reservoir capacity at the beginning of the t period; Vi, t+1 are t period Mo i reservoir capacity; Spacer segment when Δ t is; QINi, t are i level power station t period reservoir inflow; Qi, t fully utilize flow the i level power station t period;
Figure 607790DEST_PATH_IMAGE005
(4)
Figure 81366DEST_PATH_IMAGE006
is that i level power station t period interval natural comes water in the formula;
Figure 720026DEST_PATH_IMAGE007
to be i-1 level power station reach the time to the current stream in i level power station;
The constraint of reservoir reservoir level
Figure 446455DEST_PATH_IMAGE008
(5)
Figure 295200DEST_PATH_IMAGE009
is i level power station upper pond level lower limit in the formula; is the i upper limit;
The output of power station constraint
Pimin?≤?Pi ≤?Pijl (6)
Pijh?≤?Pi ≤?Pikl ?(7)
Pimh?≤?Pi ≤?Pimax (8)
Pijl is the lower limit of exerting oneself that i level power station j can not the operation area in the formula; Pijh is the upper limit of exerting oneself that i level power station j can not the operation area; M be can not the Operational Zone number; J=1 ~ m; K=j+1;
2) controlled target that above-mentioned computing is obtained affacts each local control unit through northeast DianKeYuan centralized control system or unified platform I district supervisory control system; Realization to unit output, open/stop state and each all controlled device of power station in real time, accurately, reliable and control effectively, reach the maximized target of step hydropower station waterpower utilization rate; The control strategy that forms is stored to and is used for reference and the historical query that form control strategy next time in the history server; Operator workstation is that system provides man-machine interface, and display message is sent in the large screen projection, and the operator realizes the real-time monitoring to system through it; When fault or accident generation, send audio alert by the phonological working station, and fault or accident information unification are sent in the history server, one-way transmission to III district (not expression in the accompanying drawing) integrated warning system sends note and network alarming; The engineer work station is used for the maintenance of each server and network; Gps system 10 is connected in parallel on the master control circuit to each station server, work station provide unified clock, for the system failure and accident analysis provide foundation; Through of the reverse adjusting of little storage capacity power station, the difference of will loading safety, smoothly transfer to other adjustable power stations to the big storage capacity of higher level power station.
CN201210085398.4A 2012-03-28 2012-03-28 Economical dispatch control system for cascade power station Active CN102738789B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210085398.4A CN102738789B (en) 2012-03-28 2012-03-28 Economical dispatch control system for cascade power station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210085398.4A CN102738789B (en) 2012-03-28 2012-03-28 Economical dispatch control system for cascade power station

Publications (2)

Publication Number Publication Date
CN102738789A true CN102738789A (en) 2012-10-17
CN102738789B CN102738789B (en) 2014-09-10

Family

ID=46993808

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210085398.4A Active CN102738789B (en) 2012-03-28 2012-03-28 Economical dispatch control system for cascade power station

Country Status (1)

Country Link
CN (1) CN102738789B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103066604A (en) * 2012-11-20 2013-04-24 贵州乌江水电开发有限责任公司 Stair automatic generation control method under factory network coordination mode
CN103560588A (en) * 2013-11-18 2014-02-05 国家电网公司 Inquiring and monitoring method and device for power dispatching
CN106100141A (en) * 2016-08-27 2016-11-09 无锡威泰迅电力科技有限公司 Power station active power and reactive power automatic control system
CN106953840A (en) * 2017-01-25 2017-07-14 贵州黔源电力股份有限公司 A kind of water power far controls platform method for preventing misoperation and system
CN107832917A (en) * 2017-10-13 2018-03-23 四川大学 The recognition methods of Cascade Reservoirs weakness step, crucial step and controlling step based on Bayes risk network
CN109167367A (en) * 2018-09-19 2019-01-08 长江勘测规划设计研究有限责任公司 Power station load dynamic adjusting method based on unilateral matching mechanisms
CN111924673A (en) * 2020-07-15 2020-11-13 重庆锐云科技有限公司 Linkage elevator scheduling method, system, computer equipment and storage medium
CN112685488A (en) * 2021-03-17 2021-04-20 国能大渡河大数据服务有限公司 Data management and control system for drainage basin power station equipment
CN113031661A (en) * 2021-03-05 2021-06-25 国网福建省电力有限公司石狮市供电公司 Reservoir discharge monitoring device and method
CN115730724A (en) * 2022-11-24 2023-03-03 中国长江电力股份有限公司 Cascade hydropower station joint scheduling method based on non-electric energy storage maximization
CN116663859A (en) * 2023-07-25 2023-08-29 傲拓科技股份有限公司 Optimal scheduling method, system, electronic equipment and storage medium for cascade hydropower station
CN117709682A (en) * 2024-02-02 2024-03-15 大连理工大学 Reservoir water level disturbance interval assessment and control method under cascade hydropower response flexibility demand mode

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003032917A (en) * 2001-07-18 2003-01-31 Toshiba Corp Information network system of electric station
CN2600846Y (en) * 2003-02-27 2004-01-21 南宁欧顶电气有限责任公司 Intelligent regulation and control converting station
JP2008271721A (en) * 2007-04-23 2008-11-06 Power System:Kk Power management system
CN201928023U (en) * 2010-12-08 2011-08-10 中国船舶重工集团公司第七〇四研究所 Embedded power-station-monitoring device for full electric propulsion ship

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003032917A (en) * 2001-07-18 2003-01-31 Toshiba Corp Information network system of electric station
CN2600846Y (en) * 2003-02-27 2004-01-21 南宁欧顶电气有限责任公司 Intelligent regulation and control converting station
JP2008271721A (en) * 2007-04-23 2008-11-06 Power System:Kk Power management system
CN201928023U (en) * 2010-12-08 2011-08-10 中国船舶重工集团公司第七〇四研究所 Embedded power-station-monitoring device for full electric propulsion ship

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103066604A (en) * 2012-11-20 2013-04-24 贵州乌江水电开发有限责任公司 Stair automatic generation control method under factory network coordination mode
CN103066604B (en) * 2012-11-20 2014-08-13 贵州乌江水电开发有限责任公司 Stair automatic generation control method under factory network coordination mode
CN103560588A (en) * 2013-11-18 2014-02-05 国家电网公司 Inquiring and monitoring method and device for power dispatching
CN103560588B (en) * 2013-11-18 2016-03-23 国家电网公司 A kind of inquiry monitoring method for power scheduling and device
CN106100141B (en) * 2016-08-27 2019-03-22 无锡威泰迅电力科技有限公司 Power station active power and reactive power automatic control system
CN106100141A (en) * 2016-08-27 2016-11-09 无锡威泰迅电力科技有限公司 Power station active power and reactive power automatic control system
CN106953840A (en) * 2017-01-25 2017-07-14 贵州黔源电力股份有限公司 A kind of water power far controls platform method for preventing misoperation and system
CN107832917A (en) * 2017-10-13 2018-03-23 四川大学 The recognition methods of Cascade Reservoirs weakness step, crucial step and controlling step based on Bayes risk network
CN107832917B (en) * 2017-10-13 2021-09-10 四川大学 Identification method of weak cascade, key cascade and controllable cascade of cascade reservoir group based on Bayesian risk network
CN109167367A (en) * 2018-09-19 2019-01-08 长江勘测规划设计研究有限责任公司 Power station load dynamic adjusting method based on unilateral matching mechanisms
CN111924673A (en) * 2020-07-15 2020-11-13 重庆锐云科技有限公司 Linkage elevator scheduling method, system, computer equipment and storage medium
CN113031661A (en) * 2021-03-05 2021-06-25 国网福建省电力有限公司石狮市供电公司 Reservoir discharge monitoring device and method
CN112685488A (en) * 2021-03-17 2021-04-20 国能大渡河大数据服务有限公司 Data management and control system for drainage basin power station equipment
CN115730724A (en) * 2022-11-24 2023-03-03 中国长江电力股份有限公司 Cascade hydropower station joint scheduling method based on non-electric energy storage maximization
CN115730724B (en) * 2022-11-24 2024-02-13 中国长江电力股份有限公司 Cascade hydropower station joint scheduling method based on maximization of non-stored electric energy
CN116663859A (en) * 2023-07-25 2023-08-29 傲拓科技股份有限公司 Optimal scheduling method, system, electronic equipment and storage medium for cascade hydropower station
CN116663859B (en) * 2023-07-25 2023-10-27 傲拓科技股份有限公司 Optimal scheduling method, system, electronic equipment and storage medium for cascade hydropower station
CN117709682A (en) * 2024-02-02 2024-03-15 大连理工大学 Reservoir water level disturbance interval assessment and control method under cascade hydropower response flexibility demand mode

Also Published As

Publication number Publication date
CN102738789B (en) 2014-09-10

Similar Documents

Publication Publication Date Title
CN102738789B (en) Economical dispatch control system for cascade power station
CN109272245B (en) Method and system for automatically distributing opening of flood discharge gate of cascade hydropower station in real time
CN101710711B (en) Monitoring system for energy storing device for output power of smooth wind power system
CN108493828A (en) Real time information Three-Dimensional Dynamic intelligence display systems
CN105573243A (en) Pump station monitoring system based on PLC
Wang et al. Safety constraints and optimal operation of large‐scale nuclear power plant participating in peak load regulation of power system
CN102244677A (en) Green energy Cloud computing method and system
CN111521230A (en) Water meter system capable of self-detection
CN205405200U (en) Intelligence blowdown remote monitering system
CN110543154A (en) Intelligent hydraulic power plant system
CN107827256B (en) Wind-solar-storage complementary container type intelligent micro-grid seawater desalination system
CN204883298U (en) Municipal sewage pump station centralized control system based on PLC
CN105974871A (en) Intelligent hydropower station automation control system
CN117270587A (en) Centralized regulation and control system and method for drainage pump station controlled by time-period liquid level
CN205080423U (en) Distributed control system
CN117578493A (en) Reactive voltage regulation method for river basin step chain type hydroelectric area
Twaróg Modelling of the Solina-Myczkowce pumped storage power plant
CN103545817B (en) A kind of cascaded hydropower stations automatic power generation control method
CN109683571A (en) A kind of modeling method and device of Monitoring and Control System for Hydropower Station
CN204086960U (en) A kind of Economic Operation in Hydropower Station supervisory system
CN211628271U (en) Cascade hydropower station group combined dispatching device based on machine learning
CN204662352U (en) Rubber dam water transfer control appliance
Strezoski et al. DMS-basis for increasing of green distributed generation penetration in distribution networks
CN204287931U (en) A kind of farm water supply flood discharge control system
CN203223361U (en) Remote automatic operation system for pump stations

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: JINLIN SONGJIANGHE HYDRAULIC POWDER CO.,LTD.

Effective date: 20130109

Owner name: STATE GRID XINYUAN HYDROELECTRIC COMPANY LIMITED J

Effective date: 20130109

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 134500 JILIN, JILIN PROVINCE TO: 100031 DONGCHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20130109

Address after: 100031 West Chang'an Avenue, Beijing, No. 86

Applicant after: State Grid Corporation of China

Applicant after: State Grid Xinyuan Hydropower Co., Ltd.

Applicant after: Jilin Songjianghe Hydropower Co., Ltd.

Address before: 134500 Jilin province Jilin Nanxin District of Fusong county power plant

Applicant before: Jilin Songjianghe Hydropower Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant