CN102735167A - 一种大型牌坊类设备的组对检测方法 - Google Patents
一种大型牌坊类设备的组对检测方法 Download PDFInfo
- Publication number
- CN102735167A CN102735167A CN201210188667XA CN201210188667A CN102735167A CN 102735167 A CN102735167 A CN 102735167A CN 201210188667X A CN201210188667X A CN 201210188667XA CN 201210188667 A CN201210188667 A CN 201210188667A CN 102735167 A CN102735167 A CN 102735167A
- Authority
- CN
- China
- Prior art keywords
- column
- adjustment
- memorial archway
- laser tracker
- arched girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000001514 detection method Methods 0.000 title claims abstract description 9
- 238000009434 installation Methods 0.000 claims abstract description 10
- 238000005259 measurement Methods 0.000 claims abstract description 6
- 238000010586 diagram Methods 0.000 description 6
- 238000000034 method Methods 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
Images
Landscapes
- Length Measuring Devices By Optical Means (AREA)
- Length Measuring Devices With Unspecified Measuring Means (AREA)
Abstract
一种大型牌坊类设备的组对检测方法,包括:①立柱对中检测;②上、下立柱垫块调整;③上、下拱梁调整;④应用激光跟踪仪对牌坊的整体安装精度进行复测。本发明采用激光跟踪仪分别对大型牌坊类设备组对后的立柱对中进行检测、上、下立柱垫块进行调整、上、下拱梁进行调整,既可保证检测速度,又可保证安装精度和测量精度。
Description
技术领域:
本发明涉及一种大型机械设备的组装方法,特别涉及一种大型牌坊类设备的组对检测方法。
背景技术:
为了满足经济发展的需要,设备设计和制造出的尺寸和吨位越来越大,有时一件设备可达几千吨。因此,设备无法整体供货,只能分段进入现场后再组装成整体。而现场组装实际上是设备制造的后续部分,组装精度都是按照设备制造厂商的要求安装检测。组装中经常采用挂钢线吊线坠+钢尺测量检查设备的形位公差法和挂钢线吊线坠+内径千分尺测量检查形位公差法。前者组装快捷简单,但精度较低;后者组装精度较高,但操作中人为精度影响因素太多而且效率较低。
发明内容:
本发明的目的就在于克服上述现有技术中存在的不足,而提供一种大型牌坊类设备的组对检测方法,该方法采用激光跟踪仪进行大型设备的组对测量,既可以快速简单的测量安装精度,又能保证测量精度准确无误。
如上构思,本发明的技术方案是:一种大型牌坊类设备的组对检测方法,其特征在于:包括:①立柱对中检测:立柱吊装就位后,用激光跟踪仪调平两个立柱、调整立柱中心点位置;立柱中心调好后,用激光跟踪仪及球形棱镜分别测出两立柱两端点、中心点和立柱边缘任意对称两点的坐标,然后用这些点的坐标拟合出两立柱的平面位置,由此计算出立柱的间距及平行度,最后再利用两立柱两端点对角线之间的距离进行调整,直至调整合格;②上、下立柱垫块调整:立柱调整合格后在立柱上安装上、下立柱垫块,然后用激光跟踪仪及球形棱镜分别测出立柱两端点坐标和垫块安装完毕后其外端点的坐标,以此计算调整立柱垫块;③上、下拱梁调整:立柱垫块调整合格后将上、下拱梁吊装就位组成整个牌坊,用激光跟踪仪及球形棱镜对整个牌坊的平面度和外形尺寸进行调整,然后分别测出上、下拱梁内弧的8点坐标,以此拟合出上、下拱梁内弧的最佳标准圆,得出拱梁半径,计算出拱梁圆柱度;④应用激光跟踪仪对牌坊的整体安装精度进行复测。
本发明采用激光跟踪仪分别对大型牌坊类设备组对后的立柱对中进行检测、上、下立柱垫块进行调整、上、下拱梁进行调整,既可保证检测速度,又可保证安装精度和测量精度。
附图说明:
图1是660MN挤压/模锻压机立柱调整示意图;
图2是660MN挤压/模锻压机立柱垫块调整示意图;
图3是660MN挤压/模锻压机上下拱梁调整示意图。
具体实施方式:
利用本发明对660MN挤压/模锻压机的单片牌坊重约1500t,该设备分十段供货到施工现场组对,采用本发明对组对进行测量。具体方法如下:
1)立柱对中检测:
立柱吊装就位后,用激光跟踪仪调平两个立柱,然后再用激光跟踪仪调整立柱中心点位置。立柱中心调好后,用激光跟踪仪1及球形棱镜2分别测出1、2、3、4、5、6点及A、B、C、D点坐标,见图1:660MN挤压/模锻压机立柱调整示意图,用各点的坐标拟合出两立柱的平面位置,由此计算出立柱的间距及平行度,用A--D点的坐标计算出对角线AC及BD间的距离,根据此数值进行调整,直至调整合格。
2)上下立柱垫块调整:
立柱调整合格后安装上下立柱垫块,上下立柱垫块安装完毕后,用激光跟踪仪及球形棱镜分别测出7--14的坐标,见图2:660MN挤压/模锻压机立柱垫块调整示意图,以此计算调整立柱垫块。
3)上下拱梁调整:
立柱垫块调整合格后将上下拱梁吊装就位,用激光跟踪仪及球形棱镜对整个牌坊上表面进行测量,根据测量数值对牌坊上表面平面度进行调整。平面度调整合格后对整个牌坊的外形尺寸进行测量调整,测出15--30点坐标,以此拟合出上下拱梁内弧的最佳标准圆,见图3:660MN挤压/模锻压机上下拱梁调整示意图,得出拱梁半径,计算出拱梁圆柱度。
4)牌坊复测:
660MN挤压/模锻压机牌坊组装后,应用激光跟踪仪对牌坊的整体安装精度进行复测,确保整体安装精度符合安装要求。
Claims (1)
1.一种大型牌坊类设备的组对检测方法,其特征在于:包括:①立柱对中检测:立柱吊装就位后,用激光跟踪仪调平两个立柱、调整立柱中心点位置;立柱中心调好后,用激光跟踪仪及球形棱镜分别测出两立柱两端点、中心点和立柱边缘任意对称两点的坐标,然后用这些点的坐标拟合出两立柱的平面位置,由此计算出立柱的间距及平行度,最后再利用两立柱两端点对角线之间的距离进行调整,直至调整合格;②上、下立柱垫块调整:立柱调整合格后在立柱上安装上、下立柱垫块,然后用激光跟踪仪及球形棱镜分别测出立柱两端点坐标和垫块安装完毕后其外端点的坐标,以此计算调整立柱垫块;③上、下拱梁调整:立柱垫块调整合格后将上、下拱梁吊装就位组成整个牌坊,用激光跟踪仪及球形棱镜对整个牌坊的平面度和外形尺寸进行调整,然后分别测出上、下拱梁内弧的8点坐标,以此拟合出上、下拱梁内弧的最佳标准圆,得出拱梁半径,计算出拱梁圆柱度;④应用激光跟踪仪对牌坊的整体安装精度进行复测。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210188667XA CN102735167A (zh) | 2012-06-08 | 2012-06-08 | 一种大型牌坊类设备的组对检测方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210188667XA CN102735167A (zh) | 2012-06-08 | 2012-06-08 | 一种大型牌坊类设备的组对检测方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102735167A true CN102735167A (zh) | 2012-10-17 |
Family
ID=46991105
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210188667XA Pending CN102735167A (zh) | 2012-06-08 | 2012-06-08 | 一种大型牌坊类设备的组对检测方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102735167A (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070016386A1 (en) * | 2005-07-15 | 2007-01-18 | Ernie Husted | Coordinate tracking system, apparatus and method of use |
WO2008107715A2 (en) * | 2007-03-05 | 2008-09-12 | Absolute Robotics Limited | Determining positions |
CN101391267A (zh) * | 2008-11-04 | 2009-03-25 | 北京首钢建设集团有限公司 | 立辊轧机在线组装整体落位安装方法 |
CN101700527A (zh) * | 2009-11-19 | 2010-05-05 | 中国第一冶金建设有限责任公司 | 厚壁大口径管轧机找正方法 |
CN101865653A (zh) * | 2010-03-30 | 2010-10-20 | 浙江大学 | 一种应用于飞机总装配的1#框精度测量方法 |
CN201940422U (zh) * | 2010-12-10 | 2011-08-24 | 中国二十二冶集团有限公司 | 双牌坊调整装置 |
-
2012
- 2012-06-08 CN CN201210188667XA patent/CN102735167A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070016386A1 (en) * | 2005-07-15 | 2007-01-18 | Ernie Husted | Coordinate tracking system, apparatus and method of use |
WO2008107715A2 (en) * | 2007-03-05 | 2008-09-12 | Absolute Robotics Limited | Determining positions |
CN101391267A (zh) * | 2008-11-04 | 2009-03-25 | 北京首钢建设集团有限公司 | 立辊轧机在线组装整体落位安装方法 |
CN101700527A (zh) * | 2009-11-19 | 2010-05-05 | 中国第一冶金建设有限责任公司 | 厚壁大口径管轧机找正方法 |
CN101865653A (zh) * | 2010-03-30 | 2010-10-20 | 浙江大学 | 一种应用于飞机总装配的1#框精度测量方法 |
CN201940422U (zh) * | 2010-12-10 | 2011-08-24 | 中国二十二冶集团有限公司 | 双牌坊调整装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102679903A (zh) | 一种利用激光测距的方法测量桥梁底部变形的*** | |
CN204154292U (zh) | 一种陶瓷砖超高精度平整度检测装置 | |
CN103557800B (zh) | 多层楼板分层水平位移监测方法 | |
CN203857958U (zh) | 一种巷道全断面变形监测装置 | |
CN105180912A (zh) | 一种混凝土模板垂直度检测仪 | |
CN202109865U (zh) | 一种大轴颈及大径管道顶部中心、直径测量仪 | |
CN205449052U (zh) | 一种激光测量建筑物倾斜角的装置 | |
CN102374861B (zh) | 产生铅垂激光束的全站仪或觇牌的点下对中操作方法 | |
CN206540548U (zh) | 具有仪器高精确测量功能的全站仪 | |
CN203375966U (zh) | 竖井联系测量用投点装置 | |
CN202630879U (zh) | 一种大锥孔快速检测量规 | |
CN102865826A (zh) | 研磨棒直径检测装置及检测方法 | |
CN102607379A (zh) | 内圈v形滚道相对基准端面夹角偏差的检测方法 | |
CN105300210B (zh) | 一种多功能测量仪 | |
CN103398704B (zh) | 一种测量连铸扇形段基础框架的方法 | |
CN104634315A (zh) | 多层楼板分层水平位移监测*** | |
CN108532984B (zh) | 一种支撑胎架高精度安装方法 | |
CN102735167A (zh) | 一种大型牌坊类设备的组对检测方法 | |
CN204040007U (zh) | 基线法测量基坑坡顶水平变形的辅助工具 | |
CN203148425U (zh) | 一种用于验收轨道的水准测量装置 | |
CN204944456U (zh) | 墙柱模板垂直度激光检测仪 | |
CN104316028A (zh) | 预埋钢板相对高差测量辅助装置 | |
CN105091710A (zh) | 一种检测坩埚内宽的方法及装置 | |
CN105698752B (zh) | 适用于组合式水准标尺的精密测定标高方法 | |
CN203940858U (zh) | 能自动报出测量数值的二维水平仪 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |