CN102720341A - 框架柱施工操作架及其安装方法 - Google Patents
框架柱施工操作架及其安装方法 Download PDFInfo
- Publication number
- CN102720341A CN102720341A CN2012102180368A CN201210218036A CN102720341A CN 102720341 A CN102720341 A CN 102720341A CN 2012102180368 A CN2012102180368 A CN 2012102180368A CN 201210218036 A CN201210218036 A CN 201210218036A CN 102720341 A CN102720341 A CN 102720341A
- Authority
- CN
- China
- Prior art keywords
- frame column
- support body
- frame
- base
- iron
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210218036.8A CN102720341B (zh) | 2012-06-28 | 2012-06-28 | 框架柱施工操作架及其安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210218036.8A CN102720341B (zh) | 2012-06-28 | 2012-06-28 | 框架柱施工操作架及其安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102720341A true CN102720341A (zh) | 2012-10-10 |
CN102720341B CN102720341B (zh) | 2015-04-22 |
Family
ID=46946193
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210218036.8A Active CN102720341B (zh) | 2012-06-28 | 2012-06-28 | 框架柱施工操作架及其安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102720341B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104030176A (zh) * | 2014-05-30 | 2014-09-10 | 中建七局安装工程有限公司 | 吊装平台桁架的平衡梁及其吊装方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB604588A (en) * | 1944-11-07 | 1948-07-07 | Albert Henry Hawes | Improvements in fittings for scaffolding, shores, props, trestles and the like |
CN1133078A (zh) * | 1993-08-30 | 1996-10-09 | 约翰·克雷门特·普雷斯顿 | 建筑施工平台 |
CN101255764A (zh) * | 2008-04-11 | 2008-09-03 | 江苏省华建建设股份有限公司 | 高空浇筑钢柱内混凝土操作平台架 |
CN201158933Y (zh) * | 2007-12-27 | 2008-12-03 | 上海市第七建筑有限公司 | 一种高层外挑结构维修脚手架装置 |
CN101942901A (zh) * | 2010-09-10 | 2011-01-12 | 刘辉 | 一种支撑架或脚手架及其施工方法 |
CN202023348U (zh) * | 2011-01-17 | 2011-11-02 | 中国建筑第四工程局有限公司 | 一种悬挑开口型脚手架 |
CN202689489U (zh) * | 2012-06-28 | 2013-01-23 | 中建一局集团第二建筑有限公司 | 框架柱施工操作架 |
-
2012
- 2012-06-28 CN CN201210218036.8A patent/CN102720341B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB604588A (en) * | 1944-11-07 | 1948-07-07 | Albert Henry Hawes | Improvements in fittings for scaffolding, shores, props, trestles and the like |
CN1133078A (zh) * | 1993-08-30 | 1996-10-09 | 约翰·克雷门特·普雷斯顿 | 建筑施工平台 |
CN201158933Y (zh) * | 2007-12-27 | 2008-12-03 | 上海市第七建筑有限公司 | 一种高层外挑结构维修脚手架装置 |
CN101255764A (zh) * | 2008-04-11 | 2008-09-03 | 江苏省华建建设股份有限公司 | 高空浇筑钢柱内混凝土操作平台架 |
CN101942901A (zh) * | 2010-09-10 | 2011-01-12 | 刘辉 | 一种支撑架或脚手架及其施工方法 |
CN202023348U (zh) * | 2011-01-17 | 2011-11-02 | 中国建筑第四工程局有限公司 | 一种悬挑开口型脚手架 |
CN202689489U (zh) * | 2012-06-28 | 2013-01-23 | 中建一局集团第二建筑有限公司 | 框架柱施工操作架 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104030176A (zh) * | 2014-05-30 | 2014-09-10 | 中建七局安装工程有限公司 | 吊装平台桁架的平衡梁及其吊装方法 |
CN104030176B (zh) * | 2014-05-30 | 2016-06-29 | 中建七局安装工程有限公司 | 吊装平台桁架的平衡梁及其吊装方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102720341B (zh) | 2015-04-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109838114B (zh) | 钢筋混凝土结构逆向拆除临时支撑转换装置及其操作方法 | |
CN108868193B (zh) | 钢结构建筑逆向拆除的施工方法 | |
KR19990072014A (ko) | 위에서지면으로건축물을건설하는리프트업공법 | |
CN108049656B (zh) | 一种烟囱的逆向拆除装置及拆除方法 | |
CN102587659A (zh) | 一种以混凝土柱支顶后浇带两侧结构的施工方法 | |
CN203794498U (zh) | 一种内置式自升塔吊装置 | |
CN207294093U (zh) | 一种大跨度钢桁架整体提升装置 | |
CN105804400A (zh) | 一种曲面网架提升施工方法 | |
CN111734166A (zh) | 一种可拆卸转换装置及使用该装置的逆向拆除施工方法 | |
CN202689489U (zh) | 框架柱施工操作架 | |
CN203213019U (zh) | 长悬臂盖梁现浇施工支架体系 | |
CN209837765U (zh) | 钢筋混凝土结构逆向拆除临时支撑转换装置 | |
CN102720341A (zh) | 框架柱施工操作架及其安装方法 | |
CN204530501U (zh) | 一种便于施工时控制拱肋线形的支架支座 | |
CN209874434U (zh) | 一种建筑物高空简易外挑脚手架 | |
CN212802458U (zh) | 一种可周转使用的井架施工平台 | |
CN213871393U (zh) | 一种门架支撑横梁提吊的保护结构 | |
CN107059654A (zh) | 单索面复合型超长前支点挂篮及其安装方法 | |
CN215670972U (zh) | 悬挑型钢可拆卸式预埋螺栓锚固结构 | |
CN211341606U (zh) | 一种用于结构采光井部位的操作平台 | |
CN104372948A (zh) | 一种电梯井升模架 | |
CN204530479U (zh) | 一种桥梁顶升临时反力支撑装置 | |
CN113738156A (zh) | 一种有限空间内的临时支撑结构及其拆除方法 | |
CN203361170U (zh) | 一种建筑基坑围护用的支撑立柱桩 | |
CN206800201U (zh) | 单索面复合型前支点挂篮 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170731 Address after: 100026 Beijing city Daxing District Qingyuan Road No. 15 West Building a layer of 107 Co-patentee after: Zhongjian First Group Construction Co Ltd Patentee after: China Construction First Group the Second Construction Co., Ltd. Address before: 102600, 165, Fengtai District, Beijing Patentee before: China Construction First Group the Second Construction Co., Ltd. |
|
TR01 | Transfer of patent right | ||
CB03 | Change of inventor or designer information |
Inventor after: Chen Changyuan Inventor after: Miao Yunsen Inventor after: Zhang Yongle Inventor after: Lei Shunxiang Inventor after: Li Jinyuan Inventor after: Yu Yannan Inventor after: Ren Shuhua Inventor before: Chen Changyuan Inventor before: Li Zhiqiang Inventor before: Lei Shunxiang Inventor before: Xie Zhongyuan Inventor before: Li Jinyuan Inventor before: Ren Shuhua |
|
CB03 | Change of inventor or designer information |