CN102720211B - 沉管底端锲体式纠偏精调***及其调节工艺 - Google Patents
沉管底端锲体式纠偏精调***及其调节工艺 Download PDFInfo
- Publication number
- CN102720211B CN102720211B CN201210187121.2A CN201210187121A CN102720211B CN 102720211 B CN102720211 B CN 102720211B CN 201210187121 A CN201210187121 A CN 201210187121A CN 102720211 B CN102720211 B CN 102720211B
- Authority
- CN
- China
- Prior art keywords
- jack
- immersed tube
- carve
- body piece
- rectifying
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Underground Or Underwater Handling Of Building Materials (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210187121.2A CN102720211B (zh) | 2012-05-29 | 2012-05-29 | 沉管底端锲体式纠偏精调***及其调节工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210187121.2A CN102720211B (zh) | 2012-05-29 | 2012-05-29 | 沉管底端锲体式纠偏精调***及其调节工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102720211A CN102720211A (zh) | 2012-10-10 |
CN102720211B true CN102720211B (zh) | 2014-10-15 |
Family
ID=46946066
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210187121.2A Active CN102720211B (zh) | 2012-05-29 | 2012-05-29 | 沉管底端锲体式纠偏精调***及其调节工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102720211B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105253351A (zh) * | 2015-10-23 | 2016-01-20 | 东莞市锦顺包装机械有限公司 | 一种自动纸板打包机 |
CN108660952B (zh) * | 2018-05-21 | 2020-07-21 | 南通路桥工程有限公司 | 一种装配式混凝土预制汽车箱通的顶推安装方法 |
CN108951326A (zh) * | 2018-06-28 | 2018-12-07 | 安徽东方钢结构有限公司 | 一种轨道梁坡度调节装置 |
CN111395397B (zh) * | 2020-03-20 | 2021-11-30 | 华侨大学 | 一种折弯型沉管防变形结构的施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003049441A (ja) * | 2001-08-03 | 2003-02-21 | Toyo Constr Co Ltd | 沈埋函の方向修正装置および方向修正方法 |
CN1696415A (zh) * | 2004-05-12 | 2005-11-16 | 布伊古公共工程公司 | 在海底土壤上修建沉埋隧道的方法和设备 |
CN101586342A (zh) * | 2009-06-15 | 2009-11-25 | 中交一航局第二工程有限公司 | 沉箱采用千斤顶水平移动车顶升工艺 |
CN202787315U (zh) * | 2012-05-29 | 2013-03-13 | 中交一航局第二工程有限公司 | 沉管底端锲体式纠偏精调*** |
-
2012
- 2012-05-29 CN CN201210187121.2A patent/CN102720211B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003049441A (ja) * | 2001-08-03 | 2003-02-21 | Toyo Constr Co Ltd | 沈埋函の方向修正装置および方向修正方法 |
CN1696415A (zh) * | 2004-05-12 | 2005-11-16 | 布伊古公共工程公司 | 在海底土壤上修建沉埋隧道的方法和设备 |
CN101586342A (zh) * | 2009-06-15 | 2009-11-25 | 中交一航局第二工程有限公司 | 沉箱采用千斤顶水平移动车顶升工艺 |
CN202787315U (zh) * | 2012-05-29 | 2013-03-13 | 中交一航局第二工程有限公司 | 沉管底端锲体式纠偏精调*** |
Also Published As
Publication number | Publication date |
---|---|
CN102720211A (zh) | 2012-10-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102251530B (zh) | 黄河主河道水中墩承台施工用双壁钢围堰施工工艺 | |
CN102691314B (zh) | 沉管内部纠偏精调***及其调节工艺 | |
CN102720222B (zh) | 沉管尾端纠偏调节工艺 | |
CN110185044B (zh) | 一种用于深厚不稳定地层的基坑侧壁应力调整*** | |
CN102720211B (zh) | 沉管底端锲体式纠偏精调***及其调节工艺 | |
CN106351241B (zh) | 紧临既有线大跨度连续梁深水基础施工方法 | |
CN103806464B (zh) | 大型高铁车站与地铁上下交汇逆作法施工方法 | |
CN102979069A (zh) | 一种在深水急流无覆盖层陡峭裸岩上的钻孔桩平台施工方法 | |
CN105569064A (zh) | 一种适用于深水裸岩的设置式沉井基础施工方法 | |
CN111910678A (zh) | 海上风电新型基础结构及其施工方法 | |
CN102704512B (zh) | 沉管底端千斤顶式纠偏精调***及其调节工艺 | |
GB2511520A (en) | Methods for construction and completion of underwater tunnels | |
CN102296629B (zh) | 一种适用于海洋工程的塔筒式结构物及其安装方法 | |
CN103938638A (zh) | 一种深水单壁钢围堰浮筒法的施工方法 | |
CN112301991A (zh) | 能够用于高填土与软基工程的变形自动化监测预警方法 | |
CN101608452A (zh) | 连底钢筋混凝土沉井水冲下沉施工方法 | |
CN103669383B (zh) | 一种在海底地面上安装和调平沉箱的方法 | |
CN202530464U (zh) | 降水井辅助钢板桩施工道路排水的基坑支护结构 | |
CN110258580B (zh) | 一种兼作永久地下结构的基坑围护结构的施工方法 | |
CN202787315U (zh) | 沉管底端锲体式纠偏精调*** | |
CN102704508B (zh) | 沉管底端叉车式纠偏精调***及其调节工艺 | |
CN202913431U (zh) | 沉管底端千斤顶式纠偏精调*** | |
CN202787314U (zh) | 沉管底端叉车式纠偏精调*** | |
CN102691313B (zh) | 沉管底端胶囊充水式精调***及其调节工艺 | |
CN202913427U (zh) | 沉管底端胶囊充水式精调*** |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
ASS | Succession or assignment of patent right |
Owner name: CCCC FIRST HARBOR ENGINEERING COMPANY LTD. Effective date: 20121019 |
|
C41 | Transfer of patent application or patent right or utility model | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Lin Ming Inventor after: Fu Dawei Inventor after: Qu Lili Inventor after: Liu Dejin Inventor after: Feng Haibao Inventor after: Li Zengjun Inventor after: Yang Ruiliang Inventor after: Li Dezhao Inventor after: Su Changxi Inventor after: Lu Lianzhou Inventor before: Qu Lili Inventor before: Liu Dejin Inventor before: Feng Haibao Inventor before: Yang Ruiliang Inventor before: Li Dezhao Inventor before: Su Changxi Inventor before: Lu Lianzhou Inventor before: Fu Dawei |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: QU LILI LIU DEJIN FENG HAIBAO YANG RUILIANG LI DEZHAO SU CHANGXI LU LIANZHOU FU DAWEI TO: LIN MING QU LILI LIU DEJIN FENG HAIBAO LI ZENGJUN YANG RUILIANG LI DEZHAO SU CHANGXI LU LIANZHOU FU DAWEI |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20121019 Address after: 266071 Shandong city of Qingdao province Fuzhou City Road No. 16 building in Hong Kong Applicant after: The Second Engineering Co. of CCCC First Harbor Engineering Co., Ltd. Applicant after: ENGINEERING COMPANY LTD. OF CCCC FIRST HARBOR ENGINEERING CO.,LTD. Address before: 266071 Shandong city of Qingdao province Fuzhou City Road No. 16 building in Hong Kong Applicant before: The Second Engineering Co. of CCCC First Harbor Engineering Co., Ltd. |
|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CI01 | Correction of invention patent gazette |
Correction item: Applicant Correct: CCCC Second Highway Engineering Co. Ltd.| 266071 Shandong city of Qingdao province Fuzhou City Road No. 16 building in Hong Kong|CCCC First Harbor Engineering Co., Ltd. False: CCCC Second Highway Engineering Co. Ltd.| 266071 Shandong city of Qingdao province Fuzhou City Road No. 16 building in Hong Kong|ENGINEERING COMPANY LTD. OF CCCC FIRST HARBOR ENGINEERING CO.,LTD. Number: 47 Volume: 28 |
|
ERR | Gazette correction |
Free format text: CORRECT: APPLICANT; FROM: THE SECOND ENGINEERING CO. OF CCCC FIRST HARBOR ENGINEERING CO., LTD.:266071 QINGDAO, SHANDONG PROVINCE; CCCC FIRST HARBOR ENGINEERING COMPANY LTD. TO: THE SECOND ENGINEERING CO. OF CCCC FIRST HARBOR ENGINEERING CO., LTD.:266071 QINGDAO, SHANDONG PROVINCE; CCCC FIRST HARBOR ENGINEERING CO., LTD. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |