CN101586342A - 沉箱采用千斤顶水平移动车顶升工艺 - Google Patents

沉箱采用千斤顶水平移动车顶升工艺 Download PDF

Info

Publication number
CN101586342A
CN101586342A CNA2009101483022A CN200910148302A CN101586342A CN 101586342 A CN101586342 A CN 101586342A CN A2009101483022 A CNA2009101483022 A CN A2009101483022A CN 200910148302 A CN200910148302 A CN 200910148302A CN 101586342 A CN101586342 A CN 101586342A
Authority
CN
China
Prior art keywords
jack
caisson
jacking
move horizontally
place
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2009101483022A
Other languages
English (en)
Other versions
CN101586342B (zh
Inventor
张祚森
耿新林
曲俐俐
张宝昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority to CN2009101483022A priority Critical patent/CN101586342B/zh
Publication of CN101586342A publication Critical patent/CN101586342A/zh
Application granted granted Critical
Publication of CN101586342B publication Critical patent/CN101586342B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Vehicle Cleaning, Maintenance, Repair, Refitting, And Outriggers (AREA)

Abstract

本发明涉及一种沉箱采用千斤顶水平移动车顶升工艺,采用千斤顶水平移动车进行顶升,其工艺过程为:水平移动车载千斤顶就位;千斤顶初步加压;千斤顶继续加压使沉箱离开台座地坪;沉箱运移横移车就位;千斤顶卸压,水平移动车载千斤顶撤出千斤顶坑。本发明采用千斤顶水平移动车进行顶升,省去了传统工艺中千斤顶就位所需滑道和固定钢垫板及其调整的繁琐工序;不需要机械配合,人工就位,减少因流水作业、交叉作业对起重设备的大量需求;灵活、快捷,满足高强度施工的要求;降低劳动强度,保证设备、人员安全;由于可方便移动,有效地解决了没有起重设备地方的沉箱顶升出运难题。

Description

沉箱采用千斤顶水平移动车顶升工艺
技术领域
本发明涉及一种沉箱顶升出运过程中沉箱顶升的方法,具体涉及一种沉箱采用千斤顶顶升工艺。
背景技术
在大型沉箱出运过程中,例如,长江口深水航道治理工程,该项目为国内外最大的航道整治工程,在宽阔的入海口河道内设置2条导流堤,将航道内流量进行调整,实现长江口航道水深加大,淤积减少的目的。堤身设计半圆形沉箱,共6种规格511个,单个重量840-1300t。沉箱预制场设在上海市横沙东滩,台座顶标高高出地坪728mm,呈“非”字形排列,中间为纵移区。沉箱出运过程:台座区顶升,沉箱上横移车→纵移区顶升沉箱,撤出横移车,沉箱上纵移车→溜放区顶升沉箱,纵移车撤出,沉箱上斜架车→重载斜架车沿坡道下滑→沉箱起浮拖运。沉箱出运强度最大为6个/天,一个沉箱要经过3次顶升,每次用4套500t千斤顶***,每套(包括千斤顶、必要的钢盖板等)自重超过1t,若它的移动、就位按常规做法,需要投入大量人力、物力和机械设备。
发明内容
本发明的目的针对现有沉箱在顶升出运过程中存在的上述不足,提供了一种沉箱采用千斤顶水平移动车顶升工艺。
本发明的技术方案为:一种沉箱采用千斤顶水平移动车顶升工艺,采用千斤顶水平移动车进行顶升,其工艺过程如下:
(1)水平移动车载千斤顶就位
根据顶升位置及千斤顶在水平移动车上的位置,确定水平移动车的位置,就位;连接油泵和千斤顶;
(2)千斤顶初步加压
开启油泵,千斤顶活塞上升,接触到沉箱顶升部位后,继续加压,弹簧压缩钢垫板下降,直至与千斤顶基础地坪密切接触;
(3)千斤顶继续加压使沉箱离开台座地坪
千斤顶继续加压,千斤顶活塞杆伸长,沉箱升高,沉箱离开台座地坪;
(4)沉箱运移横移车就位
(5)千斤顶卸压,水平移动车载千斤顶撤出千斤顶坑
开启油泵卸压,千斤顶活塞回落,千斤顶卸压,沉箱坐落运移横移车上;继续卸压,弹簧伸长,带动千斤顶和钢垫板上升,钢垫板离开地面,千斤顶活塞杆继续回收,至初始状态,水平移动车载千斤顶用人力水平撤出千斤顶坑。
本发明的有益效果为:本发明采用千斤顶水平移动车进行顶升,同传统工艺比,1、省去了传统工艺中千斤顶就位所需滑道和固定钢垫板及其调整的繁琐工序;2、不需要机械配合,人工就位,减少因流水作业、交叉作业对起重设备的大量需求;3、灵活、快捷,满足高强度施工的要求;4、降低劳动强度,保证设备、人员安全;5、设计构思巧妙,有效地利用了虎克定律,且可以利用螺母和连接杆进行调节钢垫板与地坪的高度,以适应弹簧的疲劳和地坪的凹凸不平;6、由于可方便移动,有利于千斤顶的集中存放和保养,且有效地解决了没有起重设备地方的沉箱顶升出运难题。
说明书附图
附图1为本发明的工艺流程框图;
附图2-7为本发明顶升工艺过程图。
具体实施方式
本发明的具体实施例,一种沉箱采用千斤顶水平移动车顶升工艺,采用千斤顶水平移动车进行顶升,所述的千斤顶水平移动车包括车体和设置在车体底部的滚轮,车体上设置有钢垫板和多个弹簧***,钢垫板上固定安放有千斤顶,弹簧***的一端固装在车体的上部,另一端通过连接杆与设置在钢垫板的螺母相连接。弹簧***包括外套筒、内套筒和弹簧,外套筒固装在车体上,并与车体连为一体,内套筒穿过弹簧并与弹簧一起套装在外套筒内,且内套筒可在外套筒内上下升降。
其具体顶升工艺如下:
(1)水平移动车载千斤顶就位
考根据顶升位置及千斤顶在水平移动车上的位置,确定水平移动车位置,人力推拉,就位,用高压油管连接油泵和千斤顶。
(2)千斤顶初步加压
开启油泵,千斤顶活塞上升,接触到沉箱顶升部位后,继续加压,弹簧压缩钢垫板下降,直至与千斤顶基础地坪密切接触。
(3)千斤顶继续加压使沉箱离开台座地坪
千斤顶继续加压,增加的顶升力由钢垫板传递给千斤顶基础;千斤顶活塞杆伸长,沉箱升高,沉箱离开台座地坪150mm后停止。
(4)沉箱运移横移车就位
盖板顶升车拆除沟盖板后,沉箱运移横移车就位。
(5)千斤顶卸压,水平移动车载千斤顶撤出千斤顶坑
开启油泵卸压,千斤顶活塞回落,千斤顶卸压,沉箱坐落运移横移车上,横移车承担沉箱重量;继续卸压,钢垫板连同千斤顶随千斤顶活塞的回落而上升(弹簧的弹性伸长),离开地面40mm后,钢垫板不再上升;千斤顶活塞杆继续回收,至初始状态,停机;拆除油泵连接油管,人力将千斤顶水平移动车拉出千斤顶坑,准备下一个沉箱的顶升。

Claims (3)

1.一种沉箱采用千斤顶水平移动车顶升工艺,其特征在于:采用千斤顶水平移动车进行顶升,其工艺过程如下:
(1)水平移动车载千斤顶就位
根据顶升位置及千斤顶在水平移动车上的位置,确定水平移动车的位置,就位;连接油泵和千斤顶;
(2)千斤顶初步加压
开启油泵,千斤顶活塞上升,接触到沉箱顶升部位后,继续加压,弹簧压缩钢垫板下降,直至与千斤顶基础地坪密切接触;
(3)千斤顶继续加压使沉箱离开台座地坪;
千斤顶继续加压,千斤顶活塞杆伸长,沉箱升高,沉箱离开台座地坪;
(4)沉箱运移横移车就位;
(5)千斤顶卸压,水平移动车载千斤顶撤出千斤顶坑。
开启油泵卸压,千斤顶活塞回落,千斤顶卸压,沉箱坐落运移横移车上;继续卸压,弹簧伸长,带动千斤顶和钢垫板上升,钢垫板离开地面,千斤顶活塞杆继续回收,至初始状态,水平移动车载千斤顶用人力水平撤出千斤顶坑。
2.根据权利要求1所述的沉箱采用千斤顶水平移动车顶升工艺,其特征在于:所述的千斤顶水平移动车包括车体和设置在车体底部的滚轮,车体上设置有钢垫板和多个弹簧***,钢垫板上固定安放有千斤顶,弹簧***的一端固装在车体的上部,另一端通过连接杆与设置在钢垫板螺母相连接。
3.根据权利要求1所述的沉箱采用千斤顶水平移动车顶升工艺,其特征在于:所述的弹簧***包括外套筒、内套筒和弹簧,外套筒固装在车体上,并与车体连为一体,内套筒穿过弹簧并与弹簧一起套装在外套筒内,且内套筒可在外套筒内上下升降。
CN2009101483022A 2009-06-15 2009-06-15 沉箱采用千斤顶水平移动车顶升工艺 Active CN101586342B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101483022A CN101586342B (zh) 2009-06-15 2009-06-15 沉箱采用千斤顶水平移动车顶升工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101483022A CN101586342B (zh) 2009-06-15 2009-06-15 沉箱采用千斤顶水平移动车顶升工艺

Publications (2)

Publication Number Publication Date
CN101586342A true CN101586342A (zh) 2009-11-25
CN101586342B CN101586342B (zh) 2011-01-19

Family

ID=41370751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101483022A Active CN101586342B (zh) 2009-06-15 2009-06-15 沉箱采用千斤顶水平移动车顶升工艺

Country Status (1)

Country Link
CN (1) CN101586342B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704508A (zh) * 2012-05-29 2012-10-03 中交一航局第二工程有限公司 沉管底端叉车式纠偏精调***及其调节工艺
CN102720211A (zh) * 2012-05-29 2012-10-10 中交一航局第二工程有限公司 沉管底端锲体式纠偏精调***及其调节工艺
CN102720222A (zh) * 2012-06-15 2012-10-10 中交一航局第二工程有限公司 沉管尾端纠偏调节工艺
CN102807174A (zh) * 2012-08-09 2012-12-05 中国海洋石油总公司 超大型深水导管架卷制管同步顶升工艺
CN103274329A (zh) * 2013-05-29 2013-09-04 南京工程学院 一种顶拉千斤顶及其用于桩锚支护的施工方法
CN103774672A (zh) * 2012-10-27 2014-05-07 山东港湾建设集团有限公司 斜坡道出运沉箱的方法
CN104612180A (zh) * 2015-02-16 2015-05-13 中交一航局第二工程有限公司 一种用于海底沉管隧道沉管管节分离装置
CN113955663A (zh) * 2021-09-30 2022-01-21 上海二十冶建设有限公司 大包回转台上部回转体水平推移及整体顶升就位的方法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4699320B2 (ja) * 2006-09-19 2011-06-08 財団法人 海洋架橋・橋梁調査会 台座コンクリートの構築方法
CN201099594Y (zh) * 2007-07-20 2008-08-13 曾柏林 移动式电动千斤顶
CN201241334Y (zh) * 2008-06-20 2009-05-20 中交第一航务工程局有限公司 液压顶推出运沉箱的设备

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704508B (zh) * 2012-05-29 2014-06-25 中交一航局第二工程有限公司 沉管底端叉车式纠偏精调***及其调节工艺
CN102720211A (zh) * 2012-05-29 2012-10-10 中交一航局第二工程有限公司 沉管底端锲体式纠偏精调***及其调节工艺
CN102704508A (zh) * 2012-05-29 2012-10-03 中交一航局第二工程有限公司 沉管底端叉车式纠偏精调***及其调节工艺
CN102720211B (zh) * 2012-05-29 2014-10-15 中交一航局第二工程有限公司 沉管底端锲体式纠偏精调***及其调节工艺
CN102720222A (zh) * 2012-06-15 2012-10-10 中交一航局第二工程有限公司 沉管尾端纠偏调节工艺
CN102720222B (zh) * 2012-06-15 2014-07-16 中交一航局第二工程有限公司 沉管尾端纠偏调节工艺
CN102807174A (zh) * 2012-08-09 2012-12-05 中国海洋石油总公司 超大型深水导管架卷制管同步顶升工艺
CN103774672A (zh) * 2012-10-27 2014-05-07 山东港湾建设集团有限公司 斜坡道出运沉箱的方法
CN103274329A (zh) * 2013-05-29 2013-09-04 南京工程学院 一种顶拉千斤顶及其用于桩锚支护的施工方法
CN103274329B (zh) * 2013-05-29 2016-03-23 南京工程学院 一种顶拉千斤顶用于桩锚支护的施工方法
CN104612180A (zh) * 2015-02-16 2015-05-13 中交一航局第二工程有限公司 一种用于海底沉管隧道沉管管节分离装置
CN113955663A (zh) * 2021-09-30 2022-01-21 上海二十冶建设有限公司 大包回转台上部回转体水平推移及整体顶升就位的方法
CN113955663B (zh) * 2021-09-30 2023-08-25 上海二十冶建设有限公司 大包回转台上部回转体水平推移及整体顶升就位的方法

Also Published As

Publication number Publication date
CN101586342B (zh) 2011-01-19

Similar Documents

Publication Publication Date Title
CN101586342B (zh) 沉箱采用千斤顶水平移动车顶升工艺
CN103061264B (zh) 水中高位支架单柱预压方法及装置
CN105424912A (zh) 一种模拟喀斯特地区土壤漏失状况的移动变坡式钢槽
CN101775811A (zh) 大型钢吊箱、围堰气囊下水方法
CN106151679B (zh) 大口径钢筋混凝土管道牵引式对口方法
CN107326904A (zh) 一种自行无配重静力压桩设备
CN103174141B (zh) 滩涂区梁下支架钢管桩拔出设备
CN101913534B (zh) 固定双吊点悬臂轨道式桁吊
CN103774672A (zh) 斜坡道出运沉箱的方法
CN100543228C (zh) 更换铁路道岔施工工艺及道岔换铺设备
CN107178655B (zh) 复杂地形条件下pccp管的施工方法
CN204592722U (zh) 辊式破碎机整体移动用升降式行走轮装置
CN102225580B (zh) 箱梁内模纵移方法
CN101469542B (zh) 农田压桩工艺方法
CN201276408Y (zh) 预制梁移动装置
CN205369182U (zh) 用于土工膜库盆防渗体系的充水消能装置
CN102108694B (zh) 闸坝式水电站工程中门机轨道梁的吊装方法
CN201560431U (zh) 出运沉箱用胶囊台车
CN204530506U (zh) 边跨合拢装置
CN202519590U (zh) 装顶小挂篮
CN202644411U (zh) 滑移法架设预制梁的施工装置
CN201485216U (zh) 千斤顶水平移动车
CN202200009U (zh) 多油缸轧辊轴承座拆装装置
CN102072072A (zh) 一种水力发电方法及装置
CN102101629A (zh) 大吨位海洋工程结构物分级同步液压顶升工艺

Legal Events

Date Code Title Description
C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Fan Jieyu

Document name: Notification of Passing Preliminary Examination of the Application for Invention

C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Fan Jieyu

Document name: Notice of conformity

DD01 Delivery of document by public notice