CN102704624A - Ecc-rc组合柱及其新型连接方式 - Google Patents

Ecc-rc组合柱及其新型连接方式 Download PDF

Info

Publication number
CN102704624A
CN102704624A CN2012101754543A CN201210175454A CN102704624A CN 102704624 A CN102704624 A CN 102704624A CN 2012101754543 A CN2012101754543 A CN 2012101754543A CN 201210175454 A CN201210175454 A CN 201210175454A CN 102704624 A CN102704624 A CN 102704624A
Authority
CN
China
Prior art keywords
ecc
post
columns
place
combination column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101754543A
Other languages
English (en)
Inventor
尹万云
张晋
金仁才
刘守城
张烨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN2012101754543A priority Critical patent/CN102704624A/zh
Publication of CN102704624A publication Critical patent/CN102704624A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

一种ECC-RC组合柱及其新型连接方式,采用工程水泥基复合材料ECC,代替原有装配整体式框架结构体系中节点连接区域所采用的常规混凝土RC,实现ECC-RC组合柱;在上、下预制普通混凝土柱中均预埋一定长度的H型钢,H型钢端部设置有带孔端板,通过螺栓联接带孔端板,由螺栓及型钢来支撑上部预制普通混凝土柱自重来实现预制柱就位;柱就位后,通过螺栓上配置的调平螺母调整柱的垂直度并实现固定。本发明不需采用外部可调斜撑校正并固定,同时可以不必配置箍筋,省略了对可调斜撑的占用,加快了施工进度,并具有更好的连接区域施工质量和抗震性能,构造合理、设计和施工简单,能较好地进一步提升装配整体式框架结构的整体性能。

Description

ECC-RC组合柱及其新型连接方式
技术领域
本发明涉及一种建筑结构领域中的装配整体式结构。
背景技术
混凝土框架结构按照施工方法可以分为现浇框架、装配式框架和装配整体式框架。
现浇框架的梁、柱均为现场现浇,整体性和抗震性能好,但施工周期长,耗费人工多,越来越不利于应对目前人力成本快速上升带来的挑战。
装配式框架的梁、柱均为预制构件,通过焊接拼装连接成整体,节点一般为铰接。由于均为预制构件,可实现标准化、工厂化、机械化生产,但结构的整体性较差,抗震能力弱,不宜在抗震设防区应用。
装配整体式框架的部分梁、柱为预制构件,在吊装就位后,焊接或绑扎节点区钢筋,通过浇捣混凝土,将梁、柱连接为整体结构,形成刚接节点。它兼有现浇式框架和装配式框架的优点,既具有良好的整体性,又可部分采用预制构件,减少现场浇捣混凝土工作量。
但是,装配整体式框架也有自身的缺点,主要有以下2个方面:(1)节点连接区域一般采用同等级或高一等级普通混凝土浇筑,但受限于普通混凝土材料本身受拉强度低、延性差等固有缺陷,再加上节点连接区域需要布置箍筋并实现梁柱纵筋的搭接,造成钢筋布置困难,混凝土浇筑质量难以有效保证等因素,所以,节点区域的抗震性能仍然是装配整体式框架结构抗震性能的瓶颈部位,并限制了装配整体式结构的整体性能;(2)如图1和图2所示,预制柱之间通常采用型钢支撑连接、或预留孔插筋连接,不管采用哪种形式,在柱就位后需采用可调斜撑校正并固定,这些斜撑须待当上一层梁柱节点混凝土强度达到10MPa后方可拆除,进一步增加了施工的难度。
发明内容
本发明的目的就是要解决以上问题,提供了一种ECC-RC组合柱及其新型连接方式,是装配整体式框架结构体系节点连接区域的新型连接方式。本连接方式能改善连接区域的施工质量、抗震性能,并能降低施工难度、加快施工速度,能较好地进一步提升装配整体式框架结构的整体性能。
本发明的技术方案是这样得以实现的:一种ECC-RC组合柱及其新型连接方式,其特点是:采用工程水泥基复合材料ECC,代替原有装配整体式框架结构体系中节点连接区域所采用的常规混凝土RC,实现ECC-RC组合柱;在上、下预制普通混凝土柱中均预埋一定长度的H型钢,H型钢端部设置有带孔端板,通过螺栓联接带孔端板,由螺栓及型钢来支撑上部预制普通混凝土柱自重来实现预制柱就位;柱就位后,通过螺栓上配置的调平螺母调整柱的垂直度并实现固定。
本发明提供了一种装配整体式框架结构体系节点连接区域新型连接方式,不需采用外部可调斜撑校正并固定,不必依赖外部支撑装置,同时可以不必配置箍筋,省略了对可调斜撑的占用,简化了施工步骤,降低了施工难度、加快了施工进度,并具有更好的连接区域施工质量和抗震性能,构造合理、设计和施工简单,能较好地进一步提升装配整体式框架结构的整体性能。
附图说明
图1是现有的预制柱型钢支撑连接方式。
图2是现有的预制柱预留孔插筋连接方式。
图3是在预制柱、叠合梁节点处采用ECC材料现浇的示意图。
图4是在预制边柱连接区域采用ECC材料现浇的示意图。
图5是在预制中柱连接区域采用ECC材料现浇的示意图。
图6是预制柱采用带端板型钢以及调平螺母的连接方式。
图7是图6的A—A剖面图。
图8是图6的B—B剖面图。
图中:1—可调斜撑;2—工字钢;3—预留孔;4—节点区现浇ECC;5—预制混凝土梁;6—后浇混凝土叠合梁;7—预制普通混凝土柱;8—预制构件连接处;9—带孔端板;10—调平螺母;11—相邻纵筋的交错机械搭接;12—H型钢;13—螺栓。
具体实施方式
从图1可见,现有的预制柱型钢支撑连接方式采用工字钢2承受上柱自重,柱就位后,采用可调斜撑1校正并固定。图2为现有的预制柱预留孔插筋连接方式,在下柱中设置预留孔3,上柱底部纵筋则外伸。安装时通过将上柱底部纵筋***下柱顶部预留孔来就位,并采用可调斜撑1校正并固定。图1、图2中的可调斜撑1须待当上一层梁柱节点混凝土强度达到10MPa后方可拆除。
工程水泥基复合材料(Engineered Cementitious Composite, 下文简称ECC),ECC材料是近年来一种新型的高性能水泥基复合材料,它基于断裂力学、微观物理力学和统计学优化设计,使用短纤维增强,且纤维掺量不超过复合材料总体积的2.5%。硬化后的复合材料具有显著的应***化特征,在拉伸荷载作用下可产生多条细密裂缝,试验研究已经证实它的应变能力一般为3~6%,最高可达8%,耗能能力是常规纤维混凝土的3倍。因此它在提高结构的延性、耗能能力、抗侵蚀性、抗冲击性和耐磨性方面具有显著的效果,在抗震结构、大变形结构、抗冲击结构和修复结构中有着广阔的发展前景。另外,试验证明,节点区域未配置箍筋的ECC节点构件,其抗震性能仍好于配置了箍筋的普通混凝土构件。如此,对现浇节点连接区域,采用ECC材料代替普通混凝土RC,实现ECC-RC组合柱,可以省略箍筋的配置,降低造价及施工难度,并且能改善节点的延性、耗能能力等抗震性能,进而通过改善这些关键部位的抗震性能,来提升装配整体式框架结构的整体性能。
图3、图4、图5可见,在普通混凝土预制柱、普通混凝土叠合梁节点连接区域采用工程水泥基复合材料即ECC材料代替普通混凝土RC进行现浇,而对叠合梁现浇部分仍然采用普通混凝土。这样,在梁柱节点核心区关键区域采用了在延性、耗能能力、抗侵蚀性、抗冲击性和耐磨性等方面比普通混凝土性能优越得多的ECC材料,构成了ECC-RC组合柱。
图6、图7、图8可见,上、下预制普通混凝土柱7中均预埋一定长度的H型钢12,型钢端部设置有带孔端板9。通过螺栓13联接带孔端板9,由螺栓13及H型钢12来支撑上部预制普通混凝土柱7自重来实现预制柱就位。柱就位后,通过螺栓13上配置的调平螺母10调整柱的垂直度并实现固定,省略了外部可调斜撑1的占用,简化了施工步骤,加快了施工进度。上、下预制柱中预留纵筋外伸,并采用滚扎直螺纹套筒连接实现相邻纵筋的交错机械搭接11;本连接方式中因预制构件连接处8采用ECC材料现浇,故可不采用箍筋,降低施工难度。

Claims (1)

1.一种ECC-RC组合柱及其新型连接方式,其特征在于:采用工程水泥基复合材料ECC,代替原有装配整体式框架结构体系中节点连接区域所采用的常规混凝土RC,实现ECC-RC组合柱;在上、下预制普通混凝土柱中均预埋一定长度的H型钢,H型钢端部设置有带孔端板,通过螺栓联接带孔端板,由螺栓及型钢来支撑上部预制普通混凝土柱自重来实现预制柱就位;柱就位后,通过螺栓上配置的调平螺母调整柱的垂直度并实现固定。
CN2012101754543A 2012-05-31 2012-05-31 Ecc-rc组合柱及其新型连接方式 Pending CN102704624A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101754543A CN102704624A (zh) 2012-05-31 2012-05-31 Ecc-rc组合柱及其新型连接方式

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101754543A CN102704624A (zh) 2012-05-31 2012-05-31 Ecc-rc组合柱及其新型连接方式

Publications (1)

Publication Number Publication Date
CN102704624A true CN102704624A (zh) 2012-10-03

Family

ID=46897653

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101754543A Pending CN102704624A (zh) 2012-05-31 2012-05-31 Ecc-rc组合柱及其新型连接方式

Country Status (1)

Country Link
CN (1) CN102704624A (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103774754A (zh) * 2014-01-07 2014-05-07 同济大学 一种预制ecc-rc组合梁柱节点构件
CN103774755A (zh) * 2014-01-07 2014-05-07 同济大学 一种预应力预制ecc-rc组合梁柱节点构件
CN104652705A (zh) * 2014-12-22 2015-05-27 西安建筑科技大学 一种带高性能混凝土边框的预制装配型钢混凝土柱及施工方法
CN103406990B (zh) * 2013-07-29 2015-06-17 江苏省交通科学研究院股份有限公司 装配式预制混凝土构件的制备方法
CN106223463A (zh) * 2016-08-30 2016-12-14 赵挺生 一种预制节点和一种预制装配式框架结构及其构建方法
CN106284851A (zh) * 2016-08-22 2017-01-04 沈阳建筑大学 单侧锥口正反丝套筒及装配式混凝土结构构件及连接方法
CN110485276A (zh) * 2019-08-15 2019-11-22 齐鲁交通发展集团有限公司 一种组合式抗震墩柱及其无模板化施工方法
CN118241754A (zh) * 2024-05-20 2024-06-25 湖南大学 一种装配式夹套组合柱及其施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006219901A (ja) * 2005-02-10 2006-08-24 Kajima Corp 合成床版
CN101694110A (zh) * 2009-10-28 2010-04-14 上海交通大学 梁柱节点连接结构及其施工方法
CN101914952A (zh) * 2010-07-23 2010-12-15 华南理工大学 中空钢管混凝土柱与钢梁的连接节点及其施工方法
CN202017278U (zh) * 2011-04-14 2011-10-26 西安建筑科技大学 半刚性连接钢框架内填延性高性能混凝土剪力墙组合结构
CN202055393U (zh) * 2011-01-26 2011-11-30 北京工业大学 高强钢筋增强高韧性纤维增强水泥基复合材料受压构件

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006219901A (ja) * 2005-02-10 2006-08-24 Kajima Corp 合成床版
CN101694110A (zh) * 2009-10-28 2010-04-14 上海交通大学 梁柱节点连接结构及其施工方法
CN101914952A (zh) * 2010-07-23 2010-12-15 华南理工大学 中空钢管混凝土柱与钢梁的连接节点及其施工方法
CN202055393U (zh) * 2011-01-26 2011-11-30 北京工业大学 高强钢筋增强高韧性纤维增强水泥基复合材料受压构件
CN202017278U (zh) * 2011-04-14 2011-10-26 西安建筑科技大学 半刚性连接钢框架内填延性高性能混凝土剪力墙组合结构

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103406990B (zh) * 2013-07-29 2015-06-17 江苏省交通科学研究院股份有限公司 装配式预制混凝土构件的制备方法
CN103774754A (zh) * 2014-01-07 2014-05-07 同济大学 一种预制ecc-rc组合梁柱节点构件
CN103774755A (zh) * 2014-01-07 2014-05-07 同济大学 一种预应力预制ecc-rc组合梁柱节点构件
CN104652705A (zh) * 2014-12-22 2015-05-27 西安建筑科技大学 一种带高性能混凝土边框的预制装配型钢混凝土柱及施工方法
CN106284851A (zh) * 2016-08-22 2017-01-04 沈阳建筑大学 单侧锥口正反丝套筒及装配式混凝土结构构件及连接方法
CN106223463A (zh) * 2016-08-30 2016-12-14 赵挺生 一种预制节点和一种预制装配式框架结构及其构建方法
CN106223463B (zh) * 2016-08-30 2019-08-30 赵挺生 一种预制节点和一种预制装配式框架结构及其构建方法
CN110485276A (zh) * 2019-08-15 2019-11-22 齐鲁交通发展集团有限公司 一种组合式抗震墩柱及其无模板化施工方法
CN118241754A (zh) * 2024-05-20 2024-06-25 湖南大学 一种装配式夹套组合柱及其施工方法

Similar Documents

Publication Publication Date Title
CN102704624A (zh) Ecc-rc组合柱及其新型连接方式
CN103510639B (zh) 一种可恢复功能的叠合板式剪力墙及其实施方法
CN105113389A (zh) 装配式钢-混凝土组合结构桥墩柱构件
CN102995789B (zh) 内藏型钢柱-格构钢梁-网状钢撑混凝土墙体及作法
CN106499247B (zh) 装配式框架梁柱连接的可更换耗能连接组件
CN105239726B (zh) 预制型钢混凝土组合异形耗能柱
CN205348391U (zh) 一种带防护套的预制梁柱钢筋机械连接节点
CN105715068A (zh) 既有砖混结构隔震支座托换加固结构及其施工方法
CN105926775A (zh) 新型钢管混凝土梁柱节点
CN102635177A (zh) 一种无粘结暗支撑钢筋混凝土框架剪力墙及其施工方法
CN102966113A (zh) 一种浅埋式钢柱脚及施工方法
CN206815525U (zh) 一种轨道交通高架车站
CN108589969A (zh) 一种带竖向ecc耗能带的组合装配式剪力墙及其制作方法
CN203640084U (zh) 一种可恢复功能的叠合板式剪力墙
CN107299789A (zh) 装配式混凝土框架的梁端可调组合耗能连接组件
CN102587576B (zh) 一种带节点的组合预制柱
CN107447857A (zh) 装配式混凝土框架的梁端可更换耗能连接组件
CN102011434A (zh) 约束屈曲支撑混凝土框架梁柱节点
CN106150119A (zh) 一种工业化高延性空间约束砌体加固体系及其施工方法
CN201011049Y (zh) 异形钢管混凝土芯柱
CN211873943U (zh) 一种古建筑抗震加固装置
CN101575887A (zh) 配置高强度筋的可自复位混凝土剪力墙
CN106337512A (zh) 底部加强型钢管混凝土边框高强混凝土组合剪力墙及制作方法
CN214090322U (zh) 一种抗震混凝土钢筋框架结构
CN202644386U (zh) 后张法预应力钢管高强混凝土叠合桥墩

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121003