CN102677777B - Square column film-penetration connecting device and construction method thereof - Google Patents

Square column film-penetration connecting device and construction method thereof Download PDF

Info

Publication number
CN102677777B
CN102677777B CN201210168466.3A CN201210168466A CN102677777B CN 102677777 B CN102677777 B CN 102677777B CN 201210168466 A CN201210168466 A CN 201210168466A CN 102677777 B CN102677777 B CN 102677777B
Authority
CN
China
Prior art keywords
film
square column
steel plate
film material
rubber pad
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210168466.3A
Other languages
Chinese (zh)
Other versions
CN102677777A (en
Inventor
李学亮
丁伟祥
宋俊杰
喻四纯
李超
陈业林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Third Engineering Division
Original Assignee
Third Construction Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Third Engineering Division filed Critical Third Construction Co Ltd of China Construction Third Engineering Division
Priority to CN201210168466.3A priority Critical patent/CN102677777B/en
Publication of CN102677777A publication Critical patent/CN102677777A/en
Application granted granted Critical
Publication of CN102677777B publication Critical patent/CN102677777B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The invention relates to a square column film-penetration connecting device and a construction method thereof. The square column film-penetration connecting device is connected with a square column and a film material which penetrates through the square column, wherein film-stretching steel plates are circumferentially welded at the periphery of a film-penetration part of the square column; bolt holes are formed in the film-stretching steel plates at intervals; the film material has a double-layer curled edges close to edges of the square column, and an embedded rope penetrates through the double-layer curled edges and is close to one side of the square column; the double-layer curled edges are arranged on the upper surfaces of the film-stretching steel plates; a rubber pad is arranged between the double-layer curled edges and the film-stretching steel plates; a circle of film pressing steel plates provided with bolt holes are arranged on the double-layer curled edges; and the bolt holes of the film-stretching steel plates are corresponding to the bolt holes of the film pressing steel plates, and bolts penetrate through the bolt holes to fix the film material and the rubber pad among the bolts by clamping. The square column film-penetration connecting device realizes fixed connection of a film-penetration penetrating a variable cross-section straight square column or an inclined square column of a large-span film-tensioning structure, and the length of the film material can be adjusted by aiming at radian, wrinkles and the like of a film surface.

Description

Square column is worn film linkage and job practices thereof
Technical field
The present invention relates to the film material of a kind of construction equipment and construction of building membrane structure, particularly a kind of large span jacking membrane structure through device and the job practices of variable cross-section Nogata post or rhombic prism.
Background technology
In rope membrane structure field, jacking membrane structure is that film material supports by support column and steelframe, regulates stretching rope moulding.Because film material curve force analysis is complicated, structural column is worn film and is caused film surface stress to be redistributed, and makes node processing also very complicated.Domestic structural column is worn Membrane of Tensile Buildings precedent seldom.When a small amount of Structure of need post is worn film, existing processing mode is constructed according to following program:
Step 1: site operation is prepared, and steel work or other support systems have been constructed;
Step 2: Membrane of Tensile Buildings cloth machines, the aluminium sheet of wearing film node apparatus is ready to complete;
Step 3: aluminium sheet and film cloth fixedly complete;
Step 4: Membrane of Tensile Buildings cloth promotes in place successively, and connect into integral body;
Step 5: two times tensioning applies prestressing force to design load, and stretch-draw completes.
Because this technique is first fixedly to wear film node apparatus on film cloth, after the lifting of film cloth is in place, can directly carry out the stretch-draw of large area film material, once the shortcoming of this technique is square column is oblique placement or column with variable cross-sections, wear film node apparatus and cannot promote film cloth as installed before in place prior to film cloth, large span film material cannot regulate moulding radian according to field conduct situation, cannot make film material reach the prestressed setting of two times tensioning.
Summary of the invention
The object of this invention is to provide a kind of square column and wear film linkage, the technical problem that the film material that solves large span jacking membrane structure is fixedly connected with through the straight square column of variable cross-section or rhombic prism, solves the technical problem of film material length adjustment.
For achieving the above object, the present invention adopts following technical scheme:
A kind of square column is worn film linkage, be connected with the film material through square column with square column, described square column is welded with the film steel plate that stretches tight wearing the peripheral hoop in film place, on the described film steel plate that stretches tight, interval has bolt hole, described film material is double seam at the edge that approaches square column, in double seam, be installed with pre-buried rope, described pre-buried rope is near square column one side, described in described double seam is placed in, stretch tight film steel plate above, double seam and stretch tight and be lined with rubber pad between film steel plate, on double seam, being arranged with an astragal has the press mold steel plate of bolt hole, the bolt hole of the described film steel plate that stretches tight is corresponding with the bolt hole of press mold steel plate and be installed with bolt, film material and rubber pad are fixedly clamped betwixt.
The described thickness that stretches tight film steel plate is not less than 8mm, and width is not less than 100mm.
Under the described film steel plate that stretches tight, square column outside is welded with floor.
The both sides of edges of described film material is all lined with rubber pad.
Described square column is batter post or right cylinder.
Square column is worn a job practices for film, applies above-described square column and wears film linkage, and its construction sequence is as follows:
Step 1: site operation is prepared, and the support system of membrane structure has been constructed;
Step 2: complete position and the radian of caudacoria material by FEM Numerical Simulation stretch-draw, square column and film material intersection location and shape;
Step 3: according to computer simulation result processing of films material, and get the various materials of wearing film location node ready;
Step 4: the film material lifting of first film unit is in place, and order is installed the film material of adjacent membranes unit;
Step 5: after the whole installations of film material of film unit, square column is installed and is worn film linkage: the good rubber pad of both sides of edges pad of film material, make pre-buried wire clips in one end of rubber pad, rubber pad both sides are clipped in stretches tight between film steel plate and press mold steel plate, bolt through stretching tight the bolt hole of film steel plate and the bolt hole of press mold steel plate, is fixedly clamped film material and rubber pad respectively;
Step 6: the pre-buried rope of stretch-draw makes all film units be linked to be an integral body, controls stretch-draw amount face is tightened, and keeps face radian smooth, and finally determines that film material, through the length after bolt, carries out at twice stretch-draw and reaches designing requirement;
Step 7: cannot carry out the film location of wearing of FEM Numerical Simulation, the film material length being installed with after bolt by adjustment is carried out local modulation, eliminates stress and concentrates the face fold causing;
Step 8: by the precalculated position of film Plate Welding in square column outside of stretching tight, itself and square column are fixed.
Compared with prior art the present invention has following characteristics and beneficial effect:
The film material that the invention solves large span jacking membrane structure is through the technical problem of variable cross-section square column or oblique square column node, and the large area film material of can accomplishing first to construct, then according to stretch tight the at the scene welding of film steel plate of the size of square column.Then according to scene, need to the radian of face, fold etc., carry out the adjusting of film material length, make film material reach the prestressing force setting of two times tensioning.
The present invention can be widely used in large span jacking membrane structure through the construction of variable cross-section Nogata post or rhombic prism.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention will be further described in detail.
Fig. 1 is structural representation of the present invention.
Fig. 2 is the structural representation of A-A section in Fig. 1.
Fig. 3 is the structural representation of B node in Fig. 2.
Reference numeral: 1-square column, 2-film material, 3-stretch tight film steel plate, 4-press mold steel plate, 5-bolt, the pre-buried rope of 6-, 7-rubber pad, 8-floor.
The specific embodiment
Embodiment is referring to shown in Fig. 1-3, a kind of square column is worn film linkage, be connected with the film material 2 through square column 1 with square column 1, described square column 1 is welded with the film steel plate 3 that stretches tight wearing the peripheral hoop in film place, on the described film steel plate 3 that stretches tight, interval has bolt hole, described film material 2 is double seam at the edge that approaches square column, in double seam, be installed with pre-buried rope 6, described pre-buried rope 6 is near square column one side, described in described double seam is placed in, stretch tight film steel plate 3 above, double seam and stretch tight and be lined with rubber pad 7 between film steel plate 3, on double seam, being arranged with an astragal has the press mold steel plate 4 of bolt hole, the bolt hole of the described film steel plate 3 that stretches tight is corresponding with the bolt hole of press mold steel plate 4 and be installed with bolt 5, film material 2 and rubber pad 7 are fixedly clamped betwixt.
The described thickness that stretches tight film steel plate 3 is not less than 8mm, and width is not less than 100mm.Under the described film steel plate 3 that stretches tight, square column 1 outside is welded with floor 8.The both sides of edges of described film material 2 is all lined with rubber pad 7.Described square column 1 is batter post or right cylinder.
This square column is worn the job practices of film, applies above-described square column and wears film linkage, and its construction sequence is as follows:
Step 1: site operation is prepared, and the support system of membrane structure has been constructed;
Step 2: complete position and the radian of caudacoria material by FEM Numerical Simulation stretch-draw, square column and film material intersection location and shape;
Step 3: according to computer simulation result processing of films material, and get the various materials of wearing film location node ready;
Step 4: the film material lifting of first film unit is in place, and order is installed the film material of adjacent membranes unit;
Step 5: after the whole installations of film material of film unit, square column is installed and is worn film linkage: the good rubber pad 7 of both sides of edges pad of film material 2, make pre-buried rope 6 be stuck in one end of rubber pad 7, rubber pad 7 both sides are clipped in stretches tight between film steel plate 3 and press mold steel plate 4, bolt 5 through stretching tight the bolt hole of film steel plate 3 and the bolt hole of press mold steel plate 4, is fixedly clamped film material 2 and rubber pad 7 respectively;
Step 6: the pre-buried rope 6 of stretch-draw makes all film units be linked to be an integral body, controls stretch-draw amount face is tightened, and keeps face radian smooth, and finally determines that film material 2, through the length after bolt 5, carries out at twice stretch-draw and reaches designing requirement;
Step 7: cannot carry out the film location of wearing of FEM Numerical Simulation, film material 2 length that are installed with after bolt 5 by adjustment are carried out local modulation, eliminates stress and concentrates the face fold causing;
Step 8: the film steel plate 3 that stretches tight is welded on to the precalculated position in square column 1 outside, itself and square column 1 are fixed.

Claims (6)

1. a square column is worn film linkage, it is characterized in that: be connected with the film material (2) through square column (1) with square column (1), described square column (1) is welded with the film steel plate (3) that stretches tight wearing the peripheral hoop in film place, the upper interval of the described film steel plate (3) that stretches tight has bolt hole, described film material (2) is double seam at the edge that approaches square column, in double seam, be installed with pre-buried rope (6), described pre-buried rope (6) is near square column one side, described in described double seam is placed in, stretch tight film steel plate (3) above, double seam and stretch tight and be lined with rubber pad (7) between film steel plate (3), on double seam, being arranged with an astragal has the press mold steel plate (4) of bolt hole, the bolt hole of the described film steel plate (3) that stretches tight is corresponding with the bolt hole of press mold steel plate (4) and be installed with bolt (5), film material (2) and rubber pad (7) are fixedly clamped betwixt.
2. square column according to claim 1 is worn film linkage, it is characterized in that: described in the stretch tight thickness of film steel plate (3) be not less than 8mm, width is not less than 100mm.
3. square column according to claim 1 is worn film linkage, it is characterized in that: described in square column (1) outside under film steel plate (3) of stretching tight be welded with floor (8).
4. square column according to claim 1 is worn film linkage, it is characterized in that: the both sides of edges of described film material (2) is all lined with rubber pad (7).
5. square column according to claim 1 is worn film linkage, it is characterized in that: described square column (1) is batter post or right cylinder.
6. square column is worn a job practices for film, it is characterized in that: application rights requires the square column described in 1-5 to wear film linkage, and its construction sequence is as follows:
Step 1: site operation is prepared, and the support system of membrane structure has been constructed;
Step 2: complete position and the radian of caudacoria material by FEM Numerical Simulation stretch-draw, square column and film material intersection location and shape;
Step 3: according to computer simulation result processing of films material, and get the various materials of wearing film location node ready;
Step 4: the film material lifting of first film unit is in place, and order is installed the film material of adjacent membranes unit;
Step 5: after the whole installations of film material of film unit, square column is installed and is worn film linkage: the good rubber pad of both sides of edges pad (7) of film material (2), make pre-buried rope (6) be stuck in one end of rubber pad (7), rubber pad (7) both sides are clipped in stretches tight between film steel plate (3) and press mold steel plate (4), bolt (5) through stretching tight the bolt hole of film steel plate (3) and the bolt hole of press mold steel plate (4), is fixedly clamped film material (2) and rubber pad (7) respectively;
Step 6: the pre-buried rope of stretch-draw (6) makes all film units be linked to be an integral body, controls stretch-draw amount face is tightened, and keeps face radian smooth, and finally determines that film material (2), through the length after bolt (5), carries out at twice stretch-draw and reaches designing requirement;
Step 7: cannot carry out the film location of wearing of FEM Numerical Simulation, film material (2) length being installed with after bolt (5) by adjustment is carried out local modulation, eliminates stress and concentrates the face fold causing;
Step 8: the film steel plate (3) that will stretch tight is welded on the precalculated position in square column (1) outside, fixes itself and square column (1).
CN201210168466.3A 2012-05-28 2012-05-28 Square column film-penetration connecting device and construction method thereof Expired - Fee Related CN102677777B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210168466.3A CN102677777B (en) 2012-05-28 2012-05-28 Square column film-penetration connecting device and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210168466.3A CN102677777B (en) 2012-05-28 2012-05-28 Square column film-penetration connecting device and construction method thereof

Publications (2)

Publication Number Publication Date
CN102677777A CN102677777A (en) 2012-09-19
CN102677777B true CN102677777B (en) 2014-02-12

Family

ID=46810296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210168466.3A Expired - Fee Related CN102677777B (en) 2012-05-28 2012-05-28 Square column film-penetration connecting device and construction method thereof

Country Status (1)

Country Link
CN (1) CN102677777B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105133557B (en) * 2015-09-11 2017-05-17 中国海洋石油总公司 Membrane tensioning device for blocking mud in wellhead area
CN105369993B (en) * 2015-11-26 2018-06-12 北京约顿气膜建筑技术股份有限公司 A kind of daylighting window frame and light inlet window for pneumatic membrane building
CN107761960A (en) * 2017-11-24 2018-03-06 天津大学 A kind of reusable building module film foundation connection joint
CN111017614A (en) * 2019-12-31 2020-04-17 郑州大学 Film stretching device for plane film material

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201194294Y (en) * 2008-05-14 2009-02-11 蔡添庆 Nut assembling construction
CN201391080Y (en) * 2009-03-10 2010-01-27 杨爱华 Embedded sleeve barrel of attached type lifting scaffold

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201194294Y (en) * 2008-05-14 2009-02-11 蔡添庆 Nut assembling construction
CN201391080Y (en) * 2009-03-10 2010-01-27 杨爱华 Embedded sleeve barrel of attached type lifting scaffold

Also Published As

Publication number Publication date
CN102677777A (en) 2012-09-19

Similar Documents

Publication Publication Date Title
CN102661001B (en) Connecting device for membranes penetrating through cylinder and construction method for connecting device
CN102677777B (en) Square column film-penetration connecting device and construction method thereof
CN103669698A (en) Prefabricated concrete component with connecting rings
CN210013469U (en) U-shaped side form reinforcing apparatus
CN103696607A (en) Prestressed assembled board column structure with steel supports and construction method thereof
RU171778U1 (en) STRINGER PANEL TEST DEVICE
CN205955228U (en) Prestressing force stretch -draw and anchor of carbon cloth
CN106758663B (en) Buried rubber fastening band installs positioning construction method in one kind
CN103225396B (en) Beam frame type construction template system
CN206052767U (en) The construction elevator basis that can be used in turn
CN102095638A (en) Crack resistance test method of seam sealing material for tunnel seams
CN105756229B (en) A kind of multilayer is from anti-buckling steel plate shear force wall
CN207630230U (en) Precast beam combined steel structure mortar leakage prevention pedestal
CN1544773A (en) Secondary prestress assembly integral concrete slab and construction process
CN215107294U (en) Special fixture for hanging die at seam of prefabricated laminated slab
CN205243062U (en) Annular steel sheet reinforcing apparatus
CN203879005U (en) Reinforcing device for large formwork of oblique-section concrete member
CN210032623U (en) Opposite-pulling screw rod for irregular concrete member template
CN105155675B (en) A kind of node structure of steel bar girder floor plates integral installation
CN109230725A (en) A kind of rectangular element film device
CN207739280U (en) Communication pipeline member and the communication well for using the communication pipeline member
CN103243731A (en) Mould supporting method for trapezoid cross section base of shear wall
CN209637063U (en) A kind of light steel composite floor of assembled
CN209538717U (en) A kind of precast concrete assembly auxiliary device
CN104790656A (en) Ultrahigh special-shaped hydraulic structure corner formwork supporting structure and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140212